MUSKINGUM_StatementOfWork.pdf

PDF 1 MB Posted

Attached to
Hang drywall and replace floor tiles at USCG Shore Side Detachment Sallisaw, OK
Solicitation number
70Z02924QNEWO396
Issued by

About this file

This document is a Statement of Work (SOW) for drywall and flooring repair work at the USCGC Muskingum facility in Sallisaw, OK. The SOW requires the contractor to replace missing drywall, paint the affected areas, and install new tile flooring in a hallway and room at the facility. The total area for drywall replacement is approximately 136 square feet, and the flooring area is approximately 145 square feet. The contractor must provide all materials, match existing finishes where possible, ensure minimal disruption to facility operations, and follow all applicable safety regulations. The work is to be completed between August 12th and August 30th, 2024. The related federal contract opportunity solicitation number is 70Z02924QNEWO396, with a Firm-Fixed Price construction order to be awarded to the lowest priced qualified contractor.

View the file

Other files

File Type Posted
ConstructionClauseProvisions_FAC_202301.pdf PDF
70Z02924QNEWO396.pdf PDF
WD_OK20240054.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

USCGC MUSKINGUM

SALLISAW OK.

SPECIFICATIONS

FOR

Hallway and Room Drywall and Flooring Repair

General: United States Coast Guard cutter Muskingum is accepting proposals for qualified individuals or firms to replace drywall, paint, and install tile in a hall way and room at its

Sallisaw OK shore facility.

Location:

United States Coast Guard Cutter Muskingum

460359 E 1137 RD

Sallisaw OK 74955

I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 7:00am to 2:00pm Monday thru

Thursday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative.

II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard two weeks prior to start of work.

III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities.

MKC Brummett Austin.o.Brummett@uscg.mil 928-899-8287

IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of by contractor.

V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and

Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.

VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the

Contracting Officer or his/her representative may accept work performed by the contractor.

VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense.

VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification.

IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

VIII: SCOPE OF WORK:

The contractor shall replace all missing drywall, paint all walls in affected spaces, and install tile in a hall way and room at its Sallisaw OK shore facility.

ITEM NAME Hallway and Room Repair

LOCATION:

USCGC Muskingum

460359 E 1137 RD

Sallisaw OK 74955

All Materials as provided by contractor must be complete, comparable to existing and approved by Contracting Officer

REQUIREMENTS:

1. SCOPE

A. The contractor shall replace all drywall in the hallway and paint the replaced dry wall to match or the entire hallway if unable to match paint colors. Missing drywall is APX 17’x2’

34SQFT entire hallway is APX 1125 SQFT of surface area.

B. The contractor shall make every effort to match the existing tile color and style in the hallway to maintain a professional appearance. At a minimum using extremely similar color and style if the tile is no longer manufactured. Missing tyle is APX 17’x6” 8.5 SQFT

C. Replace all missing drywall in the room, paint the room a similar color, replace all outlet covers install removed vent cover and replace trim around the door on the interior of the room and a new sill plate from the room to the hallway. Missing Drywall is APX 102 SQFT room measures APX 8.5’x17’ wall to wall.

D. Install all new flooring in the room this flooring shall be tile designed to withstand heavy traffic and be easily cleaned. The tile shall extend at least 4” up the wall. Flooring area is APX

8.5’x17’ or 145 SQFT

E. Clean and remove all materials, dirt, dust, and make the room move in ready after completion of all construction work.

2. REFERENCES

COAST GUARD DRAWINGS None.

OTHER REFERENCES None.

WARRANTY:

A. Standard Manufacturer's Warranty for all replacement parts and materials and workmanship

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of product and workmanship.

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .