This sources sought notice is seeking information from companies interested in providing drydock repairs for the USCGC Muskingum, a 75-foot river tender and 130-foot barge. The repairs are to take place from July 12, 2022 through September 20, 2022 at the contractor's facility. Interested companies are requested to provide information on their capabilities, past performance, and certifications by April 8, 2022. The scope of work includes approximately 71 work items and maintenance, inspection, and repair tasks outlined in the attached specification. The NAICS code is 336611 for ship building and repairing. The period of performance is 70 calendar days. Responses to this sources sought notice will be used to determine the ability of companies to meet requirements and inform any future solicitation that may be issued under this requirement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC MUSKINGUM (WLR 75402)
USCG 130 BARGE (13068)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2022
Developed By: Robert E. Ozment
(Rev-0, 10 November 2021)
USCGC MUSKINGUM (WLR-75C) DRYDOCK AVAILABILITY FY2022
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics - Tender ............................................................................................................. xiii Principal Characteristics - Barge ................................................................................................................ xiv General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing - Tender WORK ITEM 2: Hull Plating (U/W Body), Inspect - Tender WORK ITEM 3: U/W Body, Preserve (100%) - Tender WORK ITEM 4: Hull Plating Freeboard, Preserve “100%” - Tender WORK ITEM 5: Hull and Structural Plating (General) -10.2-Pound Steel, Renew - Tender WORK ITEM 6: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew - Tender WORK ITEM 7: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - Tender WORK ITEM 8: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair - Tender WORK ITEM 9: Appendages (U/W), Leak Test - Tender WORK ITEM 10: Propulsion Shaft Rope Guards, Inspect WORK ITEM 11: Appendages (U/W) - Internal, Preserve - Tender WORK ITEM 12: Tanks (MP Fuel Service), Clean and Inspect - Tender WORK ITEM 13: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 14: Propulsion Shafting, Straighten WORK ITEM 15: Propulsion Shafting, Optical or Laser Alignment Check WORK ITEM 16: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew WORK ITEM 17: Propulsion Shaft Bearings (External), Renew WORK ITEM 18: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 19: Propeller, Perform Minor Repairs and Reconditioning WORK ITEM 20: Propellers, Remove, Inspect, and Reinstall WORK ITEM 21: Keel Coolers, Clean, Inspect and Hydro - Tender WORK ITEM 22: Fathometer Transducer, General Maintenance - Tender WORK ITEM 23: Sea Valves, Renew - Tender WORK ITEM 24: Sea Strainers, Renew - Tender WORK ITEM 25: Rudder Assembly; Remove, Inspect And Reinstall WORK ITEM 26: Rudder(s), Preserve (“100%”) WORK ITEM 27: Hull Fittings (Mooring and Towing), Inspect and Test - Tender WORK ITEM 28: Spuds, Overhaul - Tender WORK ITEM 29: Spud Wells, Preserve - Tender WORK ITEM 30: Sewage Holding Tank(s), Clean and Inspect - Tender WORK ITEM 31: Tanks (Sewage Holding), Preserve “Partial” - Tender WORK ITEM 32: Cathodic Protection, Magnesium Anodes, Renew, - Tender WORK ITEM 33: Drydock - Tender WORK ITEM 34: Temporary Services, Provide - Tender WORK ITEM 35: Sea Trial Performance, Support, Provide WORK ITEM 36: Hull Plating (Side Scan), Ultrasonic Testing - Barge WORK ITEM 37: Hull Plating (U/W Body), Inspect - Barge WORK ITEM 38: U/W Body, Preserve (100%) - Barge WORK ITEM 39: Hull Plating Freeboard, Preserve “100%” - Barge WORK ITEM 40: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew - Barge WORK ITEM 41: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - Barge iii (Rev-0)
WORK ITEM 42: Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew - Barge WORK ITEM 43: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair - Barge WORK ITEM 44: Appendages (U/W), Leak Test - Barge WORK ITEM 45: Appendages (U/W) - Internal, Preserve - Barge WORK ITEM 46: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge WORK ITEM 47: Tanks (Ballast), Clean and Inspect - Barge WORK ITEM 48: Keel Coolers, Clean, Inspect and Hydro - Barge WORK ITEM 49: Fathometer Transducer, General Maintenance - Barge WORK ITEM 50: Sea Valves, Overhaul - Barge WORK ITEM 51: Sea Strainers, Renew - Barge WORK ITEM 52: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge WORK ITEM 53: Hull Fittings (Mooring and Towing), Inspect and Test - Barge WORK ITEM 54: Spuds, Overhaul - Barge WORK ITEM 55: Spud Wells, Preserve - Barge WORK ITEM 56: Tanks (Ballast), Preserve “Partial” WORK ITEM 57: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 58: Cathodic Protection, Magnesium Anodes, Renew, - Barge WORK ITEM 59: Drydock - Barge WORK ITEM 60: Temporary Services, Provide - Barge WORK ITEM 61: Boat Davit Winch, Shrink Wrap WORK ITEM 62: Buoy and Cargo Handling Crane, Shrink Wrap WORK ITEM 63: Voids (Non-Accessible), Leak Test - Barge WORK ITEM 64: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 65: Tanks (Potable Water), Clean and Inspect - Tender WORK ITEM 66: Tanks (Potable Water), Preserve, Partial - Tender WORK ITEM 67: Water Heater, Renew WORK ITEM 68: Watertight Hatch, Renew WORK ITEM 69: Lead Dust, Clean WORK ITEM 70: Lead-Based Paint and Asbestos-Containing Material, Perform Spot Abatement WORK ITEM 71: Point of Use Potable Water Filters, Install iv (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
75 WAGL 2200-010, -Rev D, Main Rudder Stock And Fittings For Jastram S2-16-2-35 Steering System
75 WAGL 2200-011, Rev D, Flanking Rudder Stock And Fittings For Jastram S2-16-2-35 Steering
System
Coast Guard Drawing 130 CGB 111-002, Rev 9, Hull Details, Side Shell Plating and Framing
Coast Guard Drawing 130 CGB 530-002, Rev 3, Cooling Water Piping Schematic
Coast Guard Drawing 130 CGB 633-001, Rev -, Cathodic Protection
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements and Profile
Coast Guard Drawing 130 CGB67 111-001, Rev 9, Hull Details – Bottom & Main Deck Plating and
Framing Details
Coast Guard Drawing 130 CGB68 111-001, Rev 3, Hull Details – Bottom & Main Deck Plating and
Framing Details
Coast Guard Drawing 130 CGB68 123-001, Rev 2, Spud Well Bhds & Spud Details
Coast Guard Drawing 130 CGB69 111-001, Rev 3, Hull Details – Bottom & Main Deck Plating and
Framing Details
Coast Guard Drawing 130 CGB71-77 085-004, Rev 1, Docking Plan
Coast Guard Drawing 130 CGB71-77 085-005, Rev -, Body Plan
Coast Guard Drawing 130 CGB71-77 085-006, Rev -, Curves of Form
Coast Guard Drawing 130 CGB71-77-085-004, Rev 1, Docking Plan
Coast Guard Drawing 130 CGB74-77 111-001, Rev A, Hull Details – Bottom & Main Deck Plating and
Framing Details
Coast Guard Drawing 130-CGB67 111-2, Rev -, Side Shell Plating Modification
Coast Guard Drawing 130-CGB67 123-2, Rev 2, Transducer Well Details
Coast Guard Drawing 130-CGB69 111-3, Rev -, Side Shell Plating Modification (CGB 69 and 70)
Coast Guard Drawing 130-CGB71-77 111-3, Rev -, Side Shell Plating Modification
Coast Guard Drawing 130-CGB68-521-1, Rev 4, Fire Water, Ballast & Jetting Piping Schematic
Coast Guard Drawing 75C-WAGL 3603-21, Rev -, Potable Wtr Piping Diag
Coast Guard Drawing 75 WAGL 0700-004, Rev A, Docking Plan
Coast Guard Drawing 75 WAGL 2901-004, Rev -, Curves of Form
Coast Guard Drawing 75 WAGL 633-001, Rev -, Cathodic Protection
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile (75401-05) vi (Rev-0)
Coast Guard Drawing 75C WAGL 0103-26, Rev-, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0500-001, Rev 1, Lines and Offsets
Coast Guard Drawing 75C WAGL 0700-025, Rev -, Docking Block Arrangement (‘C’ Class)
Coast Guard Drawing 75C WAGL 1101-003, Rev C, New Grid Cooler Pocket P/S to Suit IF1312 MDE
Coast Guard Drawing 75C WAGL 1101-1, Rev 1, Dk Plate Plan & Shell Expansion
Coast Guard Drawing 75C WAGL 1103-024, Rev 2, Transverse Frames #15-22
Coast Guard Drawing 75C WAGL 1103-025, Rev -, Hull Framing Plan
Coast Guard Drawing 75C WAGL 1103-026, Rev -, Transverse Frames #23-28
Coast Guard Drawing 75C WAGL 1105-002, Rev 4, Longitudinal Girder XA17 R/L XD17 R/L –
Longitudinal Bulkhead XB17 R/L and Longitudinal Deck Ls XG17
Coast Guard Drawing 75C WAGL 1201-032, Rev A, WLR Tender/Barge Interface System
Coast Guard Drawing 75C WAGL 2200-013, Rev F, Rudder Post Installation for Jastram S2-16-2-35
Steering System
Coast Guard Drawing 75C WAGL 2200-023, Rev 1, Backing Rudder Trunk Dets (75401-75405)
Coast Guard Drawing 75C WAGL 2200-024, Rev -, Rudder Details (75402-75405)
Coast Guard Drawing 75C WAGL 2602-21, Rev 2, Spud Derrick & Spud (75402-75405)
Coast Guard Drawing 75C WAGL 2602-24, Rev 1, Towing Knees and Spudwell (75402-04)
Coast Guard Drawing 75C WAGL 2901-021, Rev -, Tank CAPACITY - 95% Tables
Coast Guard Drawing 75C WAGL 4103-006, Rev H, Jacket Water Piping Mods to Suit IF1312 MDE
Coast Guard Drawing 75C-WAGL 4301-6, Rev F, Shafting Installation to Suit If 1312 MDE
Coast Guard Drawing 75C-WAGL 2200-022, Rev-, Steerng Rudder Trunk Dets (75401-75405)
Coast Guard Drawing 75C-WAGL 2200-11, Rev -, Steering System Arrgement for Jastrum S2-16-2-35
Coast Guard Drawing 75C-WAGL 2200-12, Rev -, Flanking Steering System Arrangement for Jastrum
S2-16-2-35
Coast Guard Drawing 75C-WAGL 2200-13, Rev A, Rudder Post Installation for Jastrum S2-16-2-35
Steering System
Coast Guard Drawing 75-WAGL 4301-5, Rev N, Shafting Machining Details to Suit If 1312 MDE
Coast Guard Drawing 75-WAGL 4400-3, Rev L, Propeller to Suit IF1312 MDE
Coast Guard Drawing 75-WAGL 4301-5, Rev N, Shafting Machining Details to Suit If 1312 MDE
Coast Guard Drawing 75-WAGL 4400-3, Rev L, Propeller to Suit IF1312 MDE
Coast Guard Drawing FL 1204-3, Rev A, Welded Padeyes & Links
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Drawing75C WAGL 103-23, Rev 4, Gen Design Plns & Outbd Profile (75401-05)
Coast Guard Fleet Drawing FL 2602-10, Rev R, Spud Arrangements and Details
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
Coast Guard Drawing 75C WAGL 3802-25, Rev -, Chiller Condenser Cooling Water Arrangement
(75402-05)
Coast Guard Drawing 75C WAGL 4803-21, Rev-, Fire Piping Diagram (75402-05)
Coast Guard Drawing 75C WAGL 4803-22, Rev 2, Fire Piping Arrangement (75402-05)
Coast Guard Drawing 75C WAGL 3603-001, Rev 5, Potable Water Piping Diagram
Coast Guard Drawing FL 533-001, Rev B, Placard Potable Water Flush vii (Rev-0)
Coast Guard Drawing FL 533-002, Rev-, Point of Use Water Filter Install
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 3494, 09-DEC-03, Shaft Seal - Type Fse
Coast Guard Technical Publication (TP) 4506, Wartsila TM-EL-68839, Issue A, Mar 2005, Rudderstock
Seal Type EL
Coast Guard Technical Publication (TP) 5491, SWBS 256, Apr 2013, Keel Grid Cooler (Duramax)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2020, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary
Hull Accesses
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
OTHER REFERENCES
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for
Personal Qualification and Certification in Nondestructive Testing
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) B 843, 2007, Standard Specification for Magnesium Alloy Anodes for
Cathodic Protection
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1709, 2008, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method
ASTM International (ASTM) D1922, 2008, Standard Test Method for Propagation Tear Resistance of
Plastic Film and Thin Sheeting by the Pendulum Method
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging viii (Rev-0)
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component
Adhesives (AN)
ASTM International (ASTM) D882, 2009, Standard Test Method for Tensile Properties of Thin Plastic
Sheeting
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene
Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum
Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Fernstrum Gridcooler Installation and Maintenance Manual, 2013, Form 175
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -
Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2020 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-24647, Jan 2020, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main
Propulsion Shafting
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard
Materials by High and Ultrahigh Pressure Water Jetting ix (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings SSPC-SP 10/NACE No.2, Jan 2007, Near-White Blast Cleaning
The Society for Protective Coatings SSPC-SP 11, Jul 2012, Power Tool Cleaning to Bare Metal x (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
13 Y **Propulsion Tail Shaft NSN: 2010-01-557-1512 2 ea. 31,000.00
13 N ** Bulkhead Seal NSN: 5330-01-F13-3234 2 ea. 5,400.00
13 N **Pedestal Line Shaft
Bearing
NSN: 3130-01-F11-2242 2 ea. 2,700.00
16 N Wartsila FSE H74537-
02 Major Overhaul Kit
(WLP001365-001)
NSN: 01-560-3274 2 ea. 7,680.00
20 Y **Propeller, LH NSN: 2010-01-534-9095 1 ea. 13,000.00
20 Y **Propeller, RH NSN: 2010-01-534-9089 1 ea. 13,000.00
20 N **Nut, Propeller-Heavy NSN: 2010-01-F18-5562 2 ea. 698.00
21 N **MDE Grid Cooler
(SC-418DP-114)
NSN: 2040-01-F11-2291 2 ea. 10,800.00
21 N **SSDG Grid Cooler
(SC-216DP-63)
NSN: 2040-01-F11-2290 2 ea. 4,500.00
22 N ***Fathometer
Transducer (Furuno
520 BLD)
NSN: 5845-01-521-8278 1 ea. 350.00
23 N Gate Valve, Flanged PN: Style 1306 1 ea. 1400.00
23 N Gate Valve, Flanged PN: Style 490 1 ea. 350.00
24 N Strainer, Sediment, Duplex (Flanged)
NSN: 4730-01-627-3047 /
PN: ST053025BF11TS
1 ea. 7,100.00
24 N Strainer, Sediment, Duplex (Threaded)
PN: ST053015BT11TS 1 ea. 5,200.00
25 Y **Rudder - Steering NSN: 2040-01-530-9095 2 ea. 28,675.25
25 Y **Rudder - Flanking NSN: 2040-01-531-4393 2 ea. 37,850.50
25 N **Upper Rudder bearing (SKF PN
23222CC/W33)
NSN: 3110-01-F11-2241 4 ea. 547.88
25 N Seal Assembly, Rudder
Stock (H75492-01)
NSN: 5330-01-565-9776 4 ea. 8,200.00
49 N ***Fathometer
Transducer (Furuno
520 BLD)
NSN: 5845-01-521-8278 2 ea. 350.00
51 N Strainer, Sediment, Simplex (Flanged)
NSN: 4730-01-428-3199 /
PN: ST0720400F1C
1 ea. 5,200.00
67 N Water Heater PN: CE-80-AS 1 ea. 3,000.00
68 N Flush Watertight Hatch
36x36
PN: 2468-0003-0001 1 ea. $4,500.00
71 N Water Filter Assembly NSN: 4330-01-F20-5959 /
PN: DWS160-L (3M)
4 ea. $160.00
71 N Water Filter Element NSN: 4330-01-F20-5960 / 4 ea. $130.00 xi (Rev-0)
PN: 56134-44 (3M)
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Hull Plating (Side Scan), Ultrasonic Testing - Tender
3 U/W Body, Preserve (100%) - Tender
9 Appendages (U/W), Leak Test - Tender
12 Tanks (MP Fuel Service), Clean and Inspect - Tender
13 Propulsion Shafting; Remove, Inspect, and Reinstall
15 Propulsion Shafting, Optical or Laser Alignment Check
16 Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew
17 Propulsion Shaft Bearings (External), Renew
25 Rudder Assembly; Remove, Inspect And Reinstall
36 Hull Plating (Side Scan), Ultrasonic Testing - Barge
38 U/W Body, Preserve (100%) - Barge
44 Appendages (U/W), Leak Test - Barge
51 Sea Strainers - Duplex (All Sizes), Overhaul xiii (Rev-0)
PRINCIPAL CHARACTERISTICS - TENDER
75’ WLR (C-CLASS: CGC MUSKINGUM), INLAND RIVER BUOY TENDER
PHYSICAL
Length overall 75' 5-1/2"
Depth 7' 8-1/2"
Maximum beam 22' 5"
Height of highest projection N/A
Full load draft 4' 1 1/8" LCF Draft
Full load displacement 135.77 Long Tons SW
Shore tie voltage requirements 480V/200amp
Frame spacing 1' 6"
MACHINERY
Number of propellers 2
Number of blades 4
Diameter of propeller 48"
Pitch 47" fixed
RPM 410
xiv (Rev-0)
PRINCIPAL CHARACTERISTICS - BARGE
130' CGB, BARGE
PHYSICAL
Length overall 130' 0"
Depth 7' 6"
Maximum beam 30' 0"
Frame spacing 15" - 30"
Full load draft 4’ 3" (LCF Draft)
Full load displacement 240.76 Long Tons SW
1 (Rev-0)
00000_0220_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 3 (Rev-0) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
7 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
8 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
9 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
10 (Rev-0)
11000_SideScan_0320_FLT
REC_11000_Side_Scan_FLT_75 WLR (‘C’ Class: Hulls 75401 – 75405)
WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing - Tender
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 75C WAGL 0700-025, Rev -, Docking Block Arrangement (‘C’ Class)
Coast Guard Drawing 75C WAGL 1101-1, Rev 1, Dk Plate Plan & Shell Expansion
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
OTHER REFERENCES
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended
Practice for Personal Qualification and Certification in Nondestructive Testing
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.2 Side scan requirements and procedures.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and
11 (Rev-0) protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Hull zinc anode system
Docking blocks.
3.2 Work coordination and preparation. The Contractor shall plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor shall abide by the following guidance, to facilitate the ultrasonic survey:
Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.
Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.
Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.
After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.
Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.
3.3 Side scan requirements and procedures. The Contractor shall ensure the following referring to the
Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.
3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:
All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended
Practice No. SNT-TC-1A.
An SNT Level III Analyst is on site, to oversee the project and evaluate the collected data.
An SNT Level III or II Analyst is on site, to verify with a hand held gauge all areas on the hull identified as thinner than the specified criteria, in order to expedite all repair procedures.
Qualified personnel are provided to complete all on-site corrosion inspections.
3.3.2 Coast Guard notification. Accomplish all required tasks within 10 calendar days of the start of the availability.
3.3.2.1 Provide a daily update to the COR on all areas inspected and potential issues or schedule changes.
12 (Rev-0)
3.3.2.2 Notify the COR at least 3 days prior to completion for an onsite review of readings and repair areas.
3.3.3 Scanning parameters. Use the following parameters during the course of this inspection:
Automated scanning resolution shall be set to 0.5” x 0.5”
Plates where scan data indicating wastage greater than or equal to 25% nominal plate thickness shall be highlighted in “RED” and designated “repair areas”.
Plates where scan data indicating wastage greater than or equal to 15% to 24% of nominal plate thickness shall be highlighted in “YELLOW”.
Plates where scan data indicating wastage greater than or equal to 10% to 14% of nominal plate thickness shall be highlighted in DARK GREEN.
Hand held UT readings shall be taken to verify bad metal areas found with the side scan equipment. All readings shall be provided to the COR and the lowest reading marked on the hull at the bad metal location.
Areas that are accessible but cannot be reached by the automated scanner shall be scanned with a hand-held meter at a resolution of 2” x 2”. Any repair areas found during the hand scan shall be marked on the ships hull and their approximate positions recorded on the plate drawings and report summary..
3.3.3.1 Any scanning parameter or scope of work changes must be approved by the KO.
3.3.3.2 The echo to echo transducer is not authorized due to inconsistent readings and technical difficulties.
3.3.3.3 There shall be no deviation from the color scheme specified above.
3.3.4 Ensure that the side scan inspection area includes the Port, Starboard, and Transom exterior shell plate below the water line, but shall exclude the following list.
Areas under and within 6-inches of blocks and side blocks (areas that are accessible 6 inches from blocks and side blocks must be hand scanned.)
Areas up to 6-inches around any obstacle on the hull including sea suctions, discharges, rudderposts, knuckle, bow stem, stabilizer tubes, and stern tubes, as applicable.
Any areas blocked by immovable scaffolding or shipyard activity.
3.4 Side scan reports. The Contractor shall submit to the COR a final report within 3 working days after the side scan inspection is completed. A copy of all repair areas shall be clearly marked, in yellow or white, on the provided shell plate drawing(s), and provide a summary document of same areas. Submit two hard copies of the report with two CD’s containing the electronic (raw) data, as part of the CIR submission prior to departing the job site. Ensure the reports include:
Inspection overview.
Data sheets for each plate with designated repair areas outlined in blue.
Mosaic of scanned data overlaid on Coast Guard Drawing 75C WAGL 1101-1.
3.4.1 Photos. Provide digital photos of all designated repair areas.
3.4.2 Electronic files. Ensure CD’s contain a complete copy of the report, interactive data files, and digital
13 (Rev-0) pictures. All electronic files shall be compatible with standard USCG workstation operating software.
Electronic files format shall be such that the CG has the capability to change the percent of wastage
(format conditioning) per plate. Electronic files shall be capable of being opened using MS Word, MS
Excel, or PDF software. Digital pictures shall be recorded in JPEG format.
4. NOTES
This section is not applicable to this work item.
14 (Rev-0)
11000_0320_FLT
REC_11000_UWHIB_FLT_75 WLR (‘C’ Class: Hulls 75401 – 75405)
WORK ITEM 2: Hull Plating (U/W Body), Inspect - Tender
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s
Under Water (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 75C WAGL 0700-025, Rev -, Docking Block Arrangement (‘C’ Class)
Coast Guard Drawing 75C WAGL 2200-024, Rev -, Rudder Details (75402-75405)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
OTHER REFERENCES
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film
Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2
(PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
15 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2
(References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:
A hull repair supervisor and a marker.
Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.
NOTES
1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.
3.2.1 Hull plating.
3.2.1.1 The Contractor shall inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.
3.2.1.2 The Contractor shall inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.
3.2.2 Sea chests and all other cooling system intake components. The Contractor shall inspect all sea chests, sea beam arrays, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.
3.2.3 Rudders. The Contractor shall check general condition, condition around the drain plugs, and check for pitting, if any, on the leading and trailing edges.
3.2.4 Propeller and shaft associated components. The Contractor shall inspect the condition of propellers for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks by side and blade; inspect fairwaters, rope guards, shafts, and mechanical seals - look for missing screws, physical damage to the blades, pitting, condition of dunce caps, and condition of securing devices.
3.2.5 Transducers. The Contractor shall check general condition for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness, and inspect cables for chafing
16 (Rev-0) and other damage.
3.2.6 Zinc anodes.
3.2.6.1 The Contractor shall remove all marine growth and oxide coating from all hull, rudder, shaft strut, sea chest, sea beam array, z-drive, and thruster tunnel zinc anodes, or water jet drives anodes, as applicable, using a light-wire brush.
3.2.6.2 The Contractor shall visually inspect all zinc anodes; check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.
3.2.7 Coating system inspections. The Contractor shall accomplish the below inspections, in conjunction with the underwater hull inspection conducted by the Underwater Hull Inspection Board (UWHIB).
Document the condition found as “Partial - Condition A”, “Partial - Condition B”, or “100%”, as applicable (see 4.1 (Definitions)). Submit a CFR.
NOTE
The following inspections are for determining the existing condition of the coating system for the…
This is the start of the file's text. The full file is on GovTribe.