MUSCOY AREA REHAB PHASE 1 - Plans.pdf

PDF 2 MB Posted

Attached to
Muscoy Area Rehabilitation - Phase 1
Solicitation number
PWG127-LANDD-6584
Issued by
San Bernardino County, San Francisco City, California

About this file

This file is a detailed project plans document for the Muscoy Area Rehabilitation Phase 1 project, a road resurfacing initiative conducted by the City of San Bernardino in collaboration with San Bernardino County and Caltrans. The project encompasses multiple treatment groups targeting various street segments including Adams Street, California Street, June Place, June Street, Porter Street, State Street, Macy Street, and University Parkway. The resurfacing work involves different treatment methodologies across five groups: Group A (Rubberized Chip Seal/Slurry Seal Type II), Group B (Leveling Course/Rubberized Chip Seal/Slurry Seal Type II), Group D-1 and D-2 (Mill & Overlay), and Group E-1 and E-2 (Mill/Stress Absorbing Membrane Interlayer/Tack Coat/Overlay). The project includes traffic signal modifications and manhole adjustments. Specific quantities include approximately 60.28 miles of road treatment with surface areas ranging from 12,210 to 306,600 square feet per segment, RHMA overlay quantities ranging from 600 to 3,035 tons, and cold mill work ranging from 1,357 to 34,067 square yards depending on the treatment group and road segment.

The document indicates key dates of July 13, 2026 through July 21, 2026 for various project phases, with sealed proposals to be received and publicly opened by San Bernardino County Public Works at 825 Third Street, San Bernardino, California 92415 in the Contracts Division. The project is classified under NIGP Class 913 and NIGP Class Item 27. The document presents technical specifications and measurement data in tabular format but does not contain explicit pricing information, set-asides, contract terms, or funding source details within the plans document itself. Additional contract terms, pricing requirements, and bidding procedures would be contained in the related solicitation documents referenced in the associated state and local contract opportunity.

View the file

Other files

File Type Posted
MUSCOY AREA REHAB PHASE 1 - Special Provisions.pdf PDF
Teams Meeting Info~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7/21/2026

07/28/2026

12 TRAFFIC SIGNAL MODIFICATION PLAN

7/13/2026

7/15/20267/13/2026

MUSCOY AREA REHABILITATION RESURFACING TABLE - PHASE 1

TREATMENT

GROUP ROAD NAME FROM TO ROAD BOOK

LENGTH (MI)

ROAD

SURFACE

(SF)

RHMA DEPTH (FT)

RHMA

OVERLAY

(TON)

LEVELING

COURSE /

PATCH

(TON)

MILL DEPTH

(FT)

COLD MILL

(SY)

SLURRY SEAL

TYPE II (SY)

CHIP SEAL

(SY)

STRESS ABSORBING

MEMBRANE

INTERLAYER (SAMI)

(SY)

MANHOLE

ADJUSTMENTS

GROUP B

(L.C. / RUBBERIZED CHIP

SEAL / SLURRY SEAL TYPE

II)

ADAMS STREET MACY STREET E / CALIFORNIA STREET 0.50 73920 0.10 610 0 0.08 8213 0

CALIFORNIA STREET 0.10M S, DARBY STREET N / CAJON BLVD 0.51 113106 0 0 492 0 0 12567 12567 0 0

JUNE PLACE SAN BENITO STREET E / JUNE STREET 0.07 12210 0 0 0 0 0 1357 1357 0 0

JUNE STREET JUNE PLACE NE / CAJON BLVD 0.11 19754 0 0 86 0 0 2195 2195 0 0

PORTER STREET MACY STREET E / CALIFORNIA STREET 0.52 96110 0.12 951 0 0.15 10679 0 0 10679 0

STATE STREET 0.14M S, CAJON BLVD N / CAJON BLVD 0.14 38428 0.20 634 0 0.20 4270 0 0 4270 0

GROUP D-1

(MILL & OVERLAY)

MACY STREET 0.13 M N OF HIGHLAND AVE (SH30) N / OGDEN STREET 1.38 306600 0.12 3035 0 0.12 34067 0 0 0 8

CALIFORNIA STREET HIGHLAND AVENUE SH30 N / PORTER STREET 0.36 80850 0.12 800 0 0.12 8984 0 0 0 6

STATE STREET HIGHLAND AVENUE SH30 ADAMS STREET 0.11 45000 0.20 745 0 0.20 5000 0 0 0 1

GROUP E-1

(MILL / STRESS

ABSORBING MEMBRANE

INTERLAYER (SAMI) / TACK

COAT / OVERLAY)

UNIVERSITY PARKWAY SHORT STREET N / 0.27 M 0.27 123840 0.20 2043 0 0.23 13760 0 0 13760 0

GROUP A

(RUBBERIZED CHIP SEAL /

SLURRY SEAL TYPE II)

0 0 8213

GROUP E-2

(MILL / STRESS

ABSORBING MEMBRANE

INTERLAYER (SAMI) / TACK

COAT / OVERLAY)

GROUP D-2

(MILL & OVERLAY) STATE STREET DARBY STREET N / NOLAN STREET 0.48 98000 0.20 1850 0 0.20 9560 0 0 0 2

CALIFORNIA STREET PORTER STREET W 30TH STREET 68000 0.12 600 0 0 7,556 0 0 0 60.28

JG GM LL

STATE STREET

2 3

1 2 3

1 2 31 2 3

S

S T O P

STOP

N

ST

SS

ST

S

G

PBOX

ELEC

PBOX

ELEC

PBOX

ELEC

PBOX

ELEC

N

STOP STOP

ST

AT

E

ST

HIGHLAND AVE(SR30)

CITY OF SAN BERNARDINO

CALTRANS R/W

SAN BERNARDINO COUNTY

C

IT

Y O

F

SA

N B

ER

N

AR

D

IN

O

SA

N

B

ER

N

AR

D

IN

O C

O U

N

TY

7/15/2026

7/14/26

7/14/26