Multi Component - WBS - Ion Nitride - Statement of Work.docx

DOCX document 47 KB Posted

Attached to
Ion Nitride Components for Watervliet Arsenal, NY
Solicitation number
W911PT26QA055
Issued by

About this file

This is a Statement of Work (SOW) for ion nitride coating services on multiple military components for Watervliet Arsenal. The work involves ion nitriding five distinct M284 component types per AMS2759/8 specification: BRUK P2 Yokes (Drawing 11583609), BRUK P2 Firing Pins (Drawing 11583606), BRUK P2 Hammers (Drawing 11583611), standard Firing Pins (Drawing 11583122 Rev. A), and standard Firing Hammers (Drawing 11583108). Core hardness must be maintained throughout the process. The period of performance spans April 15, 2026 through April 14, 2027 across four contract line items (EH25UWV404EHM7, EH25UWV405EHM7, EH25UWV406EHM7, and EH25UWV408EHM7).

Quantities range from 36 to 72 pieces per component type, with three test assets included per lot—one for vendor incoming material confirmation, one for destructive testing by the vendor, and one for customer verification testing. All test results and certificates must be included with the returned product. The associated solicitation (W911PT26QA055) is a small business set-aside resulting in a firm fixed-price contract subject to Service Contract Labor Standards. Contractors must provide pricing per CLIN based on maximum lot size, minimum lot cost, and price per additional piece, along with expected turnaround time from receipt of shipment. Watervliet Arsenal currently lacks the internal capability to perform this ion nitriding work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

SERVICE: Ion Nitride of Multiple Components – See below PROJECT (WBS #): Multiple – See Sec. 2.10 Preparer/Point of Contact (POC): Tom Gamache / Ken Chirpka

PART 1: GENERAL

1.1: OVERVIEW

1.1.1: See Sec. 2.1: Ion Nitride M284 BRUK P2 Yoke, Dwg. 11583609 Rev. -, per AMS2759/8.
1.1.2: See Sec. 2.2: Ion Nitride M284 BRUK P2 Pin, Firing - Dwg. 11583606 Rev. -, per AMS2759/8.
1.1.3: See Sec. 2.3: Ion Nitride M284 BRUK P2 Hammer, Dwg. 11583611 Rev. -, per AMS2759/8.
1.1.4: See Sec. 2.4: Ion Nitride M284 Pin, Firing - Dwg. 11583122 Rev. A, per AMS2759/8.
1.1.5: See Sec. 2.5: Ion Nitride M284 Hammer, Firing - Dwg. 11583108 Rev. -, per AMS2759/8.

PART 2: STATEMENT OF WORK

2.1: Ion Nitride M284 BRUK P2 Yoke, Dwg. 11583609 Rev. -, Note 2.

2.1.1:

2.2: Ion Nitride M284 BRUK P2 Pin, Firing - Dwg. 11583606 Rev. -, Note 2.

2.2.1:

2.3: Ion Nitride M284 BRUK P2 Hammer, Dwg. 11583611 Rev. -, Note 2.

2.3.1:

2.4: Ion Nitride M284 Pin, Firing, Dwg. 11583122 Rev. A, Note 2.

2.4.1:

2.5: Ion Nitride M284 Hammer, Firing - Dwg. 11583108 Rev. -, Note 2.

2.5.1:

2.6: Core Hardness of all components to be maintained.

2.7: Test Assets will be included and marked; 3ea per lot and used as follows:

- 1ea for vendor to confirm incoming material. (4340, HRC 36-42)

- 1ea to be processed with batch and destructively tested by vendor to confirm results.

- 1ea to be processed with batch and returned to customer for verification testing.

2.8: All test results shall be included with certificate package when returning product.

2.9: Period of Performance

2.2.1: EH25UWV404EHM7, 04/15/2026 - 04/14/2027
2.2.2: EH25UWV405EHM7, 04/15/2026 - 04/14/2027
2.2.3: EH25UWV406EHM7, 04/15/2026 - 04/14/2027
2.2.4: EH25UWV408EHM7, 04/15/2026 - 04/14/2027
2.10: Project / Quantity
2.10.01: EH25UWV404EHM7; P2 Yokes 11583609 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.
EH25UWV404EHM7; P2 Hammers 11583611 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.
EH25UWV404EHM7; P2 Pin, Firing 11583606 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.
2.10.02: EH25UWV405EHM7; P2 Yokes 11583609 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.

EH25UWV405EHM7; P2 Hammers 11583611 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.

EH25UWV405EHM7; P2 Pin, Firing 11583606 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.

2.10.03: EH25UWV406EHM7; Hammer 11583108 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.

EH25UWV406EHM7; Pin, Firing 11583122 Rev. A, QTY. 36ea w/3ea per lot for testing IAW 2.7.

2.10.04: EH25UWV408EHM7; Hammer 11583108 Rev. -, QTY. 36ea w/3ea per lot for testing IAW 2.7.

EH25UWV408EHM7; Pin, Firing 11583122 Rev. A, QTY. 36ea w/3ea per lot for testing IAW 2.7.

PART 3: BACKGROUND

3.1: Watervliet Arsenal, currently, does not have the ability to perform the outlined SOW.

image1.png image2.png image3.png

File details come from the government source that posted it. Updated .