Muldrow Street Phase III.pdf
PDF 77 KB Posted
- Attached to
- Muldrow Street Phase III
- Solicitation number
- TAP 4400(313)
- Issued by
- Atchison County, Missouri
About this file
This is an Invitation to Bid issued by the City of Mexico, Missouri for the Muldrow Street Sidewalks Phase III project (Project No. TAP-4400(313)). The project involves grading and sidewalk construction to provide pedestrian facilities along both sides of Muldrow Street from Buchanan Street to West Boulevard Street. Sealed bids will be received at City Hall, 300 N. Coal St., Mexico, Missouri 65265, with a bid opening scheduled for 10:00 A.M. on September 30, 2026. All bids received after this time will be rejected. Plans and bidding documents are available from the City's Public Works Department at 573-581-2100 ext. 3. The contractor questionnaire must be filed 7 days prior to bid opening, and all bidders must be listed on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2011 Edition.
All labor on this public improvement project must comply with prevailing wage rates as established by the Department of Labor and Industrial Relations, with the federal or state wage rate applied, whichever is higher. A certified or cashier's check or bid bond equal to 5% of the proposal amount must accompany each bid. The project has a 0% Disadvantaged Business Enterprise (DBE) goal, and no second-tier subcontracting is permitted. Contractors and subcontractors must ensure their on-site employees complete a 10-Hour OSHA construction safety program or an approved equivalent within 60 days of work commencement. The City of Mexico reserves the right to reject any or all bids and will award the project to the lowest responsive and responsible bidder. The advertisement date was September 9, 2026.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
Muldrow Street Phase III
Sealed bids for Muldrow Street Sidewalks Phase III, Project No. TAP-4400(313), will be received at City of
Mexico, City Hall, 300 N. Coal St., Mexico, Missouri 65265, 10:00 A.M. (Prevailing Local Time) on September
30, 2026, at which time and place bids will be publicly opened and read. All bids received after this time will be rejected.
The proposed work includes: TAP 4400(313) – Grading and sidewalk construction to provide pedestrian facilities along both sides of Muldrow Street from Buchanan Street to West Boulevard Street.
All equipment, materials and workmanship must be in accordance with the drawings and specifications on file with the Public Works Department, 300 N Coal St, Mexico, Missouri 65265. Copies of the plans and bidding documents may be obtained by contacting the City’s Public Works Department at 573-581-2100 ext. 3
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the
Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.
City of Mexico hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard
Specifications for Highway Construction, 2011 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works projects must provide a 10- Hour
OSHA construction safety program, or similar program approved by the Department of Labor and Industrial
Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project.
A certified or cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
The project will be awarded to the lowest, responsive, responsible bidder. City of Mexico reserves the right to reject any or all bids.
The DBE Goal for this project is 0%.
No 2nd-tier subcontracting will be allowed on this project.
Advertisement date: September 9, 2026.
File details come from the government source that posted it. Updated .