Mtgrm_Setup_(U-Shape).pdf
PDF 266 KB Posted
- Attached to
- PERMITTING HYDROLOGY (PHY-20241) Federal contract opportunity
- Solicitation number
- 140S0324Q0003
About this file
This document appears to be a set of standard requirements and equipment specifications for a classroom setup. The key details are:
The classroom must meet several standard requirements, including the ability to be darkened for projection, a minimum room size of 30ft x 40ft, electrical outlets for AV equipment, water pitchers and glasses on the tables, low noise levels, and good ventilation. The room should also have a lobby sign that reads "Office of Surface Mining" and implement social distancing.
The equipment requirements include a projection screen, flip chart pads and easels, projector and slide projector tables, a lectern, and various AV equipment like a VHS/video player and monitor. The facility should check if these items are needed and provide them as required.
This document does not appear to be a Performance Work Statement, Statement of Objectives, or other type of solicitation document. It seems to be a template or checklist for setting up a classroom for a specific government program, the Office of Surface Mining National Technical Training Program.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tax_Exempt_Form_A21.pdf | ||
| PHY-20241_PARTICIPANT_ROOMING_LIST_July_10.pdf | ||
| Sol_140S0324Q0003.pdf | ||
| PHY_Draft_Agenda.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8x8 Screen
Lectern
W at er P it ch er s/
G la ss es o n
T ab le
Projector Table
Su p p ly
T ab le
Student Table (_____)
Door Door
Classroom Setup
Standard Requirements:
1. Room can be darkened for projection.
2. Minimum acceptable room size: 30ft x 40ft.
3. Electrical Outlets for AV Equipment.
4. Water Pitchers and Glasses on table.
5. NO ASHTRAYS.
6. Room located in low noise area.
7. Good ventilation (heat/air conditioning).
8. Lobby sign to read: “Office of Surface Mining”.
9. Implement Social Distancing with respecting seating and table arrangements.
Equipment Requirements: From Facility//Check if Needed
1. Projection Screen 8’x 8’ (___)
2. Flip Chart Pad(s)
3. Flip Chart Easel(s) (___)
4. Projector Table (___)
5. Slide Projector Table (___)
6. Projector (___)
7. Slide Projector (___)
8. Extension Cord(s) (___)
9. Lectern (___)
10. ½ Inch VHS/Video Player (___)
11. 25/27 Inch Monitor (___)
U.S. Department of The Interior
Office of Surface Mining
National Technical Training Program
1849 C. St., NW
Washington, DC 20240
(No Inside Seating)
Staff/Instructor Table (_____)
( 3 )
File details come from the government source that posted it. Updated .