This document appears to be a Scope of Work for a dam rehabilitation project on Mt. Olive Church Road. The project is being solicited by the North Carolina Department of Environmental Quality, Division of Energy, Mineral, and Land Resources, Dam Safety Program.
The Scope of Work details the requirements for the rehabilitation of Dam #5 located on Mt. Olive Church Road. The project includes concrete repairs, spillway modifications, erosion control, and other ancillary work necessary to bring the dam into compliance with state regulations. Bids are due on May 3, 2023 and the project is anticipated to be awarded shortly thereafter, with a 180-day construction period. A mandatory pre-bid conference was held on April 12, 2023 for all interested contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM.pdf | ||
| Mt_ Olive Church Road Dam Removal and Replace.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
C001 COVER SHEET
C101 EXISTING CONDITIONS
C201 MAINLINE PLAN
C202 ROAD PROFILE & TYPICAL SECTION
C203-C204 ROAD CROSS SECTIONS
C301 GRADING & DRAINAGE PLAN
C401 EPD SITE IMPACT MAP
C501 INITIAL EROSION PLAN
C502 INTERMEDIATE EROSION PLAN
C503 FINAL EROSION PLAN
C504 EROSION CONTROL NOTES
C505 EROSION CONTROL DETAILS
C506 VEGETATION PLAN
C507 SWPPP
C508 DRAINAGE MAP & SEDIMENT CALCS.
C601 STORM SEWER PROFILES
C602 STORM DETAILS
C701-702 CONSTRUCTION DETAILS
SITE
N
VICINITY MAP
N
FLOOD MAP
GORDON COUNTY PUBLIC WORKS
STEVE PARRIS
116 PUBLIC SAFETY DR
CALHOUN, GA 30701
STEVE PARRIS
DATE: MAY 3RD, 2023
CONSTRUCTION DOCUMENTS FOR:
CLIENT
ENGINEER:
BAILEY CIVIL GROUP, LLC
MATT BAILEY, P.E.
P.O. BOX 4392
CARTERSVILLE, GA 30120
TELEPHONE: 678.925.6003
EMAIL: MATT@BAILEYCIVILGROUP.COM
TOTAL AREA OF DISTURBANCE = 0.85 ACRES
WETLAND DISTURBANCE = 0.168 ACRES
OPEN WATER DISTURBANCE=0.149 ACRES
STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.)
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
C001
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
GSWCC LEVEL II DESIGN
PROF. CERT#000010458
CO
VE
R
GRADING
PAVING AND
10 LANDSCAPING
CLEAN UP
FINAL
(TEMP.) (PERM.)
MAINTAIN EROSION
CONTROL
STORM DRAIN
INSTALLATION
GRASS
ANTICIPATED ACTIVITY SCHEDULE
ACTIVITY
INSTALL SEDIMENT
CONTROLS
CLEARING AND
1 3 5 7642 8
FLAG/STAKE CLEARING
LIMITS
9 10 11 12
GUARDRAIL INSTALL
EXISTING DAM
DEMOLITION OF
DRAIN LAKES
PRIMARY PERMITTEE:
GORDON COUNTY
116 PUBLIC SAFETY DR
CALHOUN, GA 30701
PHONE: 706-629-2785
sparris@gordoncounty.org
PROJECT NARRATIVE:
THE PROJECT WILL CONSISTS OF THE REMOVAL AND
REPLACEMENT OF AN EXISTING ROAD DAM. THE DAM IS IN
NEED OF REPAIR DUE TO INADEQUATE SIDE SLOPES. THE
ROAD DAM AND THE EXISTING OUTLET PIPES WILL BE
REMOVED. THE EXISTING LAKE WILL NEED TO BE DRAINED
IN ORDER TO PLACE FILL FOR THE PROPOSED DAM
RESTORATION. FILL WILL BE PLACED WITHIN THE EXISTING
LAKE OPEN WATERS, THEREFORE A CORP OF ENGINEERS
PERMIT WILL BE REQUIRED ALONG WITH AN EPD BUFFER
VARIANCE. CURRENTLY THE ROAD DAM CONSIST OF TREES
AND SHRUBS WITH STEEP SIDE SLOPES. THE PROPOSED
DAM WILL CONSIST OF A GOOD STAND OF GRASS WITH 2:1
SIDE SLOPES. A NEW LAKE OUTLET WILL BE INSTALLED.
GENERAL NOTES:
-POST SPEED: 35 MPH
-TRAFFIC ADT: N/A
-% TRUCKS: N/A
-FUNCTIONAL CLASS: LOCAL MINOR RURAL
-THIS PROJECT IS 100% LOCATED IN GORDON COUNTY
-THIS PROJECT IS FUNDED BY GORDON COUNTY
- NET LENGTH OF PROJECT: 0.104 MILES
-MID POINT COORDINATES: 2113406.17, 1622173.74
SITE
MT. OLIVE CHURCH ROAD
STATE ROUTE # N/A
COUNTY ROUTE # N/A
FEDERAL ROUTE # N/A
DAM REMOVAL & RESTORATION
AutoCAD SHX Text D.
40'18.3'
EXISTING CONDITIONS PLAN
DEMOLITION NOTES:
1. CONTRACTOR SHALL OBTAIN ALL PERMITS BEFORE DEMOLITION AND
CONSTRUCTION BEGINS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING
WITH GORDON COUNTY REGULATIONS, O.S.H.A. STANDARDS, AND GOVERNING EPA
REGULATIONS.
2. CONTRACTOR TO COMPLY WITH LOCAL AND COUNTY REGULATIONS REGARDING
HAULING, DISPOSAL, AND THE BURNING OR BURYING OF DEBRIS ON-SITE.
3. DEMOLITION MATERIALS NOT SUITABLE FOR FILL MATERIAL SHALL BE DISPOSED
OF OFF-SITE. ALL DEBRIS SHALL BE HAULED OFF-SITE TO A DISPOSAL AREA
APPROVED BY GORDON COUNTY AND STATE OF GEORGIA FOR THE HANDLING OF
DEMOLITION DEBRIS.
4. THE LOCATIONS OF EXISTING UTILITIES SHOWN ARE BASED ON A SURVEY AS
INDICATED IN THE GENERAL NOTES ON THE SITE PLAN. CONTRACTOR SHALL NOTIFY
ENGINEER OF ANY DISCREPANCIES BETWEEN THESE PLANS AND FIELD
CONDITIONS.
5. CONTRACTOR SHALL CONTACT ALL UTILITIES COMPANIES (WATER, SEWER,
POWER, TELEPHONE, NATURAL GAS, CABLE, ETC) FOR PROPER DISCONNECT OF
UTILITIES TO BUILDING TO BE REMOVED, AS WELL AS VERIFICATION OF UTILITIES TO
BE RELOCATED DUE TO CONSTRUCTION. CONTRACTOR TO CALL GEORGIA ONE-CALL
CENTER @ 811 AT LEAST 72-HOURS PRIOR TO CONSTRUCTION TO HAVE UTILITIES
LOCATED.
6. CONTRACTOR RESPONSIBLE FOR LOCATING, IDENTIFYING, DISCONNECTING, AND
SEALING OR CAPPING UTILITIES SERVING BUILDINGS AND STRUCTURES TO BE
DEMOLISHED.
7. THE PURPOSE OF THIS PLAN IS FOR DEMOLITION ONLY. UTILITIES SHALL NOT BE
REMOVED, ABANDONED OR RELOCATED UNTIL ALTERNATE PROVISIONS ARE MADE
TO MAINTAIN SERVICE TO OTHER BUILDINGS/FACILITIES AS APPROVED BY THE
OWNER.
8. CONTRACTOR SHALL PROTECT ALL ADJACENT LANDS FROM DAMAGE DURING
DEMOLITION WORK. ANY OFF-SITE AREAS DISTURBED SHALL BE RETURNED TO A
CONDITION EQUAL TO OR BETTER THAN THE EXISTING CONDITION.
C101
20 20 40 60 FEET
SCALE: 1" = 20'
024 HOUR CONTACT
STEVE PARRIS
706-629-2785
Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
N
EX
IS
TI
N
G
CO
N D
IT
IO
N S
PL
AN
GSWCC LEVEL II DESIGN
PROF. CERT#000010458
AutoCAD SHX Text
MT. OLIVE CHURCH RD. 40' R/W
AutoCAD SHX Text
EXISTING LAKE W.S.E.=739.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=747.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=751.30
BP
: 0
+0 0.
PC
: 0
+7 5.
PT
: 1
+0 7.
PC
: 1
+4 7.
PT
: 2
+4 9.
11 PC
: 3
+9 6.
PT
: 4
+0 7.
PC
: 5
+4 9.
PT
: 6
+1 0.
40'18.3'
R10'
R10'
R1000' R300'
R700'
0+00
1+00 2+00
3+00
4+00
5+00
6+00
50'
24'
12'
12' 6.5' SHOULDER
SLOPE @ 3 4"/FOOT
6.5' SHOULDER
SLOPE @ 3 4"/FOOT
6.5' SHOULDER
SLOPE @ 3 4"/FOOT
6.5' SHOULDER
SLOPE @ 3 4"/FOOT
CONSTRUCTION
CENTERLINE
BEGIN PROJECT
STA: 0+08.06
N:2113165.87 E:1622182.42
BEGIN TAPER
STA: 0+08.06
OFF: 9.45'
BEGIN TAPER
STA: 0+08.06
OFF: 9.429'
END TAPER
STA: 0+58.06
OFF: 12.0'
END TAPER
STA: 0+58.06
OFF: 12.0'
BEGIN TAPER
STA: 4+65.40
OFF: 12.0'
BEGIN TAPER
STA: 4+65.40
OFF: 12.0'
END TAPER
STA: 5+15.40
OFF: 9.58''
END TAPER
STA: 5+15.40
OFF: 9.18''
END PROJECT
STA: 5+40.24
N:2113696.50 E:1622195.25
PROPOSED EDGE
OF PAVEMENT
PROPOSED 5"
SOLID WHITE LINE
PROPOSED 5"
SOLID WHITE LINE PROPOSED EDGE
OF PAVEMENT
5" SOLID
DOUBLE YELLOW
BEGIN W-BEAM
GUARDRAIL
STA: 0+58.06
OFF:16.00
TYPE 12A ANCHOR
BEGIN W-BEAM
GUARDRAIL
STA: 0+07.66
OFF:16.00
TYPE 1 ANCHOR
END W-BEAM
GUARDRAIL
STA: 5+40.24
OFF:13.50
TYPE 1 ANCHOR
END W-BEAM
GUARDRAIL
STA: 5+00
OFF:14.00
TYPE 12A ANCHOR
50'
PERMANENT SLOPE
EASEMENT
PERMANENT SLOPE
EASEMENT
A1
A2
" R
CP
C201
20 20 40 60 FEET
SCALE: 1" = 20'
24 HOUR CONTACT
STEVE PARRIS
706-629-2785 Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
N
M
AI
N
LI
N E
PL
AN
ST
A:
+0
TO
+5
LIGHT DUTY ASPHALT DETAIL
NOTE:
98% STANDARD PROCTOR COMPACTION IS REQUIRED IN ALL AREAS
OF FILL. GEOTECHNICAL ENGINEER TO OBSERVE PLACEMENT OF FILL
DURING CONSTRUCTION.
LAKE POND PIPE TRENCH TO BE FILLED WILL CONCRETE UP TO THE
SPRINGLINE.
NO TREE GROWTH ON DAMS. DAM IS TO MAINTAIN A GOOD
STAND OF GRASS, AND TO BE MAINTAINED BY GORDON COUNTY TO
PREVENT BRUSH AND TREE GROWTH.
AutoCAD SHX Text
MT. OLIVE CHURCH RD. 40' R/W
AutoCAD SHX Text
EXISTING LAKE W.S.E.=739.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=747.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=751.30
AutoCAD SHX Text D.
AutoCAD SHX Text
12" SUBGRADE COMPACTED
AutoCAD SHX Text
TO 98% MAX. DRY DENSITY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text ASPHALT CONC. 9.5 mm SUPERPAVE 2.0")
AutoCAD SHX Text
6" CRUSHED STONE COMPACTED
AutoCAD SHX Text
OR SOIL CEMENT
AutoCAD SHX Text
TO 100% MAX. DRY DENSITY
ASPHALT CONC. 19 mm SUPERPAVE (2.0")
MT. OLIVE CHURCH RD
VERTICAL SCALE: 5.00
HORIZONTAL SCALE: 20.00
1.28% -0.50%
GR
AD
E
BR
EA
K
ST
A
0+
.0
EL
EV
.5
GR
AD
E
BR
EA
K
ST
A
5+
.4
EL
EV
.0
HIGH PT STA: 2+18.63
HIGH PT ELEV: 755.42
PVI STA:1+75.00
PVI ELEV:755.78
K:112.44
LVC:200.00
BV
CS
: 0 +7
5.
BV
CE
: 7
.5
EV
CS
: 2 +7
5.
EV
CE
: 7
.2
END PROJECT
STA: 5+40.24
C202
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
RO
AD
P
RO
FI
LE
T
YP
IC
AL
S
EC
TI
ON
AutoCAD SHX Text D.
AutoCAD SHX Text
TYPICAL #1 STA 0+58.06 TO 4+65.40-MT. OLIVE CHURCH RD.
AutoCAD SHX Text Profile Grade
AutoCAD SHX Text 2%
AutoCAD SHX Text 2%
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text Travel Lane
AutoCAD SHX Text Travel Lane
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text
TANGENT SECTION
AutoCAD SHX Text 6.25%%%
AutoCAD SHX Text 6.5'-0"
AutoCAD SHX Text 8'-0"
AutoCAD SHX Text
TO R.O.W.
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
GADOT
AutoCAD SHX Text
LOWNDES
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text
2:1 MAX
AutoCAD SHX Text 6.25%%%
AutoCAD SHX Text
2:1 MAX
AutoCAD SHX Text 6.5'-0"
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text 8'-0"
AutoCAD SHX Text
TO R.O.W.
AutoCAD SHX Text Shoulder Pav.
AutoCAD SHX Text ( If Req'd. )
AutoCAD SHX Text "S"+ 8'
AutoCAD SHX Text S=4'
AutoCAD SHX Text Roadway
AutoCAD SHX Text
NORMAL SHOULDER
AutoCAD SHX Text Shoulder Graded for Type 12 Anchorage
AutoCAD SHX Text Shoulder Graded for Guardrail
AutoCAD SHX Text "S" + 2'-6" Typical
AutoCAD SHX Text 2: 1 Maximum Behind guardrail
AutoCAD SHX Text 3:1 Maximum 4: 1 Or Flatter Desirable behind Type 12 Anchorage
AutoCAD SHX Text
TYPICAL SHOULDER DETAIL FOR GUARDRAIL
AutoCAD SHX Text
SEE PLAN FOR LOCATION
USE 7.0' LENGTH POST
3+50.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
0+50.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
1+00.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
1+50.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
2+00.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
2+50.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
3+00.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
4+00.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
-6.25%
50.00% -2.00%
-50.00%
O
FF
SE
T
=0 .0
FG
. E
LE
V
4.
O
FF
SE
T
.5
FG
. E
LE
V
4.
O
FF
SE
T
=1 8.
FG
. E
LE
V
4.
O
FF
SE
T
=0 .0
FG
. E
LE
V
5.
O
FF
SE
T
=1 8.
FG
. E
LE
V
4.
O
FF
SE
T
.5
FG
. E
LE
V
4.
O
FF
SE
T
=0 .0
FG
. E
LE
V
5.
O
FF
SE
T
.5
FG
. E
LE
V
4.
O
FF
SE
T
=1 8.
FG
. E
LE
V
4.
O
FF
SE
T
=0 .0
FG
. E
LE
V
4.
O
FF
SE
T
.5
FG
. E
LE
V
3.
O
FF
SE
T
=1 8.
FG
. E
LE
V
3.
O
FF
SE
T
=0 .0
FG
. E
LE
V
4.
O
FF
SE
T
=1 8.
FG
. E
LE
V
4.
O
FF
SE
T
.5
FG
. E
LE
V
4.
O
FF
SE
T
=0 .0
FG
. E
LE
V
5.
O
FF
SE
T
.5
FG
. E
LE
V
4.
O
FF
SE
T
=1 8.
FG
. E
LE
V
4.
O
FF
SE
T
=0 .0
FG
. E
LE
V
5.
O
FF
SE
T
.5
FG
. E
LE
V
4.
O
FF
SE
T
=1 8.
FG
. E
LE
V
4.
O
FF
SE
T
=0 .0
FG
. E
LE
V
4.
O
FF
SE
T
.5
FG
. E
LE
V
4.
O
FF
SE
T
=1 8.
FG
. E
LE
V
4.
-6.25%
50.00% -50.00%
-2.00%
-2.00% -6.25% -50.00%50.00%
-2.00% -6.25% -50.00%
-2.00% -6.25% -50.00%
-2.00% -6.25%
-50.00% 50.00%
-2.00%
50.00% -50.00%
-2.00% -6.25% -50.00%50.00%
40' R/W
40' R/W
40' R/W
40' R/W
40' R/W
40' R/W
40' R/W
40'
R/WEXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
-6.25%
-6.25%-6.25%
-6.25%
-6.25%
-6.25%
-6.25%
-6.25%
-6.25%
-2.00%
-2.00%
-2.00%
-2.00%-2.00%
-2.00%
-2.00%
-2.00% C203
24 HOUR CONTACT
STEVE PARRIS
706-629-2785 Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD, 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
RO
AD
C
RO
SS
SE
CT
IO
N
S
20 20 40 60 FEET
SCALE: 1" = 20'
4+50.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
5+00.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.000.00-10.00-20.00-30.00-40.00-50.00-60.00-70.00-80.00-90.00-100.00
40' R/W
O
FF
SE
T
=0 .0
FG
. E
LE
V
4.
O
FF
SE
T
.5
FG
. E
LE
V
3.
O
FF
SE
T
=1 8.
FG
. E
LE
V
3.
O
FF
SE
T
=0 .0
FG
. E
LE
V
4.
O
FF
SE
T
.5
FG
. E
LE
V
3.
O
FF
SE
T
=1 8.
FG
. E
LE
V
3.
-2.00% -6.25% -50.00%
-2.00% -6.25% -50.00%
40' R/W
EXISTING
GROUND
EXISTING
GROUND
-6.25% -6.25% -2.00%-2.00%
C204
24 HOUR CONTACT
STEVE PARRIS
706-629-2785 Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD, 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
RO
AD
C
RO
SS
SE
CT
IO
N
S
20 20 40 60 FEET
SCALE: 1" = 20'
F
F F F F F F F
F F F F F F F F F F F F F F F F F F F F F F F F F
F F
F
F F F F F
40'18.3'F F F
F F F F F F F F F F F F F F F F F F F F F F F F
F F F F F F F F F
A
A
0+
.0
1+
.0
1+
.0
2+
.0
2+
.0
3+
.0
3+
.0
4+
.0
4+
.0
5+
.0
5+
.0
6+
.0
TOE OF PROPOSED SLOPE
LIMITS OF FILL
TOE OF PROPOSED SLOPE
LIMITS OF FILL
CONTRACTOR TO USE A
SIPHON OR PUMP TO DRAW
DOWN THE UPPER LAKE
WATER LEVEL TO BELOW
THE PROPOSED FILL LINE
CONTRACTOR TO CONSTRUCT
A COFFERDAM FOR FILL
PLACEMENT IN THE LOWER
LAKE. OR LOWER THE LAKE
LEVEL AT THE OUTLET.
LAKE OUTLET CONTROL
72" 1011A MANHOLE
W/ PEDESTAL TOP
10'X10'X2'
PLUNGE POOL
A1
A2
" R
CP
AREA TO BE RE-VEGETATED
WITH BROOMSEDGE
BLUESTREAM, EASTERN
DAISY, AND FESUE.
AREA TO BE RE-VEGETATED
WITH BROOMSEDGE
BLUESTREAM, EASTERN
DAISY, AND FESUE.
GRADING NOTES:
1. ALL AREAS TO RECEIVE PAVEMENT, STRUCTURES OR FILL MATERIAL SHALL BE STRIPPED OF ORGANIC
MATERIAL, TOPSOIL, AND DEBRIS PRIOR TO CONSTRUCTION.
2. ONCE STRIPPING HAS BEEN COMPLETED, ALL AREAS TO RECEIVE FILL SHOULD BE PROOF-ROLLED IN THE PRESENCE OF A REPRESENTATIVE OF THE SOILS ENGINEER. SOFT AREAS ENCOUNTERED DURING
PROOF-ROLLING SHALL BE STABILIZED BY COMPACTION OR UNDERCUT.
3. ALL FILL AREAS SHALL BE FREE OF ORGANIC OR OTHERWISE UNSUITABLE MATERIALS AND
COMPACTED TO 95% OF MAXIMUM DRY DENSITY PER STANDARD PROCTOR ASTM D698 UNLESS
OTHERWISE SPECIFIED BY THE GEOTECHNICAL REPORT AS LISTED BELOW. THE TOP TWO (2) FEET OF FILL UNDER STRUCTURES AND PAVEMENT SHALL BE COMPACTED TO 98% OF MAXIMUM DRY DENSITY PER STANDARD PROCTOR ASTM D698 UNLESS OTHERWISE SPECIFIED BY THE GEOTECHNICAL REPORT
AS LISTED BELOW.
4. EARTHMOVING OPERATIONS SHALL BE PERFORMED IN ACCORDANCE TO THE GEOTECHNICAL REPORT BY GEOHYDRO ENGINEERS, DATED MARCH 24TH 2004 : 95% (COMPACTION RECOMMENDATIONS)".
5. ALL SITE PREPARATION SHOULD BE MONITORED BY A REPRESENTATIVE OF THE GEOTECHNICAL ENGINEER. INSPECTIONS AND TESTING FOR ALL UNDERCUT AND FILL OPERATIONS AS WELL AS THE UTILIZATION OF ACCEPTABLE OFF-SITE BORROW MATERIALS SHOULD BE PERFORMED. THE OWNER, AT HIS OPTION, MAY HAVE DENSITY TESTS PERFORMED TO VERIFY THAT SPECIFIC COMPACTION IS
OBTAINED.
6. CUT OR FILL SLOPE SHOULD NOT BE STEEPER THAN 2H:1V. ALL PROPOSED SLOPES SHOULD BE OVERBUILT AND CUT BACK TO THE PROPOSED GRADES, EXPOSING THE FIRM COMPACTED INNER CORE.
THE EXCAVATION FOR THE SLOPES SHOULD BE MONITORED BY A REPRESENTATIVE OF THE
GEOTECHNICAL ENGINEER. VERTICAL CUTS EXCEED 5 FEET SHOULD BE BRACED AS REQUIRED BY OSHA
REGULATIONS FOR SAFETY.
7. SPOT ELEVATIONS SHALL TAKE PRECEDENCE OVER CONTOURS AND SLOPES SHOWN. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF SPOT ELEVATIONS WHICH DO NOT APPEAR TO BE CONSISTENT WITH THE CONTOURS AND SLOPES. SPOT ELEVATIONS SHOWN ALONG CURB & GUTTER
DESIGNATE THE PROPOSED GRADE AT THE LIP OF THE GUTTER UNLESS OTHERWISE NOTED.
8. CONTRACTOR SHALL INSTALL APPROPRIATE EROSION CONTROL MEASURES PRIOR TO ANY LAND
DISTURBANCE ACTIVITIES.
9. THE CONTRACTOR SHALL ADJUST ALL MANHOLE COVERS, VALVE COVERS, CLEAN OUTS, VAULTS, BOXES, AND GRATES, EXISTING AND PROPOSED, TO "AS-CONSTRUCTED" FINISHED GRADE.
10. IF GRADE ADJUSTMENTS ARE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TO
INVESTIGATE SUCH ADJUSTMENTS.
GRADING PLAN
C301
20 20 40 60 FEET
SCALE: 1" = 20'
024 HOUR CONTACT
STEVE PARRIS
706-629-2785
Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
N
G
RA
D
IN
G
D
RA
IN
AG
E
PL
AN
EARTH EMBANKMENT CONSTRUCTION: (PER GEOTECHNICAL REPORT PREPARED BY GEOHYDRO ENGINEERS, DATED MARCH 24TH, 2004)
· DAM EMBANKMENT: A TYPICAL MAXIMUM SLOPE GRADIENT FOR EARTHEN DAMS 3H:1V. STEEPER SLOPES MAY RESULT IN STABILITY PROBLEMS AND CAN BE DIFFICULT TO MAINTAIN.
· DAM VEGETATION: VEGETATION ACCEPTABLE FOR A DAM SHOULD CONSIST OF GRASS COVER SUCH AS FESCUE OR BERMUDA. THE PRESENCE OF UNDERBRUSH AND TREES IMPEDE THE PROPER
PERIODIC EVALUATION OF THE DAM FOR SEEPAGE, STRUCTURAL DAMAGE, OR ANIMAL BURROWS WHICH CAN LEAD TO THE DEGRADATION OF THE DAM. IN ADDITION, TREES SHOULD NOT BE ALLOWED TO GROW WITHIN THE EMBANKMENTS. SUCH PLANT GROWTH CAN LEAD TO STRUCTURAL STABILITY CONCERNS.
· EROSION CONTROL: EROSION CONTROL MEASURES ALONG THE UPSTREAM EMBANKMENT AND DOWNSTREAM EMBANKMENTS SHOULD CONSIST OF GRASS, RIP RAP, OR OTHER EROSION CONTROL MEASURES. PROPER EROSION CONTROL AT THE OUTLET STRUCTURE IN THE FORM OF A PLUNGE POOL LINED WITH RIP RAP WILL NEED TO BE INSTALLED TO ENSURE THE STRUCTURAL INTEGRITY OF THE
OUTLET PIPE AND EMBANKMENT.
· SPILLWAYS: THE PRINCIPAL SPILLWAY SHOULD BE DESIGNED TO MOVE WATER THROUGH THE DAM TO AN OUTLET AT THE DOWNSTREAM BASE OF THE DAM DURING NORMAL FLOW CONDITIONS. THE OUTFLOW SHOULD BE RELEASED INTO A PLUNGE POOL. GRATES AND GUARDS SHOULD BE USED TO KEEP DEBRIS FROM ENTERING AND CLOGGING THE PIPES IN ADDITION TO KEEPING ANIMALS OUT.
TYPICALLY, EMERGENCY SPILLWAYS ARE DESIGNED TO PASS FLOOD FLOW WITHIN A CONTROLLED AREA TO PREVENT OVERTOPPING.
EARTH EMBANKMENT CONSTRUCTION
-PAVEMENTS, TREES, UNDERBRUSH, TOPSOIL, ROOTS, AND OTHER DELETERIOUS MATERIALS SHOULD BE REMOVED FROM THE PROPOSED CONSTRICTION AREA. THE UPPER LAKE SHOULD BE DRAINED, AND THE STREAM CHANNEL SHOULD BE DIVERTED TO ALLOW DEMOLITION OF THE ROAD EMBANKMENT AND CONSTRUCTION OF THE NEW EMBANKMENT. TEMPORARY DEWATERING WILL BE NECESSARY TO MANAGE GROUNDWATER WITHIN THE NEW EMBANKMENT FOOTPRINT. DEWATERING REQUIREMENTS WILL BE DETERMINED BY SITE CONDITIONS AT THE TIME OF NEW CONSTRUCTION. GROUNDWATER LEVELS SHOULD BE MAINTAINED AT LEAST 3 FEET BELOW PREVAILING EXCAVATION LEVELS. WE EXPECT THAT DIRECT PUMPING FROM TEMPORARY TRENCHES AND SUMPS WILL SUFFICE TO MAINTAIN TEMPORARY CONTROL OF THE GROUNDWATER. THE COST AND TIME REQUIRED FOR TEMPORARY GROUNDWATER CONTROL MUST BE CONSIDERED FOR BUDGETING PURPOSES. THE CONTRACTOR MUST BE PREPARED TO IMPLEMENT TEMPORARY DEWATERING AS NECESSARY TO ALLOW WORK IN EXCAVATION. WE RECOMMEND THAT THE CONSTRUCTION DOCUMENTS INCLUDE A MINIMUM PERFORMANCE SPECIFICATION FOR DEWATERING. THIS SPECIFICATION SHOULD REQUIRE SPECIFIC RESULTS FROM DEWATERING RATHER THAN DICTATE A DEWATERING METHOD. A SAMPLE GUIDE SPECIFICATION IS INCLUDED IN THE APPENDIX AS EXHIBIT “A”. IN GENERAL, WE FEEL THAT EXHIBIT “A” REPRESENTS THE MINIMUM SPECIFICATION FOR A PROJECT OF THIS SCOPE.
-BASED ON OUR EXPERIENCE, WE EXPECT AREAS OF SOFT SOILS WITHIN THE FOUNDATION AREAS FOR THE NEW EMBANKMENT. AFTER EXPOSURE OF THE FOUNDATION FOR THE NEW EMBANKMENT, THE FOUNDATION AREA SHOULD BE OBSERVED GEO- HYDRO. ANY EXCESSIVELY SOFT FOUNDATION MATERIAL SHOULD BE REMOVED AND REPLACED WITH SUITABLE, WELL COMPACTED STRUCTURAL FILL.
-TO REDUCE SEEPAGE ALONG THE PRINCIPAL SPILLWAY PIPE, THE TRENCH FOR THE PIPE MUST BE BACKFILLED WITH CONCRETE UP TO THE SPRINGLINE. THE TRENCH EXCAVATION SHOULD BE THOROUGHLY CLEANED TO AVOID LOOSE MATERIALS WHICH COULD CREATE VOIDS OR CONDUITS BETWEEN THE CONCRETE AND THE TRENCH SIDES AND BOTTOM.
-ABOVE THE SPRINGLINE, THE BACKFILL SOILS OVER THE PRINCIPAL SPILLWAY PIPE SHOULD BE CAREFULLY COMPACTED WITH HAND OPERATED EQUIPMENT UNTIL ENOUGH COVER HAS BEEN PLACED TO
ALLOW THE OPERATION OF CONVENTIONAL SELF-PROPELLED COMPACTION EQUIPMENT.
-IN ADDITION TO PROPER BACKFILLING ALONG THE PRINCIPAL SPILLWAY TRENCH, WE RECOMMEND THAT ANTI SEEP COLLARS BE INSTALLED. ANTI SEEP COLLARS SHOULD FURTHER REDUCE SEEPAGE ALONG THE PRINCIPAL SPILLWAY PIPE TRENCH. CONSTRUCTION OF ANTI SEEP COLLARS AND BACKFILLING AROUND THE COLLARS IS OFTEN DIFFICULT AND LABOR INTENSIVE. SPECIAL ATTENTION SHOULD BE PAID TO PROPER BACKFILLING TO AVOID AREAS OF LOOSE SOIL WHICH MAY CREATE VOIDS OR CONDUITS. HAND OPERATED COMPACTION EQUIPMENT WILL BE REQUIRED FOR BACKFILLING AROUND
ANTI SEEP COLLARS.
-TYPICAL EARTHEN EMBANKMENT DAMS ARE CONSTRUCTED OF MATERIALS WITH HYDRAULIC CONDUCTIVITY ON THE ORDER OF 1 X 10^-6 CM/SEC OR LOWER. SOME DESIGNS MAY INCLUDE A CORE OF LESSER HYDRAULIC CONDUCTIVITY MATERIALS PROTECTED BY CONVENTIONAL FILL MATERIALS. ALTERNATELY, THE EMBANKMENT MAY BE CONSTRUCTED AS A HOMOGENEOUS MASS WITH SOILS
THROUGHOUT THE EMBANKMENT HAVING THE SAME HYDRAULIC CONDUCTIVITY.
-MATERIALS SELECTED FOR USE AS STRUCTURAL FILL SHOULD BE FREE OF ORGANIC MATTER AND OTHER DELETERIOUS MATERIALS. THE MATERIAL SHOULD NOT CONTAIN ROCKS HAVING DIAMETER OVER 3 INCHES. THE MOISTURE CONTENT OF SUITABLE BURROW SOILS SHOULD BE WET OPTIMUM FOR CONSTRUCTION OF THE EARTH EMBANKMENT. TYPICALLY, MOISTURE CONTENTS UP TO ABOUT 4 PERCENT POINTS ABOVE OPTIMUM WILL BE ADEQUATE FOR THIS APPLICATION. TIGHTER MOISTURE LIMITS MAY BE NECESSARY WITH CERTAIN SOILS. USE OF SOILS HAVING MOISTURE CONTENT DRY OF OPTIMUM IS
NOT ACCEPTABLE.
-SUITABLE FILL MATERIAL SHOULD BE PLACED IN THIN LIFTS (LIFT THICKNESS DEPENDS ON TYPE OF COMPACTION EQUIPMENT, BUT IN GENERAL, LIFTS OF 8 INCHES LOOSE MEASUREMENT ARE RECOMMENDED.) THE SOILS SHOULD BE COMPACTED BY HEAVY COMPACTION EQUIPMENT SUCH AS A CATERPILLAR 815 SHEEPSFOOT ROLLER. FILL MATERIALS SHOULD BE PLACED OVER AS LARGE AS AN AREA OF THE EMBANKMENT FOOTPRINT AS POSSIBLE AT ANY GIVEN TIME TO MINIMIZE VERTICALLY ORIENTED INTERFACES BETWEEN ZONES OF FILL PLACED AT DIFFERENT TIMES. AS THE EMBANKMENT IS CONSTRUCTED, FILL ON THE FACE OF THE SLOPES SHOULD BE COMPACTED BY OPERATING TRACK MOUNTED EQUIPMENT UP AND DOWN THE SLOPES.
-AS THE EARTH EMBANKMENT IS CONSTRUCTED, NO PREVIOUS FILL LIFT SHOULD BE LEFT IN A SMOOTH CONDITION. SHOULD A SMOOTH CONDITION DEVELOP, SUCH AS RESULTS FROM THE RUBBER TIRED ROLLING, IT WILL BE NECESSARY TO LIGHTLY SCARIFY THE EMBANKMENT SURFACE TO ASSURE ADEQUATE BONDING WITH THE NEXT LIFT OF FILL MATERIAL. ADDITIONALLY, DURING BREAKS IN CONSTRUCTION ACTIVITIES, SHOULD EXPOSED SUBGRADE BECOME OVERLY WET OR DRY, IT WILL BE NECESSARY TO BLADE THESE SOILS OFF, OR SCARIFY AND RECOMPACT THESE SOILS IN PLACE PRIOR TO PLACEMENT OF SUBSEQUENT FILL LAYERS. FILL PLACED ON THE FACE OF THE EXISTING SLOPES SHOULD BE ADEQUATELY BENCHED INTO THE EXISTING SLOPE TO PROVIDE A HORIZONTAL SURFACE FOR
COMPACTION AND MINIMIZE THE CHANGES OF SLIPPAGE AT THE CUT/FILL INTERFACE.
-WE RECOMMEND THAT STRUCTURAL FILL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698.) GEO- HYDRO SHOULD OBSERVE PLACEMENT OF
STRUCTURAL FILL ON A FULL-TIME BASIS AND PERFORM DENSITY TEST.
NOTE:
98% STANDARD PROCTOR COMPACTION IS REQUIRED IN ALL AREAS
OF FILL. GEOTECHNICAL ENGINEER TO OBSERVE PLACEMENT OF FILL
DURING CONSTRUCTION.
LAKE POND PIPE TRENCH TO BE FILLED WILL CONCRETE UP TO THE
SPRINGLINE.
NO TREE GROWTH ON DAMS. DAM IS TO MAINTAIN A GOOD
STAND OF GRASS, AND TO BE MAINTAINED BY GORDON COUNTY TO
PREVENT BRUSH AND TREE GROWTH.
AutoCAD SHX Text
MT. OLIVE CHURCH RD. 40' R/W
AutoCAD SHX Text
EXISTING LAKE W.S.E.=739.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=747.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=751.30
F F F F F F F
F F F F F F F F F F F F F F F F F F F F F F F F F
F F
F
F F F F F
BP
: 0
+0 0.
PC
: 0
+7 5.
PT
: 1
+0 7.
PC
: 1
+4 7.
PT
: 2
+4 9.
11 PC
: 3
+9 6.
PT
: 4
+0 7.
PC
: 5
+4 9.
PT
: 6
+1 0.
40'18.3'F F F
F F F F F F F F F F F F F F F F F F F F F F F F
F F F F F F F F F
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
25'
25'
ANCHOR ON LAND
ANCHOR ON LAND
ANCHOR ON LAND
ANCHOR ON LAND
25'
25'
Ss Su
Ds1 Ds2 Du
Ds3
Ss Su
Ds1 Ds2 Du
Ds3
Ss Su
Ds1 Ds2 Du
Ds3
Ss Su
Ds1 Ds2 Du
Ds3
Ss Su
Ds1 Ds2 Du
Ds3
Ss Su
Ds1 Ds2 Du
Ds3
Sd1-S
Sd1-S
Sd1-S
Sd1-S
Sd1-S
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
St
CONCRETE
WASHOUT
SAMPLING
LOCATION
DOWNSTREAM
SAMPLING
LOCATION
UPSTREAM
Co 0+00
1+00 2+00
3+00
4+00
5+00
6+00
TOE OF PROPOSED SLOPE
LIMITS OF FILL
TOE OF PROPOSED SLOPE
LIMITS OF FILL
CONTRACTOR TO USE A
SIPHON OR PUMP TO DRAW
DOWN THE UPPER LAKE
WATER LEVEL TO BELOW
THE PROPOSED FILL LINE
CONTRACTOR TO CONSTRUCT
A COFFERDAM FOR FILL
PLACEMENT IN THE LOWER
LAKE. OR LOWER THE LAKE
LEVEL AT THE OUTLET.
LAKE OUTLET CONTROL
72" 1011A MANHOLE
W/ PEDESTAL TOP
10'X10'X2'
PLUNGE POOL
A1
A2
" R
CP
AREA TO BE RE-VEGETATED
WITH BROOMSEDGE
BLUESTREAM, EASTERN
DAISY, AND FESUE.
AREA TO BE RE-VEGETATED
WITH BROOMSEDGE
BLUESTREAM, EASTERN
DAISY, AND FESUE.
C302
20 20 40 60 FEET
SCALE: 1" = 20'
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
N
EP
D
S
IT
E M
AP
TOTAL AREA OF DISTURBANCE = 0.85 ACRES
WETLAND DISTURBANCE = 0.168 ACRES
OPEN WATER DISTURBANCE=0.149 ACRES
STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.)
WETLAND IMPACT AREA
OPEN WATER IMPACT AREA
STATE BUFFER IMPACT AREA
AutoCAD SHX Text
MT. OLIVE CHURCH RD. 40' R/W
AutoCAD SHX Text
EXISTING LAKE W.S.E.=739.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=747.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=751.30
F F F F F F F
F F F F F F F F F F F F F F F F F F F F F F F F F
F F
F
F F F F F
WATER
TmD
TaD
DsA
F F F
F F F F F F F F F F F F F F F F F F F F F F F F
F F F F F F F F F
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
25'
25'
ANCHOR ON LAND
ANCHOR ON LAND
ANCHOR ON LAND
ANCHOR ON LAND
25'
25'
Sd1-S
Sd1-S
Sd1-S
Sd1-S
Sd1-S
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Co
WATER
TmD
TOTAL AREA OF DISTURBANCE = 0.85 ACRES
WETLAND DISTURBANCE = 0.168 ACRES
OPEN WATER DISTURBANCE=0.149 ACRES
STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.)
STONECd-S
Co
Co CONSTRUCTION
EXIT
DIVERSIONDi
TEMPORARY
DOWNDRAIN
STRUCTURE
Dn1
(Label)
Dn1
PERMANENT
DOWNDRAIN
STRUCTURE
Dn2
(Label)
Dn2
FILTER
RING
FrFr
Rt RETRO
FITTING
SEDIMENT
BARRIER
Sd1
INLET
SEDIMENT
TRAP
TEMPORARY
SEDIMENT
BASIN
Sd3
StSTORMDRAIN
OUTLET
PROTECTION
St
SURFACE
ROUGHENINGSu
EROSION
CONTROL
MATTING AND
BLANKETS
Ss
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
Ds1
DISTURBED AREA
STABILIZATION
(WITH TEMP SEEDING)
Ds2
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
Ds3
DISTURBED AREA
STABILIZATION
(SODDING)
Ds4
DUST CONTROL ON
DISTURBED AREASDu
Pm
POLY-
ACRYLAMIDE
(PAM)
Sd2-P
INLET
SEDIMENT
TRAP
Sd2-F
CHECKDAM
GSWCC LEVEL II DESIGN
PROF. CERT#000010458
C501
20 20 40 60 FEET
SCALE: 1" = 20'
24 HOUR CONTACT
STEVE PARRIS
706-629-2785 Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
N
IN
IT
IA
L
ER
OS
IO
N
CO
TR
OL
PL
AN
INITIAL PHASE CONSTRUCTION SCHEDULE NOTES:
· STAKE CLEARING LIMITS
· PRIOR TO BEGINNING MASS CLEARING CONTRACTOR TO INSTALL SILT FENCE, TURBIDITY
CURTAINS, AND CONSTRUCTION ENTRANCE.
· INSTALL ALL EROSION CONTROL MEASURES AS SHOWN ON THE INITIAL PHASE PLAN
(EROSION CONTROL MEASURES TO BE CONSTRUCTED AND FULLY FUNCTIONAL PRIOR
TO ANY GRADING).
· BEGIN DRAINING UPPER LAKE.
· START STORMWATER MONITORING, INSPECTIONS, AND SAMPLING.
INTERMEDIATE PHASE CONSTRUCTION SCHEDULE NOTES:
· INSTALL CONCRETE WASHOUT AREA
· AFTER UPPER LAKE HAS BEEN DRAINED BEGIN REMOVAL OF THE ROAD DAM AND
EXISTING STORM PIPES.
· DRAIN LOWER LAKE OR INSTALL COFFERDAM FOR PLACEMENT OF FILL.
· BEGIN INSTALLING THE PROPOSED STORM PIPE OUTLET.
· ENSURE ALL SILT FENCE AND TURBIDITY CURTAINS ARE FUNCTIONING AND MAINTAIN
AS NEEDED.
· INSTALL THE PLUNGE POOL AT THE PIPE OUTFALL.
· CONSTRUCT ROAD DAM IMPERVIOUS CORE AND PLACE FILL. HAVE A GEOTECHNICAL
ENGINEER ON SITE MONITORING THE COMPACTION.
· PROVIDE DS1, DS2, & SS FOR AREAS THAT HAVE NOT BEEN DISTURBED FOR MORE
THAN 14 DAYS AS GRADING PROGRESSES.
· INSTALL SS & DS3 AS SOON AS THE DAM SLOPE IS ESTABLISHED.
· MAINTAIN BMP'S AS NEEDED AND CONTINUE WITH STORMWATER MONITORING,
INSPECTIONS, AND SAMPLING.
FINAL PHASE CONSTRUCTION SCHEDULE NOTES:
· MAINTAIN BMP'S AS GRADING PROGRESSES.
· FINAL GRADE PROPOSED ROADWAY AND SLOPES
· BEGIN INSTALLING BASE AND PAVING.
· BEGIN INSTALLING GUARDRAIL.
· BEGIN INSTALL PERMANENT VEGETATION AND LANDSCAPING, Ds3 & Ds4.
· REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER SITE IS 100% STABILIZED.
· REMOVE TURBIDITY CURTAINS FROM BOTH UPPER AND LOWER LAKE.
· STRIP ROADWAY AND INSTALL ANY NECESSARY SIGNS.
AutoCAD SHX Text
MT. OLIVE CHURCH RD. 40' R/W
AutoCAD SHX Text
EXISTING LAKE W.S.E.=739.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=747.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=751.30
F F F F F F F
F F F F F F F F F F F F F F F F F F F F F F F F F
F F
F
F F F F F
F F F
F F F F F F F F F F F F F F F F F F F F F F F F
F F F F F F F F F
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
FLOATING
TURBIDITY CURTAIN
25'
25'
ANCHOR ON LAND
ANCHOR ON LAND
ANCHOR ON LAND
ANCHOR ON LAND
25'
25'
Ss Su
Ds1 Ds2 Du
Ss Su
Ds1 Ds2 Du
Ss Su
Ds1 Ds2 Du
Ss Su
Ds1 Ds2 Du
Ss Su
Ds1 Ds2 Du
Ss Su
Ds1 Ds2 Du
Sd1-S
Sd1-S
Sd1-S
Sd1-S
Sd1-S
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
DOUBLE ROW
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
St
CONCRETE
WASHOUT
SAMPLING
LOCATION
DOWNSTREAM
SAMPLING
LOCATION
UPSTREAM
Co
A1
A2
" R
CP
TOTAL AREA OF DISTURBANCE = 0.85 ACRES
WETLAND DISTURBANCE = 0.168 ACRES
OPEN WATER DISTURBANCE=0.149 ACRES
STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.)
STONECd-S
Co
Co CONSTRUCTION
EXIT
DIVERSIONDi
TEMPORARY
DOWNDRAIN
STRUCTURE
Dn1
(Label)
Dn1
PERMANENT
DOWNDRAIN
STRUCTURE
Dn2
(Label)
Dn2
FILTER
RING
FrFr
Rt RETRO
FITTING
SEDIMENT
BARRIER
Sd1
INLET
SEDIMENT
TRAP
TEMPORARY
SEDIMENT
BASIN
Sd3
StSTORMDRAIN
OUTLET
PROTECTION
St
SURFACE
ROUGHENINGSu
EROSION
CONTROL
MATTING AND
BLANKETS
Ss
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
Ds1
DISTURBED AREA
STABILIZATION
(WITH TEMP SEEDING)
Ds2
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
Ds3
DISTURBED AREA
STABILIZATION
(SODDING)
Ds4
DUST CONTROL ON
DISTURBED AREASDu
Pm
POLY-
ACRYLAMIDE
(PAM)
Sd2-P
INLET
SEDIMENT
TRAP
Sd2-F
CHECKDAM
GSWCC LEVEL II DESIGN
PROF. CERT#000010458
C502
20 20 40 60 FEET
SCALE: 1" = 20'
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
N
IN
TE
RM
ED
IA
TE
ER
OS
IO
N C
ON
TR
OL
PL
AN
AutoCAD SHX Text
MT. OLIVE CHURCH RD. 40' R/W
AutoCAD SHX Text
EXISTING LAKE W.S.E.=739.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=747.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=751.30
F F F F F F F
F F F F F F F F F F F F F F F F F F F F F F F F F
F F
F
F F F F F
40'18.3'F F F
F F F F F F F F F F F F F F F F F F F F F F F F
F F F F F F F F F
Ss Su Ds3
Ss Su Ds3
Ss Su Ds3
Ss Su Ds3
Ss Su Ds3
Ss Su Ds3
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
St
SAMPLING
LOCATION
DOWNSTREAM
SAMPLING
LOCATION
UPSTREAM
TOE OF PROPOSED SLOPE
LIMITS OF FILL
TOE OF PROPOSED SLOPE
LIMITS OF FILL
CONTRACTOR TO USE A
SIPHON OR PUMP TO DRAW
DOWN THE UPPER LAKE
WATER LEVEL TO BELOW
THE PROPOSED FILL LINE
CONTRACTOR TO CONSTRUCT
A COFFERDAM FOR FILL
PLACEMENT IN THE LOWER
LAKE. OR LOWER THE LAKE
LEVEL AT THE OUTLET.
LAKE OUTLET CONTROL
72" 1011A MANHOLE
W/ PEDESTAL TOP
10'X10'X2'
PLUNGE POOL
A1
A2
" R
CP
AREA TO BE RE-VEGETATED
WITH BROOMSEDGE
BLUESTREAM, EASTERN
DAISY, AND FESUE.
AREA TO BE RE-VEGETATED
WITH BROOMSEDGE
BLUESTREAM, EASTERN
DAISY, AND FESUE.
TOTAL AREA OF DISTURBANCE = 0.85 ACRES
WETLAND DISTURBANCE = 0.168 ACRES
OPEN WATER DISTURBANCE=0.149 ACRES
STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.)
STONECd-S
Co
Co CONSTRUCTION
EXIT
DIVERSIONDi
TEMPORARY
DOWNDRAIN
STRUCTURE
Dn1
(Label)
Dn1
PERMANENT
DOWNDRAIN
STRUCTURE
Dn2
(Label)
Dn2
FILTER
RING
FrFr
Rt RETRO
FITTING
SEDIMENT
BARRIER
Sd1
INLET
SEDIMENT
TRAP
TEMPORARY
SEDIMENT
BASIN
Sd3
StSTORMDRAIN
OUTLET
PROTECTION
St
SURFACE
ROUGHENINGSu
EROSION
CONTROL
MATTING AND
BLANKETS
Ss
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
Ds1
DISTURBED AREA
STABILIZATION
(WITH TEMP SEEDING)
Ds2
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
Ds3
DISTURBED AREA
STABILIZATION
(SODDING)
Ds4
DUST CONTROL ON
DISTURBED AREASDu
Pm
POLY-
ACRYLAMIDE
(PAM)
Sd2-P
INLET
SEDIMENT
TRAP
Sd2-F
CHECKDAM
GSWCC LEVEL II DESIGN
PROF. CERT#000010458
C503
20 20 40 60 FEET
SCALE: 1" = 20'
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
N
FI
N
AL
E
RO
SI
ON
CO
N
TR
OL
PL
AN
AutoCAD SHX Text
MT. OLIVE CHURCH RD. 40' R/W
AutoCAD SHX Text
EXISTING LAKE W.S.E.=739.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=747.50
AutoCAD SHX Text
EXISTING LAKE W.S.E.=751.30
EROSION CONTROL NOTES & CHECKLIST
GSWCC LEVEL II DESIGN
PROF. CERT#000010458
C504
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
Know what'sbelow.
before you dig.Call
R
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
EROSION CONTROL NOTES
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND
SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
THE APPLICABLE PORTION OF THE PRIMARY PERMITTEES ES&PC PLAN IS TO BE PROVIDED TO EACH SECONDARY PERMITTEE PRIOR TO SECONDARY CONDUCTING ANY CONSTRUCTION ACTIVITY AND THAT EACH SECONDARY SHALL SIGN THE PLAN OR PORTION OF THE PLAN APPLICABLE TO THEIR SITE. LIST THE
NAMES AND ADDRESSES OF ALL SECONDARY PERMITTEES.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN, AND REPAIRED AS NECESSARY.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED
NECESSARY BY ON-SITE INSPECTION.
ALL SILT FENCES MUST MEET THE REQUIREMENTS OF SECTION 171-TEMPORARY SILT FENCE FOR THE
DEPARTMENT OF TRANSPORTATION, QUALIFIED PRODUCTS LIST #36.
SILT FENCES SHALL NOT BE PLACED IN STREAM BUFFER OR FLOODPLAINS, UNLESS UTILIZED FOR THE CONSTRUCTION OF AN EXEMPT ACTIVITY (I.E. ROADWAY DRAINAGE STRUCTURES, SEWER/WATER CROSSINGS, OR DRAINAGE STRUCTURES) PER THE APPROVED PLANS. FOR SUCH DISTURBANCES WITHIN THE BUFFER, THE AREA SHALL BE IMMEDIATELY STABILIZED USING EROSION CONTROL MATTING AND/OR
BLANKETS ONCE THE ACTIVITY IS COMPLETE.
SEDIMENT STORAGE VOLUME (67 CY/ACRE) MUST BE INSTALLED PRIOR TO ANY OTHER LAND DISTURBANCE
ACTIVITY AND IN PLACE UNTIL FINAL STABILIZATION OCCURS.
FOR EACH SITE ON WHICH LAND DISTURBING ACTIVITY OCCURS, EACH ENTITY OR PERSON ACTING AS EITHER A PRIMARY, SECONDARY, OR TERTIARY PERMITTEE, AS DEFINED IN THE STATE GENERAL PERMIT, SHALL HAVE AS A MINIMUM ONE PERSON WHO IS IN RESPONSIBLE CHARGE OF EROSION AND
SEDIMENTATION CONTROL ACTIVITIES ON BEHALF OF SAID ENTITY OR PERSON AND MEETS THE APPLICABLE (LEVEL 1A) EDUCATION OR TRAINING CERTIFICATION REQUIREMENTS (O.C.G.A. 12-7-19(A)(2)).
ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE APPROPRIATE SEASON. IN SUCH INSTANCES WHERE THE ESTABLISHMENT OF VEGETATION IS INOPPORTUNE DUE TO SEASON OR DROUGHT, DISTURBED AREAS SHALL BE TEMPORARILY STABILIZED USING 2”-4” OF MULCH (DS1).
ADDITIONAL PLANTINGS WILL BE NECESSARY IF A SUFFICIENT STAND OF GRASS FAILS TO GROW.
A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE AT ALL
TIMES.
PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE LIMITS OF LAND DISTURBANCE AND ALL STREAM BUFFERS SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE
SHALL OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS.
PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED
AT EACH POINT OF ENTRY TO OR EXIT FROM THE SITE OR ONTO ANY PUBLIC ROADWAY.
THE FOLLOWING INITIAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY OTHER
CONSTRUCTION ACTIVITY.
THE CONSTRUCTION EXIT, CONSISTING OF A MINIMUM PAD SIZE OF 20 FEET BY 50 FEET WITH A MINIMUM OF 6” THICK STONE, SHALL BE PLACED AS SHOWN ON THE PLAN. THE STONE SIZE SHOULD CONSIST OF COURSE AGGREGATE BETWEEN 1-1/2” & 3-1/2” IN DIAMETER AND OVERLAID ON A GEOTEXTILE UNDERLINER.
THE GEOTEXTILE UNDERLINER SHALL MEET THE REQUIREMENTS OF AASHTO M288-96, SECTION 7.3
SEPARATION REQUIREMENTS.
IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION ENTRANCE/EXITS, ALL PERIMETER EROSION CONTROL AND TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS SHOWN ON THE INITIAL PHASE
EROSION CONTROL PLAN.
SILT FENCE SHOULD BE INSTALLED AT THE PERIMETER OF THE DISTURBED AREA AS SHOWN ON THE PLAN.
THE SILT FENCE SHOULD BE PLACED IN ACCORDANCE WITH THE MANUAL FOR EROSION CONTROL IN GEORGIA, TABLE 6-27.1. THE SILT FENCE SHOULD BE KEPT ERECT AT ALL TIMES AND REPAIRED WHEN REQUESTED BY THE SITE INSPECTOR OR THE PROJECT DESIGN PROFESSIONAL OF RECORD. SILT SHOULD BE REMOVED WHEN ACCUMULATION REACHES ½ HEIGHT OF THE BARRIER. THE PERIMETER SILT FENCE SHOULD BE INSPECTED DAILY FOR ANY FAILURES. ANY FAILURES OF SAID FENCING SHOULD BE REPAIRED
IMMEDIATELY.
STONE CHECK DAMS SHALL BE INSTALLED IN AREAS OF CONCENTRATED FLOWS AS SHOWN ON THE PLAN.
TREE PROTECTION FENCING SHOULD BE INSTALLED PRIOR TO THE START OF ANY LAND DISTURBANCE ACTIVITY AND MAINTAINED UNTIL FINAL LANDSCAPE IS INSTALLED. THE TREE PROTECTION FENCING SHOULD BE INSPECTED DAILY. ANY FAILURES OF SAID FENCING SHOULD BE REPAIRED IMMEDIATELY.
ADDITIONAL SILT BARRIERS MUST BE PLACED AS SHOWN ON THE PLAN AS ACCESS IS OBTAINED DURING CLEARING. NO GRADING SHALL TAKE PLACE UNTIL SILT BARRIER INSTALLATION AND SEDIMENT PONDS ARE
CONSTRUCTED AS SHOWN ON THE CLEARING PHASE EROSION CONTROL PLAN.
SEDIMENT AND EROSION CONTROL MEASURES SHOULD BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE
CAPACITY OF THE DEVICE.
THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION, WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1-3” OF STONE, AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM
VEHICLE ON TO PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED IMMEDIATELY.
CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO
ENSURE MEASURES ARE FUNCTIONING PROPERLY.
FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE
APPROVED EROSION CONTROL PLANS.
THE SITE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES INCLUDING REPLACING OR REPAIRING ANY DAMAGED DEVICES DUE TO ANY CONSTRUCTION ACTIVITY BY
OTHERS.
EARTHWORK OPERATIONS IN THE VICINITY OF STREAM BUFFERS SHALL BE CAREFULLY CONTROLLED TO
AVOID DUMPING OR SLOUGHING INTO THE BUFFER AREAS.
SEDIMENT SHALL NOT BE WASHED INTO INLETS. IT SHALL BE REMOVED FROM THE SEDIMENT TRAPS AND
DISPOSED OF AND STABILIZED SO THAT IT WILL NOT ENTER THE INLETS AGAIN.
EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS.
THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING THE CONSTRUCTION ARE DIFFERENT FROM THE PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH
EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING
CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION
SHALL BE REPORTED TO THE DESIGN PROFESSIONAL IMMEDIATELY.
THE CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY BARRICADES WHILE ROADWAY
FRONTAGE IMPROVEMENTS ARE BEING MADE.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING BARRIERS AT THE TOE OF SLOPES UNDER CONSTRUCTION. THESE BARRIERS SHALL BE AS SHOWN IN THE PLANS. THESE BARRIERS MAY BE RELOCATED AND REUSED AFTER PERMANENT SLOPE STABILIZATION BECOMES FULLY ESTABLISHED. AS THEY ARE RELOCATED, ANY DEFECTIVE MATERIALS IN THE BARRIER SHALL BE REPLACED. IN ADDITION, ALL DEBRIS AND SILT AT THE PREVIOUS LOCATION SHALL BE REMOVED.
CUT AND FILL SLOPES ARE NOT TO EXCEED “2H:1V”.
INLET SEDIMENT PROTECTION MEASURES SHALL BE INSTALLED ON ALL STORM STRUCTURES AS THEY ARE
CONSTRUCTED. SEE PLAN VIEW FOR SPECIFIC TYPE AND SEPARATE DETAILS FOR ADDITIONAL
INFORMATION ON TYPE OF INLET PROTECTION SPECIFIED.
STORM DRAIN OUTLET PROTECTION SHALL BE PLACED AT ALL OUTLET HEADWALLS AS SOON AS THE
HEADWALL IS CONSTRUCTED. SEE DETAILS FOR ADDITIONAL INFORMATION.
ER
OS
TR
OL
N
OT
ES
LANDSCAPING
10 CLEAN UP
SANITARY SEWER
INSTALL SEDIMENT
MAINTAIN EROSION
(TEMP.) (PERM.)
INSTALLATION
CLEARING AND
CONTROLS
GRADING
ACTIVITY
STORM DRAIN
INSTALLATION
CONTROL
GRASS
UTILITY
INSTALLATION
53 421
AND PAVING
FINAL
BLDG. CONST.
129 10 1186 7
ANTICIPATED ACTIVITY SCHEDULE29
C505
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
SILT FENCE - TYPE SENSITIVE
SIDE VIEW
FRONT VIEW
Sd1-S
CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
NOTES:
1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.
2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN
FOR POSITIVE DRAINAGE.
3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE).
4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6".
5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.
6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%..
7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.
8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS
INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE
ENTRANCE TO A SEDIMENT CONTROL DEVICE).
9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT.
10.MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
ENTRANCE ELEVATION
Co
PIPE OUTLET TO WELL DEFINED CHANNEL
PIPE OUTLET TO FLAT AREA -- NO WELL DEFINED CHANNEL
RIPRAP OUTLET PROTECTION
NOTES:
1. La IS THE LENGTH OF THE RIPRAP
APRON.
2. D = 1.5 TIMES THE MAXIMUM STONE
DIAMETER BUT NOT LESS THAN 6".
3. IN A WELL-DEFINED CHANNEL, EXTEND
THE APRON UP THE CHANNEL BANKS TO
AN ELEVATION OF 6" ABOVE THE
MAXIMUM TAILWATER DEPTH OR TO THE
TOP OF THE BANK (WHICHEVER IS LESS).
4. A FILTER BLANKET OR FILTER FABRIC
SHOULD BE INSTALLED BETWEEN THE
RIPRAP AND THE SOIL FOUNDATION.
La
D
SECTION A-A
FILTER
BLANKET
D3d
D
La
FILTER BLANKET
PLAN
SECTION A-A
RIPRAP APRON
PLAN
A A
RIPRAP APRON
St 43
STRUCTURE Q100 V100 La W1 W2 (cfs) (fps) (ft) (ft) (ft)
St - CALCULATIONS d50 (ft)
DEPTH
(ft)
St
A1-48" RCP OUTFALL 100.32 10.85 30 12 20 1.50 2.01
Do (in)
SCALE: NONE
ABOVE GROUND CONCRETE WASHDOWN
A A
SECTION A-A
NOTES
1. AREA TO BE USED TO WASHDOWN TOOLS,
CONCRETE MIXER CHUTES, HOPPERS AND THE
REAR OF VEHICLES. WASHOUT OF THE DRUM
AT CONSTRUCTION SITE IS PROHIBITED.
2. WASHDOWN FACILITY MUST BE CLEANED, OR
NEW FACILITIES MUST BE CONSTRUCTED AND
READY FOR USE ONCE WASHDOWN AREA IS 75%
FULL.
STRAW BALE
BINDING
WIRE
10 MIL PLASTIC LINING
2"X4" 'SOD' STAPLES
(2 PER BALE)
WOOD OR METAL STAKE
(2 PER BALE)
STRAW BALE
(TYP.)
STAKE (TYP.)
VA
RI
ES
10' MIN.
10 MIL PLASTIC LINING
STONE CHECK DAM
CROSS SECTION
PROFILE VIEW
SPACING BETWEEN CHECK DAMS
Cd-S
TOTAL AREA OF DISTURBANCE = 0.85 ACRES
WETLAND DISTURBANCE = 0.168 ACRES
OPEN WATER DISTURBANCE=0.149 ACRES
STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.)
Know what'sbelow.
before you dig.Call
R
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
ER
OS
TR
OL
D
ET
AI
LS
GSWCC LEVEL II DESIGN
PROF. CERT#000010458
AutoCAD SHX Text D.
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
30" MIN.
AutoCAD SHX Text 28"
AutoCAD SHX Text 6"
AutoCAD SHX Text 2"
AutoCAD SHX Text
4' MAX. O.C.
AutoCAD SHX Text
FABRIC (WOVEN WIRE FENCE BACKING)
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text 6"
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
30" MIN.
AutoCAD SHX Text 28"
AutoCAD SHX Text NOTES: : 1. USE STEEL OR WOOD POSTS OR AS SPECIFIED BY THE EROSION, SEDIMENTATION, USE STEEL OR WOOD POSTS OR AS SPECIFIED BY THE EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN. 2. HEIGHT (28") IS TO BE SHOWN ON THE EROSION, SEDIMENTATION, AND POLLUTION HEIGHT (28") IS TO BE SHOWN ON THE EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN.
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
CULVERT UNDER ENTRANCE (IF NEEDED)
AutoCAD SHX Text
DIVERSION RIDGE (SEE NOTE 6)
AutoCAD SHX Text
N.S.A. R-2 (1.5"-3.5") COARSE AGGREGATE
AutoCAD SHX Text
GEOTEXTILE UNDERLINER
AutoCAD SHX Text
TIRE WASHRACK AREA/ TIRE WASHERS
AutoCAD SHX Text
SUPPLY WATER TO WASH WHEELS IF NECESSARY
AutoCAD SHX Text
HARD SURFACE PUBLIC ROAD
AutoCAD SHX Text
SEDIMENT TRAP (SEE NOTE 8)
AutoCAD SHX Text
COARSE AGGREGATE (N.S.A. R-2)
AutoCAD SHX Text
ORIGINAL GRADE
AutoCAD SHX Text
GEOTEXTILE UNDERLINER
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
MINIMUM 9"
AutoCAD SHX Text
24" MAXIMUM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24" MAXIMUM
AutoCAD SHX Text NOTES: : 1. CHECK DAMS ARE TO BE USED ONLY IN SMALL OPEN CHANNELS (THEY ARE NOT TO CHECK DAMS ARE TO BE USED ONLY IN SMALL OPEN CHANNELS (THEY ARE NOT TO ONLY IN SMALL OPEN CHANNELS (THEY ARE NOT TO IN SMALL OPEN CHANNELS (THEY ARE NOT TO THEY ARE NOT TO BE USED IN LIVE STREAMS). . 2. THE DRAINAGE AREA FOR STONE CHECK DAMS SHALL NOT EXCEED TWO ACRES. THE DRAINAGE AREA FOR STONE CHECK DAMS SHALL NOT EXCEED TWO ACRES. 3. THE CENTER OF THE CHECK DAM MUST BE AT LEAST 9 INCHES LOWER THAN THE THE CENTER OF THE CHECK DAM MUST BE AT LEAST 9 INCHES LOWER THAN THE OUTER EDGES. 4. THE DAM HEIGHT SHOULD BE A MAXIMUM OF 2 FEET FROM CENTER TO RIM EDGE. THE DAM HEIGHT SHOULD BE A MAXIMUM OF 2 FEET FROM CENTER TO RIM EDGE. 5. THE SIDE SLOPES OF THE CHECK DAM SHALL NOT EXCEED A 2:1 SLOPE. THE SIDE SLOPES OF THE CHECK DAM SHALL NOT EXCEED A 2:1 SLOPE. 6. GEOTEXTILE SHALL BE USED TO PREVENT THE MITIGATION OF SUBGRADE SOIL GEOTEXTILE SHALL BE USED TO PREVENT THE MITIGATION OF SUBGRADE SOIL PARTICLES INTO THE STONES (REFER TO AASHTO M288-96, SECTION 7.3, TABLE 3).
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
A = THE TOE OF THE UPSTREAM CHECK DAM.
AutoCAD SHX Text
B = TOP OF THE DOWNSTREAM CHECK DAM.
AutoCAD SHX Text
L = THE DISTANCE SUCH THAT POINTS A AND
B ARE OF EQUAL ELEVATION.
C506
GEORGIA
RE
G ISTERED
No. PE36309
PROFESSIONAL
E N G I N E E R
MATTHEW BA ILE
Y
Group
P.
O
. B ox
8.
5.
Ca rt er sv ill e, G a ba ile yc iv ilg ro up .c om
BA
IL
EY c iv il
23112
M T.
O
LI
VE
C
H
UR
CH
R
OA
D
D
AM
R
EP
LA
CE
M
EN
T
PR
O
JE
CT
FO
R
DATE
PROJECT NUMBER
REVISIONS
MAY 3RD 2023
G
OR
D
ON
C
OU
N
TY
PU
BL
IC
S
AF
ET
Y D
R
CA
LH
OU
N , G
A
SH
EE
T
TI
TL
E
SHEET NUMBER
M T.
O
LI
VE
C
H
UR
CH
R
D
G
OR
D
ON
C
OU
N
TY
, G A
ER
OS
VE
G
ET
AT
PL
AN
24 HOUR CONTACT
STEVE PARRIS
706-629-2785
1'-2"
1'-0"
6"
9"
1'-2'
1'-0" 15"
15'-20'
5'
UPSTREAM TERMINAL
TRANSVERSE CHECK SLOT
DOWNSTREAM TERMINAL
STEP 1 : CUT TERMINAL SLOT
STEP 2 : SNUG MAT INTO
SLOT
STEP 3 : A. STAKE MAT INTO SLOT.
B. USE 1"x3"…