mt-a0300461_WarmanLoopRoad_Prelim-Plans.pdf
PDF 8 MB Posted
- Attached to
- MT BIGHORN 46(1), WARMAN LOOP ROAD Federal contract opportunity
- Solicitation number
- 69056721B000003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Warman Loop Road Prelim Letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preliminary - N ot fo r Construction
F-
Top of existing pavement
Roadway aggregate, method 2, 18-inch compacted depth
Existing ground
Geogrid, stabilization
Separation-stabilization geotextile, class 1, type C (nonwoven)
Profile grade
18-inch Subexcavation depth
<t.
I
Surfacing structure r11
SUBEXCAVATION DETAIL
f2H3l
6 6
0 __ ____________ L _ _ _ _ _ _ _ _ _ _ _ __ o
Surfacing structure !11
Roadway aggregate, method 2, 18-inch compacted depth
Geogrid, stabilization
Separation-stabilization geotextile, class 1, type C (nonwoven)
Top of existing pavement
SUBEXCAVATION PROFILE
STATE PROJECT
MT BIGHORN 46(1)
fost;ng ground
NOTE:
1. See sheet C.2 for quantities.
FOOTNOTE:
f11 See sheet C.3.
£21 Mirror detail as appropriate.
f3l Adjust locations to meet field conditions as approved.
NO SCALE
SUBEXCAVATION DETAILS
SHEET
NUMBER
C.4
Preliminary - Not fo
UTILITY CONTACT INFORMATION
PHILLIPS 66 PIPELINE 338 HIGHWAY 87 EAST, BILLINGS, MT 59101 JIM COSTELLO (406) 855-7456
COMPANY ADDRESS CONTACT PHONE NUMBER
BIG HORN COUNTY ELECTRIC COOPERATIVE 303 S. MITCHELL AVE., HARDIN, MT 59034 MONTY RUSSELL (406) 665-2830
NEMONT TELEPHONE COOPERATIVE 2457 MAIN STREET, WORDEN, MT 59088 TROY UNREIN (406) 620-7011
STATE PROJECT
BIGHORN 46(1) D.1MT
F:
\h ig h w ay s\
FH
W
A \1 m t-a0
W ar m an Lo op R oa d \W ar m an L oo p R oa d \d g n \P la n a n d
-N ov -2
:1
B
T H
O M
PS
O
N /2
J.
K E Y
/2
D es ig n ed b y:
C h ec ke d b y:
SHEET
NUMBER
UTILITY CONTACT
INFORMATIONPreliminary - Not fo
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER
NORTH EAST ELEVATION LATITUDE LONGITUDE
ELLIPSOID
HEIGHT
COMBINED
FACTOR
DESCRIPTION NOTE:
WL1 405175.769 2404860.473 3169.708 45°20'53.467344"N 107°48'08.636020"W 3125.1864 0.999659554 5/8" IR w/FHWA Alum Cap 1.
WL2 404805.504 2404871.001 3174.232 45°20'49.809596"N 107°48'08.600989"W 3129.7242 0.999659843 5/8" IR w/FHWA Alum Cap
WL3 404911.648 2400344.758 3170.763 45°20'51.821163"N 107°49'11.940419"W 3126.4669 0.99965972 5/8" IR w/FHWA Alum Cap
WL4 405039.355 2399573.603 3171.551 45°20'53.245151"N 107°49'22.699088"W 3127.2867 0.999659484 5/8" IR w/FHWA Alum Cap
WL5 403541.438 2395185.676 3168.339 45°20'39.379563"N 107°50'24.579752"W 3124.3424 0.999661544 5/8" IR w/FHWA Alum Cap
WL6 403516.308 2394362.973 3159.679 45°20'39.303440"N 107°50'36.105208"W 3115.7217 0.999661966 5/8" IR w/FHWA Alum Cap
WL7 403370.940 2389022.359 3146.488 45°20'38.976620"N 107°51'50.917864"W 3102.7836 0.99966263 5/8" IR w/FHWA Alum Cap
WL8 403304.663 2388169.658 3147.820 45°20'38.497954"N 107°52'02.875257"W 3104.1557 0.99966263 5/8" IR w/FHWA Alum Cap
WL9 398962.057 2388104.957 3196.552 45°19'55.637632"N 107°52'05.047986"W 3153.0499 0.999666255 5/8" IR w/FHWA Alum Cap
WL10 399141.803 2388369.776 3200.692 45°19'57.357721"N 107°52'01.288793"W 3157.1714 0.999665819 5/8" IR w/FHWA Alum Cap
PROJECT :Warman Loop Road DATE OF FIELD WORK :March 2020 DATE OF FINAL ADJUSTMENT : March 2020
PROJECT UNITS :International Foot COORDINATE SYSTEM : Montana SPCS NAD83 2011
EPOCH DATE :2010.0000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID18
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
F:
\h ig h w ay s\
FH
W
A \1 m t-a0
W ar m an Lo op R oa d \W ar m an L oo p R oa d \d g n \P la n a n d P ro fi le m t- -N ov -2
:1
W
FL
H
D S u rv ey
W
FL
H
D S u rv ey
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
D.10
SHEET
NUMBER
BIGHORN 46(1)MT
SURVEY CONTROLPreliminary - Not fo
E:
Width £11
,J : l.3
R�a::.y�g:::.: :e:o::, 7�-�,----.-i-'(------..;::::--, - - - - - - - - - - - 3-inch compacted depth Top of existing approach surfacing
APPROACH ROAD SECTION DETAIL - TYPE A APPROACHES
Length r11
Edge of pavement \1 • Match existinq aooroach qrade --
Roadway aggregate, method 2, / 3-inch compacted depth
Adjust connection to match existing approach road profile and cross slope
APPROACH ROAD CONNECTION DETAIL - TYPE A APPROACHES
NO SCALE
STATE PROJECT
MT BIGHORN 46(1)
FOOTNOTE:
lll See Sheet E.2.
APPROACH ROAD DETAILS
SHEET 2 OF 2
SHEET
NUMBER
E.3
Preliminary - Not fo
10.4 x 16 60201 -0400
60201 -0800
60220 -2400
60704 -0000
Station E S T
IM
A T E D
M A X
IM
U M
C O
V E R
S T R U
C T U
R A L
E X C
A V A T
IO
N
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
F
E E T S
PA
N
F
E E T R
IS
E
PR
C A S T R
E
IN
FO
R
C
D
C O
N C
R E T E B
O X C
U
LV
E R T
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
S K E W
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
B E V E
LS
V :n
H
B E V E
LS
V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT LNFT LNFT EACH Lt Rt 37+85 1 51+21 2 44 48 x/C,P 1,2,3 76+16 1 77+72 1 83+81 2 19 32 x/C,P 1,2,3 95+74 1 105+64 1 109+11 1 124+29 1 167+25 1 24 32 x/C,P 1,2,3 219+98 2 200 60 2 2
PROJECT TOTAL 287 32 80 60 7
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the thickness required AS Aluminized steel by the Std. 602-1 fill height table. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
F:
\h ig h w ay s\
FH
W
A \1 m t-a0
W ar m an Lo op R oa d \W ar m an L oo p R oa d \d g n \D ra in ag e\
[m t-
-N ov -2
:2
B
T h om p so n /2
J.
K ey /2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.1
SHEET
NUMBER
BIGHORN 46(1)MT
Note: The quantities shown hereon are approximate and are subject to field adjustments.
Preliminary - N
| b1.pdf |
| Sheet |
File details come from the government source that posted it. Updated .