This document is a Manufacturing Qualification Requirements specification for a DC Motor (NSN: 6105-01-306-8304, P/N: SC6105-0008-1 // TTB3-2931-3093BA) intended for UMTE application, effective March 10, 2026.

Offerors seeking to qualify as approved sources must satisfy nine mandatory requirements: notify the appropriate government Small Business Office or contracting officer of intent to qualify; certify possession of required manufacturing, inspection, testing, packaging, and storage facilities and equipment; verify possession of a complete technical data package including Sierra Research drawing SC6105-0008 and all associated procedures and specifications; manufacture items to conform to ESA-approved engineering data and demonstrate compliance with Unique Identification (UID) requirements per DFARS 211.274; prepare and submit a qualification test plan for government approval detailing verification of all performance, environmental, mechanical, and quality assurance requirements, then submit complete test results for approval prior to contract award, with the government retaining the right to witness on-site testing upon 60-day advance notice; and complete qualification within an estimated 60 days. The estimated cost to become qualified is $15,000. Offerors demonstrating ability to meet qualification standards before the contract award date will not be denied the opportunity to submit proposals, though award will not be delayed for this purpose. Full qualification is mandatory for contract eligibility, and approval as a qualified source does not guarantee subsequent contract award.

The document also establishes six Source Qualification Waiver Criteria (QWC1-QWC6) permitting eligible sources to request waivers of all or part of qualification requirements. Qualifying circumstances include prior government supply history, qualification on mirror-image articles, qualification on assemblies extending to subassemblies and components, qualification on earlier dash numbers of the same basic part number, qualification on similar items with no increased complexity or criticality, and prior qualification following corporate transactions such as acquisitions or mergers. Sources granted waivers and subsequently awarded contracts may still be required to provide post-award first article exhibits to verify production capability.

View the file

Other files

File Type Posted
CDRLCPP.pdf PDF
SOW.pdf PDF
CDRLFATR.pdf PDF
SPRHA526R0567.pdf PDF
EDL.pdf PDF
CDRLFATP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURING QUALIFICATION REQUIREMENTS

NSN: 6105-01-306-8304

P/N: SC6105-0008-1 // TTB3-2931-3093BA

Noun: Motor, DC Application: UMTE

10 Mar 2026 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Motor, DC.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Sierra Research (12115) drawing SC6105-0008. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS. The offeror shall also identify its sources for materials and its standards for internally used processes.

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing SC6105-0008. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 415 SCMS for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 60 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.

f. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $$15,000.

P/N: SC6105-0008-1 // TTB3-2931-3093BA

10 Mar 2026 Section C 2/3

g. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 60 days. This is based on complexity of the Motor, DC and other factors.

h. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

i. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: SC6105-0008-1 // TTB3-2931-3093BA

10 Mar 2026 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.