Moore-SC-26-002 PWS_Grounds Maintenance.docx
DOCX document 394 KB Posted
- Attached to
- Fort Benning Grounds Maintenance
- Solicitation number
- PANMCC_25_P_0000_014579
About this file
This Performance Work Statement (PWS) details grounds maintenance services for Fort Benning, Georgia, covering approximately 184,000 acres across four training areas. The contract is a non-personal services, firm fixed-price solicitation with a base year and four 12-month option years, running from December 1, 2025 to November 30, 2030. The scope includes maintaining High Visibility Areas (approximately 6,400 acres), Common Areas, and Unimproved Grounds, with services such as mowing, edging, trimming, tree and shrub maintenance, debris removal, and special event support.
The procurement is currently in a Sources Sought phase, with the government considering a small business set-aside under NAICS code 561730 (Landscaping Services) with a small business size standard of $9.5 million. Interested businesses are invited to submit a five-page capabilities statement by 12 p.m. EST on April 11, 2025, to usarmy.moore.acc-micc.mbx.micc-proposals@army.mil. The contract will be managed by the Mission and Installation Contracting Command at Fort Benning, with services to be performed across Muscogee and Chattahoochee Counties in Georgia and Russell County in Alabama.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TE-1 Grounds Maintenance cutting schedule (Ranges) (002) (004).pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND MAINTENANCE SERVICES
PERFORMANCE WORK STATEMENT (PWS)
Fort Benning, GA
July 17, 2024
Table of Contents
| 1.0 General. | 1 |
| 1.1 Description of Services/Introduction. | 1 |
| 1.2 Background. | 1 |
| 1.3 Objectives. | 1 |
| 1.4 Scope. | 2 |
| 1.5 Period of Performance (PoP). | 2 |
| 1.6 Traffic Flow. | 2 |
| 1.7 Restoration of Real Property Damage. | 2 |
| 1.8 General Information. | 3 |
| 1.8.1 Scope. | 3 |
| 1.8.2 Place of Performance | 3 |
| 1.8.3 Recognized Holidays. | 3 |
| 1.8.4 Hours of Operation. | 3 |
| 1.8.5 Installation Closures. | 3 |
| 1.8.6 Emergency Delays. | 4 |
| 1.8.7 Unforeseen Closures of Service Areas. | 4 |
| 1.8.8 Place of Performance. | 4 |
| 1.8.9 Type of Contract. | 4 |
| 1.8.10 Security Requirements. | 4 |
| 1.8.11 Access and General Protection/Security Policy and Procedures. | 5 |
| 1.8.12 Physical Security. | 5 |
| 1.8.13 Security Training. | 5 |
| 1.8.14 Anti-Terrorism (AT) Level I Training. | 5 |
| 1.8.15 iWATCH Training. | 6 |
| 1.8.16 Operational Security (OPSEC) Awareness Training. | 6 |
| 1.8.17 Threat Awareness and Reporting Program Training. | 6 |
| 1.8.18 Local Health Protection Conditions | 6 |
| 1.8.19 Key Control. | 7 |
| 1.8.20 Lost Keys. | 7 |
| 1.8.21 Prohibited use of Government provided keys or key cards. | 7 |
| 1.8.22 Lock Combinations. | 7 |
| 1.8.23 Post Award Conference/Periodic Progress Meetings. | 7 |
| 1.8.24 For contractors that do not require CAC but require access to a DoD facility or installation. | 8 |
| 1.8.25 OPSEC Standing Operating Procedure/Plan. | 8 |
| 1.8.26 Identification of Contractor Employees. | 8 |
| 1.8.27 Background Check Requirements. | 8 |
| 1.9 Government Roles and Responsibilities. | 9 |
| 1.9.1 Contracting Officer (KO). | 9 |
| 1.9.2 Contracting Officer’s Representative (COR). | 9 |
| 1.9.3 COR Authority. | 10 |
| 1.9.4 COR or Designated Government Representative Functions. | 10 |
| 1.10 Specific Contractor Requirements, Roles and Responsibilities. | 10 |
| 1.10.1 U.S. Residency. | 10 |
| 1.10.2 Contractor Hiring Restrictions. | 11 |
| 1.10.3 Contractor Identification. | 11 |
| 1.10.4 Standards of Conduct. | 11 |
| 1.10.5 Contractor Key Personnel. | 11 |
| 1.10.6 Project Manager (PM). | 11 |
| 1.10.7 Quality Control Manager (QCM). | 12 |
| 1.10.8 Quality Control Inspectors (QCI). | 12 |
| 1.10.9 Phase In /Phase Out Period. | 12 |
| 1.11 Emergency Services. | 12 |
| 1.11.1 Emergency Medical Treatment. | 13 |
| 1.11.2 Accident Reporting. | 13 |
| 1.12 Environment and OSHA. | 13 |
| 1.12.1 Safety. | 13 |
| 1.12.2 Safety Plan. | 14 |
| 1.12.3 Spill Plan. | 14 |
| 1.12.4 Asbestos Awareness. | 14 |
| 1.13 Environmental Compliance. | 14 |
| 1.13.1 Safety Data Sheets. | 15 |
| 2.0 Definitions and Acronyms. | 16 |
| 2.1 Definitions. | 16 |
| 2.2 ACRONYMS. | 20 |
| 3.0 Government Furnished Property, Equipment and Services. | 22 |
| 3.1 Property. | 22 |
| 3.2 Equipment. | 22 |
| 3.3 Services. | 22 |
| 3.4 Utilities. | 22 |
| 3.5 Materials. | 22 |
| 4.0 Contractor Furnished Items and Services. | 23 |
| 4.1 General. | 23 |
| 4.2 Classified Controlled Facility Clearance. | 23 |
| 4.3 Materials. | 23 |
| 4.4 Equipment. | 23 |
| 4.5 Unserviceable Contractor Equipment. | 23 |
| 5.0 Specific Tasks for Grounds Maintenance. | 24 |
| 5.1 General. | 24 |
| 5.2 Description of Services. | 24 |
| 5.2.1 Scope. | 24 |
| 5.2.2 Service High Visibility Areas. | 24 |
| 5.2.3 Mowing. | 25 |
| 5.2.4 Edging. | 25 |
| 5.2.5 Trimming | 25 |
| 5.2.6 Fertilizing and Liming. | 25 |
| 5.2.7 Seeding and Sodding. | 25 |
| 5.2.8 Hydroseeding. | 25 |
| 5.2.9 Sodding. | 26 |
| 5.2.10 Aerating and Overseeding. | 26 |
| 5.2.11Maintain Flower Beds. | 26 |
| 5.2.12 Weed Control. | 26 |
| 5.2.13 Remove Debris, Leaves, and Litter. | 26 |
| 5.2.14 Service/Maintain Trees. | 27 |
| 5.2.15 Perform Mechanical Tree Spading and Transplanting. | 27 |
| 5.2.16 Tree Mulching. | 27 |
| 5.2.17 Tree Fertilization. | 27 |
| 5.2.18 Tree Pruning. | 27 |
| 5.2.19 Tree Removal and Replacement. | 28 |
| 5.2.20 Emergency Tree Removal. | 28 |
| 5.2.21 Reforestation. | 28 |
| 5.2.22 Hedge and Shrub Maintenance. | 28 |
| 5.2.23 Hedge and Shrub Mulching. | 28 |
| 5.2.24 Hedge and Shrub Fertilization. | 29 |
| 5.2.25 Hedge and Shrub Pruning. | 29 |
| 5.2.26 Irrigation. | 29 |
| 5.2.27 Operation of Irrigation Systems. | 29 |
| 5.2.28 Maintenance of Irrigation Systems. | 29 |
| 5.2.29 Service/Maintain Xeriscape Areas. | 30 |
| 5.2.30 Athletic Fields Grounds Maintenance. | 30 |
| 5.2.31 Special Services. | 30 |
| 5.2.32 Special Event Services. | 30 |
| 5.2.33 Service Common Areas. | 30 |
| 5.2.34Service Fire Breaks and Ranges. | 30 |
| 5.2.35 Service Unimproved Areas | 31 |
| 5.2.36 Service Specialized Locations | 31 |
| 5.3 Other Special Services. | 31 |
| 5.3.1 Refuge and Nature Trail Maintenance. | 31 |
| 5.3.2 Special Equipment Requirements. | 31 |
| 6.0 Applicable Publications (Current Editions). | 32 |
| 6.1 Regulations, Publications, Manuals, Local Policies and Procedures. | 32 |
| 7.0 Mandatory Records and Report Forms. | 35 |
| 8.0 Attachment/Technical Exhibits (TEs). | 36 |
| 8.1 Attachment 1/TE-1 – Performance Requirements Summary. | 37 |
| 8.2 Attachment 2/TE-2 – Deliverables Schedule. | 38 |
| 8.3 Attachment 3/TE-3 Estimated Workload. | 39 |
| 8.3.1 Data. | 39 |
| 8.4 Attachment 4/TE4 – List of Areas to receive services. | 40 |
| 8.4.1 Work Capability Levels. | 40 |
| 8.5 Attachment 5/TE – List of Areas to receive services. | 41 |
| 8.6 Attachment 6/TE 6 – Installation Map(s). | 42 |
i
1.0 General.
This is a non-personal services contract to provide Grounds Maintenance Services for the U.S. Army Garrison Fort Benning, Georgia.
The Government will not exercise any supervision or control over the contract service providers.
The Contractor shall perform to the standards specified in this Performance Work Statement (PWS).
Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the requirements as outlined and defined in this PWS.
1.1 Description of Services/Introduction.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Grounds Maintenance at Fort Benning, Georgia as defined in this Performance Work Statement (PWS), FY25 ID-T reduced standards IAW TE-1. The Contractor shall perform to the standards of this PWS and Minimum frequency standards outlined in the FY25 ID-T revised standards and Part 5 of the Specific tasks.
1.2 Background.
Fort Benning is in the state of Georgia and Alabama neighboring Columbus Georgia and Phenix City Alabama. Fort Benning consists of approximately 184,000 acres and over 5000 buildings. The population base consists of approximately 120,000 military and Government civilian and Contractor personnel, as well as resident family members. The installation consists of four (4) different training areas. Main Post, Sand Hill, Kelley Hill and Harmony Church. The grounds maintenance contract has been a 100% Small Business set-side with competition contract for five years.
1.3 Objectives.
The Contractor shall ensure all work accomplished as fulfillment of this PWS meets all applicable Federal, State, and local laws, regulations, directives and other requirements to include, but not limited to the documents in Part 6 Applicable Publications. The Contractor shall ensure all work accomplished maintains and presents a healthy, clean, neat, and professional appearance to all grounds included and covered by this contract in support of mission requirements for users, residents, and visitors to the installation (in accordance with DA PAM 420-1-1, Housing Management, Table 2-14). Objectives will be met in accordance with the FY25 ID-T revised standards.
Technical Exhibit (TE-6) identifies which buildings/areas belong to each building type, the square footage of the building/areas, any special security considerations, and any constraints as to when during the day or week scheduled services can be performed to the building/area. TE-4 Enterprise Municipal Grounds Maintenance Services Performance Standards and Frequencies identifies tasks and frequencies for minimum standards for each type of building.
1.4 Scope.
The Contractor shall inspect, service, maintain, and landscape grounds at Fort Benning, Georgia. The work shall include scheduling and performance of mowing and trimming; turf replacement; leaf and debris removal; tree, hedge, and shrub planting, maintenance; policing of areas; and other associated work as directed by the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR). The Contractor shall provide all work necessary to maintain the grounds to the standards specified herein. The Contractor shall maintain Improved, Semi-Improved, and Un-Improved Grounds as identified in this PWS. The Contractor shall provide all personnel, management, tools, supplies, transportation, labor, equipment, and other items and services necessary to perform Grounds maintenance services as defined in this Performance Work Statement (PWS), The Contractor shall perform grounds maintenance services to the standards in this contract and in a manner that will maintain grounds in a satisfactory condition and present a clean, neat, and professional appearance. The Main Post Cemetery, Golf Course, Snow Removal and Salting Sidewalks. MWR, AAFES, DECA, DOD Schools and Martin Community Hospital (MACH) are not included in this PWS.
1.5 Period of Performance (PoP).
The period of performance shall be for one (1) Base Year of 12 months and FOUR (4) 12-month option years. The Period of Performance reads as follows:
Base Year 12/01/2025-11/30/2026 (Includes a 30-day Phase-In) Option Year I 12/01/2026-11/30/2027 Option Year II 12/01/2027-11/30/2028 Option Year III 12/01/2028-11/30/2029 Option Year IV 12/01/2029-11/30/2030
1.6 Traffic Flow.
The Contractor shall maintain the free flow of vehicular and pedestrian traffic while conducting grounds maintenance service tasks.
1.7 Restoration of Real Property Damage.
Any damage to Government Real Property by the Contractor’s operations shall be restored to the original state at no additional cost to the Government (e.g., structural damage, damage to landscape or fencing, et al).
1.8 General Information.
1.8.1 Scope.
The Contractor shall perform grounds maintenance services in accordance with the PWS and the technical exhibits. During performance of the contract, the Government reserves the right to add or delete facilities and/or the level of services required. A modification to the contract will be executed to incorporate these changes.
1.8.2 Place of Performance
The work to be performed under this contract will be performed at Fort Benning, Georgia. Areas includes Main Post and Cantonment Areas, Kelley Hill, Sand Hill, Harmony Church, Camp Rogers, Ranges, training Areas and Battle Park the Contractor shall provide the KO a schedule no later than (10) workdays prior to commencing work. Schedule shall outline tasks to be performed by specific building and identify the timeline for the task to be accomplished. The KO will provide the Contractor with requirements to make changes to the schedule as they occur.
1.8.3 Recognized Holidays.
| New Year’s Day | Labor Day |
| Martin Luther King Jr.’s Birthday | Columbus Day |
| President’s Day | Veteran’s Day |
| Memorial Day | Thanksgiving Day |
| Independence Day | Christmas Day |
| Juneteenth |
1.8.4 Hours of Operation.
Normal hours of operation are between the hours of 0730 AM to 5 PM, Monday through Friday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
The Contractor shall coordinate with COR to establish a schedule to conduct business if services are required outside of normal hours of operation.
The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when Government facilities are not closed for the above reasons.
1.8.5 Installation Closures.
When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.
1.8.6 Emergency Delays.
If the Contractor determines unsafe weather conditions or work environment is cause for an interruption of services, the Contractor shall notify the COR (2) hours prior to curtailing operations.
· The Contractor shall obtain COR approval to resume operations.
The Contractor shall coordinate with the DPW designated representative(s) in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations.
1.8.7 Unforeseen Closures of Service Areas.
When an unforeseen closure occurs on a regularly scheduled day of work (i.e., severe weather, training holiday, day of mourning, etc.).
The Contractor shall reschedule the service on any day satisfactory to the customer and minimizes impact on the Contractor’s normal work schedule.
1.8.8 Place of Performance.
The work to be performed under this requirement will be performed throughout the entire area occupied by Fort Benning, Georgia and at any pertinent locations in and around Fort Benning, Georgia. A map of Fort Benning is located in Part 8, Attachment/Technical Exhibit Listing, TE 6.
1.8.9 Type of Contract.
The government will award a FIRM FIXED PRICE (FFP) type of contract with some “As Required” CLIN’s (See Frequency Table Located in Part 8, Attachment/Technical Exhibit Listing, TE-1/TE-2 Performance Standards and Frequencies).
1.8.10 Security Requirements.
Contractor and all associated sub-contractor's employees shall comply with applicable installation, facility and area commander installation/facility TSBD local security policies and procedures (provided by the government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.8.11 Access and General Protection/Security Policy and Procedures.
Contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (i.e., FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.8.12 Physical Security.
At the close of each work period, the contractor shall ensure government facilities, equipment, and materials are secured.
1.8.13 Security Training.
In the event of a National Defense Emergency affecting Fort Benning, the Fort Benning POC will immediately notify the contract POC. At that time, the contractor shall take immediate steps to cease all activities on the installation(s) and will cause all personnel to leave the installation(s) property until notice is given by the installation and Fort Benning POC that National Defense Emergency conditions are no longer in effect.
1.8.14 Anti-Terrorism (AT) Level I Training.
IAW Department of Defense Instruction (DoDI) 2000.16, Vol. 1 DoD Antiterrorism Standards and Army Regulation (AR) 525-13 Antiterrorism, all Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date. The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the KO or COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: http://jko.jten.mil.
If access to a computer is not available, the Government will provide AT Level I training to Contractor employees within 30 business days after contract start and maintain a copy of the attendance roster for one (1) year. Any Contractor hired after contract start will be required to receive AT Level I training within 30 calendar days either online or as provided by the Government. The Contractor must present the training certificate to the KO or designated Government representative/COR within 30 calendar days.
1.8.15 iWATCH Training.
The Contractor shall brief the local iWATCH program (training standards provided by the Installation Anti-Terrorism Officer (ATO)) to all its’ employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to Fort Benning, Military Police and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion.
1.8.16 Operational Security (OPSEC) Training.
In accordance with AR 530-1 all personnel, to include contractor employees and associated sub-contractor employees must complete Level I Operations Security (OPSEC) training which is composed of both initial and continual awareness training (annually). All personnel within the first 30 days of arrival in the organization must receive initial training to include a briefing on the organizations critical information read/sign the OPSEC Individual User Compliance Agreement form. The end state of initial and continual awareness training is that each individual should have the requisite knowledge to safeguard critical information.
1.8.17 Threat Awareness and Reporting Program Training.
For all DA contractors. Training will be completed within 30 days of assignment or employment to an organization and will undergo live environment TARP training will be completed annually IAW AR 381-12 Threat Awareness and Reporting Program. The Contractor shall provide either certificates of completion or dates of attendance at Fort Benning, Georgia for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel.
1.8.18 Local Health Protection Conditions
Contractor will comply with all national and DoD policies with regard to health protection issues including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area and in cooperation with local, state and national guidance. The Contractor shall comply with installation and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases.
(As of publication date of this document, Fort Benning, does not have an installation mask policy in place in response to the coronavirus outbreak and IAW SecDef guidance.)
1.8.19 Key Control.
The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards.
No keys issued to the Contractor by the Government shall be duplicated.
The Contractor shall develop procedures covering key control that shall be included in the QCP.
Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
1.8.20 Lost Keys.
No keys issued to the Contractor by the Government shall be duplicated.
The Contractor shall immediately report any occurrences of lost keys/key cards to the KO in the event keys, other than master keys are lost or duplicated.
In the event a key is lost, the Contractor shall, upon direction of the KO, have the Government re-key or replace the affected lock or locks.
When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor.
In the event a master key is lost, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.8.21 Prohibited use of Government provided keys or key cards.
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees.
No keys issued to the Contractor by the Government shall be duplicated.
The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO.
1.8.22 Lock Combinations.
N/A
1.8.23 Post Award Conference/Periodic Progress Meetings.
The Contractor shall attend the post award conference convened by the Contracting Activity or Contract Administration Office as agreed upon and stated in the contract award document.
When the KO, COR and DPW management meets with the Contractor to review the Contractor's performance, written minutes of meetings will be recorded by the Government and signed by the Requirements Authority (RA) and the KO.
The written minutes will be distributed within five (5) business after the meeting.
If any party does not concur with any portion of the minutes, the non-concurrence shall be provided in writing to the KO/COR within two (2) workdays following receipt of the minutes.
Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
These meeting shall be at no additional cost to the government.
1.8.24 For contractors that do not require CAC but require access to a DoD facility or installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.8.25 OPSEC Standing Operating Procedure/Plan.
The contractor shall adhere to the Government's Operations Security (OPSEC) Standard Operating Procedure (SOP)/Plan during the entire period of performance.
1.8.26 Identification of Contractor Employees.
All contract personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties shall be required to identify themselves as contractors to avoid creating an impression in the minds of members of the public that they are government officials. They shall also ensure all documents or reports produced by the contractor are suitably marked as contractor products or that contractor participation is appropriately disclosed
1.8.27 Background Check Requirements.
Contractor/Sub-Contractor employees providing services under contracts are subject to the following process:
· Each employee (direct employee and sub-contractor employee) working under this contract who has contact with children under 18 years of age, shall be screened with the appropriate background checks as governed by the Army Directive 2014-23 “Conduct of Screening and Background Checks For Individuals Who Have Regular Contact With Children in Army Programs”, dated 10 September 2014. A copy of the Army Directive can be found at http://www.apd.army.mil/pdffiles/ad2014_23.pdf. The background check requirements for Contractors can be found in Enclosure 3 – Screening and background checks for appropriated and non-appropriated fund personnel, military personnel, foreign national employees overseas, and contractors.
· Background checks will be initiated and paid for by the Government. The cost for the pre- employment screening is the responsibility of the Contractor. The Commander Designated Entity (CDE) at the Installation supports IMCOM by coordinating, submitting, tracking child related background checks, and reviewing and compiling the results to identify whether they contain derogatory information to be passed on for a suitability determination. The CDE will advise and assist CONTRACTOR and sub- CONTRACTOR employees completing all required documents required for the background check process. CDE contact information will be provided upon contract award.
· Additional information on the background check process can be found at: http://www.opm.gov/investigations/background-investigations.
· Re-verification (IRC and FBI fingerprint check) is required every 5 years.
1.9 Government Roles and Responsibilities.
1.9.1 Contracting Officer (KO).
The KO is the only person authorized to make any changes in any of the requirements listed on this PWS; notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.
In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor.
All contract administration will be affected by the KO.
Communications pertaining to contractual administrative matters shall be addressed to the KO.
No changes in or deviations from the terms and conditions shall be affected without a written modification to the contract, executed by the KO authorizing such changes.
The KO will approve all Deliverables and plans required in this PWS.
1.9.2 Contracting Officer’s Representative (COR).
The KO will appoint a COR during the performance of this requirement.
Additional Government personnel may be designated to assist in contract oversight IAW AR 70-13 Management and Oversight of Service Acquisitions.
Other surveillance personnel may be designated as COR and shall be trained and appointed IAW DoDI 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification.
The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems.
The COR will perform IAW the responsibilities and duties identified in the appointment letter.
1.9.3 COR Authority.
A letter of designation will be issued to the COR by the KO.
A copy of the letter will be sent to the Contractor.
The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
1.9.4 COR or Designated Government Representative Functions.
The COR or designated Government representative shall monitor all technical aspects of the contract and assists in contract administration. The COR for this contract is located at Director of Public Work, 6650 Meloy Dr. Bldg. 6 Suite 313D, Fort Benning, GA, 31905.
The COR or designated Government representative is authorized to perform the following functions:
assure the Contractor performs the technical requirements of the contract.
perform inspections necessary in connection with contract performance.
maintain written and oral communications with the Contractor concerning technical aspects of the contract.
issue written interpretations of technical requirements.
monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies.
coordinate availability of Government-Furnished Property and provides direction or assistance for site entry requests of Contractor personnel.
1.10 Specific Contractor Requirements, Roles and Responsibilities.
1.10.1 U.S. Residency.
All Contractor employees shall be legal U.S. residents.
The Contractor shall immediately remove any employee that is not a legal U.S. resident.
The Contractor personnel shall be able to communicate clearly in the English language.
1.10.2 Contractor Hiring Restrictions.
The Contractor shall not hire or subcontract with off-duty or former Government employees whose employment would result in a conflict of interest as defined in DOD 5500.7-R Joint Ethics Regulation 30 August 1993, to include change dated 17 November 2011.
1.10.3 Contractor Identification.
The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees.
The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
Contractor owned/leased vehicles and trailers shall be clearly identified.
1.10.4 Standards of Conduct.
Contractor personnel’s conduct shall not reflect discredit upon the Government.
The Contractor shall ensure all personnel present a professional appearance while working on the Government installation.
The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.
The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner.
The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.
The Contractor shall ensure employee conduct complies with 41 USC §423, Procurement Integrity.
· The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
1.10.5 Contractor Key Personnel.
Contractor shall provide a resume of key personnel, who will be designated in writing, to the KO within one week of the contract award.
These key personnel shall be available during normal duty hours.
These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
1.10.6 Project Manager (PM).
The Contractor shall provide a PM who is responsible for the performance of the work.
A minimum of two (2) years of documented service contract management experience with team management and scheduling of workflow is required.
The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract.
The name and contact information of the PM shall be provided to the KO and shall be present and on-site, and available during normal duty hours.
In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
1.10.7 Quality Control Manager (QCM).
The Contractor shall designate a full time QCM on site during normal duty hours.
As a minimum, the QCM shall have at least two (2) years of documented relative grounds maintenance services experience and shall be responsible for the overall management and implementation of the Contractor's Quality Control Plan.
1.10.8 Quality Control Inspectors (QCI).
The Contractor shall designate QCI personnel sufficient to monitor Contract work to assure compliance with Government requirements.
Depending on the size of the contract, the QCM may also serve as the QCI.
1.10.9 Phase In /Phase Out Period.
The Contractor shall prepare and submit (within ten (10) business days after contract award), a Phase In/Phase Out Plan to be implemented by the Contractor (See Deliverables Schedule, paragraph 8.2).
The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency.
During the phase-in, the Contractor shall observe all operations pertinent to the requirements of the PWS.
The Contractor shall commence all operations required by this PWS by the end of phase in period.
On the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract.
During the ten (10) business day transition period immediately prior to the end of the previous contract, the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract.
The Contractor shall fully cooperate with the successor Contractor during Phase Out and the Government so as not to interfere with future work or duties.
1.11 Emergency Services.
1.11.1 Emergency Medical Treatment.
The Contractor or their employees shall immediately notify their supervisor of any incident requiring immediate emergency medical treatment.
The Government may provide 911 emergency support ambulance service and/or DoD medical facility, if available.
If injuries incurred while an employee is performing work under this contract, the contractor shall verbally notify the KO/COR no later than (NLT) two (2) hours after an emergency medical event, followed by a documented summary of events.
The Contractor shall be responsible for reimbursement of any cost of provided emergency medical treatment services provided to Contractor personnel.
Reimbursement shall be paid to the U.S. Treasury.
1.11.2 Accident Reporting.
The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact.
The Contractor shall provide a verbal report to the KO/COR within two (2) hours of each such occurrence followed up by an email documenting each such occurrence.
The Contractor shall adhere to reporting of mishaps IAW AR 385-10, The Army Safety Program (Chapter 3 Accident Investigation and Reporting, Chapter 4 Contracting Safety) and DA Pam 385-40, Army Accident Investigations and Reporting.
1.12 Environment and OSHA.
IAW para. 1.4 Scope, any apparent conflict between compliance (with such local, State, and Federal environmental and occupational safety laws, rules, and regulations) and the requirements of the contract shall be immediately brought to the attention of the KO and authorized representative(s) (i.e., Environmental Officer, Safety Officer and COR) verbally.
The Contractor shall notify the KO and authorized representative(s) via email outlining the details for each said conflict such that a final resolution is derived (See Deliverables Schedule, paragraph 8.2 Deliverable A024) The Contractor shall be liable for all fines, penalties, and costs that result from violations of, or failure to comply with para. 1.4 Scope.
1.12.1 Safety.
The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract.
The Contractor shall comply with AR 385-10, The Army Safety Program.
All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the KO to halt any and all Contractor performance until such unsafe conditions are corrected.
The Contractor shall take due caution not to endanger personnel during performance of this contract.
Upon discovery of a serious hazard such as, but not limited to, fire, or fuel spill, the Contractor shall immediately notify the KO and designated authorized representatives verbally followed up with an email notification.
1.12.2 Safety Plan.
The Contractor shall develop and implement a safety plan for its employees.
The Contractor shall submit the safety plan to the KO/COR for review and acceptance within 30 business days after contract award.
Revisions shall be submitted to the KO/COR five (5) business days prior to the effective date of change.
1.12.3 Spill Plan.
The Contractor shall comply with the Fort Benning’s Spill Prevention Control and Countermeasure Plan.
The Contractor shall submit a Spill Plan to the KO or designated Government representative/COR for approval within 30 calendar days of contract award.
The Contractor shall verbally notify the KO and COR, followed by written notification as required in the Fort Benning’s Spill Plan, if the Contractor spills or releases any hazardous substances, (i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.)
1.12.4 Asbestos Awareness.
IAW 29 CFR 1910.1101 Asbestos, all personnel that may come into contact with asbestos while performing work duties shall attend asbestos awareness training annually.
· This training course is targeted for employees who may disturb asbestos containing materials while performing normal work duties.
· This includes all grounds maintenance personnel.
1.13 Environmental Compliance.
The contractor shall implement the following environmental objectives in accordance with FAR 23.4; FAR 23.7; FAR 52.223-1 through 52.223-5; and based on EPA-issued guidance):
Maximize the utilization of environmentally preferable products.
Maximize the utilization of bio-based products. See USDA-designated items at http://www.biopreferred.gov or 7 CFR part 3201.
Maximize the reutilization of nonhazardous and recovered materials.
Promote recycling and other cost-effective waste reduction.
Eliminate or reduce the generation of hazardous waste and the need for special material processing (including special handling, storage, treatment, and disposal).
Promote energy-efficiency and water conservation.
1.13.1 Safety Data Sheets.
For materials that have Safety Data Sheets (SDS) associated with them, the Contractor shall submit the SDS to the KO or designated Government representative (i.e., COR) for approval five (5) business days after contract award.
The Contractor shall adhere to all applicable requirements of the Installation Hazardous Waste Management Plan.
The Contractor shall provide all materials, labor, training, transportation, and equipment for the handling and storage of hazardous materials or toxic materials.
PART 2
DEFINITIONS & ACRONYMS
2.0 Definitions and Acronyms.
2.1 Definitions.
Ability One Commission.
Formally known as “The Committee for Purchase for People Who Are Blind or Severely Disabled”. This is the independent Government Agency responsible for the Ability One Program. (For more information, go to website http://www.AbilityOne.gov)
Acceptable Quality Level (AQL).
The AQL is the maximum percent defective (or the number of defects per hundred units) that, for purposes of sampling inspection can be considered satisfactory.
Call Outs.
Call outs may be requested for tasks identified as a standard or enhanced service. These can include nonrecurring requests for special events, spills, and events that may be reoccurring however on an unscheduled basis such as cleaning before and after flights which do not have a set, predetermined schedule.
Child, Youth and School Services (CYS).
Overarching naming convention for Child Development Center (CDC); Youth Activity Center; and School Age Services (SAS) is Child, Youth and School, Services (CYS); shall be used when referencing all programs.
Contractor.
A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor Acquired Property (CAP).
Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Contracting Officer (KO).
A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer’s Representative (COR).
An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Deficient Service.
A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable.
Objective evidence that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Equipment.
A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
Government Furnished Property (GFP).
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Government Property.
All property owned or leased by the Government. Government property includes both Government- furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Government Project Manager.
The DPW Project Engineer/Technician assigned to manage this PWS.
Legal and Other Requirements.
Applicable Federal, State, local, DoD and Army laws, codes, regulations and other requirements.
Loss of Government Property.
Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:
Items that cannot be found after a reasonable search.
Theft Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair. Contractor shall prepare damage reports monthly and submit to COR.
Material.
Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.
Non-Personal Services.
The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non personal service contracts are authorized by the Government in accordance with FAR 37.012, under general contracting authority, and do not require specific statutory authorization.
Performance Requirements Summary (PRS).
Identifies the key service outputs of the Contractor.
Physical/Community Fitness Centers.
Physical/Community Fitness Center facilities may include a gymnasium, athletic courts, work out areas, weight rooms, showers, restrooms, locker rooms, indoor hand ball courts, whirlpool, sauna, administrative space, and storage space. Outdoor fitness/recreation facilities, indoor/outdoor swimming pools, ice- and/or roller-skating rinks, physical educational training facilities, and buildings that house a fitness center are not included.
Physical Security.
Actions that prevent the loss or damage of Government property.
Property.
All tangible property, both real and personal.
Property Records.
Records created and maintained by the Contractor in support of its stewardship responsibilities for the management of Government property.
Provide.
To furnish, as in Government-furnished property, or to acquire, as in Contractor-acquired property.
Public Traffic Areas.
Lobbies, hallways, corridors, stairwells, meeting rooms, and lavatories.
Quality Assurance.
The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP).
An organized document written by the Government specifying the surveillance methodology used for surveillance of Contractor performance.
Quality Control.
All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Real Property.
See Federal Management Regulation 102-71.20 (41 CFR 102-71.20).
Sensitive Property.
Property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.
Spill Plan.
A plan designed to identify steps to prevent a discharge of one or more hazardous substances that adversely impact, or threaten to adversely impact, human health, welfare or the environment and requires an immediate response.
Subcontractor.
One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Wide Area Workflow (WAWF).
A secure web system for electronic invoicing, receipt, and acceptance. WAWF allows Government vendors to submit and track invoices and receipt/acceptance documents over the web and allows Government personnel to process those invoices in a real-time, paperless environment.
Workday.
The number of hours per day the Contractor provides services in accordance with the contract.
Work Week.
Monday through Friday, unless specified otherwise (Installation specific or as defined by the Collective Bargaining Agreement).
2.2 ACRONYMS.
| ACC | Army Contracting Command |
| ACOR | Alternate Contracting Officer's Representative |
| ANSI | American National Standards Institute |
| AQL | Acceptable Quality Level |
| AR | Army Regulation |
| ATO | Anti-Terrorism Officer |
| CDC | Child Development Center |
| CFE | Contractor Furnished Equipment |
| CFR | Code of Federal Regulations |
| CLIN | Contract Line-Item Number |
| CLS | Common Levels of Support |
| COR | Contracting Officer’s Representative |
| DA | Department of the Army |
| DoD | Department of Defense |
| DPW | Directorate of Public Works |
| FAR | Federal Acquisition Regulation |
| FIPS | Federal Information Processing Standards |
| FPCON | Force Protection Condition |
| GFM | Government-Furnished Material |
| HQDA | Headquarters Department of the Army |
| HSPD | Homeland Security Presidential Directive |
| IG | Inspector General |
| KO | Contracting Officer |
| N/A | Not Applicable |
| NLT | Not Later Than |
| OCONUS | Outside Continental United States (includes Alaska and Hawaii) |
| OPSEC | Operational Security |
| OSHA | Occupational Safety and Health Administration |
| PAM | Pamphlet |
| PM | Project Manager |
| POC | Point of Contact |
| PoP | Period of Performance |
| PRS | Performance Requirements Summary |
| PWS | Performance Work Statement |
| QA | Quality Assurance |
| QAP | Quality Assurance Program |
| QASP | Quality Assurance Surveillance Plan |
| QC | Quality Control |
| QCP | Quality Control Plan |
| SDS | Safety Data Sheets |
| SF | Square Foot |
| TARP | Threat Awareness and Reporting Program |
| TE | Technical Exhibit |
| VIP | ‘Very Important Person |
| WAWF | Wide Area Workflow |
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 Government Furnished Property, Equipment and Services.
3.1 Property.
The Government will provide two (2) laydown areas for this contract. These areas are necessary for the contractor staff to provide the support outlined in this PWS. These areas will provide a place to store and maintain tractors, mowers, trailers, equipment, an office environment and security. Any facilities provided shall be secured, maintained and cleaned by the Contractor.
3.2 Equipment.
The Government will not provide desk space, telephones, computers, and other items necessary to maintain an office environment. The contractor is responsible providing these items.
3.3 Services.
The government will provide Police and fire protection when working on Fort Benning, Georgia.
Emergency medical services (see section 1.11)
3.4 Utilities.
The Government will provide on a reimbursable basis, water, solid…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .