Module_1,_Phase_4_and_5_Closure,_and_Module_4,_Phase_2_Base_Liner_System_(Addendum_#5_Revision).pdf
PDF 310 KB Posted
- Solicitation number
- 4561
- Issued by
- California
About this file
This is a Notice to Contractors issued by Sacramento County for the Module 1, Phase 4 and 5 Closure, and Module 4, Phase 2 Base Liner System project. The contract involves furnishing labor, materials, equipment, and work necessary to complete landfill closure and base liner system construction at the Kiefer Landfill. The project has a mandatory pre-bid meeting on August 25, 2022, at 10:00 am, and requires electronic bid submissions by September 22, 2022, at 2:00 pm. The estimated construction cost is $25,878,048.00, and contractors must have a General Engineering Contractor, Class A license. An early completion incentive of $500,000 is available, and the project involves extensive work including waste excavation, recompaction, cover placement, liner system construction, and various infrastructure modifications.
The pricing proposal is structured as a base bid with multiple line items covering activities such as mobilization, site preparation, excavation, material placement, erosion control, seeding, downdrain installation, gas well modifications, and geosynthetic liner systems. Bidders must submit a bid guarantee of at least 10% of the bid amount, either as a bid bond, certified check, or cash. Additional requirements include compliance with the Labor Compliance Program, prevailing wage regulations, and California Senate Bill 1383 on short-lived climate pollutants. Contractors must also complete non-collusion declarations, provide subcontractor information, and verify their Department of Industrial Relations registration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO CONTRACTORS
MODULE 1, PHASE 4 AND 5 CLOSURE, AND MODULE 4, PHASE 2
BASE LINER SYSTEM
County of Sacramento
9660 Ecology Lane
Sacramento, CA 95827
RELEASE DATE: August 18, 2022
DEADLINE FOR QUESTIONS: September 7, 2022
RESPONSE DEADLINE: September 22, 2022, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/%7bproject.government.code%7d
County of Sacramento
NOTICE TO CONTRACTORS
Module 1, Phase 4 and 5 Closure, and Module 4, Phase 2 Base Liner
System
I. Introduction II. Notice to Contractors
III. Pricing Proposal IV. Vendor Submissions
Attachments:
A - 2022-04-01 Kiefer Landfill Module 4, Phase 2 CQA Plan
B - 2022-08-11 M1, P4 and 5 Final Closure CQA Plan
C - 2022-08-18 M4, Ph 2 and M1, Ph 4 and 5 Contract Specifications
D - 2022-08-17 M4P2 Base Liner, and M1, P4 and 5 Final Cover Plans
E - Environmental Purchasing Policy and Attachments
Notice to Contractors #4561 Title: Module 1, Phase 4 and 5 Closure, and Module 4, Phase 2 Base Liner System
1. INTRODUCTION
1.1. Summary
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.
1.2. Contact Information
Rachel Davis
Senior Engineer
Email: davisrac@saccounty.gov
Phone: (916) 876-9425
Department:
Waste Management and Recycling
Department Head:
Keith Goodrich
Interim Director
1.3. Timeline
Release Project Date August 18, 2022
Pre-Bid Meeting (Mandatory) August 25, 2022, 10:00am
Agenda
Engineering Building Conference Room, 12701
Kiefer Blvd, Buliding B, Sloughhouse, CA 95683
Question Submission Deadline September 7, 2022, 2:00pm
Question Response Deadline September 12, 2022, 2:00pm
Bid Submission Deadline September 22, 2022, 2:00pm mailto:davisrac@saccounty.gov tel:(916)876-9425 https://government-project.s3.amazonaws.com/24971/8d85c48b-db47-4b00-9af3-6ac0787ee24e_2022-08-25_Prebid_Meeting_Agenda.pdf
Bid Opening September 22, 2022, 2:00pm
2. NOTICE TO CONTRACTORS
2.1. ADVERTISEMENT SUMMARY
Notice is hereby given that the Board of Supervisors of the County of Sacramento will receive sealed bids for the following project:
Bid Date: Thursday, September 22, 2022
Submit Bids To: COUNTY OF SACRAMENTO. SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO
COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT
THEIR BID ONLINE NO LATER THAN 2:00 PM ON THE DAY OF THE BID. BID OPENING(S) WILL BE ONLINE
AT 2:00 PM AT THE FOLLOWING LINK: SACCOUNTYEBIDS.
Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to SacCountyEbids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder’s submission. See this training guide for assistance in entering your online response.
FOR: Module 1, Phase 4 and 5 Closure, and Module 4, Phase 2 Base Liner System
CONTRACT NUMBER: 4561
ESTIMATED CONSTRUCTION COST: $25,878,048.00
CONTRACTOR LICENSE REQUIRED: General Engineering Contractor, Class A
PRE-BID QUESTIONS DUE VIA Q&A: Date: Wednesday, September 7, 2022 No later than: 2:00 pm
PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: Construction of a section of base liner system for the landfill (Module 4, Phase 2), and construction of a section of final cover for the landfill
(Module 1, Phase 4 and 5).
CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to
Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the
Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project.
• Contract Documents are available at: SacCountyEbids
• The Standard Construction Specifications, which are incorporated by reference in the Contract
Documents, may be downloaded at: https://saccountyspecs.saccounty.gov/Pages/default.aspx.
2.2. MANDATORY PRE-BID MEETING
A mandatory pre-bid meeting will be held on Thursday, August 25, 2022, at 10:00 am, Engineering
Building Conference Room, 12701 Kiefer Blvd, Buliding B, Sloughhouse, CA 95683. The project engineers will be present to provide a project summary and to answer questions.
https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training https://secure.procurenow.com/portal/saccounty https://saccountyspecs.saccounty.gov/Pages/default.aspx
Attendance of the Pre-Bid Conference is MANDATORY for this project. The mandatory pre-bid conference and walk-through will be held for the purpose of reviewing questions regarding the project.
A representative of the prime Contractor must be in attendance and sign the log. A representative of the
County will be present to review the project with the bidders, allow bidders to walk the site and to answer questions. Bids received from bidders who do not attend this meeting will be deemed non-responsive.
2.3. BID GUARANTEES
Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the
Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.
2.4. BONDS
The successful bidder shall be required to execute a material and labor Payment Bond and Performance
Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.
Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The
Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract.
2.5. LICENSE REQUIREMENTS
Award of this contract requires a valid California contractor's license with the classification identified above.
Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor’s license number on the bid form.
No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5.
2.6. LABOR COMPLIANCE PROGRAM
The County of Sacramento received final approval from the Director of California Department of
Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor
Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work.
This is a Construction project in accordance with Labor Code section 1771.5.
Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the
Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700
Goethe Road, Suite D, Sacramento, CA 95827, and are also available at http://www.dir.ca.gov/DLSR/PWD.
2.7. QUESTIONS
Direct pre-bid questions to the Project Manager, Rachel Davis, via the Q&A tab in the portal. ALL PRE-
BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Wednesday, September 7, 2022 BY
2:00 pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents.
The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.
By order of the Board of Supervisors of the County of Sacramento, Sacramento County, California, dated: 08/09/22.
Clerk of the Board
County of Sacramento
2.8. CALIFORNIA SB 1383, Short-lived Climate Pollutants
CONTRACTOR’s failure to comply with relevant SB 1383 regulations, effective January 1, 2022, to include reporting requirements in the provision of Recycled-Content Paper Products and/or Printing and Writing
Paper and/or Recovered Organic Waste Material is a material breach of this Contract. CONTRACTOR shall be required to submit SB 1383 compliance reports to the County as directed. Reports must be submitted to: sb1383reports@saccounty.gov.
Information on SB1383 can be found here: California’s Short-Lived Climate Pollutant Reduction Strategy mailto:sb1383reports@saccounty.gov https://www.calrecycle.ca.gov/organics/slcp/
3. PRICING PROPOSAL
Note for Contractors:
Basis of Award is Base Bid Only
Early Completion Incentive applies: $500,000. See Special Provisions for details.
BASE BID
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Mobilization/Demobilization 1 LS
2 Prepare Stormwater Pollution
Prevention Plan
1 LS
3 Health & Safety 1 LS
4 Traffic Control 1 AL $100,000.00
5 Layout of Work and Surveys 1 LS
6 Clearing and Stripping 103 AC
7 Selective Demolition 1 LS
8 Waste Excavation and Relocation for
Module 1, Phase 4& 5 Partial Final
Closure
57,900 CY
9 Recompaction of Existing Intermediate
Cover
1,431,000 SF
10 Excavation and Placement of
Evapotranspirative (ET) Cover
(Suitable)
451,000 CY
11 Excavation of Stockpile B and
Placement of ET Cover (Suitable)
87,000 CY
12 Excavation and Placement of Material to Stockpile C (Unsuitable)
690,000 CY
13 Excavation and Placement of Material to Stockpile D (Sand)
92,300 CY
Line Item Description Quantity Unit of
Measure Unit Cost Total
14 Excavation and Placement as
Engineered Fill
11,600 CY
15 Excavation and Placement of Material to Stockpile G (Operations Cover)
1,000 CY
16 Erosion Control Mat 196,000 SF
17 Module 1, Phase 4 and 5 and Module 1
Mid-Slope Bench Final Cover Seeding
63 AC
18 18"Ø CMP Downdrain 450 LF
19 30"Ø CMP Downdrain 490 LF
20 Module 1 Mid-Slope Bench 5,800 CY
21 Grouted Rock Slope Protection 300 TN
22 Extension of Existing Gas Wells 67 EA
23 Landfill Gas System Maintenance and
Modifications
1 LS
24 Settlement Monuments 11 EA
25 Class 2 Aggregate Base 360 TN
26 Woven Geotextile 9,700 SF
27 Over-Excavation of Unsuitable
Material - Base
2,000 CY
28 Over-Excavation of Unsuitable
Material - Side Slope
1,300 CY
29 Waste Excavation at Existing Module 4, Phase 1 Liner Termination
200 CY
30 Liner Subgrade Preparation 1,175,000 SF
31 Geosynthetic Clay Liner 1,771,000 SF
Unit Cost Total
32 60-mil Double-Sided Textured HDPE
Geomembrane
1,076,000 SF
33 60-mil Single-Sided Textured HDPE
Geomembrane
727,400 SF
34 Geocomposite 538,000 SF
35 8 oz/sy Nonwoven Geotextile Filter 552,600 SF
36 12 oz/sy Nonwoven Geotextile Cushion 523,400 SF
37 Soil Operations Layer - Base 38,600 CY
39 Screen and Stockpile Future Soil
Operations Layer - Side Slope
48,800 CY
40 Gravel Drainage Layer 20,500 CY
41 Geosynthetic Ballast System 571,900 SF
42 Phase 1/ 2 Liner Tie-In 890 LF
43 Phase 1/ 2 Side Slope Liner Tie-in 390 LF
44 Phase 1/ 2 Eastern Side Slope Liner Tie-in
55 LF
45 Perimeter Anchor Trench 1,880 LF
46 Eastern Liner Termination 990 LF
47 Internal Bench Anchor Trench 1,610 LF
48 Temporary Side Slope Liner
Termination
250 LF
49 3"Ø SDR-11 Perforated HDPE Pipe 1,270 LF
50 4"Ø Solid Corrugated HDPE Drain Pipe 1,720 LF
Unit Cost Total
51 4"Ø Perforated Corrugated HDPE Drain
Pipe
310 LF
52 6"Ø SDR-11 Solid HDPE Pipe 990 LF
53 6"Ø SDR-11 Perforated HDPE Pipe 3,350 LF
54 Drainage Channel 730 LF
55 Rock Slope Protection 790 TN
56 Module 4, Phase 2 and Stockpile Areas
Hydroseeding
30 AC
57 Excavation and Placement as
Engineered Fill Berm
450 CY
58 Straw Wattles 11,000 LF
59 Geoelectric Leak Location Survey
Support
1 LS
60 18"Ø Corrugated HDPE Downdrain 340 LF
61 24"Ø Corrugated HDPE Downdrain 170 LF
62 Module 1 Final Cover Seeding 4 AC
63 Vertical Landfill Gas Well Installation 390 LF
64 Landfill Gas Well Destruction 251 LF
65 Landfill Gas Borehole Abandonment 100 LF
66 Early Completion Incentive (Refer to
Special Provisions, 1.09)
1 AL $500,000.00
TOTAL
4. VENDOR SUBMISSIONS
4.1. What form of Bid Guaranty will Contractor be submitting?*
Bid security must be a bidder bond, a certified check or cashier’s check payable to the Treasurer of the
County of Sacramento, or cash. Bids secured by personal checks or personal guarantees will be rejected.
☐ Scanned copy of Fully Executed Bid Bond
☐ E-bid Bond (Use Surety 2000)
☐ Cashier's or Certified Check
☐ Cash
*Response required
4.2. Bid Guaranty
Upload a scanned copy of your fully executed bid bond here if Contractor is submitting a scanned bid bond.
3. E-Bid Bond
Please enter your Bid Bond information from Surety2000 below If Contractor is submitting an E-Bid
Bond
4.3. Non-collusion Declaration*
The undersigned declares:
I am an authorized representative with binding authority for my company, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the date this bid is submitted.
☐ Please confirm
*Response required
4.4. Designation of Subcontractors - Unit Price Contracts*
Please download the below documents, complete, and upload.
• Designation_of_Subcontracto...
*Response required
4.5. Iran Contracting Act Disclosure Form *
(California Public Contract Code, sections 2202-2208)
When responding to a bid or proposal or executing a contract or renewal for a County of Sacramento contract for goods or services of $1,000,000 or more, a vendor must either:
A. certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section
2203(b) and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS; or
B. demonstrate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code section 2203(c) or (d).
To comply with this requirement, please select one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of
$250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)
OPTION #1 - CERTIFICATION
I certify I am duly authorized to execute this certification on behalf of the vendor/financial institution, and the vendor/financial institution is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person/vendor, for 45 days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.
OPTION #2 – EXEMPTION
Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid https://government-project.s3.us-west-2.amazonaws.com/14260/24ab65cf-a692-47a7-9030-a6d3f30d6ea3_Designation_of_Subcontractors_Form.pdf?AWSAccessKeyId=AKIAJX4CP36AEOP5JL2A&Expires=1663441103&Signature=sQef06vauY2virDxpwsWigi%2FrJU%3D&response-content-disposition=attachment%3B%20filename%3D%22Designation_of_Subcontractors_Form.pdf%22 on, submit a proposal for, or enters into or renews, a contract for goods and services. If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please select
"EXEMPTION" below, and attach documentation demonstrating the exemption approval with your electronic submission.
☐ Certification
☐ Exemption
*Response required
4.6. Type of Business*
☐ C Corporation
☐ S Corporation
☐ Limited Liability C Corporation
☐ Partnership
☐ Limited Liability Partnership
☐ Sole Proprietor/Individual
☐ Other
*Response required
4.7. Type your Legal Company Name Here*
State your Company's Name Here. This will be verified against the California Secretary of State's
Website.
*Response required
4.8. Contractors State License Board (CSLB) Number*
Please enter your License Number here. This will be verified against the state database
*Response required
4.9. Contractors State License Board (CSLB) Expiration Date & Classifications*
Expiration Date:
Classification(s):
*Response required
4.10. California Department of Industrial Relations Registration*
Please enter your Public Works Contractor Registration Number. This will be verified against the state database.
*Response required
4.11. Please provide the full contact name, title, and e-mail of the signatory for your firm. If awarded, please provide contact information (i.e. Full Name, E-mail address, phone number) for the Contract Manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy.**
*Response required
4.12. I hereby certify under penalty of perjury that the above statements are true.*
☐ Please confirm
*Response required
File details come from the government source that posted it. Updated .