Mobile_Breathing_Air_Cascade_System_(Re-Bid).pdf

PDF 481 KB Posted

Attached to
Mobile Breathing Air Cascade System (Re-Bid)
Solicitation number
2025-11.
Issued by
Hidalgo County, Texas

About this file

This is a Request for Bids (RFB) issued by the City of Edinburg, Texas for a Mobile Breathing Air Cascade System through a grant from the Office of the Governor's FY 2025 Border Zone Fire Departments (BZFD) Grant #5172701. The solicitation seeks a comprehensive mobile breathing air system to be mounted in a 7'x12' enclosed trailer, including a Bauer H25-D compressor, BAS Mod CS6-4 Cascade/Storage System, two-position containment fill station, electronic carbon monoxide monitor, and related components. The bid was released on April 23, 2025, with a pre-bid meeting scheduled for April 30, 2025, and responses due by May 13, 2025, at 3:30 pm. The system must meet specific technical specifications for emergency operations, including the ability to refill SCBA cylinders and provide high-pressure breathing air.

The pricing proposal is structured as a line-item bid with nine separate items, including the trailer, compressor, cascade system, filling station, CO monitor, delivery, testing, warranty, and overall delivery. The bid includes various legal and procedural requirements, such as compliance with Texas House Bills 89, 13, and 19, which address restrictions on contracting with companies that boycott Israel, energy companies, or firearm entities. The supplier must provide product liability insurance of at least $1 million, a one-year warranty, and be capable of providing factory-trained technicians for service. The system is funded through a state grant and is designed to enhance the Edinburg Fire Department's emergency response capabilities by providing a mobile high-pressure breathing air system.

View the file

Other files

File Type Posted
Rules_for_Electronic_Bidding_.pdf PDF
Bidders_List_-_Mobile_Cascade_System.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR BIDS

2025-11.

MOBILE BREATHING AIR CASCADE SYSTEM (RE-BID)

City of Edinburg

415 W. University Drive

Edinburg, TX 78541

RELEASE DATE: April 23, 2025

DEADLINE FOR QUESTIONS: May 5, 2025

RESPONSE DEADLINE: May 13, 2025, 3:30 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/cityofedinburg https://secure.procurenow.com/portal/%7bproject.government.code%7d

City of Edinburg

REQUEST FOR BIDS

Mobile Breathing Air Cascade System (Re-Bid)

I. Introduction II. Legal Notice

III. Instructions, Terms and Conditions IV. Specifications V. Vendor Questionnaire

VI. Pricing Proposal

Request for Bids #2025-11.

Title: Mobile Breathing Air Cascade System (Re-Bid)

1. Introduction

1.1. Summary

The Edinburg Fire Department has been approved for a grant through the Office of the Governor (OOG)

FY 2025 Border Zone Fire Departments (BZFD) Grant #5172701. The purpose of this purchase is for a

Mobile Breathing Air Cascade System mounted within a cargo trailer. The system must be capable of supplying high-pressure breathing air for refilling SCBA cylinders and support emergency operations. The system must include a six (6) bank cascade system, proper breathing air compressor, control panel, fill stations with blast protection, air reels for quick fill connections and custom graphics.

1.2. Contact Information

Project Contact:

Maricruz Tovar

Emergency Management Planner

212 W. McIntyre

Edinburg, TX 78539

Email: mtovar@cityofedinburg.com

Phone: (956) 383-7691

Procurement Contact:

Criselda Lozano

Purchasing Manager

415 W. University Drive

Edinburg, TX 78541

Email: clozano@cityofedinburg.com

Phone: (956) 388-8964

Department:

Fire

Department Head:

Omar Garza

Chief of Fire

1.3. Timeline

Release Project Date April 23, 2025 mailto:mtovar@cityofedinburg.com tel:(956)383-7691 mailto:clozano@cityofedinburg.com tel:(956)388-8964

Pre-Bid Meeting (Non-Mandatory) April 30, 2025, 3:00pm

A Pre-Bid Meeting will be held via zoom:

https://cityofedinburg.zoom.us/j/89676594653?p wd=WUEmmOyVaLZhRtxNbTeI7uBNK6x8OE.1

Meeting ID: 896 7659 4653

Passcode: 749856

Question Submission Deadline May 5, 2025, 5:00pm

Proposal Submission Deadline May 13, 2025, 3:30pm https://cityofedinburg.zoom.us/j/89676594653?pwd=WUEmmOyVaLZhRtxNbTeI7uBNK6x8OE.1 https://cityofedinburg.zoom.us/j/89676594653?pwd=WUEmmOyVaLZhRtxNbTeI7uBNK6x8OE.1

2. Legal Notice

2.1. Notice to Respondents

The City of Edinburg is soliciting competitive sealed bids from qualified vendors for Mobile Breathing Air

Cascade System (Re-Bid)

Sealed Bids should be submitted electronically or received by the City Secretary’s Office no later than:

3:30 pm, Tuesday, May 13, 2025.

All sealed bids should be received either electronically or at the designated location or by the deadline shown above. Bids received after the deadline will not be considered for the award of the contract and shall be considered void and unacceptable.

All bids will be opened and bidder's names publicly read aloud promptly in the City Hall Community

Room, 1st Floor, at 415 W. University Dr. Edinburg, TX 78539 at 3:30 pmon Tuesday, May 13, 2025

To obtain a copy of the Invitation to Bid or submit an electronic proposal please visit:

https://procurement.opengov.com/portal/cityofedinburg

If a Bidder chooses to submit a Hard Copy Bid, it must be delivered in a sealed envelope, with a return address and clearly marked "City of Edinburg Bid 2025-11." to the City Secretary's Office prior to the bid opening date and time. The receiving time in the City Secretary's Office will be the governing time for acceptability of the bids. The Bidder's firm name shall appear on the outside of the envelope.

Submit Bids To:

If submitting Electronic:https://procurement.opengov.com/portal/cityofedinburg

If Hand-Delivering Bids: 415 W. University Drive c/o City Secretary Department (1st Floor)

Bids will not be accepted by telephone or facsimile machine. All bids must bear original signatures and figures.

If you have any questions o require additional information regarding this bid, you may contact Veronica

Gutierrez, Purchasing Specialist II, please submit your questions via OpenGov at the website listed above no later than 5:00 pm on Monday, May 5, 2025.

The City of Edinburg reserves the right to refuse and reject any or all Bids and to waive any or all formalities or technicalities and to accept the Bid deemed most advantageous to the City, and hold the

Bids for a period of 60 days without taking action.

The City of Edinburg reserves the right to refuse and reject any or all Bids and to waive any or all formalities or technicalities and to accept the Bid deemed most advantageous to the City, and hold the Bids for a period of 60 days without taking action.

Any entity choosing to bid on this project must adhere to federal regulations found at 2 CFR Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, as applicable.

https://procurement.opengov.com/portal/cityofedinburg

Any entity choosing to bid or provide proposals on Federally Funded projects must be currently REGISTERED and ACTIVE in the System for Awards Management (SAM) database, at the time of bid opening. The entity’s Unique Entity Identification (UEI) Number must be submitted with the bid/proposal documents as instructed. Immediately after the bid opening takes place, the City will enter the respondents UEI number into the SAM database search engine. If the respondent is not in ACTIVE status on the database, the bid will be deemed non-responsive and disqualified from consideration of award. Entity registration may be completed at www.sam.gov. All contractors and/or subcontractors who are debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project.

http://www.sam.gov/

3. Instructions, Terms and Conditions

3.1. Instructions to Bidders

PURPOSE

The purpose of these solicitation documents is to provide a Bids for: Mobile Breathing Air Cascade

System (Re-Bid)

The SERVICES/ITEMS to be furnished under this bid shall be as specified in these bid documents. All specifications/requirements shown are minimum. There is no intention to disqualify any bidder who can meet these specifications/requirements.

SUBMITTAL OF "HARD COPY" BID

If submitting a Hard Copy Bid, it must be submitted in a sealed envelope by the vendor. Submit two (2) complete sets of the bid, one (1) original marked "ORIGINAL" and one (1) digital copy in a flash drive.

Each mid must be completely filled out and SUBMITTED IN ORIGINAL FORM complete with all the supporting documentation

If Hand-Delivering Bids: 415 W. University Drive c/o City Secretary Department (1st Floor)

If submitting Electronic:https://procurement.opengov.com/portal/cityofedinburg

PREPARATION OF BID

Bids MUST give full firm name and address of bidder, and be manually signed. Failure to do so will disqualify your bid. Person signing bid must show title or AUTHORITY TO BIND HIS/HER FIRM IN A

CONTRACT. Firm name and authorized signature must appear on each page that calls for this information. The legal status of the Respondent/Bidder whether corporation, partnership, or individual, shall also be stated in the bid. A corporation shall execute the bid by its duly authorized officers in accordance with its corporate by-laws and shall also list the state in which it is incorporated. A partnership Respondent/Bidder shall give full names and addresses of all partners. All partners shall execute the bid. Partnership and Individual Respondent/Bidder shall state in the bid the names and addresses of all persons with a vested interest therein. The place of residence of each

Respondent/Bidder, or the office address in the case of a firm or company, with county and state and telephone number, shall be given after the signature.

DEVIATION FROM SPECIFICATION

Please read your specifications/requirements thoroughly and be sure that the SERVICES/ITEMS offered comply with all specifications/requirements. Any variation from the specifications/requirements must be clearly indicated by letter attached to your bid referencing variations on a point-by-point basis. If no exceptions are noted, and you are the successful bidder, it will be required that the SERVICES/ITEMS be provided as specified.

ALTERATIONS/AMENDMENTS TO BID

Bids CANNOT be altered or amended after opening time. Alterations made before opening time must be initialed by bidder guaranteeing authenticity. No bid may be withdrawn after opening time without acceptable reason in writing and only after approval by the City of Edinburg.

SALES TAX

State sales tax must not be included in the bid.

SUBSTITUTIONS

No substitutions or cancellations will be permitted without written approval of City of Edinburg.

NO BID RESPONSE

If unable to submit a bid, bidder should return inquiry giving reasons.

EXCEPTIONS

Any additions, deletions, or variations from the following specifications/requirements must be noted.

The bidder shall attach to his/her bid sheet a list of any exceptions to the specifications/requirements if unable to do so, on specification sheet.

BRAND OR MANUFACTURER REFERENCE

Unless otherwise specified, any catalog or manufacturer’s reference or brand name used in describing an item is merely descriptive, and not restrictive, and is used only to indicate type and style of product desired. Bids on alternate brands will be considered if they meet specification requirements. If a bidder quotes on equipment other than the one(s) specified in the bid, sufficient specifications and descriptive

(pictured literature) data must accompany same to permit thorough evaluation. In the absence of these qualifications, he/she will be expected to furnish the product called for.

DELIVERY

Number of days required to deliver/perform SERVICES/ITEMS after receiving order must be stated in the bid. Failure to so state will obligate bidder to complete service delivery within ONE day.

DELAY IN SERVICE DELIVERY

When delay can be foreseen, Bidder shall give prior notice to City of Edinburg. Bidder must keep City of

Edinburg advised at all times of status of order. Default in promised service delivery (without acceptable reasons) or failure to meet specifications/requirements, authorizes the City of Edinburg to purchase such SERVICES/ITEMS elsewhere and charge increase in cost to defaulting vendor. Acceptable reasons for delayed delivery are as follows: Acts of God (floods, tornadoes, hurricanes, etc.), acts of government, fire, strikes, war; Actions beyond the control of the successful bidder.

SERVICE DELIVERED PRICING

Bids in units of quantity specified - extend and show total. In the event of discrepancies in extension, unit prices will govern. Bids subject to unlimited price increase will not be considered.

RIGHT TO REJECT/AWARD

The City of Edinburg reserves the right to refuse and reject any or all Bids, and to waive any or all formalities or technicalities, and to make such awards of contract as may be deemed to be the best and most advantageous to the City of Edinburg.

MULTIPLE VENDOR CONTRACTS

Bidders are advised that the City of Edinburg may award Service Contracts to multiple vendors based on low bid per item basis. All items specified on the “Bid Form” must reflect the individual unit prices. The

City of Edinburg reserves the right to award all items individually or in any combination thereof.

INDEMNIFICATION CLAUSE

The Bidder agrees to indemnify and save harmless the City, from all suits and actions of every nature and description brought against them or any of them, for or on account of the use of patented appliances, products or processes, and he shall pay all royalties and charges which are legal and equitable. Evidence of such payment or satisfaction shall be submitted upon request of the Purchasing

Manager, as a necessary requirement in connection with the final estimate for payment in which such patented appliance, products or processes are used.

ADDENDA

Bidder shall carefully examine the bid forms, specifications/requirements, and instructions to Bidders.

Should the bidder find discrepancies in, or omissions from bid forms, specifications/requirements, or other documents, or should he/she be in doubt as to their meaning, he/she should request an interpretation via the OpenGov portal:https://procurement.opengov.com/portal/cityofedinburg and obtain clarification by addendum prior to submitting any bid. Explanations, interpretations, and supplemental instructions shall be in the form of written Addenda which shall become a part of the

Contract documents. Said Addenda shall be available through the e-procurement portal or e-mailed to all prospective Bidders. All Addenda issued in respect to this project shall be considered official changes to the original bid documents. Verbal statements in response to inquiries and/or requests for explanations shall not be authoritative nor binding. It shall be the Bidder(s) responsibility to ensure that they have received all Addenda in respect to this project. Furthermore, Bidders are advised that they must recognize, comply with, and attach a signed copy of each Addendum which shall be made part of their Bid Submittal. Bidder(s) signature on Addenda shall be interpreted as the bidder’s “recognition and compliance to” official changes as outlined by the City of Edinburg and as such are made part of the original solicitation documents. Failure of any bidder to receive any such addendum or interpretation shall not relieve such Bidder from its terms and requirements. The City may issue a written addendum no later than five calendar days prior to the date bids must be received. Addendums are available online at https://procurement.opengov.com/portal/cityofedinburg

PAYMENT

The City of Edinburg will execute payment by mail in accordance with the State of Texas Pay Law after

SERVICES/ITEMS have been provided and invoiced. No other method of payment will be considered.

SYNONYM

Where in this bid package SERVICES/ITEMS is used, its meaning shall refer to the Mobile Breathing Air

Cascade System (Re-Bid) as specified.

ASSIGNMENT

Neither the Bidder’s contract nor payment due to an awarded vendor may be assigned to a third party without the written approval of the Purchasing Department for the City of Edinburg.

BIDDER’S EMPLOYEES

Neither the Bidder nor his/her employees engaged in fulfilling the terms and conditions of this Purchase

Contract shall be considered employees of the City. The method and manner of performance of such undertakings shall be under the exclusive control of the vendor on contract. The City shall have the right of inspection of said undertakings at any time.

INTERPRETATIONS

Any questions concerning the conditions and/or specifications/requirements with regards to this solicitation for Bids shall be directed to the designated individuals as outlined in the Request for Bids.

Such interpretations, which may affect the eventual outcome of this request for Bids, shall be furnished in writing to all prospective Bidders via Addendum. No interpretation shall be considered binding unless provided in writing by the City of Edinburg in accordance with paragraph entitled “Addenda”.

STATUTORY REQUIREMENTS

It shall be the responsibility of the successful Bidder to comply with all applicable State & Federal laws, Executive Orders and Municipal Ordinances, and the Rules and Regulations of all authorities having jurisdiction over the work to be performed hereunder and such shall apply to the contract throughout, and that they will be deemed to be included in the contract as though written out in full in the contract documents. (To include issues related to health, environmental, and safety to name a few.)

RIGHT TO WAIVE

City of Edinburg reserves the right to waive or take exception to any part of these specifications/requirements when in the best interest of the City of Edinburg.

COOPERATIVE PRICING

Bidders are advised that in addition to responding to our “local” solicitation for bids/Bids with Dealer pricing, vendors/contractors are encouraged to provide pricing on the below referenced items/products/services based on BuyBoard, TX-MAS, H-GAC and/or any other State of Texas recognized and approved cooperative which has complied with the bidding requirements for the State of Texas. If bidding other than or in addition to “dealer” pricing, kindly duplicate the bid forms for each bid being provided from a cooperative contract. Any and all applicable fees must be included. All cooperative pricing must be submitted on or before bid opening date and hour.

VALID BID TIME FRAME

The City of Edinburg may hold bids 60 days after the opening of Bids without taking action. Bidders are required to hold their Bids firm for same period of time.

PREPARATION OF BID

The City of Edinburg shall not be held liable for any costs incurred by any bidder for work performed in the preparation of and production of a bid or for any work performed prior to execution of contract.

CONFIDENTIAL INFORMATION

Any information deemed to be confidential by the bidder should be clearly noted on the pages where confidential information is contained; however, the City cannot guarantee that it will not be compelled to disclose all or part of any public record under Texas Public Information Act, since information deemed to be confidential by the bidder may not be considered confidential under Texas Law, or pursuant to a

Court order.

VERBAL THREATS

Any threats made to any employee of the City, be it verbal or written, to discontinue the providing of item/material/services for whatever reason and/or reasons shall be considered a breach of contract and the City will immediately sever the contract with the Vendor on contract.

MATHEMATICAL ERRORS

In the event that mathematical errors exist in any bid unit prices/rates will govern.

AUDIT

The City of Edinburg reserves the right to audit the vendor’s books and records relating to the performance of this contract. The City of Edinburg, at its own expense, shall have the right at all reasonable times during normal business hours and upon at least twenty-four (24) hours’ advance notice, to audit, to examine, and to make copies of or extracts from the books of account and records maintained by the vendor(s) with respect to the Supply/Service and/or Purchase Contract. If such audit shall disclose overpayment by City to vendor, written notice of such overpayment shall be provided to the vendor and the amount of overpayment shall be promptly reimbursed by vendor to the City. In the event any such overpayment is not paid within ten (10) business days after receipt of such notice, the unpaid amount of such overpayment shall bear interest at the rate of one percent (1%) per month from the date of such notice until paid.

PAST PERFORMANCE

Vendor’s past performance shall be taken into consideration in the evaluation and award of Service

Contract for the Purchase of SERVICES/ITEMS.

JURISDICTION

Contract(s) executed as part of this solicitation shall be subject to and governed under the laws of the

State of Texas. Any and all obligations and payments are due and performable and payable in Hidalgo

County, Texas.

VENUE

The parties agree that venue for purposes of any and all lawsuits, cause of action, arbitration, and/or any other dispute(s) shall be in Hidalgo County, Texas.

CONSIDERATION OF LOCATION OF BIDDER'S PRINCIPAL PLACE OF BUSINESS

The City may give local vendors, whose principal place of business is located within the City of Edinburg, and whose bid is within five percent (5%) of the lowest bid price preference as allowed by Section

271.9051 of the Local Government Code.

AWARD

For purposes of this project, award will be contingent on approval of budget.

CONSIDERATION OF LOCATION OF BIDDER'S PRINCIPAL PLACE OF BUSINESS

The City may give local vendors, whose principal place of business is located within the City of Edinburg, and whose bid is within five percent (5%) of the lowest bid price preference as allowed by Section

271.9051 of the Local Government Code.

SPECIAL CIRCUMSTANCES

In the event that the City of Edinburg has an immediate need for a particular service(s) that is/are on contract and the successful vendor on contract is not able to meet the special service delivery needs of the City of

Edinburg, the City of Edinburg reserves the right to purchase such services elsewhere to fulfill its’ immediate need.

TERMINATION OF CONTRACT

The City of Edinburg reserves the right to terminate the contract if, in the opinion of the City of

Edinburg, the successful vendor’s performance is not acceptable, if the City is being repeatedly over charged, improperly charged, no funds are available, or if the City wishes, without cause, to discontinue this contract. Termination will be in written form allowing a 30-day notice. The bidder shall be afforded the same right to terminate this contract in the same manner.

ETHICAL STANDARD

No City official or employee shall have interest in any contract resulting from this bid.

3.2. INSURANCE REQUIREMENTS

Staff may waive insurance requirements for contracts $0 - $4,999.99, including but not limited to contracts for food, materials, supplies, and construction. Workers’ Compensation in amounts which satisfy statutory coverage shall be required for construction projects.

The following insurance requirements will be included in all City contracts of $5,000 - $14,999.99. In contracts not involving building and construction projects, as that activity is defined in TEX. LABOR CODE

§406.096, contractors may obtain alternative form of worker accident insurance with minimum limits of liability of $100,000 per claim.

Minimum Insurance Requirements

Type of Coverage Limits of Liability

Worker’s Compensation Statutory Coverage

Comprehensive General Liability

(City named as additional insured)

Bodily Injury $250,000 each person/$500,000 each occurrence

Property Damage $100,000 each occurrence/$100,000 aggregate or $500,000 combined single limits

The following insurance requirements will be included in all City contracts of $15,000 or more.

(1) The successful bidder will be required to carry the following insurance coverage and limits of coverage, as well as list the City as an additional insured to liability coverage as requested by the City. In addition, the successful bidder shall provide the City with evidence of coverage and furnish acceptable proof of payment of insurance premiums.

(2) The successful bidder will be required to secure and/or have insurance coverage in force with an admitted property and casualty insurance company licensed by the State of Texas to conduct business in the State of Texas.

(3) In contracts not involving building and construction projects, as that activity is defined in TEX. LABOR

CODE §406.096, contractors may obtain alternative form of worker accident insurance with minimum limits of liability of $100,000 per claim

Minimum Insurance Requirements

Type of Coverage Limits of Liability

Worker’s Compensation Statutory Coverage

Employer’s Liability Bodily Injury by Accident:

$100,000 each accident

Bodily Injury by Disease:

$100,000 each employee/$500,000 policy limit

Comprehensive General Liability

Property Damage $100,000 each occurrence/$100,000 aggregate or $500,000 combined single limits

Comprehensive Auto Liability

Bodily Injury $100,000 each person/$500,000 each occurrence

City’s Protective Liability

Policies must name the City of Edinburg as an Additional Insured.

Certificates of insurance naming the CITY as an additional insured shall be submitted to the CITY for approval prior to any services being performed by Contractor. Each policy of insurance required hereunder shall extend for a period equivalent to, or longer than the term of the Contract, and any insurer hereunder shall be required to give at least thirty (30) days written notice to the CITY prior to the cancellation of any such coverage on the termination date, or otherwise. This Contract shall be automatically suspended upon the cancellation, or other termination, of any required policy of insurance hereunder, and such suspension shall continue until evidence that adequate replacement coverage is provided to the CITY. If replacement coverage is not provided within thirty (30) days following suspension of the Contract, the Contract shall automatically terminate.

4. Specifications

4.1. Mobile Breathing Air Trailer (or equivalent)

Shall be a 7’x12’ totally enclosed trailer with dual 3.500 lbs axles, highway lighting, electric brakes on each axle and designed for this specific application. The trailer shall be a major brand for readily available localized service (one of a kind custom fabrication) will not be acceptable.

Trailer shall be equipped with

• Complete highway rated lighting package with vehicle connector plug.

• Electric brakes on both axles

• 2 5/16 ball hitch

• 3 Diamond Door / Dover roll up doors.

• 4 mounted LED exterior lights 12 VDC

• Painted metal exterior in your choice of standard factory colors

4.2. Compressor Bauer H25-D (or equivalent)

The compressor shall be rated for 13-cfm and capable of continuous duty at 6000-psi. All components shall be mounted on a heavy-duty powder coated steel frame. The compressor and diesel engine shall be mounted in a horizontal design and mounted in the rear of the trailer with flow through ventilation.

The system shall be supplied on a steel frame designed for both the static and dynamic loads of the system and of sufficient size to adequately accommodate all of the system’s components. The arrangement of components on the frame shall permit unrestricted cooling air flow to the compressor and prime mover, and provide access for operation, inspection and maintenance.

These units shall have the compressor and engine arranged in a horizontal design.

The system shall be designed for operation in ambient temperatures ranging between 40°F and 115°F.

And be properly ventilated by means of a flow thru system with remote exhaust and intake piping.

All piping and tubing should be properly supported and protected to prevent damage from vibration during shipment, operation, or maintenance. Piping and tubing shall be installed in a neat and orderly arrangement, adapting to the contours of the system. All instrument tubing shall be 300 series stainless steel.

Compressor Bauer H13D ( or equivalent )

The compressor shall be an air-cooled, oil lubricated, 3 cylinders, 4 stage, reciprocating compressor rated for continuous duty at the maximum working pressure without the need for auxiliary fans or cool-down cycles. The crankcase shall be cast of a high strength, aluminum alloy. The crankshaft shall be of a single piece forged steel construction and supported in the crankcase by three long-life roller bearings. The connecting rods shall be of single piece design and constructed of a high strength alloy. Each connecting rod shall incorporate a roller bearing at the crank end and a needle bearing at the pin end. The pistons shall be constructed of heavy-duty aluminum alloy. The final stage shall incorporate a free-floating, heavy-duty piston which is driven by a guide piston and fourth stage discharge pressure. The cylinders shall be of cast iron construction with deep cooling fins on the external surface for optimum heat dissipation. The cylinders shall be arranged in an “w” configuration with each cylinder located directly in the cooling fan’s blast. The cylinders shall be removable from the crankcase. The compressor’s flywheel shall be of an aluminum alloy. A multi-wing, high velocity cooling fan shall be attached to the flywheel.

A stainless-steel inter-stage cooler shall be provided after each stage of compression and an after cooler shall be provided after the final stage of compression. The cooler assemblies shall be individually detachable from the compressor, located directly in the cooling fan’s blast and made of stainless steel. The after cooler shall be designed to cool the discharge air to within 18°F of ambient temperature. A cool-down cycle shall not be required prior to stopping the compressor.

A separator shall be supplied after each stage of compression excluding the first stage and a coalescing separator shall be supplied after the final stage of compression. An automatic condensate drain (ACD) system shall be supplied for all of the separators. Adjustable drain timers shall be factory preset to drain the separators. The ACD system shall unload the compressor on shutdown for unloaded restart. An exhaust muffler shall be supplied. The condensate reservoir shall have a high liquid level indication system to provide system shutdown and to alert the operator that the condensate reservoir is at capacity. Manually operated valves shall be supplied to override the automatic operation of the ACD system for test and maintenance purposes.

The compressor shall be lubricated by a low-pressure lubrication system incorporating a gear driven low pressure oil pump, easily replaceable oil filtration element, and oil pressure regulator. A sight glass shall be provided to check the oil level. The oil drain for the compressor shall be piped to the outside of the frame.

The compressor shall be equipped with an inlet filter with replaceable particulate element and piped to the outside of the trailer, weather protection shall be provided.

Prime Mover and V-Belt Drive

The engine driven unit shall be supplied with electric start, centrifugal clutch, and speed control solenoid. An enclosure shall be supplied to the supplied battery.

The unit shall be supplied with a water cooled 16 HP diesel engine.

The compressor and prime mover shall be mounted on a common base that is vibration isolated from the system’s main frame. Power from the prime mover shall be transmitted to the compressor by a v-belt drive. The Engine driven unit shall be supplied with a sliding base to facilitate tightening the drive belts manually. The v-belt drive shall be suitably guarded. Rotation arrows shall be affixed in a conspicuous place on the compressor. An exhaust system shall be provided and installed under the trailer and piped to the front end and away from the compressor inlet.

Electrical Control and Instrument Panel

The engine control center shall include a PLC controller. The electrical panel shall be built in compliance to

UL’s Industrial Control Panel Custom Builders Program and shall be affixed with a U.L. label.

The PLC compressor control system consists of a programmable logic controller for the monitoring, protection and control of standard compressor systems.

Standard features include:

• A NEMA 4 enclosure

• On / off selector switch

• Emergency stop

• Final air pressure shutdown

• Warning and alarm indicator lights o All lamps shall be of a minimum 22 mm diameter.

o Lamp test function built in o Lamps will flash code representing fault.

• Built in overtime timer set at 5 hours - optional times available.

• Final separator counter warning and alarm functions

• Full support of SECURUS warning and alarm functions

• Full support of CO monitor alarm functions (optional)

• UL listed panel.

A non-resettable hour meter shall be supplied to record the number of compressor operating hours. The hour meter shall be installed in the instrument panel.

The compressor oil pressure shall be monitored by a pressure switch and pressure gauge installed in the instrument panel. The compressor shall shut down and a fault light illuminate should the compressor’s oil pressure drop below the factory preset value during operation. The oil pressure switch shall be by-passed during start-up to permit the oil pump to achieve the normal operating pressure.

A temperature switch shall be supplied on the discharge line of the final stage of compression. The compressor shall shut down and a fault light illuminate should the final stage discharge temperature exceed the tamper-proof set point during operation.

For ease of system diagnosis and maintenance, the low oil pressure and high-pressure air shutdown switches shall be equipped with DIN type connectors. Additionally, all of the wiring shall be encapsulated within a split corrugated type loom. Each wire end connection shall be machine crimped and numbered.

All fault lights shall be installed on the instrument panel and shall be red in color. Each fault light shall be labeled with an engraved nameplate.

All instrument panel mounted pressure gauges shall be 2 ½” diameters and be liquid filled.

Purification System

The purification system shall be designed to process 67,000 cubic feet of high-pressure air to a quality that meets or exceeds the requirements of CGA Pamphlet G-7, Compressed Air for Human Respiration, ANSI/CGA

G-7.1, Commodity Specification for Air, Grade E, and all other recognized standards for breathing air. Purification shall be achieved by mechanical separation of condensed oil and water droplets, absorption of vaporous water by a desiccant, absorption of oil vapor and elimination of noxious odors by activated carbon and conversion of carbon monoxide to acceptable levels of carbon dioxide by catalyst.

The high-pressure purification chambers shall have a working pressure of 6000 PSIG. The purification system shall utilize replaceable cartridges. The purification system shall be designed so that the replacement of the cartridges can be accomplished without disconnecting system piping. The design of the chambers shall preclude the possibility of operating the system without cartridges installed or with improperly installed cartridges. A bleed valve shall be provided to vent the purification system to facilitate replacing the cartridges. A pressure maintaining valve and a check valve shall be supplied downstream of the purification system to increase the efficiency of the purification system by maintaining a positive back pressure. A check valve shall be supplied between the coalescing separator on the compressor’s discharge line and the purification system to maintain the positive pressure in the purification system when the compressor shuts down.

The purification system shall include Bauer’s patented Securus Electronic Moisture Monitor System. A sensor shall be located in the Securus cartridge for direct monitoring of moisture level. A display module shall be supplied to indicate the status of the Securus cartridge. The moisture monitoring system shall warn the operator, in advance, of the impending saturation of the Securus cartridge. The system shall shut down automatically should the operator fail to change the Securus cartridge within the warning period. The system shall not be capable of restarting until the saturated cartridge is replaced with a new one. The moisture monitoring system shall be of a fail-safe design. Should the electrical contact between the display module and sensor be disconnected, an immediate fault shutdown shall be affected. For absolute safety and highest quality breathing air, no manual override shall be supplied for the moisture monitor.

Documentation A documentation package shall be supplied with the system. The documentation package shall include, at a minimum, an operation manual, recommended spare parts list, warranty information and a start-up/warranty registration form.

The Operator’s Instruction and Maintenance Manual for the system shall be as detailed as possible, outlining all operation and maintenance instructions. The manual shall include detailed illustrated drawings for the compressor block and all system components along with a complete parts listing for all illustrated components. Warnings and safety precautions shall be identified clearly in the manual.

4.3. BAS Mod CS6-4 Cascade/Storage System (or equivalent)

There shall be four DOT/ISO/UN rated 6000-psi cascade cylinders with a capacity of 509 cubic foot, each mounted in the walk-in area of the trailer. The cylinders shall be securely mounted with a heavy-duty rack in a horizontal configuration beneath the compressor. Each cylinder will be clearly marked with a label stating the cylinders working pressure type of gas and time of visual inspection.

Each cylinder will have a CGA 702 valve and (NFPA 1901) compliant valve protection device. Each cylinder shall be plumbed directly to the containment style fill station using 7000 Psi hose and stainless-steel fittings. Each cylinder will be new and have a current test date.

4.4. Filling Station

Two Position Containment Style Fill Station Model CFS5.5-2Sx4x4 (or equivalent)

The fill station shall be built and tested to conform to (NFPA 1901)

The fill station shall be mounted so as to direct expanding air away from the operator in the unlikely event of a cylinder failure.

The fill station shall be built and tested to conform to NFPA 1901, 2016 Edition.

The fill station shall be designed for mobile applications. The fill station shall be constructed of formed plate steel and shall be fully enclosed.

The fill station shall be warranted free from defects in material and workmanship for a period of eighteen months from date of shipment or twelve months from date of start-up, whichever expires first.

Containment Fill Station

The front-loading, two position; containment fill station shall totally enclose the SCBA or SCUBA (SCUBA cylinders not to exceed 31” length) cylinders during the refilling process.

The fill station’s outer enclosure and door assemblies shall be constructed of formed ¼ inch thick plate steel. Venting shall be provided in the bottom of the fill station to allow the rapidly expanding air from a ruptured cylinder to escape from the fill station. The fill station shall be ergonomically designed for maximum operator convenience and safety for refilling cylinders. The fill station door and cylinder holder assembly shall tilt out towards the operator 45 degrees, providing unobstructed access to the cylinder holder to load and unload the cylinders. A handle and heavy-duty gas spring shall be incorporated into the design of the fill station to assist the operator in opening and closing the fill station door. It shall take no more than approximately eighteen pounds of effort to open or close the fill station door thereby eliminating operator fatigue.

Each cylinder holder shall be lined to prevent scuffing the outer surface of the SCBA cylinders. For complete operator protection, the fill station shall include a safety interlock system that will prevent refilling SCBA cylinders unless the fill station door is closed and secured in the locked position. The automatic interlock will require no actuation of secondary latching mechanism on the outside of the fill station.

Two fill hoses shall be located within the fill station. Each fill hose shall be equipped with a bleed valve and

SCBA fill adapter of choice. Fill hose retainers shall be provided to anchor the fill hoses when not in use.

Control Panel

The fill control panel shall be installed at the front of the fill station. The control panel shall be factory piped and designed to fill two SCBA or SCUBA cylinders either independently or simultaneously.

The control panel shall include the following standard features:

• Inlet pressure gauge

• Adjustable pressure regulator

• Regulated pressure gauge

• Two (2) fill control valves

• Two (2) fill pressure gauges

• One (1) relief valve for regulated fill pressure

• Four (4) Cascade control valves

• Four (4) Cascade Control Gauges

• One (1) auxiliary refill port with 6000 psi quick connect adapter and valve.

All piping and tubing should be properly supported and protected to prevent damage from vibration during shipment, operation, or maintenance. Piping and tubing shall be installed in a neat and orderly arrangement, adapting to the contours of the station. All instrument tubing shall be 300 series stainless steel.

All control panel mounted pressure gauges shall be 2 ½” diameter and be liquid filled. All panel-mounted components shall be labeled with a nameplate.

The fill station shall be provided on its own freestanding base and shall not exceed the following approximate dimensions: 58” high, 30” wide, and 22” deep. Weight with base and control panel shall not exceed 750 lbs.

4.5. Electronic Digital Readout (CO) Carbon Monoxide Monitor Model BAS-4021 (or equivalent)

The monitor shall be powered by 12-volt DC and be mounted in the trailer with the compressor and shall only be on when the compressor is operating.

A. The monitor shall be designed to monitor breathing air for Carbon Monoxide. It shall have a range of

0-50 ppm and be rated for 6000-psi inlet pressure.

B. The unit shall be powered by 12 volts DC.

C. The unit shall incorporate an electric-chemical sensor that puts out a signal that is displayed on an

LCD display.

D. The electronics shall be enclosed in a NEMA-4 dust and drip tight enclosure.

E. An audible alarm shall be standard. It shall have a sound level of 95 decibels.

F. The unit shall be equipped with an alarm level, preset but field adjustable. There shall be a red light to indicate alarm. The alarm level will have terminals that will be connected to shut down the compressor.

G. The supplied calibration gas will have a flexible connection that will allow the user to choose to calibrate the monitor.

H. A shut off valve shall be supplied so that the monitor can be removed from the system without interrupting service in the event of needed repairs or failure.

I. A complete bound operator’s manual shall be provided.

4.6. Supplier Requirements

The supplier of the system shall professionally install and test all equipment prior to delivery of the unit. They shall also perform and provide a detailed inspection sheet signed by quality control personnel.

The supplier of this system must have been a regular dealer in the brand proposed/provided for at least ten years and must supply a listing of several similar and recent products with his bid. They must stock all parts and materials at all times, and be capable of providing factory trained technicians to service the unit.

4.7. Warranty: [1 year]

A Factory warranty of at least one full year is to be provided on workmanship, equipment and labor, There shall be no charge to the buyer for any parts or labor during the first-year warranty. All warranty work is to be performed within a reasonable time frame. Unless otherwise arranged all warranty work shall be performed at the supplier’s facilities without cost to the buyer. The buyer shall pay all delivery charges or pay travel for repairs, all On-Site time and parts will be covered by the supplier. Any supplier whose warranty does not meet these terms shall provide a clear statement as to what the exceptions would be.

4.8. Insurance and Liability

It shall be the responsibility of the supplier, [selling and or installing vendor], to carry and show proof of having

Product Liability Insurance, [PLI], commercial general and automotive liability insurance of at least [1] one million dollars, manufacturers bidding on behalf of the local distributor due to the local distributor not having

[PLI] is not acceptable as the manufacture will not be providing the LOCAL support or installation. They must further show that they and their workers are covered under workers’ compensation and in accordance with state laws.

4.9. Delivery

Unless otherwise arranged, The mobile air and light trailer may be picked up at the suppliers facility where the supplier will provide the buyer with a comprehensive training and instruction program.

The buyer will provide personnel to take delivery of the system if shipped.

4.10. General

The supplier shall provide with their bid, fully descriptive literature on the product proposed.

Any exceptions to any of these specifications must be clearly stated on a separate page and attached to the bid form. (Failure to mention exceptions regardless of how insignificant could result in having their bid removed from consideration.)

The buyer reserves the right to reject acceptance on any product which does not meet these specifications, if the exceptions have not been agreed to in advance, in writing.

5. Vendor Questionnaire

5.1. Required Forms

5.1.1. Attach a copy of your bid.*

*Response required

5.1.2. Attach a copy of the current insurance certificate.*

Attach a copy of the current insurance certificate.

*Response required

5.1.3. Please fill out General Questionnaire and upload here * Please download the below documents, complete, and upload.

• GENERAL_QUESTIONNAIRE.pdf

*Response required

5.1.4. Please fill out and sign House Bill 89 and upload here*

HB 89

The 85th Texas Legislature approved new legislation, effective Sept. 1, 2017, which amends Texas Local

Government Code Section 1. Subtitle F, Title 10, Government Code by adding Chapter 2270 which states that a governmental entity may not enter into a contract with a company for goods or services unless the contract contains a written verification from the company that it:

1) does not boycott Israel; and

2) will not boycott Israel during the term of the contract

• HOUSE_BILL_89_VERIFICATION.pdf

*Response required

5.1.5. Please fill out and sign Senate Bill 13 and upload here* SB 13 ENERGY COMPANY BOYCOTTSThe 87th Texas Legislature approved new legislation, effective Sept.

1, 2021, which amends Texas Local Government Code 2274.002 Section 1. Subtitle A, Title 8 by adding

Chapter 809 which states that a governmental entity may not enter into a contract with a company for goods or services unless the contract contains a written verification from the company that it:

1) does not boycott energy companies and will not boycott energy companies during the term of the

Contract. If Respondent does not make that verification, Respondent must so indicate in its Response and state why the certification is not required , or

2) the verification required by Section 2274.002 of the Texas Government Code does not apply to the contract. If circumstances relevant to this provision change during the course of the contract, Respondent shall promptly notify Agency.

• SENATE_BILL_13_VERIFICATION...

https://government-project.s3.us-west-2.amazonaws.com/28881/e4ba0d4f-dcd1-421d-9962-703c9b136b30_GENERAL_QUESTIONNAIRE.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4NTDKDORC%2F20250423%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250423T191956Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEGsaCXVzLXdlc3QtMiJHMEUCIBd%2Bu7lfoNeBsrk9qoBsVvqrVrfy2fM4tNJ6MWZCloS5AiEA0dC6huBy6O7nN9Ai9YYnJIEbjAb955LBi7b%2BO4au2UEqjAUI9P%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDG%2FQ%2BMw%2FANld8eHQ6SrgBARnG9dM6ibUzMh0nAvgQa8HuilN9mOGN0%2B%2Bsm4gMdPuVF4VmoqkWpBp4xnFe5QGTiSCx4gtflWmzxlAoJXISnkg3NKXulXp6e71tEx9Yn86t79D0DKcv9E2H5gu6fGyIS%2BqHlbHPfQsbe7wqxRcqpP%2B0RwU5hJMqh6It%2FGMLas1OyAcBwiTdoln5m2Hc2zmsO7vY0KSBDlQ23y8BX1Fl6xGGILKBE5vdOs%2BmDu%2FuLPKYQpx6kUd7lSB79npIxCKBHXy9aiC0kEZxvNXI%2FHDGi9GcbIy1bYTj5IxWijUKJ9S9X7R6U7zn23pWnfIB1YFa7qlgU2X4eJpHUDOTjQCeSFiiy6jcz8UyASBCKehlghs6Z2Cp3roWmYIZIsBScB369ZGvea3hVBRSBrwLYwI1%2FGlInArA6%2FaF%2FUoW%2BAuZoQ36Qlk8L7%2BO8eqCavlwAJX68K%2Blg7ycMV4Poj6umA8Jm3b2osco%2FSB0xhCE4Na%2FBtxgTyhYsjQGTVXzUFEOP37n4kWtqIte3KgPIlbzpCkqtOiNB6584eQNtnMbxewhzdhBFu0mEnFWZoTw2l7%2FktZy9SxIyz0tps4r01QCfMNE5zuscTavKqt18YEt9OeaVBJq70tLqQoSw76G5eNP32POU0acUUGj2GuF%2Bp66JmB0y0Mc9WJw5veKY9Lt3fN3okexRIO7ID4pJii%2BZIxL0vjeDwFM1WTaadBB%2FiYFguLeTO2%2BJctmj9CqbAshrdvDl5WiU3z%2Fzgo9OVAao8VcQNrmaemsRlyPstVoKmvdhiYwhpbg6HZNrMic2vOU5W2gojoMLTxpMAGOpsByUJCekUIM118hxJEQpuqb8w%2Ff%2B7DkmE0KFw0fCL18aqoY7kO600LzkBP6t7FSM%2BPZfi1wZ0y%2FxqJHc%2BUvQu2r7KkvZMl5qAr27JWcyOKPczhVoKAwhimbZOyBahu5a7IZt2277pg7XXu2B1q4QyetrtLiGA44Yp%2BnfEJZgqo4JEdb5ugxKKBpzbbRaLJVQdi30mcOS1n7kGPRHA%3D&X-Amz-Signature=f7cc55bd1b11f2cef35b73797ac108fccadb2dadc5c1bbcb5723cde099784034&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22GENERAL_QUESTIONNAIRE.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/28881/56280c7e-eb4f-4add-b641-73cfb1bc8942_HOUSE_BILL_89_VERIFICATION.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4NTDKDORC%2F20250423%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250423T191956Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEGsaCXVzLXdlc3QtMiJHMEUCIBd%2Bu7lfoNeBsrk9qoBsVvqrVrfy2fM4tNJ6MWZCloS5AiEA0dC6huBy6O7nN9Ai9YYnJIEbjAb955LBi7b%2BO4au2UEqjAUI9P%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDG%2FQ%2BMw%2FANld8eHQ6SrgBARnG9dM6ibUzMh0nAvgQa8HuilN9mOGN0%2B%2Bsm4gMdPuVF4VmoqkWpBp4xnFe5QGTiSCx4gtflWmzxlAoJXISnkg3NKXulXp6e71tEx9Yn86t79D0DKcv9E2H5gu6fGyIS%2BqHlbHPfQsbe7wqxRcqpP%2B0RwU5hJMqh6It%2FGMLas1OyAcBwiTdoln5m2Hc2zmsO7vY0KSBDlQ23y8BX1Fl6xGGILKBE5vdOs%2BmDu%2FuLPKYQpx6kUd7lSB79npIxCKBHXy9aiC0kEZxvNXI%2FHDGi9GcbIy1bYTj5IxWijUKJ9S9X7R6U7zn23pWnfIB1YFa7qlgU2X4eJpHUDOTjQCeSFiiy6jcz8UyASBCKehlghs6Z2Cp3roWmYIZIsBScB369ZGvea3hVBRSBrwLYwI1%2FGlInArA6%2FaF%2FUoW%2BAuZoQ36Qlk8L7%2BO8eqCavlwAJX68K%2Blg7ycMV4Poj6umA8Jm3b2osco%2FSB0xhCE4Na%2FBtxgTyhYsjQGTVXzUFEOP37n4kWtqIte3KgPIlbzpCkqtOiNB6584eQNtnMbxewhzdhBFu0mEnFWZoTw2l7%2FktZy9SxIyz0tps4r01QCfMNE5zuscTavKqt18YEt9OeaVBJq70tLqQoSw76G5eNP32POU0acUUGj2GuF%2Bp66JmB0y0Mc9WJw5veKY9Lt3fN3okexRIO7ID4pJii%2BZIxL0vjeDwFM1WTaadBB%2FiYFguLeTO2%2BJctmj9CqbAshrdvDl5WiU3z%2Fzgo9OVAao8VcQNrmaemsRlyPstVoKmvdhiYwhpbg6HZNrMic2vOU5W2gojoMLTxpMAGOpsByUJCekUIM118hxJEQpuqb8w%2Ff%2B7DkmE0KFw0fCL18aqoY7kO600LzkBP6t7FSM%2BPZfi1wZ0y%2FxqJHc%2BUvQu2r7KkvZMl5qAr27JWcyOKPczhVoKAwhimbZOyBahu5a7IZt2277pg7XXu2B1q4QyetrtLiGA44Yp%2BnfEJZgqo4JEdb5ugxKKBpzbbRaLJVQdi30mcOS1n7kGPRHA%3D&X-Amz-Signature=1049752b45403ca6049f28949e4fb333ff6585aac387930d018ad744e89bb15f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22HOUSE_BILL_89_VERIFICATION.pdf%22&x-id=GetObject…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .