MOBLIE BOAT HOIST PRODUCT SPECIFICATION SHEET –
The Government’s Requirement is for 2 separate hoist systems. One is located in Sector San Francisco San Francisco, CA, and the other is Sector Lake Michigan, Milwaukee, WI.
This PSS is broken down into 2 requirements with each containing different specifications:
Sector San Francisco Hoist System Specifications:
Hoist System: Each end of the hoisting strap (control) must be capable on moving independently.
Hoist speed: low/high – This is usually listed as “creep” and “travel” speeds, but we are open to suggestions.
Wire rope: Must have a minimum rating of 84,000 lbs.
Slings: Min spacing 7’, Max spacing 19’, (2) Nylon 2-ply, quick disconnect pin, keel pads, 12’x26” – Both slings must be capable of moving side to side to achieve the Min and Max spacing identified above.
Drive System: Must be capable of moving back and forth and side-to-side. This can typically be accomplished via 4 independent controls but doesn’t necessarily have to be.
Hoist System Travel speed: low / high Shall have a maximum Hoist height of 28’ Shall have a maximum Hoist Width of 24’ 4” and a minimum hoist width of 20’ 7”. Shall have a maximum Hoist Length of 25’. No minimum length as long as it meets the sling spacing measurements identified above.
Hoist Weight: based on pier rating Must be capable of lifting a Minimum of 35 Metric Tons Standard equipment: Vendor shall provide product sheet for hoist system they may choose to propose that can meet (or exceed) the standard equipment requirements identified here.
Formed Beam design Greaseless pivot trunnion Bolting flange in top beam No sheet metal O-ring face hydraulic fittings 316 Stainless steel hydraulic tubing Inline hoist block sheaves Powered sling adjustment Independent hoists (synchronized) Load indicators Zinc enriched primer to prevent rusting Weighted Chine pads for each sling Shall have both drive lights and work lights designed to provide safe nighttime operating capabilities.
Overload alarm system installed in accordance with SFLC Technical Standard (TS) 583-4, which is included as Attachment 1.1.
Application and type of paint used shall be industry standard for marine zone (saltwater spray and air) –Open to suggestion from vendor on what type of paint is most appropriate for marine zone.
Manufacturer shall provide all maintenance and (2) operating manuals, drawings and a consumable parts list Manufacturer shall provide a minimum of a 2-year parts and labor warranty Manufacturer shall provide onsite maintenance training – Government expectation is for 1-3 days of training.
Manufacturer shall provide onsite operator training – Government expectation is for 1-3 days of training. Would this also include the generator or propulsion power system? Can you also provide a certification for this training as well?
3rd party inspection of final assembly prior to acceptance, which includes 3 Static and 3 Dynamic Weight Tests Hoist shall be built to comply with all federal, state, and local standards.
Manufacture shall provide reaction data provided with proposal.
Hoist must be delivered and installed 120 days after award.
Contractor is responsible for removing the old hoist and disposing of it properly in accordance with Federal, State and Local regulations.
Coast Guard Facilities to Provide A staging area sufficient for delivery and installation of the hoist
Sector Lake Michigan Hoist System Specifications:
Hoist System: Each end of the hoisting strap (control) must be capable on moving independently.
Hoist speed: low/high – This is usually listed as “creep” and “travel” speeds, but we are open to suggestions.
Wire rope: Must have a minimum rating of 84,000 lbs.
Slings: Min spacing 7’, Max spacing 19’, (2) Nylon 2-ply, quick disconnect pin, keel pads, 12’x26” – Both slings must be capable of moving side to side to achieve the Min and Max spacing identified above.
Drive System: Must be capable of moving back and forth and side-to-side. This can typically be accomplished via 4 independent controls but doesn’t necessarily have to be.
Hoist System Travel speed: low / high Shall have a maximum Hoist height of 28’ Shall have a maximum Hoist Width of 24’ 4” and a minimum hoist width of 20’ 7”. Shall have a maximum Hoist Length of 25’. No minimum length as long as it meets the sling spacing measurements identified above.
Hoist Weight: based on pier rating Must be capable of lifting a Minimum of 35 Metric Tons Standard equipment: Vendor shall provide product sheet for hoist system they may choose to propose that can meet (or exceed) the standard equipment requirements identified here.
Formed Beam design Greaseless pivot trunnion Bolting flange in top beam No sheet metal O-ring face hydraulic fittings 316 Stainless steel hydraulic tubing Inline hoist block sheaves Powered sling adjustment Independent hoists (synchronized) Load indicators Zinc enriched primer to prevent rusting Weighted Chine pads for each sling Shall have both drive lights and work lights designed to provide safe nighttime operating capabilities.
Overload alarm system installed in accordance with SFLC Technical Standard (TS) 583-4, which is included as Attachment 1.1.
Application and type of paint used shall be industry standard for marine zone (saltwater spray and air) –Open to suggestion from vendor on what type of paint is most appropriate for marine zone.
Manufacturer shall provide all maintenance and (2) operating manuals, drawings and a consumable parts list Manufacturer shall provide a minimum of a 2-year parts and labor warranty Manufacturer shall provide onsite maintenance training – Government expectation is for 1-3 days of training.
Manufacturer shall provide onsite operator training – Government expectation is for 1-3 days of training. Would this also include the generator or propulsion power system? Can you also provide a certification for this training as well?
3rd party inspection of final assembly prior to acceptance, which includes 3 Static and 3 Dynamic Weight Tests Hoist shall be built to comply with all federal, state, and local standards.
Manufacture shall provide reaction data provided with proposal.
Hoist must be delivered and installed 120 days after award.
Contractor is responsible for removing the old hoist and disposing of it properly in accordance with Federal, State and Local regulations.
Coast Guard Facilities to Provide A staging area sufficient for delivery and installation of the hoist image1.png