Windsorsf30.docx
DOCX document 21 KB Posted
- Attached to
- Repairs/renovations to single family dwelling
- Solicitation number
- MO-64KY-P-10-369917B
About this file
SF-30 amendment information
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WindsorAbstract.pdf | ||
| 30CircleDrive Windsor QandA.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
04/21/2010
4. REQUISITION/PURCHASE REQ. NO..
N/A 5.PROJECT NO.. (If applicable)
N/A
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6 ) CODE
USDA Rural Development ATTN: Lue R. Lockridge-Lane 601 Business Loop 70 West Parkade Center, Suite 235 Columbia, MO 65203
Same as Block 6
To all Offerors/Bidders
9A. AMENDMENT OF SOLICITATION NO.
MO-64KY-P-10-369917B
9B. DATED (See Item 11) 03/29/2010
10A. MODIFICATION OF CONTRACT /Order No.
10B. DATED (See Item 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
|X| The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers |X| is extended, |_| is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _ 1____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION data (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
| D. OTHER (Specify type of modification and authority) |
| 52.243-5 CHANGES AND CHANGED CONDITIONS (APR 1984) |
E. IMPORTANT: Contractor |_| is not, |_| is required to sign this document and return ________ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The HOUR & DATE for Receipt of Bids is EXTENDED to 2:00 pm CST, May 19, 2010.
Refer to Page 2 of 2 for items being amended and added.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
BY:_____________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
MO-64KY-P-10-369917B
Under DOORS on Page 10 Delete Items #2 and #3 and Replace with the following Items #2 & #3:
2. Provide and install 2 new pre-finished metal clad combination storm and screen doors at the front door and exterior garage door. Door to be 1 1/4” aluminum framed, with a clad aluminum door and 1/8” safety glass window with an aluminum or nylon screen. Installation to include all the hardware, weather stripping, sweeps, pneumatic closers with safety chain, etc., necessary for a complete installation. $_________/________
3. Install sliding glass doors. Remove and dispose of existing sliding glass door assembly. Provide and install a new combination sliding glass and screen door assembly. Door to be pre-finished, aluminum (or vinyl) clad, with double glazed, low E insulated glass. Mount tracks and hardware in compliance with manufacturer’s instructions complete with frames, hardware and screen door. Repair exterior and interior finishes where they adjoin door and completely caulk and seal entire assembly for a weather tight installation. $_________/________ Under WINDOWS on Page 10: Delete Item #1 and Replace with the following paragraph:
1. Install 3 replacement windows to the dwelling – one in kitchen, one in garage, one in the master bedroom (back corner room). Replacement windows must meet the following requirements. Windows must have a maximum overall U-Value of 0.47 IAW ANSI C236 standards. If the U factor documentation cannot be provided by the contractor, the window must be dual paned, and have a combination storm window applied. Windows can be single or double hung with spring loaded balances. Wood windows will need to be painted with acrylic primer with enamel finish coat. Vinyl windows can have “LOW” E glazing, with dual pane and air space between each pane, and light color frames. The contractor will have to make any necessary repairs on the interior and exterior of the dwelling which includes the area around the new window units. Windows must be level with the siding. $_________/________
THE FOLLOWING ITEMS ARE HEREBY ADDED TO THE SOLICITATION:
SOFFITS
1. Replace existing eave system. Install galvanized steel roof edging. Install new pre-finished aluminum fascia and vented soffit system complete with all associated fittings and hardware for a complete installation. Color to be approved by USDA Rural Development.
SHUTTERS
1. Install new shutters to match existing. Provide three (3) pairs of shutters of the same style, size and material as the existing and install per manufacturer’s recommendations.
The HOUR & DATE for Receipt of Bids is EXTENDED to 2:00 pm CST, May 19, 2010.
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .