MN_Valley_ES_Pole_Barn_Electrical_Scope_of_Work.pdf
PDF 11 MB Posted
- Attached to
- Ecological Services MN-WI Field Office Electrical Federal contract opportunity
- Solicitation number
- 140FC223Q0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC223Q0017_Amd_0001.pdf | ||
| Wage_Determination_MN20230117.pdf | ||
| Sol_140FC223Q0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Ecological Services
Minnesota-Wisconsin Field Office 3815 American Boulevard East
Bloomington, Minnesota 55425-1665 Phone: (952) 858-0793
Purpose: The existing pole barn electrical panel was fed via a 50 amp breaker located in the adjacent office building. The adjacent office building was demolished March 2023. This scope of work is to connect the pole barn electrical panel to an existing ground mounted transformer.
The Contractor shall furnish all materials, labor, equipment, and superintendence for the work described below. The work includes but is not limited to; project mobilization and demobilization, project management and oversite, demolition and construction of items described below, quality control, testing and inspections, permits, cleanup, and removal of all debris and waste generated during performance of the work.
Item 1 Base Bid: Work includes but is not limited to installing single phase, 120/240 volt, 3 wire underground service entrance conductors minimum 24” below grade from an existing ground mounted utility transformer to an existing 200 amp pole barn electrical panel.
Directional bore or trench from an existing ground mounted utility transformer approximately 200’‐0” to an existing metal pole barn.
Contractor to verify length and route prior to bidding.
o Approximately 30’‐0” of the proposed utility pathway is underneath an existing asphalt parking area. Contractor may neatly sawcut existing asphalt for utility installation and backfill flush with clean soil.
Install new underground conduit and wiring for 200 amp electrical service.
Work new conduit into the existing outdoor meter socket at the pole barn and under & into the utility transformer.
Remove existing 50 amp principal breaker and wiring from existing electrical panel.
Ground existing electrical panel and new service per code.
Shovel and rake the ground back to grade.
Coordinate and pay for new electrical service application and installation of new electrical utility meter with Xcel Energy.
Obtain and pay for all federal, state, and local permits and inspections required for installation.
All work items that are not specifically called out are considered incidental and no direct compensation will be provided. This work shall be performed on a firm fixed price lump sum basis.
Untitled Map Write a description for your map.
Legend
Minnesota Valley National Wildlife?
Minnesota Valley, A National Wildlife?
Proposed ELC path, EST 220'
Sewer Service Termination
Transformer
Water Service Termination
100 ft
N
N
Image Landsat / Copernicus
Image Landsat / Copernicus
Image Landsat / Copernicus tfuller Callout Existing Pole Barn tfuller Callout Existing transformer tfuller Callout Proposed electrical service route tfuller Callout Existing Meter Socket tfuller Callout Office building and sidewalks from asphalt turn-around demolished March 2023 tfuller Line tfuller Callout Existing asphalt parking area tfuller Callout Existing asphalt turn-around tfuller
Existing transformer tfuller Callout Existing asphalt parking area tfuller Callout Existing asphalt turn-around tfuller Callout Existing Pole Barn tfuller Callout Existing meter socket tfuller Callout Office building and sidewalks from asphalt turn-around demolished March 2023
Line
Existing meter socket and conduit tfuller Callout Abandoned water spigot tfuller Callout Abandoned 50 amp feed from demolished office building tfuller Callout Existing grounding rod tfuller Callout Grounding wire and conduit from existing electrical panel tfuller Line tfuller Line tfuller
Existing Pole Barn
200 amp main breaker tfuller
50 amp principal breaker
Grounding wire connected to exterior grounding rod