MMLA - RFP - Gym Floor & Bleacher Replacement(s) 2026 [FINAL DOC].pdf

PDF 2 MB Posted

Attached to
The Academy is soliciting sealed proposals for the prepping
Solicitation number
RFP CHSP 260000001653 1
Issued by
Kent County, Michigan

About this file

This Request for Proposal (RFP) is issued by Mid-Michigan Leadership Academy in Lansing, Michigan, for the prepping and replacement of gymnasium flooring and bleacher systems. The Academy seeks sealed proposals for two primary services: preparation of existing gymnasium flooring with installation of a synthetic rubber shock pad and multi-purpose plastic resin surface material, and demolition and replacement of existing bleachers with a wall-mounted, electronically operated telescopic bleacher system with a minimum capacity of 300 seats. The flooring contractor will serve as the general contractor with the bleacher contractor as subcontractor. A voluntary walk-through is scheduled for 1:30 PM on April 2, 2026, at the facility located at 730 W Maple Street, Lansing, Michigan 48906. The proposal questions deadline is April 6, 2026, with sealed proposals due by 12:00 PM on April 10, 2026, submitted to CS Partners at 869 S Old US 23, Suite 500, Brighton, Michigan 48114. Board approval is scheduled for April 13, 2026. The flooring replacement project must be completed no later than August 14, 2026, while the bleacher replacement project must be completed by November 27, 2026. Construction must commence within seven days of notice to proceed. All proposals must be accompanied by three references from previous projects.

Bidders are required to submit a 5% bid bond and a 100% performance and payment bond. All proposals must include completed prevailing wage compliance certifications, familial disclosure statements, school safety affidavits, and Iran sanctions certifications. Contractors must maintain comprehensive insurance coverage including workers' compensation ($100,000 minimum employer's liability), commercial general liability ($1,000,000 per occurrence/$2,000,000 annual aggregate), and motor vehicle liability ($1,000,000 per occurrence). The Academy is a tax-exempt entity and will provide tax-exempt documentation to the successful bidder. All state of Michigan and local building codes must be strictly followed, and contractors are responsible for obtaining all required permits at their own cost. The gymnasium court dimensions are 93 linear feet by 60 linear feet, totaling 5,580 square feet. Specifications require FIBA and IHF-approved flooring systems, with the bleacher system designed to IBC 2018 and ADA standards. All proposals are valid for thirty days following the April 10, 2026, submittal deadline, and the successful bidder must provide a one-year workmanship warranty on all work performed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

Mid-Michigan Leadership Academy

Gym Floor & Bleacher Replacement(s) 2026

Jeana Bolton-Carrasco School Leader

REQUEST FOR PROPOSAL---THIS IS NOT AN ORDER OR OFFER

IF FOR ANY REASON YOU CANNOT RETURN THIS BID, PLEASE RETURN THIS FORM INDICATING

SO TO ENSURE THAT YOUR NAME MAY BE RETAINED ON OUR BIDDER LIST.

SCHEDULE:

RFP RELEASE: MARCH 30, 2026

VOLUNTARY WALK-THRU: 1:30 PM, APRIL 2, 2026

WALK-THROUGH LOCATION: MID-MICHIGAN LEADERSHIP ACADEMY

730 W MAPLE ST

LANSING, MI 48906

PROPOSAL QUESTIONS DEADLINE: APRIL 6, 2026

PROPOSAL SUBMITTAL DEADLINE: APRIL 10, 2026

BOARD APPROVAL: APRIL 13, 2026

SUBMIT PROPOSAL TO:

CS PARTNERS

869 S OLD US 23 (SUITE 500)

BRIGHTON, MI 48114

MARK PROPOSAL:

MID-MICHIGAN LEADERSHIP ACADEMY

“GYM FLOOR & BLEACHER REPLACEMENT(S) 2026”

730 W MAPLE ST

LANSING, MI 48906

ATTN: JEANA BOLTON-CARRASCO

The Academy is soliciting sealed proposals for the prepping of the existing gymnasium flooring material and overlaying it with a synthetic rubber shock pad and covered with a high-quality multi-purpose plastic resin surface material. The project will also include the demolition and removal of the existing bleachers to be replaced with a wall-mounted, electronically operated and telescopically designed bleacher system with a total capacity of 300 seats. The flooring contractor shall be considered the general contractor with the bleacher contractor as the sub-contractor.

MID-MICHIGAN LEADERSHIP ACADEMY

GYM FLOOR & BLEACHER REPLACEMENT(S) 2026

SCOPE OF SERVICES (SOS)

GENERAL SPECIFICATIONS:

1. The flooring contractor shall be considered the general contractor with the bleacher contractor as the sub-contractor.

2. The existing flooring shall be prepped (including transitions) for placement of a synthetic rubber shock pad with an all-purpose athletic resin flooring.

3. The existing bleachers shall be dismantled in place and removed from the site. The new bleachers shall be closed back, wall mounted and electronically operated in a telescopic manner. Minimum seating shall be 300 seats.

4. See EXHIBIT “A” for the written specification requirements.

5. See EXHIBIT “B” for an aerial view of the school campus and work area.

REQUIREMENTS OF BIDDER:

1. A VOLUNTARY WALK THROUGH shall be provided to allow contractors to become familiar with the project as described in the schedule above.

2. The successful bidder shall complete and submit the Prevailing Wage, Familial Relationships, School Safety and the Iran Sanctions forms with the bid packet. Failure to execute and include these documents will result in bid rejection.

3. (3) References must be provided by ALL prospective Bidders.

4. Successful bidder shall commence construction no less than (7) days after issuance of a notice to proceed.

5. The flooring replacement project SHALL be completed no later than August 14th, 2026.

6. The bleacher replacement project SHALL be completed no later than November 27th, 2026.

7. A Bid-bond will be required in the form of 5% of the project amount from each bidder.

8. A Performance and Payment bond on 100% of the bid will be required by the successful bidder.

9. All bids shall be good for thirty (30) days after the proposal submittal deadline.

10. Successful bidder will be required to field verify square footage and conditions.

11. Successful bidder will be required to secure a permit, if required. Permits and associated costs are the contractor’s responsibility.

12. All State of Michigan and local building codes shall be strictly followed.

13. All proposals to be backed by a 1-year workmanship warranty from the contractor.

CONTENTS OF PROPOSAL PACKET:

1. Proposal Cover & Schedule Document

2. Scope of Services Document

3. Pricing (ATTACHMENT A)

4. Specifications (EXHIBIT A)

5. Aerial Map of Work Limits (EXHIBIT B)

6. Various Documents (ATTACHMENT B)

GENERAL INFORMATION:

1. CHANGES TO RFP: All additions, corrections or changes to the solicitation documents will be made in the form of a written Change Form as issued by the Academy only. Bidders shall not rely upon interpretations, corrections, or changes made in any other manner, whether by telephone or in person. Additions, corrections, and changes shall not be binding unless made by such a written, signed Change Form. All written, signed Change Forms issued shall become part of the Agreement documents. Change Forms will be sent to all known potential bidders by e-mail.

2. CONTACT INFORMATION: To receive future communications related to this RFP, possible bidders are asked to immediately send contact information by email to David Blackmar, at dblackmar@charterschoolpartners.com failure to do so may limit your ability to submit a complete, competitive Proposal.

3. RIGHT TO WITHDRAW BIDS: By submitting a Proposal in response to this RFP, Bidder agrees to be bound by this RFP’s terms and conditions. Proposals may be withdrawn by the Bidder without penalty at any time before notification that the Bidder’s Proposal has been selected. However, if the Bidder withdraws after selection of its

Proposal but before executing the Contract for any reason (“Late Withdrawal”), Bidder shall pay liquidated damages to the Academy in an amount equal to five percent (5%) of the amount of the Proposal (“Liquidated

Damages”). The Academy and Bidder intend these Liquidated Damages to constitute compensation and not a penalty. Bidder’s payment of the Liquidated Damages shall be Bidder’s sole liability and entire obligation and the

Academy’s exclusive remedy for Late Withdrawal of Bidder’s Proposal.

4. RFP, PROPOSALS AND ACCEPTANCE DO NOT OBLIGATE: The parties agree that they will not consider either distribution of this RFP or receipt of Proposals by the Academy or even notification of Proposal acceptance by the

Academy as an obligation or commitment by the Academy to either purchase equipment from the Bidder or to enter into a contractual agreement. Rather, the parties understand that the Academy will have no binding obligation until it signs the Contract approved by its legal counsel.

5. TAX-EXEMPT STATUS: The Academy is a tax-exempt entity. A tax-exempt form will be provided to the successful bidder.

6. FOIA: All bids are confidential until the listed bid opening time and date; however, as a public entity, the

Academy is subject to the Michigan Freedom of Information Act (FOIA). Information contained in proposals may be subject to FOIA requests.

7. RESPONSIBILITY: Bidder is solely responsible for ensuring its bid is received by the Academy in accordance with the solicitation requirements, before the date and time specified in this Request, and at the place specified.

mailto:dblackmar@charterschoolpartners.com

8. INSURANCE: The Bidder shall purchase and maintain insurance sufficient to protect it from any and all claims which may arise out of or result from the Bidder’s services related to this RFP and any resultant contract, whether such service be by the Bidder individually or by anyone directly or indirectly employed by Bidder, or by anyone for whose acts Bidder may be liable, including independent contractors. Insurance policies purchased and maintained shall include, but are not limited to, the following:

a. Worker’s compensation insurance for claims under Michigan’s Workers’ Compensation Act or other similar employee benefit act of any other state applicable to an employee in the minimum amount as specified by statute;

b. Employer’s liability insurance, in conjunction with workers’ compensation insurance, for claims for damages because of bodily injury, occupational sickness or disease or death of an employee when workers’ compensation may not be an exclusive remedy, subject to a limit of liability of not less than

$100,000 each incident;

c. Motor vehicle liability insurance required by Michigan law including no-fault coverage for claims arising from ownership, maintenance or use of a motor vehicle with liability limits of not less than $1,000,000 per occurrence. Coverage shall include all owned vehicles, all non-owned vehicles, and all hired vehicles.

d. Commercial General Liability insurance for claims for damages because of bodily injury or death of any person, other than the Bidder’s employees, or damage to tangible property of others, including loss of use, which provides coverage for contractual liability, with a limit of not less than $1,000,000 each occurrence and a mandatory $2,000,000 annual aggregate.

Insurance required shall be in force until acceptance by the Academy of the entire completed work, and shall be written for not less than any limits of liability specified above. Certificates of insurance, acceptable to the

Academy, shall be provided to the Academy no less than ten (10) working days prior to the project start-up.

All Certificates of Insurance and duplicate policies shall contain the following clauses:

1. “It is understood and agreed that thirty (30) days advance written notice of cancellation, nonrenewal, reduction and/or material change in coverage will be mailed to the Academy; and

2. “It is understood and agreed that the following are listed as additional insureds: The Academy, including all elected and appointed officials, all employees and volunteers, all boards, commissions, departments and/or authorities and their board members, employees and volunteers and CS Partner, it’s management consultant firm.”

9. NON-DISCRIMINATION: In the performance of the proposal and resultant contract, bidder agrees not to discriminate against or grant preferential treatment to any individual or group on the basis of race, sex, color, ethnicity, or national origin in the operation of public employment, public education, or public contracting. Bidder shall not discriminate against any employee or applicant for employment to be employed in the submission of this Proposal or in performance of the duties necessitated by an award of the proposed contract with respect to his or her hire, tenure, terms, conditions or privileges of employment, or any matter directly or indirectly related to employment, because of his or her race, color, religion, national origin, ancestry, gender, height, weight, marital status, age, except where a requirement as to age is based on a bona fide occupational qualification, or disability that is unrelated to the individual's ability to perform the duties of a particular job or position. Any breach of this provision will be regarded as a material breach of the contract.

10. PROPOSAL DELIVERY: Proposals must be returned no later than 12:00 pm, April 10th, 2026. (No Proposals will be accepted after this time) in a sealed envelope clearly marked:

Mid-Michigan Leadership Academy DELIVER TO:

“Gym Floor & Bleacher Replacement(s) 2026” CS Partners

730 W. Maple St 869 S. Old US 23 (Suite 500)

Lansing, MI 48906 Brighton, MI 48114

Attn: Jeana Bolton-Carrasco

Please provide one (1) original, three (3) printed copies and one (1) electronic copy (USB drive) of the submission delivered to the above stated location. The Academy will accept proposals sent by FAX or Email under extenuating circumstances as approved by the Academy only.

11. PROPOSAL OPENING: There will be a public proposal opening for this RFP at 12:00 pm, October 16th, 2023 and will take place at a designated location on the School campus. (NOT REQUIRED)

12. PROPOSAL REJECTION/ACCEPTANCE: The Academy reserves the right to accept or reject any or all proposals, to waive any irregularities and to make the final determination as to the best low qualified proposal.

The Academy is not required to accept the lowest cost proposal in all or in part. The proposal award will not be based solely upon cost, but will be evaluated based upon criteria formulated around the most important features of the services, of which qualifications, experience or capacity may be overriding factors.

The Academy reserves the right to waive any informalities or immaterial omissions or defects not involving prices, time or changes in the work and to reject any or all proposal, if to do so is deemed in the best interest of the Academy. In no event will an award be made until all necessary investigations are made as to the responsibility and qualification of the bidder to whom is it proposed to make such an award. Any contract awarded to a person or company who is discovered to have been in default or disqualified at the time of the awarding of the contract shall be voidable at the discretion of the Academy.

13. PROPOSAL AWARD: In the event the proposal is awarded by the Academy, a Notice of Intent to Award will be used to notify all bidders of her intent to award the proposal to the Bidder providing the best value to the

Academy.

14. CONTRACT: The Academy’s award of any proposal is subject to and conditioned upon execution of a formal agreement for products and services between the successful bidder and the Academy. In submitting a proposal, the bidder acknowledges that the contents of the RFP will become incorporated within any formal agreement.

This RFP does not include every term and provision which shall be included in the formal agreement. In the event that the bidder fails to execute the formal agreement within 14 days of its presentment by the Academy, the Academy may reject the selected bidder, and proceed to accept another qualified proposal, or reject all proposals.

A copy of a bidder’s suggested terms and conditions may be submitted with bidder’s proposal, however, neither the Academy’s acceptance of any proposal nor award of any contract pursuant to this RFP shall be construed as any definitive acceptance by the Academy of Bidder’s suggested terms and conditions. In the event of a conflict in terms, the order of precedence to resolve the conflict will be as follows: Michigan State law, the terms and conditions of the signed contract, the terms and conditions of the RFP, and last, the Bidder’s Proposal.

15. DISPUTES: In the event a bidder disagrees with the recommendation of the Academy concerning this award, the bidder is required to submit their concern(s) in writing to the Board Attorney within ten (10) business days from the date of the notice of intent to award.

16. QUESTIONS: All questions about this RFP must be received by 5:00 pm, April 6th, 2026 in writing, via email, to:

David Blackmar

CS Partners dblackmar@charterschoolpartners.com

Correspondence or inquiries made directly to bidders regarding their proposals from all other persons are to be directed to the person(s) designated above for appropriate review and response. Contact with other Academy staff or School Board members could be reason for disqualification.

Any significant explanation desired by a proposer, regarding the meaning or interpretation of the Request for Proposals must be requested with sufficient time allowed for a reply to reach all prospective proposers to submit their proposals. Any information given to a prospective bidder concerning the Request for Proposal will be furnished to all prospective bidders as an amendment or addendum to the Request for Proposal, if such information would be of significance to uninformed bidders. The Academy shall make the sole determination as to the significance to uninformed bidders.

ADA ASSISTANCE:

The Academy will provide necessary and reasonable auxiliary aids and services, such as signers for the hearing impaired and audio tapes of printed materials being considered, to individuals with disabilities upon two days’ notice to the Academy. Individuals with disabilities requiring auxiliary aids or services should contact the Academy by writing or calling.

mailto:dblackmar@charterschoolpartners.com

ATTACHMENT A

PROJECT PRICING

Proposal Sheet for: Mid-Michigan Leadership Academy

Contract Price for: “Gym Floor & Bleacher Replacement(s) 2026”

Proposal Deadline: 12:00 pm, April 10, 2026

ITEM DESCRIPTION ALT AMOUNT AMOUNT

1) Gym Floor Replacement 2026 (General Contractor) $

2) Gym Bleacher Replacement 2026 (Sub Contractor) $

GRAND TOTAL $

VENDOR INFORMATION

Company Name: _____________________________________________________________________

Address/City/State/Zip: _______________________________________________________________

Email Address: _______________________________________________________________________

Company website: ____________________________________________________________________

Printed name and title of Authorized Company Representative:

Name

Title

Signature of Authorized Company Representative:

Date: _______________________

EXHIBIT A

{1 of 2}

1.0 GYM FLOOR & BLEACHER REPLACEMENT(S) SPECIFICATIONS:

1.1.0 GENERAL DESCRIPTION:

1.1.1 The existing flooring shall be prepped (including transitions) for placement of a synthetic rubber shock pad with all-purpose athletic resin flooring. This work shall include game lines and wall base.

1.1.2 The existing bleachers shall be dismantled in place and removed from the site. The new bleachers shall be closed back, wall mounted and electronically operated in a telescopic manner. Minimum seating shall be 300 seats.

1.1.3 The units shall be installed to meet all applicable manufacturers specifications and guidelines, all applicable governmental guidelines, and all industry-approved standards.

2.0 PREPARATION & REMOVALS:

2.1.0 GYM FLOOR PREPARATION:

2.1.1 The existing asbestos tiles shall be abated by others.

2.1.2 The existing flooring shall be prepped (including transitions) for placement of the new materials.

2.2.0 MATERIALS REMOVAL:

2.2.1 The existing bleachers shall be dismantled in place and removed from the site in a safe manner.

2.3.0 MATERIALS DISPOSAL:

2.3.1 Proper off-site disposal shall be coordinated with the Academy as the project begins.

3.0 INSTALLATION:

3.1.0 GYM FLOORING:

3.1.1 A 9 mm synthetic rubber shock pad shall be adhered to the existing flooring material as standard.

3.1.2 2 mm of Pulastic Classic 90 resin (or owner approved) shall be placed over the rubber pad as standard.

3.1.3 Wall base will be installed as appropriate to provide a finished floor look.

3.1.4 Game lines and custom logo (within the circle at center court) shall be installed per the owner’s specifications.

3.1.5 No traffic or other trades shall be allowed on the surface for a period of one week following completion to allow for complete and proper cure of the finish.

3.1.6 It shall be the responsibility of the general contractor to protect the surface from damage by other trades before acceptance by the owner or the owner's authorized agent.

3.1.7 Supplier shall be an established firm experienced in field and have been in business for a minimum of ten (10) years, Robbins, Inc. or an approved equal.

3.1.8 Floor system shall be approved by F.I.B.A. (International Basketball Federation) and provide copy of

Approval upon request.

3.1.9 Floor system shall be approved by I.H.F. (International Handball Federation) and provide copy of

Approval upon request.

3.2.0 BLEACHERS:

3.2.1 Any electrical needs shall be provided by others and coordinated by the school.

3.2.2 The bleacher system shall be comprised of (7) tiered, closed deck seating rows operating in a telescopic manner, incorporating the most economical quantity of sections while still complying with all loading requirements.

3.2.3 The seating shall be (306) net seats as standard.

3.2.4 The first moving row shall be secured with friction or mechanical locks. Other rows shall be mechanically locked, operable only upon unlocking and cycling the first row, as determined by the designer.

3.2.5 Each bleacher row shall be comprised of risers, seat and deck components, and a complete set of supportive columns and braces.

3.2.6 The telescopic bleacher shall incorporate a locking system permitting the use of one, several, or all rows, each locked in the extended position.

EXHIBIT A

{2 of 2}

3.2.7 (2) vinyl end curtains made of standard swatch shall be provided.

3.2.8 (2) pendent controllers shall be standard.

3.2.9 The manufacturer shall be regularly engaged in the design and manufacturing of telescopic seating for not less than ten years.

3.2.10 It shall be mandatory that each bidder submit with their bid an affidavit signed by a Registered Professional Engineer stating that the product to be supplied has been tested by an independent testing facility and meets all applicable code requirements.

3.2.11 Telescopic bleacher design and fabrication shall conform to IBC 2018 and ADA requirements.

3.2.12 Telescopic gymnasium seating will be designed to support a vertical live load of 100 PSF, but not less than 120 PLF on both seat boards and footboards. Seating shall also be designed to carry a horizontal sway force of 24 PLF parallel to the seating and 10 PLF perpendicular to the seating.

3.2.13 Provide 3'-0 1/4" wide wheel chair spaces as shown on the plans and as required to meet local code jurisdiction compliance with ADA. Notchouts to be 1 row deep.

3.2.14 Furnish a friction powered, integral automatic electro-mechanical propulsion system to open and close telescopic seating system.

3.2.15 All floor friction power systems shall be controlled by a dual directional, removable walk along pendant which plugs into the front of the first row to give the operator proper position for visual control.

3.2.16 All deck boards shall consist of 19/32” nominal C-C plugged Group 1 plywood with exterior glue and solid cross bands. Tongue and Groove deck boards are unacceptable.

3.2.17 All welds shall be made at factory by welders that are AWS certified on equipment and process used.

3.2.18 Steel Understructure abraded, cleaned and finished with russet brown water base acrylic paint. Steel risers and nose beams finished with corrosion resistant silver-gray matte finish with galvanized alloy plating.

3.2.19 18” wide one-piece individual seating modules shall be constructed of solid injection molded high-density polyethylene. Provide in 10" depth

5.0 MODIFICATIONS:

5.0.1 All power wiring must be performed by a licensed journeyman electrician or licensed master electrician.

5.0.2 A 208 volt 3-phase power source, including conduit, wiring, and safety disconnect must be provided by others.

6.0 ALTERNATE:

6.0.1 There is no alternate for this project.

7.0 NOTES:

7.0.1 Contractor to provide site-specific safety plan prior to any work commencing. All applicable MIOSHA safety regulations to be strictly followed on this project.

7.0.2 The bleacher system must be fully functional and operational after installation.

7.0.3 Installations must comply with all current relevant standards, codes of practice, and the State building regulations.

7.0.4 Any and all state and local permits shall be obtained by the prospective contractor with pricing included in the proposal.

7.0.5 All training for proper use and maintenance of the flooring and bleachers (including any applicable manuals) shall be provided prior to project close-out.

7.0.6 The furnished and installed systems shall be to be backed by manufactures warranty from the manufacturer and a 1-year workmanship warranty from contractor.

7.0.7 The work site shall be properly cleaned after each work day and upon project completion to the owner’s satisfaction.

EXHIBIT “B”

. -:4:1"', .

'. ' r/ .,.

1: \< }'i •'L

EXHIBIT B (#2)

Dave Blackmar Callout

COURT SIZE: 93 LF X 60 LF = 5,580 SF

ATTACHMENT B (#1)

Prevailing Wage Compliance Certification

Under Michigan law, MCL 408.1101 et seq., Public Act 10 of 2023, contractors and subcontractors are required to pay prevailing wage and benefit rates to employees on state funded construction projects. These rates are set by the Michigan Department of Labor and

Economic Opportunity. This requirement does not change compliance with the Davis-Bacon Act, 40 USC 3121 et seq., for prevailing wage rates applying to federally funded or assisted projects.

I, _____________________ (bidder), certify that _______________ (company name) will follow all the requirements under Michigan law described on form WHD 9918 DTMB form

(attached).

***The current prevailing wages are located at the State of Michigan website here https://www.michigan.gov/leo/-/media/Project/Websites/leo/Documents/WAGE-HOUR/WHD-99xx-Information-Sheets/WHD-9918-PW-REQUIREMENTS-INFO-SHEET/WHD-9918-DTMB-PW-rates-1-31-2022_ad-jf_.pdf?rev=d6d173da37ed451c9da6027ef1b0c54c&hash=89C157647352E20578EFB6C578C810A8 https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage

ATTACHMENT B (#2)

FAMILIAL DISCLOSURE STATEMENT

All bidders must complete the following familial disclosure form in compliance with MCL 380.1267 (Public

Act 232 of 2004) and attach this information to the bid.

By the attached sworn and notarized statement we are disclosing the following familial relationship(s) that exists between the owner or any employee of the bidder and any member of the school or academy board, the superintendent, executive officer, school leader or principal of the school or academy, or employee of the educational service provider. The school or academy shall not accept a bid that does not include this sworn and notarized disclosure statement.

Disclose any familial relationship and complete the form below in its entirety:

The following are familial relationships as described above (provide employee name, family contact name, family contact position, and familial relationship or NONE.)

Signature(s) Title:

Name of Firm:

State of County of

On this day of , 20 , before me a Notary Public in and for said county, personally appeared , agent of the said firm and who acknowledge the same to be his free act and deed as such agent.

Notary Public Commission Expires

Affidavit of Bidder-Compliance with School Safety Initiative Legislation

The undersigned, the owner or authorized officer of _____________________________(the “Bidder”), certifies to the School or Academy, that any and all persons who will work directly or indirectly for the

Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any School or Academy property, shall at all times be in compliance with MCL

380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g and have not been convicted of any “listed offenses”.1 The Bidder further warrants and represents that all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any School or Academy property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g. In this regard, Bidder agrees, without limitation, to report within 3 business days to the School or Academy when any such person is charged with a crime listed in Section 1535a(1) of the Revised School Code2 or a substantially similar law, and to immediately report to the School or Academy if that person is subsequently convicted, plead guilty or plead no contest to that crime.

BIDDER: __________________________________

By: _______________________________________

Its: _______________________________________

ATTACHMENT B (#3)

Iran Economic Sanctions Act Certification

I am the __________________(insert title) of _________________________ (insert bidder company name), or I am bidding in my individual capacity ("Bidder"), with authority to submit a binding bid for the provision of contracted services to the School. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq. ("Act"). I am fully aware that the School will rely on my representations in evaluating bids.

I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.

Signature ____________________________________

ATTACHMENT B (#4)

ATTACHMENT “B” (#5)

REFERENCES

1. Customer Name:

Contact: Title:

Project:

Phone Number:

Address:

Project Date:

2. Customer Name:

3. Customer Name:

STATE OF MICHIGAN

Wage and Hour Division PO Box 30476

Lansing, MI 48909 517-284-7800

Informational Sheet: Prevailing Wages on State Funded Projects

WHD 9918 (2/24)

REQUIREMENTS

Effective February 13, 2024

The purpose of establishing prevailing rates is to provide minimum rates of pay that must be paid to workers on construction projects that are financed or financially supported by the state Prevailing rates compiled from the rates contained in collectively bargained agreements which cover the locations of the state projects. While the prevailing wage rates are compiled through surveys of collectively bargained agreements, a collective bargaining agreement is not required for contractors to be on or be awarded state projects. The prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. The prevailing wage is satisfied when wages plus fringe benefits are equal to or greater than the required rate.

State of Michigan responsibilities:

• The department establishes the prevailing rate for each classification of construction mechanic requested by the contracting agents prior to contracts being let out for bid on a state project.

DTMB responsibilities

• If a contract is not awarded or construction does not start within 90 days of the date of the issuance of rates, a re- determination of rates must be requested by the contracting agents.

• Rates for classifications needed but not provided on the Prevailing Rate Schedule, must be obtained prior to contracts being let out for bid on a state project.

Contractor responsibilities:

• Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing rates prescribed in a contract.

• Every contractor and subcontractor shall keep an accurate record showing the name and occupation of and the actual wages and benefits paid to each construction mechanic. This record shall be available for reasonable inspection by DTMB or the department.

• Each contractor or subcontractor is liable for the payment of the prevailing rate to its employees.

• The prime contractor is responsible for advising all subcontractors of the requirement to pay the prevailing rate prior to commencement of work.

• A construction mechanic shall only be paid the apprentice rate if registered with the United States Department of Labor, Bureau of Apprenticeship and Training and the rate is included in the contract.

Enforcement:

A person who has information of an alleged prevailing wage violation on a prevailing wage project may file a complaint with the State of Michigan. The department will investigate and attempt to resolve the complaint informally. During the course of an investigation, if the requested records and posting certification are not made available in compliance with contractual requirements, the Contracting Agent may consider the Contractor to be in material breach of the contract and may terminate the contract for cause at the sole discretion. There are also civil penalties for failure to be in compliance with Act 10. View the entire text of Act 10 of 2023 at michigan.gov/wagehour.

Informational Sheet: Prevailing Wages on State Projects

P a g e | 1 of 10

WHD-9917 2/24

General Information Regarding Fringe Benefits

Certain fringe benefits may be credited toward the payment of the Prevailing Wage Rate:

o If a fringe benefit is paid directly to a construction mechanic o If a fringe benefit contribution or payment is made on behalf of a construction mechanic o If a fringe benefit, which may be provided to a construction mechanic, is pursuant to a written contract or policy o If a fringe benefit is paid into a fund, for a construction mechanic

When a fringe benefit is not paid by an hourly rate, the hourly credit will be calculated based on the annual value of the fringe benefit divided by 2080 hours per year (52 weeks @ 40 hours per week).

The following is an example of the types of fringe benefits allowed and how an hourly credit is calculated:

Vacation 40 hours X $14.00 per hour = $560/2080 = $.27 Dental insurance $31.07 monthly premium X 12 mos. = $372.84 /2080 = $.18 Vision insurance $5.38 monthly premium X 12 mos. = $64.56/2080 = $.03 Health insurance $230.00 monthly premium X 12 mos. = $2,760.00/2080 = $1.33 Life insurance $27.04 monthly premium X 12 mos. = $324.48/2080 = $.16 Tuition $500.00 annual cost/2080 = $.24 Bonus 4 quarterly bonus/year x $250 = $1000.00/2080 = $.48 401k Employer Contribution $2000.00 total annual contribution/2080 = $.96

Total Hourly Credit $3.65

Other examples of the types of fringe benefits allowed:

Sick pay Holiday pay Accidental Death & Dismemberment insurance premiums

The following are examples of items that will not be credited toward the payment of the Prevailing Wage Rate o Legally required payments, such as:

Unemployment Insurance payments Workers’ Compensation Insurance payments FICA (Social Security contributions, Medicare contributions) o Reimbursable expenses, such as:

Clothing allowance or reimbursement Uniform allowance or reimbursement Gas allowance or reimbursement Travel time or payment Meals or lodging allowance or reimbursement Per diem allowance or payment o Other payments to or on behalf of a construction mechanic that are not wages or fringe benefits, such as:

Industry advancement funds Financial or material loans

P a g e | 2 of 10

OVERTIME PROVISIONS for MICHIGAN PREVAILING WAGE RATE COMMERCIAL SCHEDULE

1. Overtime is represented as a nine character code. Each character represents a certain period of time after the first 8 hours Monday thru Friday.

Monday thru Friday

Saturday

Sunday & Holidays

Four 10s

First 8 Hours 4

8 9 9th Hour 1 5

10th Hour 2 6

Over 10 hours 3 7

Overtime for Monday thru Friday after 8 hours:

the 1st character is for time worked in the 9th hour (8.1 - 9 hours) the 2nd character is for time worked in the 10th hour (9.1 - 10 hours) the 3rd character is for time worked beyond the 10th hour (10.1 and beyond)

Overtime on Saturday:

the 4th character is for time worked in the first 8 hours on Saturday (0 - 8 hours) the 5th character is for time worked in the 9th hour on Saturday (8.1 - 9 hours) the 6th character is for time worked in the 10th hour (9.1 - 10 hours) the 7th character is for time worked beyond the 10th hour (10.01 and beyond)

Overtime on Sundays & Holidays The 8th character is for time worked on Sunday or on a holiday

Four Ten Hour Days The 9th character indicates if an optional 4-day 10-hour per day workweek can be worked between Monday and Friday without paying overtime after 8 hours worked, unless otherwise noted in the rate schedule. To utilize a 4 ten workweek, notice is required from the employer to employee prior to the start of work on the project.

2. Overtime Indicators Used in the Overtime Provision:

H - means TIME AND ONE-HALF due X - means TIME AND ONE-HALF due after 40 HOURS worked D - means DOUBLE PAY due Y - means YES an optional 4-day 10-hour per day workweek can be worked without paying overtime after 8 hours worked N - means NO an optional 4-day 10-hour per day workweek cannot be worked without paying overtime after 8 hours worked

3. EXAMPLES:

HHHHHHHDN - This example shows that the 1½ rate must be used for time worked after 8 hours Monday thru Friday (characters 1 - 3); for all hours worked on Saturday, 1½ rate is due (characters 4 - 7). Work done on Sundays or holidays must be paid double time (character 8). The N (character 9) indicates that 4 ten-hour days is not an acceptable workweek at regular pay.

XXXHHHHDY - This example shows that the 1½ rate must be used for time worked after 40 hours are worked Monday thru Friday (characters 1-3); for hours worked on Saturday, 1½ rate is due (characters 4 – 7). Work done on Sundays or holidays must be paid double time (character 8). The Y (character 9) indicates that 4 ten-hour days is an acceptable alternative workweek.

P a g e | 3 of 10

ENGINEERS - CLASSES OF EQUIPMENT LIST

UNDERGROUND ENGINEERS

CLASS I

Backfiller Tamper, Backhoe, Batch Plant Operator, Clam-Shell, Concrete Paver (2 drums or larger), Conveyor Loader (Euclid type), Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, End Loader, Gradall (and similar type machine), Grader, Power Shovel, Roller (asphalt), Scraper (self propelled or tractor drawn), Side Broom Tractor (type D-4 or larger), Slope Paver, Trencher (over 8’ digging capacity), Well Drilling Rig, Mechanic, Slip Form Paver, Hydro Excavator.

CLASS II

Boom Truck (power swing type boom), Crusher, Hoist, Pump (1 or more 6" discharge or larger gas or diesel powered by generator of 300 amps or more, inclusive of generator), Side Boom Tractor (smaller than type D-4 or equivalent), Tractor (pneu-tired, other than backhoe or front end loader), Trencher (8’ digging capacity and smaller), Vac Truck.

CLASS III

Air Compressors (600 cfm or larger), Air Compressors (2 or more less than 600 cfm), Boom Truck (non-swinging, non-powered type boom), Concrete Breaker (self-propelled or truck mounted, includes compressor), Concrete Paver (1 drum, ½ yard or larger), Elevator (other than passenger), Maintenance Man, Mechanic Helper, Pump (2 or more 4" up to 6" discharge, gas or diesel powered, excluding submersible pump), Pumpcrete Machine (and similar equipment), Wagon Drill Machine, Welding Machine or Generator (2 or more 300 amp or larger, gas or diesel powered).

CLASS IV

Boiler, Concrete Saw (40HP or over), Curing Machine (self-propelled), Farm Tractor (w/attachment), Finishing Machine (concrete), Firemen, Hydraulic Pipe Pushing Machine, Mulching Equipment, Oiler (2 or more up to 4", exclude submersible), Pumps (2 or more up to 4" discharge if used 3 hrs or more a day-gas or diesel powered, excluding submersible pumps), Roller (other than asphalt), Stump Remover, Vibrating Compaction Equipment (6’ wide or over), Trencher (service) Sweeper (Wayne type and similar equipment), Water Wagon, Extend-a-Boom Forklift.

HAZARDOUS WASTE ABATEMENT ENGINEERS

CLASS I

Backhoe, Batch Plant Operator, Clamshell, Concrete Breaker when attached to hoe, Concrete Cleaning Decontamination Machine Operator, Concrete Pump, Concrete Paver, Crusher, Dozer, Elevating Grader, Endloader, Farm Tractor (90 h.p. and higher), Gradall, Grader, Heavy Equipment Robotics Operator, Hydro Excavator, Loader, Pug Mill, Pumpcrete Machines, Pump Trucks, Roller, Scraper (self-propelled or tractor drawn), Side Boom Tractor, Slip Form Paver, Slope Paver, Trencher, Ultra High Pressure Waterjet Cutting Tool System Operator, Vactors, Vacuum Blasting Machine Operator, Vertical Lifting Hoist, Vibrating Compaction Equipment (self-propelled), and Well Drilling Rig.

CLASS II

Air Compressor, Concrete Breaker when not attached to hoe, Elevator, End Dumps, Equipment Decontamination Operator, Farm Tractor (less than 90 h.p.), Forklift, Generator, Heater, Mulcher, Pigs (Portable Reagent Storage Tanks), Power Screens, Pumps (water), Stationary Compressed Air Plant, Sweeper, Water Wagon and Welding Machine.

P a g e | 4 of 10

CARPENTER CRAFT JURISDICTION

Michigan recognizes the Carpenters for any and all work related to weatherization that has historically been the work of the Carpenter. This work shall include, but not be limited to: all work defined under the Federal Weatherization Assistance Program.

The jurisdiction of Carpenters, as to all work that has historically and traditionally been performed consisting of the milling, fashioning, joining, assembling, erecting, fastening or dismantling of all materials of wood, plastic, metal, fiber, cork, or composition and all other substitute materials, as well as the handling, cleaning, erecting, installing and dismantling of all machinery, equipment and all materials used by Carpenters.

The jurisdiction, therefore, extends over the following divisions and subdivisions of the trade: Carpenters and Joiners, Millwrights, Pile Drivers, Bridge, Dock and Wharf Carpenters, Underpinners, Timbermen, and Core-drillers, Shipwrights, Boat Builders, Ship- hand, Stair-Builders, Millmen, Wood and Resilient Floor Decorators, Floor Finishers, Carpet-layers, Shinglers, Siders, Insulators, Acoustic and Drywall Applicators, Sharers and House Movers, Loggers, Lumber and Sawmill Workers, Reed and Rattan Workers, Shingle Weavers, Casket and Coffin Makers, Railroad Carpenters and Car Builders, regardless of material used and all those engaged in the operation of woodworking or other machinery required in fashioning, milling or manufacturing of products used in the trade, and the handling, erecting and installing materials on any of the above divisions or sub-divisions, burning, welding and rigging incidental to the trade. When the term "Carpenter and Joiner" is used, it shall mean all the subdivisions of the trade. The trade autonomy of Carpenters therefore extends over the divisions and subdivisions of the trade, which are set forth as follows:

(a) The framing, erecting and prefabrication of roofs, partitions, floors and other parts of buildings of wood, metal, plastic or other substitutes; application of all metal flashing used for hips, valleys and chimneys; the erection of Stran Steel section or its equal. The building and setting of all forms and centers for brick and masonry. The fabrication and erection of all forms for concrete and decking, the dismantling of same (as per International Agreement) when they are to be re-used on the job or stored for re-use. The cutting and handling of all falsework for fireproofing and slabs. Where power is used in the setting or dismantling of forms, all signaling and handling shall be done by carpenters. The setting of templates for anchor bolts for structural members and for machinery, and the placing, leveling and bracing of these bolts. All framing in connection with the setting or metal columns. The setting of all bulkheads, footing forms and the setting of and fabrication of, screeds and stakes for concrete and mastic floors where the screed is notched or fitted, or made up of more than one member. The making of forms for concrete block, bulkheads, figures, posts, rails, balusters and ornaments, etc.

(b) The handling and erecting of rough material and drywall, the handling, assembly, setting and leveling of all fixtures, display cases, all furniture such as tables, chairs, desks, coat racks, etc., all de-mountable or moveable partitions such as Von wall, E Wall, Steel Case, Herman Miller, Haworth, American Seating, Westinghouse, Lazy Boy, rosewood, etc. All rebuilding, remodeling and setting up of all kinds of partitions, finished lumber, metal and plastic trim to be erected by Carpenters shall be handled from the truck or vehicle delivering same to the job by Carpenters.

P a g e | 5 of 10

CARPENTER CRAFT JURISDICTION

(c) The building and moving of all scaffolding runways and staging where carpenters' tools are used, the building from the ground up of all scaffolds over fourteen (14) feet in height including metal and specially designed scaffolding. The building and construction of all hoists and derricks made of wood; the making of mortar boards, boxes, trestles, all shoring, razing and moving of buildings. Lift type trucks are to be considered a tool of the trade.

Metal siding and metal roofing fall within the scope of jurisdiction for the carpenters.

(d) The cutting or framing and fireproofing of the openings for pipes, conduits, ducts, etc., where they pass through floors, partitions, walls, roofs or fixtures composed in whole or in part of wood. The laying out of making and installation of all inserts and sleeves for pipes, ducts, etc., where carpenters' tools and knowledge are required.

The making and installing of all wooden meter boards, crippling and backing for fixtures. The welding of studs and other fastenings to receive material being applied by carpenters.

(e) The installation of all grounds, furring or stripping, ceilings and sidewalks, application of all types of shingling and siding, etc.

(f) The installation of all interior and exterior trim or finish of wood, aluminum, kalamein, hollow or extruded metal, plastic, doors, transoms, thresholds, mullions and windows. The setting of jambs, bucks, window frames of wood or metal where braces or wedges are used. The installation of all wood, metal or other substitutes of casing, molding, chair rail, wainscoting, china closets, base of mop boards, wardrobes, metal partitions as per National Decisions or specific agreements, etc. The complete laying out, fabrication and erection of stairs. The making and erecting of all fixtures, cabinets, shelving, racks, louvers, etc. The mortising and application of all hardware in connection with our work. The sanding and refinishing of all wood, cork or composition floors to be sanded or scraped, filled, sized and buffed, either by hand or power machines. The assembling and setting of all seats in theaters, halls, churches, schools, auditorium, grandstands and other buildings. All bowling alley work.

(g) The manufacture, fabrication and installation of all screens, storm sash, storm doors and garage doors; the installation of wood, canvas, plastic or metal awnings or eye shades, door shelters, jalousies, etc. The laying of wood, wood block and wood composition in floors.

(h) The installation of all materials used in drywall construction, such as plasterboard, all types of asbestos boards, transite and other composition board. The application of all material which serves as base for acoustic tile, except plaster. All acoustical applications as per National Agreement or specific agreement.

(i) The building and dismantling of all barricades, hand rails, guard rails, partitions and temporary partitions. The erection and dismantling of all temporary housing on construction projects.

(j) The installation of rock wool, cork and other insulation material used for sound or weatherproofing. The removal of caulking and placing of staff bead and brick mold and all Oakum caulking, substitutes, etc., and all caulking in connection with carpentry work.

(k) The installation of all chalk boards/marker boards.

P a g e | 6 of 10

CARPENTER CRAFT JURISDICTION

(l) The operation of all hand operated winches used to raise wooden structures.

(m) The erection of porcelain enameled panels and siding.

(n) The unloading and distribution of all furnished, prefabricated and built-up sections such as door bucks, window frames, cupboards, cabinets, store fixtures, counters and show cases or comparably finished or prefabricated materials, to the job sites or points of installation as used in the construction, alteration and remodeling industry.

(o) The handling of doors, metal, wood or composite, partitions and other finished bulk materials used for trim from the point of delivery.

(p) All processing of these materials and handling after processing.

(q) The making up of panels and fitting them into walls, all bracing and securing, all removal of panels from the casting including all braces, whalers, hairpins, etc.

(r) The handling and setting of all metal pans and sections from the stock piles of reasonable distance as required by job needs shall be performed by carpenters. The stripping of such metal pans, panels or sections is to be performed by carpenters.

(s) The sharpening of all carpenter hand or power tools, or those used by carpenters.

(t). The layout, fabrication, assembling of and erection and dismantling of all displays made of wood, metal, plastic, composition board or any substitute material; the covering of same with any type of material, the crating and un-crating, the handling from the point of unloading and back to the point of loading of all displays and other materials or components.

(u) The same shall apply to all other necessary component parts used for display purposes such as turntables, platforms, identification towers and fixtures, regardless of how constructed, assembled or erected or dismantled.

(v) The make-up, handling, cutting and sewing of all materials used in buntings, flags, banners, decorative paper, fabrics and similar materials used in the display decorative industry for draperies and back drops. The decorative framing of trucks, trailers and autos used as floats or moving displays. The slatting of walls to hand fabrics and other decorative materials, drilling of all holes to accommodate such installations. Setting up and removal of booths constructed of steel or aluminum tubing as stanchions, railings, etc., handling and placing of furniture, appliances, etc., which are being used to complete the booth at the request of the exhibitor. Fabricating and application of leather, plastic and other like materials used for covering of booths. The handling of all materials, fabricating of same. The loading and unloading, erecting and assembling at the exhibit of show area, also in or out of storage when used in booth decorations.

P a g e | 7 of 10

CARPENTER CRAFT JURISDICTION

(w) A display shall be construed as any exhibit or medium of advertising, open to private or public showing, which is constructed of wood, metal, plastic or any other substitute to accomplish the objectives of advertising or displaying.

(x) Handling, fitting, draping, measuring and installation of fixtures and other hardwares for draperies, all manner of making, measuring, repairing, sizing, hanging and installation of necessary fixtures and hardware for shades and Venetian blinds.

(y) Work consisting of cutting and/or forming of all materials in preparation for installing of floors, walls and ceilings; the installation of all resilient floor and base; wall and ceiling materials to include cork, linoleum, prefabricated, laminated, rubber, asphalt, vinyl, metal, plastic, seamless floors and all other similar materials in sheet, interlocking liquid or tile form; the installation of all artificial turf, the installation, cutting and/or fitting of carpets; installation of padding, matting, linen crash and all preformed resilient floor…

This is the start of the file's text. The full file is on GovTribe.