MINIMUM REQUIREMENTS.docx
DOCX document 13 KB Posted
- Attached to
- Lead Zirconate Titanate ceramic (PZT) Materials
- Solicitation number
- N6660421Q0221
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ split award.docx | DOCX document | |
| Example Cylinder Measurements.xlsx | XLSX spreadsheet | |
| RFQ final.docx | DOCX document | |
| Clause 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNMENT MINIMUM REQUIREMENTS
The Contractor shall manufacture, package, and deliver the following PZT-4 material in accordance with the attached drawings:
QTY 21/ea.- PZT-4 Hemisphere QTY 1,254/ea. - PZT-4 Bar QTY 124/ea. - PZT-4 Bar (unpolarized) QTY 50/ea. - PZT-4 Cylinder
The parts shall be manufactured per the attached drawings:
| - | Hemisphere: drawing number 1007 |
| - | Cylinder: drawing number 8440464 |
| - | Bar: drawing number 00001202 |
As specified in note 7 on drawing number 8440464, electrode width and spacing shall be equidistance around the cylinders. In end use they are assembled in a stack and the stripes of all cylinders in the stack must align.
The drawings specify measurements on the PZT-4, which shall be provided in an excel spreadsheet. Measurements in pdf form alone are not acceptable. These measurements shall contain the serial number for the individual part along with (1) capacitance, (2) dissipation, (3) any additional measurements specified by the drawings, for example:
| - | Cylinder drawing no. 8440464, notes 9, 11, and 16 |
| - | Bar drawing no 00001202, note 8, |
Measurement values shall conform to nominal values within tolerances specified in the drawings. As the PZT-4 cylinders are more complicated than the other items, the attached excel spreadsheet, “Example Cylinder Measurements” is an example of such measurements for the cylinder assembly. In the example, quadrant 1 is defined/chosen, and then the capacitance and dissipation of quadrants 1-4 are measured. If the cylinder measurements are performed differently than the attached example, please provide your convention.
Hemisphere drawing no. 1007, sheet 1 is for reference only, these properties do not need to be included in supplied measurements. Hemisphere measurements shall include Capacitance, dissipation, fr, fa, and coupling coefficient (k_eff), which must meet Navy type I material requirements. Hemisphere measurements shall be performed at 1 kHz.
As these materials have different lead time and manufacturing times, partial shipments are allowed not to exceed 5 total shipments, portioned between parts as follows:
| - | Cylinders, drawing number 8440464: 1 full shipment |
| - | Bars, drawing number 00001202: 1 full shipment |
| - | Hemispheres, drawing number 1007: up to 3 partial shipments as units become available. |