Minimum Facility Requirements 20221128.pdf

PDF 413 KB Posted

Attached to
Code 45 SVTT Engineering Services
Solicitation number
N66604
Issued by

About this file

This document outlines minimum facility requirements for the overhaul of Surface Vessel Torpedo Tube Mk 32 units and exit velocity testing capabilities. The facility must include a 10,000 square foot area for launcher overhaul, a 2,000 square foot area each for subassembly overhaul and material storage, a loading dock, and capability to load units onto flatbed trucks. Exit velocity testing facilities are required to repeatedly fire a torpedo test shape from a SVTT unit and obtain the muzzle velocity, while minimizing damage to the test shape and hazards downrange. The recommended test envelope is 40 feet by 150 feet.

The related federal contract opportunity is a pre-solicitation notice from the Department of the Navy Naval Sea Systems Command for Code 45 SVTT Engineering Services. Offerors are directed to the attached sources sought description, draft statement of work, and minimum facility requirements document.

View the file

Other files

File Type Posted
Draft SOW_Sources Sought.docx DOCX document
Sources Sought Description.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Surface Vessel Torpedo Tube Mk 32 Minimum Facility Requirements:

Production:

Facility Must be large enough to accommodate overhaul of six (6) SVTT Mk 32 units with an approximate footprint of 12 ft long x 4 ft wide x 5 ft tall weighing approximately 2500 lbs.

Various stages of overhaul consist of (1) teardown, (2) refurbishment, (3) reassembly, (4) quality assurance testing, and (5) packaging for shipment. The facility must be large enough to house an additional four (4) units in preparation of refurbishment. All equipment at various stages of overhaul must be stored indoors in a secured facility. Recommended minimum work area of 10,000 sq ft for launcher overhaul.

The facility must allow for ample space to overhaul subassemblies. Recommended minimum work area of 2,000 sq ft for subassembly overhaul.

The facility must include storage space for the housing of replacement material in preparation for the overhaul of a unit. Recommended minimum work area of 2,000 sq ft for material storage.

The facility must have a loading dock to allow for receipt of shipments. The facility must also have the capability of loading SVTT units onto flatbed trucks for transportation.

Non-refurbished launchers are normally mounted to standard pallets. Crated launchers are mounted to an extended pallet with a size of 4 ft wide by 12 ft long. A standard forklift may be used to load and unload both crated and non-crated launchers.

Exit Velocity Testing:

The test facility must be capable of repeatedly allowing a SVTT unit to fire a torpedo test shape.

The facility must obtain the exit velocity of the test shape at the muzzle of the barrel. There must be minimal damage to the torpedo test shape after firing. The facility must minimize any hazards down range of the weapon. The torpedo test shape must be recoverable.

Recommended test envelope of 40 ft x 150 ft. Exit Velocity requirements are defined in the

Surface Vessel Torpedo Tube (SVTT) Quality Assurance and Test Inspection Procedures (QATIP) as well as the SVTT Mk 32 Mod 15 Overhaul Manual SW395-AV-MMI-010. The contractor will be required to develop a test plan in order to obtain the weapon velocity at the muzzle of the barrel.

The government will provide the torpedo test shape required for exit velocity testing.