MIMA_Gowing-Clark House_RFB-2_Attachment C_LBP Disclosures.pdf
PDF 39 MB Posted
- Solicitation number
- MIMA_Gowing-Clark-House_RFB-2
About this file
This is a Request for Proposal (RFP) for lead-based paint abatement services at the Gowing-Clark House, a historic property within Minute Man National Historical Park in Concord, Massachusetts. The National Park Service, through its Contracting Operations East office, is soliciting sealed bids for comprehensive lead abatement work on the Federal-style home built in 1836. The project scope includes lead-based paint removal and remediation on interior and exterior surfaces across approximately 1,500 square feet, with specific work required on room hallways, stairs (risers, treads, and baseboards), balusters, newel posts, handrails, east porch components (flooring, columns, trim, fascia, skirting, ceiling), kitchen hearth, fireplace, window openings, and exterior elevations. All work must employ best lead-based paint abatement practices with proper containment procedures, including plastic sheeting to capture debris and safe removal protocols. The contractor must begin performance within seven calendar days of receiving the notice to proceed and complete all work within 60 days, with the performance period running from May 19, 2025 to July 31, 2025.
The contract is a fixed-price lump-sum award with an estimated magnitude between $25,000 and $100,000. Sealed offers are due by 10:00 a.m. local time on May 12, 2025, to the NPS Contracting Operations East office in Boston. This is a small business set-aside contract subject to limitations on subcontracting (85 percent for general construction work), prevailing wage requirements under the Davis-Bacon Act, Buy American construction materials provisions, and sustainability requirements. The contractor must furnish performance and payment bonds if required and comply with various federal clauses including provisions for inspection of construction, differing site conditions, material and workmanship standards, and prohibition against lead-based paint use on new surfaces. Offerors must acknowledge receipt of any solicitation amendments and provide pricing on the provided contract price schedule form. Invoices must be submitted electronically through the Treasury's Invoice Processing Platform (IPP), with draft payment packages submitted to the Construction Management Representative at least five working days prior to formal submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G R E A T E R B O S T O N R E A L E S T A T E B O A R D
Tenant Certification Form Required Federal Lead Warning Statement Housing built before 1978 may contain lead-based paint. Lead from paint, paint chips, and dust can pose health hazards if not managed properly. Lead exposure is especially harmful to young children and pregnant women.
Before renting pre-1978 housing, lessors must disclose the presence of known lead-based paint and/or lead-based paint hazards in the dwelling. Lessees must also receive a federally approved pamphlet on lead poisoning prevention. The Massachusetts Tenant Lead Law Notification and Certification Form is for compliance with state and federal lead notification requirements.
Owners’s Disclosure
a. Presence of lead-based paint and/or lead-based paint hazards (check (i) or (ii) below):
i. ___X_____ Known lead-based paint and/or lead-based paint hazards are present in the housing (explain). __House been deleaded 3 times since 1990's. Currently have a lead safe form from insoector.
ii. ________ Owner/Lessor has no knowledge of lead-based paint and/or lead-based paint hazards in the housing.
b. Records and reports available to the seller (check (i) or (ii) below):
i. ____X____ Owner/Lessor has provided the purchaser with all available records and reports pertaining to lead-based paint and/or lead-based paint hazards in the housing (circle documents below).
Lead Inspection Report; Risk Assessment Report; Letter of lnterim Control; Letter of Compliance
ii. ________ Owner/Lessor has no reports or records pertaining to lead-based paint and/or lead-based paint hazards in the housing.
Tenant’s Acknowledgment (initial)
c. ________ Tenant has received copies of all documents circled above.
d. ________ Tenant has received no documents listed above.
e. ________ Tenant has received the Massachusetts Tenant Lead Law Notification.
Agent’s Acknowledgment (initial)
f. ________ Agent has informed the owner/lessor of the owner’s/lessor’s obligations under federal and state law for leadbased paint disclosure and notification and is aware of his/her responsibility to ensure compliance.
Certification of Accuracy The following parties have reviewed the information above and certify, to the best of their knowledge, that the information they have provided is true and accurate.
Owner/Lessor Tenant Agent
Date Date Date
Owner/Lessor Tenant Agent
Date Date Date
Owner/Managing Agent Information for Tenant (Please Print):
Name Street Apt.
_______________________________________________________781-472-0970________________________ City/Town Zip Telephone
______I (owner/managing agent) certify that I provided the Tenant Lead Law Notification/ Tenant Certification Form and any existing Lead Law documents to the tenant, but the tenant refused to sign this certification.
The tenant gave the following reason:_____________________________________________________________ The Massachusetts Lead Law prohibits rental discrimination, including refusing to rent to families with children or evicting families with children because of lead paint.
Contact the Childhood Lead Poisoning Prevention Program for information on the availability of this form in other languages.
Tenant and owner must each keep a completed and signed copy of this form. CLPPP95-17 Rev.8/09
174 Liberty StMinute Man NHP
1742Concord
6/17/2026
6/17/2026
A dd en du m : 4
/3 0/
Lead Abatement Project
Gowing-Clark House
663 Lexington Rd Concord Mass
Date: 3/18/2025
Minute Man National Historical Park 174 Liberty St Concord Ma 01742
Room 102 & 202 Hallway stairs:
Risers, treads, and baseboards to be LBP abated and repainted using means specified. Newel post and handrails to be scraped and stripped. Stains and coatings to be chosen in coordination with COR for likeness. Baluster to scraped and stripped of LBP and repainted using means specified.
East Porch:
Flooring, columns, trim, fascia, skirting, boxing and ceiling to be LBP abated and repainted using means specified. Repairs to be carried out by NPS.
Kitchen hearth and fireplace to LBP abated.
Color to be chosen by COR based of existing colors. Binders as necessary for paint adhesion.
Brick and mortar work not included in this work.
All architectural elements to remain on the structure. Storm windows to be removed with care and replaced in their original locations.
A dd en du m : 4
/3 0/
Gowing-Clark House
663 Lexington Rd Concord Mass
Date: 3/18/2025
Minute Man National Historical Park 174 Liberty St Concord Ma 01742 pmcpherson Line pmcpherson Line pmcpherson Oval pmcpherson Oval pmcpherson Oval pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Oval pmcpherson Oval pmcpherson Oval pmcpherson Oval pmcpherson Oval pmcpherson Oval pmcpherson Oval pmcpherson Polygonal Line pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Rectangle pmcpherson Line pmcpherson Rectangle pmcpherson Line pmcpherson Line
205206
201A 201B 203A
206A
N201A N201B
E201C
S204A
W203C
W203D
N203A N203B
N205A
E206B
N206A
Room 102 & 202 Hallway stairs:
Risers, treads, and baseboards to be LBP abated and repainted using means specified. Newel post and handrails to be scraped and stripped. Stains and coatings to be chosen in coordination with COR for likeness. Baluster to scraped and stripped of LBP and repainted using means specified.
N201B
Colonial six panel doors throughout, typical.
Example of door casing and moldings throughout.
Standard tall baseboard throughout, typical. Note: electrical hardware in baseboards, throughout.
A dd en du m : 4
/3 0/
Gowing-Clark House
663 Lexington Rd Concord Mass
Date: 3/18/2025
Minute Man National Historical Park 174 Liberty St Concord Ma 01742 pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Rectangle pmcpherson Rectangle pmcpherson Line pmcpherson Line pmcpherson Rectangle pmcpherson Line pmcpherson Line pmcpherson Line
No work to be carried out to gutters, throughout. Work highlighted to be verified in the Whole of South entrance door, side field by Contractors and COR. Allow lights and surround is considered inside 1500 SQFT for LBP Abatement. All scope of work.
critical path carpentry repairs to be taken on by NPS.
Care to be giving to safely capture all loose paint as sanding and scraping are happening.
Plastic sheeting is expected to capture all debris. Proper health and safety mitigation practiced being exercised
All first and second floor interior window openings including: Headers, Sills, Casings, require best LBP abatement practices. Sash is not included in this Scope of Work.
Storm windows to be removed with care and replaced in their original locations.
South Elevation
A dd en du m : 4
/3 0/
Gowing-Clark House
663 Lexington Rd Concord Mass
Date: 3/18/2025
Minute Man National Historical Park 174 Liberty St Concord Ma 01742 pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Rectangle
No work to be carried out to gutters, throughout.
Scrape and clean all sides of columns including trim to remove LBP using best
West Elevation
A dd en du m : 4
/3 0/ practices. Clean, prime and paint in accordance with Section 3.2.2. Scrape, light sanding, and clean to LBP free substrate:
Trim, Fascia, Moldings, and Freeze boards.
prime and paint in accordance with Section 3.2.2.
Lead Abatement Project
Gowing-Clark House
663 Lexington Rd Concord Mass
Date: 3/18/2025
No work to be carried out to storm doors, throughout.
Care to be giving to safely capture all loose paint as sanding and scraping are happening.
Plastic sheeting is expected to capture all debris. Proper health and safety mitigation practiced being exercised
Work highlighted to be verified in the field by Contractors and COR. Allow 1500 SQFT for LBP Abatement. All critical path carpentry repairs to be taken on by NPS.
Minute Man National Historical Park 174 Liberty St Concord Ma 01742 pmcpherson Rectangle pmcpherson Line pmcpherson Polygonal Line pmcpherson Polygonal Line pmcpherson Line pmcpherson Line pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Line pmcpherson Polygonal Line pmcpherson Line pmcpherson Line
No work to be carried out to gutters, throughout.
Care to be giving to safely capture all loose paint as sanding and scraping are happening.
Plastic sheeting is expected to capture all debris. Proper health and safety mitigation practiced being exercised
Scrape and clean all sides of columns including trim to remove LBP using best practices. Clean, prime and paint in accordance with Section 3.2.2. Scrape, light sanding, and clean to LBP free substrate: Floor boards, Trim, Fascia, and ceiling. prime and paint in accordance with Section 3.2.2.
Floorboard to be scraped and sanded to clean and fair substrate. Prime and paint as to match existing.
East Elevation
A dd en du m : 4
/3 0/
Gowing-Clark House
663 Lexington Rd Concord Mass
Date: 3/18/2025
Minute Man National Historical Park 174 Liberty St Concord Ma 01742 pmcpherson Polygonal Line pmcpherson Polygonal Line pmcpherson Polygonal Line pmcpherson Polygonal Line pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Rectangle pmcpherson Polygonal Line pmcpherson Polygonal Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Line pmcpherson Rectangle
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
140P4325R0014
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
x NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED
04/11/2025
PAGE
OF PAGES
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)FOR
0044009334
NPS, NER - NE MABO
Boston National Historical Park
Charlestown Navy Yard Building I-1
PNN
Boston MA 02129-4543
Jason_Albright@nps.gov
Jason Albright 6175196145
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The National Park Service, Contracting Operations East, New England Major
Acquisition Buying Office, issues this Request for Proposal (RFP) for a construction requirement at Minute Man National Historical Park in Concord, Massachusetts. Work will consist of furnishing all Work will consist of providing all labor, materials, tools and other equipment and supervision as required for completing the necessary lead paint abatement at the Gowing Clark House at Minute Man National Historical
Park. Information is provided in the Statement of Work, provided with the solicitation documents.
The estimated magnitude of the complete requirement is between $25,000 and $100,000.
Provisions and clauses - 04/11/2025
Attachment 1 - Statement of Work - 03/25/2025
Attachment 2 - Gowing Clark House Floor Plans - 03/18/2025
Attachment 3 - Lead Inspection/Risk Assessment Report - 03/29/2018
Attachment 4 - DOL Construction Wage Rate Determination - 04/04/2025
Attachment 5 - Construction Contract Administration - 04/11/2025
Attachment 6 - Limitation on Subcontracting Report - 04/11/2005
11. The Contractor shall begin performance within ________________ calendar days and complete it within ________________ calendar days after receiving7 60 Statement of Work Section 6.1 award, x notice to proceed. The performance period is x mandatory negotiable. (See ________________________________________________.)
12b. CALENDAR DAYS YES x NO12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by 1000 (hour) local time_____________ ___________________
________________________ (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be 05/12/2025 marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, x is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
60d. Offers providing less than _________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
NSN 7540-01-155-3212 STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
Continued...
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
NPS, NER - NE MABO
Boston National Historical Park
Charlestown Navy Yard Building I-1
PNN
Boston MA 02129-4543
10 U.S.C. 3204(a) 41 U.S.C. 3304(a) ( ))(
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
Jason Albright
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
STANDARD FORM 1442 (REV. 12/2022) BACK
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P4325R0014
PAGE
OF
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
Delivery: 60 Days After Notice to Proceed
Delivery Location Code: 0011282793
NPS, Minute Man NHP
174 Liberty Street
Concord MA 01742 US
Period of Performance: 05/19/2025 to 07/31/2025
00010 Gowing Clark House Lead Abatement
Product/Service Code: F108
Product/Service Description: ENVIRONMENTAL
SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation Date 04/11/2025
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
TABLE OF CONTENTS
PART I – THE SCHEDULE
SECTION A – SOLICITATION / CONTRACT FORM
SECTION B – BID SCHEDULE
SECTION C – SPECIFICATIONS / DRAWINGS
SECTION D – PACKING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
SECTION F – DELIVERIES OR PERFORMANCE
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
52.242-14 SUSPENSION OF WORK (APR 1984)
SECTION G – CONTRACT ADMINISTRATION DATA
1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
1452.204-70 RELEASE OF CLAIMS—DEPARTMENT OF THE INTERIOR (JUL 1996)
NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING
SYSTEM (DEC 2015)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INTERNET PAYMENT PLATFORM
(FEB 2021)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
CLAUSES INCORPORATED BY REFERENCE
1452.203-70 RESTRICTIONS ON ENDORSEMENTS (JUL 1996)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES AND EQUIPMENT (NOV 2021)
52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION
(DEC 2023) ………………………………………………………………………………………………………….19
1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF THE INTERIOR (APR 1984)..23
52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) (DEVIATION OCT 2022)
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024) (DEVIATION FEB 2025)……..….25
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)
1452.228-70 LIABILITY INSURANCE. (JUL 1996)
52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236-8 OTHER CONTRACTS (APR 1984)
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236-12 CLEANING UP (APR 1984)
52.236-13 ACCIDENT PREVENTION (NOV 1991)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236-17 LAYOUT OF WORK. (APR 1984)
52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT (JUL 1996)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (NOV 2020)
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
PROVISIONS INCORPORATED BY REFERENCE
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)(DEVIATION FEB 2025)..36
52.204-24 REPRESENTATIONS REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES AND EQUIPMENT (NOV 2021)
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-REPRESENTATION
(OCT 2020)
52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION
AND DISCLOSURES (DEC 2023)……………………………………………………………………………………42
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS-CERTIFICATION (NOV
2021)
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
PROVISIONS INCORPORATED BY REFERENCE
52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS. (JUNE 1988)
1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION—DEPARTMENT OF THE
INTERIOR (APR 1984)
52.216-1 TYPE OF CONTRACT (APR 1984)
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT–CONSTRUCTION MATERIALS (MAY 2014)..49
52.233-2 SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR (JUL 1996) (DEVIATION)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.236-27 SITE VISIT (CONSTRUCTION) – ALTERNATE I (FEB 1995)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER INFORMATION – COMPETITIVE
SOURCE SELECTION
SECTION M – EVALUATION FACTORS FOR AWARD
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
PART I – THE SCHEDULE
SECTION A – SOLICITATION / CONTRACT FORM
Solicitation, Offer, and Award (SF-1442) - pages 1- 3 of this package
SECTION B – BID SCHEDULE
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P4325R0014
PARK – Minute Man National Historical Park PROJECT TITLE: Gowing Clark House Lead Abatement
Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Round totals & extended prices to whole dollars. Refer to section “H” of this solicitation for additional information regarding contract options.
CONTRACT LINE
ITEM NUMBER
(CLIN)
CONTRACT LINE ITEM TITLE QUANTITY UNIT OF
MEASURE BASE PRICE
00010 Base – Gowing Clark House Lead Abatement
TOTAL CONTRACT PRICE (Contract Line Item Number 00010) --- All measurement and payment information are included in the project specifications.
1 LUMP SUM $__________
SECTION C – SPECIFICATIONS / DRAWINGS
The work of this contract is for a construction requirement at Minute Man National Historical Park in Concord, MA.
Work will consist of providing all labor, materials, tools and other equipment and supervision as required for completing the necessary lead abatement at the Gowing Clark House.
Project Location: Minute Man National Historical Park, Concord, MA.
Statement of Work is attached and incorporated herein by reference. Refer to section J.
SECTION D – PACKING AND MARKING
No clauses included.
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
SECTION E – INSPECTION AND ACCEPTANCE
0B52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause)
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
SECTION F – DELIVERIES OR PERFORMANCE
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days from the issuance of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.242-14 SUSPENSION OF WORK (APR 1984)
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed—
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(End of clause)
SECTION G – CONTRACT ADMINISTRATION DATA
1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of clause)
1452.204-70 RELEASE OF CLAIMS—DEPARTMENT OF THE INTERIOR (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI–137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of clause)
NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING
SYSTEM (DEC 2015)
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations may be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of Notice)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INTERNET PAYMENT PLATFORM
(FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/ https://www.ipp.gov/
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
The contractor shall submit a draft Invoice Package, including copies of the following documents, to the National Park Service’s (NPS) Construction Management Representative (CMR) a minimum of 5 working days prior to submittal of the formal Invoice through IPP. Within 5 working days of receipt, the CMR shall provide an acceptability recommendation to both the NPS Contracting Officer’s Representative (COR) and the contractor. If the CMR recommends acceptance, the contractor shall submit a copy of the final version of the CMR’s checklist and the Invoice Package to the NPS through IPP.
1. Completed copy of the CMR’s final Construction Payment Request Checklist (Submit only with the formal submittal to IPP)
2. Completed copy of the Pay Estimate Form (including signed certification of subcontractor payments)
3. Completed copy of the Limitations on Subcontracting Report (Include if acquisition is being set-aside and clause
52.219-14 is included)
4. Information required by contract clause 52.232-27, Prompt Payment for Construction Contracts
5. A copy of the current construction schedule (refer to project specification section 013216)
6. A copy of the current Schedule of Values. (refer to project specification section 013216)
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Clause)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
No Special Contract Requirements included.
mailto:IPPCustomerSupport@fiscal.treasury.gov
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
CLAUSES INCORPORATED BY REFERENCE
The following contract clauses pertinent to this section are incorporated by reference (by Citation Number, Title, and Date) per the clause at FAR “52.252-2 CLAUSES INCORPORATED BY REFERENCE” in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to a clause’s full text.
52.202-1 DEFINITIONS (JUN 2020)
52.203-3 GRATUITIES (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
52.203-8 CANCELLATION, RECESSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY
(MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)
52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR
STATEMENTS (JAN 2017)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUNE 2023)
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUB-CONTRACTING WITH CONTRACTOR’S
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT
2018) 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)
52.215-2 AUDIT AND RECORDS-NEGOTIATIONS (JUN 2020)
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997)
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (MAR 2020)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2025)
52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)
52.222-3 CONVICT LABOR (JUN 2003)
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS-OVERTIME COMPENSATION (MAR 2018)
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
52.222-8 PAYROLLS AND BASIC RECORDS (JUL 2021)
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
52.222-9 APPRENTICES AND TRAINEES (JUL 2005)
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222-12 CONTRACT TERMINATION - DEBARMENT (MAY 2014)
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIRMENTS AND RELATED REGULATIONS
(MAY 2014)
52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APRIL 2015)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2025)
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 14026 DEVIATION (OCT 2023)
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
52.223-21 FOAMS (MAY 2024)
52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
52.224-2 PRIVACY ACT (APR 1984)
52.224-3 PRIVACY TRAINING (JAN 2017)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.226-7 DRUG-FREE WORKPLACE (MAY 2024)
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)
52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JUN 2020)
52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)
52.227-17 RIGHTS IN DATA – SPECIAL WORKS (DEC 2007)
52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (DEC 2022)
52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
52.232-17 INTEREST (MAY 2014)
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS CONTRACTORS (MAR 2023)
52.233-1 DISPUTES (MAY 2014) – ALTERNATE 1 (DEC 1991)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.242-13 BANKRUPTCY (JUL 1995)
52.243-4 CHANGES (JUN 2007)
52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2024)
52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) ALT 1 (APR 1984)
52.248-3 VALUE ENGINEERING – CONSTRUCTION (OCT 2020)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012), ALT 1 (SEP
1996)
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
1452.203-70 RESTRICTIONS ON ENDORSEMENTS (JUL 1996)
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205–1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
(End of clause)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies established at 41 U.S.C. 4712 and Federal Acquisition Regulation (FAR) 3.900 through 3.905.
(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in FAR 3.900 through 3.905.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts.
(End of clause)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)
(a) Definitions. As used in this clause—
Kaspersky Lab covered article means any hardware, software, or service that–
(1) Is developed or provided by a Kaspersky Lab covered entity;
(2) Includes any hardware, software, or service developed or provided in whole or in part by a Kaspersky Lab covered entity; or
(3) Contains components using any hardware or software developed in whole or in part by a Kaspersky Lab covered entity.
Kaspersky Lab covered entity means– https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/part-3#FAR_3_900 https://www.acquisition.gov/far/part-3#FAR_3_905 https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/part-3#FAR_3_900 https://www.acquisition.gov/far/part-3#FAR_3_905
Document No.
140P4325R0014
Document Title ConOps East- Boston – Minute Man National Historical Park
– Gowing Clark House Lead Abatement
(1) Kaspersky Lab;
(2) Any successor entity to Kaspersky Lab, including any change in name, e.g., “Kaspersky”;
(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or
(4) Any entity of which Kaspersky Lab has a majority ownership.
(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L.
115-91) prohibits Government use of any Kaspersky Lab covered article. The Contractor is prohibited from—
(1) Providing any Kaspersky Lab covered article that the Government will use on or after October 1, 2018; and
(2) Using any Kaspersky Lab covered article on or after October 1, 2018, in the development of data or deliverables first…
This is the start of the file's text. The full file is on GovTribe.