Milan BP-T1 RFP.pdf

PDF 262 KB Posted

Attached to
Bid Package T1 Video Surveillance
Solicitation number
RFP - MAS - 240000001608
Issued by
Washtenaw County, Menominee City, Michigan

About this file

This document is a Request for Proposals (RFP) issued by Barton Malow on behalf of the Milan Area Schools (MAS) in Milan, Michigan for a districtwide video surveillance system replacement project. MAS is seeking proposals for the purchase and installation of a cloud-based video surveillance system covering five school buildings. The RFP includes the project scope, schedule, evaluation criteria, submission requirements, and other terms. Proposals are due on April 3, 2024 at 11:00 AM local time, and a pre-bid meeting will be held on March 19, 2024. The project is expected to start on June 10, 2024 and be substantially complete by August 20, 2024.

The RFP outlines pricing and payment terms, including unit pricing for camera types, a 5-year warranty on the video management system, and the ability to purchase additional equipment at the bid pricing. Bidders must provide a bid bond, comply with prevailing wage requirements, and may be required to furnish performance and payment bonds. The Owner reserves the right to negotiate with the successful bidder and to accept or reject any and all proposals.

View the file

Other files

File Type Posted
Milan BP T1 Video Surveillance - Drawings.pdf PDF
Milan BP-T1 Specifications.pdf PDF
Milan Legal Ad BP-T1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNOLOGY DESIGNER:

MILAN AREA SCHOOL

MILAN, MICHIGAN

BID PACKAGE T1

VIDEO SURVEILLANCE

REQUEST FOR PROPOSALS AND SPECIFICATIONS

MARCH 12, 2024

Bid Proposal Due Date / Opening:

April 3, 2024 at 11:00 AM local time

Online Pre-Bid Proposal Meeting:

March 19, 2024 at 12:30 PM local time

Barton Malow Milan Area Schools Bid Package T1

Request for Proposals Page 2 of 17 © 2024 Barton Malow March 12, 2024

REQUEST FOR BIDS/PROPOSALS

VIDEO SURVEILLANCE

1. STATEMENT OF PURPOSE

A. Milan Area Schools (MAS or Owner) is requesting bid proposals for the purchase and installation of a replacement districtwide video surveillance system. Their preference is for a cloud-based system. This project will use grant funding. Barton Malow Builders, LLC (BMB or Designer) is the Technology Designer related to the Work included in this RFP.

B. District Buildings:

1. Early Childhood Center 707 Marvin Street Milan, MI 48160

2. Paddock Elementary 707 Marvin Street Milan, MI 48160

3. Symons Elementary 432 S. Platt Road Milan, MI 48160

4. Milan Middle School 920 North Street Milan, MI 48160

5. Milan High School 200 Big Red Dr. Milan, MI 48160

C. The submission of a bid proposal on the bid proposal form shall constitute an offer on behalf of the Bidder to provide equipment and services through the duration of the Project at or below the bid proposal pricing / unit pricing if the Owner chooses to purchase additional equipment.

D. If the manufacturer’s product changes during the Project, the Bidder for no additional cost will supply the model marketed by the manufacturer as being the successor to the model initially chosen. If there is no successor model, the Bidder will propose alternative product options and the associated cost, based on the minimum discount percentage outlined in the Unit Price section of the bid proposal form. The Owner may choose to select that model or end the intent of purchasing through this RFP.

2. SCOPE OF WORK

A. This bid consists of 1 bid category. Bidders must submit a bid for the entire scope of work.

B. This project is to include planning, demolition, installation, configuration, training, and documentation.

C. The successful Bidder will be responsible for demolishing and removing the existing system in it’s entirety aside from cables being reused.

D. Contractors will be responsible for all equipment and material handling. The Owner will not accept equipment or material deliveries directly to the school buildings.

Bid Category 1: Video Surveillance

A. The drawings are conceptual based on information provided by the Owner. Once a Contractor has been awarded the Contractor, BMB, and Owner will walk each building to verify camera locations and camera types based on the models available from the selected Bidder. Unit prices will be utilized for any changes in camera quantities as well as for change in camera models and/or mounts as determined necessary by the project team and Owner. Contractors should not order cameras until after the site survey has been completed.

B. Unit pricing for each camera type must be provided.

C. Provide cloud-based management and video storage with a minimum of 30 days of video retention for each camera.

D. Remove existing video surveillance cameras and install new cameras in the locations shown on the attached drawings. The drawings are intended to convey the general location and direction for

Request for Proposals Page 3 of 17 © 2024 Barton Malow March 12, 2024 the cameras. Contractor, BMB, and Owner will walk the locations after contract award to identify the locations to install cameras.

E. Provide a new Category 6 cable to each new camera location (i.e. existing cables can be reused where existing cameras will be replaced). Include cable, supports, penetration, firestopping, raceway, etc. for a complete installation. Where existing cameras will be shifted as new cameras are installed the Contractor is to relocate the existing cable and/or extend with a longer patch cable.

F. Contractor is responsible for covering the existing camera opening if it will not be covered by the new cameras (e.g. ceiling tile; patch screw holes, etc.).

G. Label all equipment according to the Owner’s nomenclature standard.

H. Include 5-year warranty for the VMS including licensing, software version upgrades, patches, etc.

Provide all labor to service the VMS during this warranty period. During warranty period the Contractor will be responsible for coordinating camera replacement from the manufacturer, but the Owner will install the replacement camera.

I. Configure all VMS and camera settings as appropriate for the installed location. Coordinate network requirements with the Owner.

J. After all cameras are installed Contractor will review field-of-view with the building administration and school resource officer and make adjustments as requested by the Owner.

K. Provide all documentation, user training, and system administrator training.

L. During warranty period the Contractor will be responsible for coordinating camera replacement from the manufacturer, but the Owner will install the replacement camera.

M. Refer to Specification Sections:

1. 27 0000 General Technology Requirements

2. 27 1000 General Cabling Requirements

3. 27 1500 Data Horizontal Cabling

4. 28 2300 Video Surveillance

3. ALTERNATES

The Project consists of the following alternates to be submitted in addition to the base bid proposal:

A. Alternate 1: 10 Year Warranty Provide 10-year solution for all cameras including any licenses, upgrades, camera and hardware warranties, etc.

Request for Proposals Page 4 of 17 © 2024 Barton Malow March 12, 2024

4. PRE-BID PROPOSAL MEETING

A. For the dissemination of information and clarification of intent of the Contract Documents, a pre-bid proposal meeting will be held on:

Date: March 19, 2024

Time: 12:30pm local time

Place: Meeting will be an online Microsoft Teams meeting. For full access go to:

https://bit.ly/MAS-BPT1-PreBid

Meeting ID: 232 785 377 596

Passcode: sbX9Sr

B. A date will be setup at the pre-bid proposal meeting for any bidders requesting to tour the inside of buildings. Bidders wishing to visit the outside of buildings only are still asked to check-in at the office upon their arrival to notify office staff that you may be on their grounds.

C. The pre-bid proposal meeting is not mandatory, but bidders are responsible for the information provided at the pre-bid proposal meeting.

D. Responses to questions and requests for clarifications will be made by written addenda only after the pre-bid proposal meeting if required. Any representations and/or oral discussions not confirmed by addenda will not be binding upon the Owner.

5. RECEIPT AND OPENING OF BID PROPOSALS

A. Bid Proposals must be submitted prior to the Time and Due Date specified below, at which time they will be publicly opened and read aloud. Bid Proposals will be opened publicly in a manner to avoid full public disclosure of contents until after all evaluations have been completed; however Bidder’s name and bid proposal amount will be read aloud. Decisions will not be made at the bid proposal opening; bid proposals will be evaluated before presentation to the Board of Education for approval.

DUE DATE: April 3, 2024

TIME: 11:00 am

The public bid opening may be attended virtually at: https://bit.ly/MAS-BPT1-Opening

B. Online Submission though BuildingConnected.com

1. Bid Proposals will be received online through www.BuildingConnected.com up until the time of the Bid Proposal Due Date and Time. Through Building Connected, all Bid Proposals are kept confidential until the Bid Proposal Due Date and Time. Bidders will be able to submit and revise their Bid Proposals right up to the Bid Proposal Due Date and Time, but no revisions or new bid proposals will be accepted after the deadline has passed.

2. The Bid Proposal form and bid proposal documents are available through Building Connected using the following link:

https://app.buildingconnected.com/public/55a1292ff1a96708004a19dc

3. For instructions on how to submit a Bid Proposal please follow this link:

https://buildingconnected.zendesk.com/hc/en-us/articles/360010222793-How-to-submit-your-bid-through-BuildingConnected-

4. Bidders can start typing information into Building Connected immediately upon invitation.

The information is sealed and not accessible by the Owner until the Bid Proposal Due Date and Time but the Bidder can enter and change information until the Bid Proposal Due Date and Time.

https://bit.ly/MAS-BPT1-PreBid https://bit.ly/MAS-BPT1-Opening http://www.buildingconnected.com/

Request for Proposals Page 5 of 17 © 2024 Barton Malow March 12, 2024

5. Bidders must type answers into the Building Connected Bid Proposal Form as well as upload signed and notarized copies of the Iran Sanctions Form, Familial Disclosure Affidavit, Bid Bond, Bill of Materials, Criminal Background Check Affidavit, and any other required or supporting documentation.

6. Bidders are encouraged, but not obligated, to submit bid proposals electronically via Building Connected. If a Bidder chooses to submit an electronic bid proposal, it assumes any and all risk related to software, connectivity, or any other issues related to the electronic bidding process. It is further recommended, but not required, that any electronic bid proposals be submitted at least two hours before the deadline for bid proposal submission to confirm that the bid proposal has been timely, accurately, and completely received.

7. Bidders submitting a hard copy of their Bid Proposal can print the Bid Proposal Form from Building Connected. Bidders submitting a hard copy of their Bid Proposal must notify BMB at least 24 hours prior to when the bids are due to ensure an Owner’s representative will be available for receiving the Bid Proposal.

C. All bid proposals must be accompanied by the following documents uploaded through Building Connected. Bidders who will be awarded Work will be required to provide original hardcopies.

1. Familial Disclosure Affidavit, sworn and notarized.

2. Affidavit of Compliance – Iran Economic Sanctions Act, sworn and notarized.

3. Affidavit of Compliance – Criminal Background Checks, sworn and notarized.

4. Executive Summary or other supporting documentation including a summary of any deviations/enhancements/exemptions to the minimum configurations listed

5. Bill of materials with itemized costs.

6. Specification sheets on the systems proposed.

7. Summary of manufacturer’s standard warranty.

8. A list of projects completed during the previous three (3) years, including the contract values and owner’s contact information.

9. A statement regarding any past, present, or pending litigation with an owner. Such additional information may be required to satisfy the Owner that the bidder is adequately prepared, in technical experience, or otherwise, to fulfill the contract.

D. Bid Proposals received from Bidders after the Due Date and Time will be returned to Bidder unopened.

E. When submitting a bid proposal, use only the forms provided. Forms that have been altered or substitute forms will not be accepted.

F. A Bid Security in the form of a bid bond from a qualified surety for the full amount of the bid or a cashier’s check equal to five percent (5%) of the total bid. Bid bonds shall be duly executed by the Bidder, as principal, and by a surety that is properly licensed and authorized to do business in the state in which the Work is to be performed. Bidder agrees that this Bid Proposal shall be irrevocable. All sureties providing bid bonds for this Project must be listed in the latest version of the Department of Treasury’s Circular 570, entitled “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies”, with the bond amount less than or equal to the underwriting limitation, and/or have an A.M. best rating of A- or better.

1. Note: Bid Bonds may be submitted electronically through Building Connected with the original provided afterward; but the original cashier’s check must be provided to the Owner prior to the Bid Proposal Date and Time to be considered a valid Bid Security.

G. All Bid Proposals must include the sworn statement included with the Bid Proposal Form, in accordance with MCL 380.1267, disclosing any familial relationship that exists between the

Request for Proposals Page 6 of 17 © 2024 Barton Malow March 12, 2024 owner(s) or any employee of the Bidder and any member of the school board or the superintendent of the school district.

H. All Bid Proposals must include the affidavit included with the Bid Proposal Form certifying that the Bidder is not Iran-linked business.

I. All Bid Proposals must include a completed version of the provided “Affidavit of Compliance – Criminal Background Checks” form.

J. Milan Area Schools reserves the right to accept or reject any or all bid proposals, either in whole or in part, to waive any informalities or irregularities therein, and the right to award the Contract to other than the Bidder(s) submitting the best financial Bid Proposal (low bidder).

K. Additional information provided with a Bid Proposal shall be used in the evaluation of bid proposals, but do not replace the requirements established by the Contract Documents (request for proposals, drawings, specifications, etc.). Neither BMB nor the Owner will be responsible for reviewing equipment lists for completeness or conformance to the Contract Documents. Lists of material, bills of material, etc. submitted by the Bidder do not replace the submittal requirements and do not replace the requirements established by the Contract Documents.

6. TIMELINE

A. Milestone Dates:

1. Release of the bid document: March 12, 2024

2. Pre-bid proposal meeting: March 19, 2024 at 12:30 PM

3. Deadline for written requests for clarification: March 25, 2024 - 3:00 PM

4. Bid Proposal Time: April 3, 2024 at 11:00 AM

5. Post-bid proposal Interviews: April 9-10, 2024

6. Board of Education consideration: April 24, 2024 (anticipated)

7. Project Start Date: June 10, 2024

8. Project Substantial Completion: August 20, 2024

B. On-site Work shall be performed around school activities, cleaning schedules, etc. Any changes to the established schedule must have prior approval of the Owner, and scheduled at the least disruptive time possible. In general buildings will be available:

1. School Breaks (summer, spring break) 7:00 AM to 3:30 PM, Mon thru Fri

2. Early Childhood 6:30 PM to 10:30 PM, Mon thru Fri

3. Elementary Schools 4:30 PM to 10:30 PM, Mon thru Fri

4. Middle School 4:00 PM to 10:30 PM, Mon thru Fri

5. High School 3:00 PM to 11:30 PM, Mon thru Fri

6. Admin/Support 5:00 PM to 11:30 PM, Mon thru Fri or as arranged

C. Any installation in staff and student occupied areas (classrooms, offices, cafeteria, gym, etc.)

must be performed outside of school hours aside from scheduled Work completed during school breaks. Contractor to include the cost of any premium time in their base bid proposal.

D. The Bidder must provide written documentation outlining their Work schedule.

E. The Bidder will be charged for weekends and holidays if Owner, BMB, or Owner’s Representative’s labor force is scheduled to allow access to the facility.

7. EVALUATION AND POST-BID INFORMATION

A. An Evaluation Committee selected by the Superintendent, or their designee, will make evaluation of evaluate the Bid Proposals. The Committee will evaluate the bid proposals and recommend a prospective Contractor for award based on the best interests of the Owner.

Request for Proposals Page 7 of 17 © 2024 Barton Malow March 12, 2024

B. After the Bid Proposals are received, the Project team may require a post-bid proposal meeting for the purpose of further evaluating and clarifying the bid proposal. Items clarified during the post-bid proposal evaluation will become part of the Contract between Owner and the selected Contractor.

C. Shortlisted Bidders may be asked to provide a demonstration of their systems during the Post-Bid Proposal interview and may be asked to provide an evaluation unit for the Owner to evaluate.

D. Bidder may be requested to provide follow up information including but not limited to:

1. Designation of the Work to be performed by the Bidder with his/her own forces, and that to be contracted.

2. Complete detailed cost breakdown including manpower requirements and cleanup costs associated with Work activities.

3. A list of names of the Subcontractors or other entities (including those who are to furnish systems of materials and/or equipment fabricated to a special design) proposed for the principal portions of the Work. The list shall further include the value of the subcontracts and their percentage of value of the Bidder’s total bid proposal. The Bidder will be required to establish, to the satisfaction of the Owner, the reliability and responsibility of the persons or entities proposed.

E. Any requests made by the Owner for written cost analysis shall be adhered to by the bidder. Any bidder that does not comply with this request may be rejected.

F. Once the Contract is awarded to the successful bidder(s), the successful bidder shall be known as the “Contractor”.

8. CLARIFICATIONS, DISCREPANCIES, OMISSIONS OR INTERPRETATIONS

A. Bidder shall promptly notify BMB in writing of any ambiguity, conflict, inconsistency, discrepancy, omission or other errors which they may discover upon examination of the RFP, otherwise the bid proposal will be deemed to incorporate appropriate solution to the issue. Bidders requesting clarification or interpretation of the RFP Documents can:

1. Submit questions through the Messages tab in BuildingConnected (preferred)

2. Email to: Michael.Terrell@bartonmalow.com

B. All such requests must be made in writing via Building Connected or e-mail. No response will be made to any oral question.

C. Any interpretation, correction or change of the Contract Documents will be made by Addendum issued by BMB on behalf of the Milan Area Schools. Interpretations, corrections or changes of the Contract Documents made in any other manner will not be binding, and Bidders shall not rely upon such interpretations, corrections and/or changes. Addenda will be distributed through BuildingConnected.

D. Each bidder in its Bid Proposal must acknowledge all addenda which it has received, but the failure of a Bidder to receive, or acknowledge receipt of, any addendum shall not relieve the Bidder of the responsibility for complying with the terms thereof.

E. The Owner intends that all bidders have equal access to information relative to this RFP, and that this RFP contains adequate information. No information communicated, either verbally or in writing, to or from a Bidder shall be effective unless confirmed by written communication contained in an addendum to this RFP, or a Request for Clarification, or other written response thereto.

F. From the issue date of this RFP until a Bidder is selected and the selection announced, a prospective Bidder shall not communicate about the subject of this RFP or a Bidder’s Bid Proposal with the Owner, its Board of Education, or any individual member, administrator, faculty, staff, student, employee, or its Owner’s Representatives.

mailto:Michael.Terrell@bartonmalow.com

Request for Proposals Page 8 of 17 © 2024 Barton Malow March 12, 2024

9. BID PROPOSAL FORM

A. Each bid proposal shall be submitted on the bid proposal form in BuildingConnected.com with all blank spaces filled in (enter “$0.00” where items are included at no additional charge, enter “N/A” for items that are not applicable or available from the Bidder.

B. All interlineations, alternations or erasures shall be initialed by the bid representative of the Bidder that executes the bid proposal form.

C. Each copy of the Bid Proposal Form shall include the legal name of the Bidder and shall be signed by the person or persons legally authorized to bind the Bidder to a contract. If Bid Proposals are submitted by an agent, provide satisfactory evidence of agency authority.

10. VOLUNTARY ALTERNATES

A. All bid proposals must be based upon the base requirements established in this RFP. In addition to a base bid proposal, the submission of voluntary alternates is acceptable. If a voluntary alternate is submitted for consideration, it shall be expressed on the bid proposal form along with sufficient information in the form of an executive summary, specification, product data, etc., sufficient for analysis of the alternate.

11. TAXES

A. The bidder shall pay applicable taxes for any Work that is not tax exempt. Exemption certificates, if required, will be furnished when requested by awarded Bidder.

12. CONTRACT AND INSURANCE

A. The Owner will issue a purchase order for the equipment and installation. Bidder, if chosen, agrees to begin immediately following receipt of a Milan Area Schools Purchase Order Form".

B. Before commencement of any Work, a Certificate of Insurance executed by Bidder's insurance agent or carrier showing evidence of required insurance coverages shall be submitted in accordance with the Insurance Requirements attached the Contract.

C. Any exceptions to the terms and conditions contained in this RFP or the form of Contract attached to this RFP, or any other special considerations or conditions requested or required by the Bidder MUST be specifically enumerated by the Bidder and be submitted as part of its Bid Proposal, together with an explanation as to the reason such terms and conditions of this RFP cannot be met by, or, in the Bidder’s opinion, are not applicable to, the Bidder. All Pricing factors must be clearly indicated in the Bid Proposal Forms provided as part of the Bidder’s Bid Proposal.

13. PREVAILING WAGE

A. Please adhere to Michigan’s prevailing wage rate regulations.

14. PAYMENTS

A. Contractor may submit for progress payments for Work complete at most monthly.

B. Contractor may bill for equipment when it has been delivered to the site.

C. Contractor may bill for 50% of labor and cabling costs upon installation of cameras, cabling, and management system.

D. Remaining 50% of labor and other costs upon project completion including delivery of all closeout documents and owner sign-off.

Request for Proposals Page 9 of 17 © 2024 Barton Malow March 12, 2024

15. PERFORMANCE AND PAYMENT BONDS

A. Bidders are to include the price of a performance and payment bond in their bid proposal. The bid proposal form provides a means for identifying the cost of the bond. For bid proposals under $50,000, the Owner may choose to waive the bonds in which case the amount would be deducted from the contract price.

B. For all bid proposals over $50,000, Owner will require Bidder to furnish a Performance Bond and a Payment Bond, in amounts equal to the Contract Sum, by a qualified surety naming both Milan Area Schools and Barton Malow Builders, LLC as dual Obligees. All sureties providing bonds on this Project must be listed in the Department of Treasury’s Circular 570, entitled “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” with the bond amounts less than or equal to the underwriting limitation indicated in the Circular, and/or must have an A.M. Best rating of A - or better. Bonds shall be duly executed by the Bidder, as principal, and by a surety that is licensed in the state in which the Work is to be performed.

C. The Bidder shall deliver the required bonds to The Owner prior to commencement of on-site Work. In no event may the Bidder commence on-site Work without the required bonds properly issued and delivered.

D. The Bidder’s proposed surety must be acceptable to the Owner. If, at any time, after acceptance of the Bidder’s bonds, the surety fails to meet the criteria stated above, the Bidder must, as a precondition to continuing Work and receiving further payments, replace the bonds with bonds from a surety that meets the stated criteria.

E. In the event of a Change Order to the Contract that increases the Contract Sum, the penal sum of any required Performance and Payment Bonds shall also be increased so that each penal sum equals the adjusted Contract Sum. The Owner shall have the right to request submission of bond riders, issued by the original qualified surety, evidencing that such increase to the penal sum of the bonds has been accomplished. Notwithstanding the foregoing, in the next invoice after the Contract Sum has been increased by twenty-five percent (25%) or more, as a condition precedent to payment, Bidder shall deliver a bond rider issued by the original qualified surety evidencing that the appropriate increase in penal sums has been accomplished. No alteration, erasure, or addition is to be made in the typewritten matter.

16. DELIVERIES

A. Contractors will be responsible for all equipment and material handling. The Owner will not accept deliveries to equipment or materials directly to the school buildings. Contractor must be onsite to accept any deliveries.

B. Refer to the Contract Form for detailed information on deliveries.

C. Contractor will coordinate delivery with the Owner’s staff, and other Contractors working at the schools. Delivery dates will be confirmed by the Contractor one (1) week prior to delivery.

D. The Owner will issue individual purchase orders stating the number of systems and the building slated for delivery. Delivery is to include:

1. Inside delivery to the central warehouse at the maintenance wing of the administration building.

2. Deliveries received after 3:00 PM local time will not be accepted. Delivery service will be required to return the next business day.

3. Note: the building does NOT have a truck well.

Request for Proposals Page 10 of 17 © 2024 Barton Malow March 12, 2024

E. The Owner will not accept any deliveries on Saturdays, Sundays, or legal holidays, except commodities required for daily consumption or where the delivery is an emergency, a replacement, or is overdue, in which event the convenience of the Owner shall govern.

F. Item(s) shall be securely and properly packed for shipment, storage, and stocking in new shipping containers and according to accepted commercial practice, without extra charge for packing cases, baling or sacks.

G. The Contractor shall be responsible for delivery of items in good condition at point of destination.

They shall file with the carrier all claims for breakage, imperfections, and other losses, which will be deducted from invoices. The receiving school/department will note for benefit of Contractor when packages, or package contents in cases of concealed damage, are not received in good condition.

H. All deliveries shall be accompanied by delivery tickets or packing slips. All packing slips or delivery tickets shall indicate the purchase order no., name of the article and the quantity delivered and back-ordered.

17. DEFINITIONS

A. The Contract Documents consist of this Request for Proposal, the post-bid proposal review form, the Project Manual, all Addenda issued prior to Bid Proposal Due Date and Time, and all clarifications noted during the post-bid proposal interview.

B. The Project Manual refers to this document and all associated documents issued as part of this RFP. This includes the drawings, specifications, equipment lists, schedules, documentation of existing equipment, etc.).

C. Addenda are written and/or graphic instruments issued by the Owner or BMB prior to the award of the Contract which modify or interpret the Contract Documents by additions, deletions, clarifications or corrections.

D. A Bidder is a legal entity submitting a bid proposal.

E. Bid, Bid Proposal, and Proposal are used interchangeably and refer to the bid proposal submission from the Bidder in accordance with the Contract Documents.

F. Base bid proposal is the sum stated for which the Bidder offers to perform the complete Work of, or supply equipment to which Work may be added or deducted. The base bid proposal shall be in strict accordance with this RFP, though voluntary alternates may be submitted in addition to the base bid proposal.

G. An alternate bid (or alternate) is an amount stated in the bid proposal corresponding to change in Project, materials, or methods of Work described in the Contract Documents if accepted by the Owner.

H. A unit price is an amount stated in the bid proposal as a price per unit of measurement for materials or services as described in the Contract Documents.

I. The term "day" is defined as calendar days unless otherwise specified.

J. The term “Subordinate Parties” includes all of Contractor’s employees, workers, laborers, agents, consultants, suppliers, sub-contractors or sub-subcontractors, at any tier, who perform, assist with or otherwise are involved in any of the Work.

K. The term “Work” includes all work and responsibilities performed or to be performed by Contractor or its Subordinate Parties under the Contract Documents.

18. GENERAL CONDITIONS

A. The submission of a bid proposal will be construed to mean that the Bidder is fully informed as to the extent and the character of the supplies, materials, or equipment and services required and a

Request for Proposals Page 11 of 17 © 2024 Barton Malow March 12, 2024 representation that the Bidder can furnish the item(s) in complete compliance with the Contract Documents.

B. Before submitting a bid proposal, each Bidder shall make all investigations and examinations necessary to ascertain conditions, requirements and obstacles, if any exist, affecting the operation of the proposed services. Failure to make such investigations and examinations shall not relieve the successful Bidder from the obligation to comply, in every detail, with all provisions and requirements of this RFP nor shall it be a basis for any claim whatsoever for alteration in any term or payment required by the Contract.

C. No alteration, erasure, or addition is to be made to the Bid Proposal Form or other Contract Documents. Deviations from the Contract Documents must be set forth-in space provided on the Bid Proposal Form.

D. The Owner intends to communicate with Bidders via email or Building Connected (e.g. RFP clarifications and addenda). Except for the delivery of the Proposal itself, references in this RFP to “written” form of communication include e-mail.

E. Any decision made by the Owner, including Bidder selection, shall be final.

F. Products and services which are not specifically requested in this RFP, but which are necessary to provide the functional capabilities proposed by the Bidder, shall be included in the Bid Proposal.

G. Each Bidder submitting its Proposal releases the Owner from any and all claims arising out of, and related to, this RFP process and selection of a Bidder.

H. A recipient of this RFP is responsible for any and all costs and liabilities incurred by it or others acting on its behalf in preparing or submitting a Proposal, or otherwise responding to this RFP, or any negotiations incidental to its Proposal or this RFP.

I. The Bidder certifies that its Proposal is made without any previous understanding, agreement or connection with any person, firm or corporation making a Proposal for the same equipment and/or services and is in all respects fair, without outside control, collusion, fraud or otherwise illegal action.

J. The material/equipment specifications should be considered as a minimum requirement. Any deviations from the standard specified will be considered only when fully described and accompanied by descriptive literature and samples.

K. All equipment must be supplied directly from the manufacturer with manufacturer standard components. No mixing of products or components from various manufacturers will be accepted, unless approved by the Owner.

L. Bidders must pass through all rebates, incentives, warranties, and licenses purchased through this RFP and not require the Owner to file with a manufacturer.

M. All components must be identical in similar systems purchased for each implementation phase.

N. All prices bid must be "per unit" as specified.

O. Prices shall be net, including transportation and delivery charges fully prepaid by the Contractor to destination indicated in the Contract Documents. If award is made on any other basis, transportation charges must be prepaid by the Contractor and added to the invoice as a separate item. In any case, title shall not pass until item(s) have been delivered and accepted by the Owner, in its sole determination.

P. The Owner’s operations must continue uninterrupted throughout the Project. Certain portions of the Work must be performed and completed in such order so as to permit the orderly operation of the Owner’s activities. Each bidder shall review the work of their particular bid category, and all other bid categories to assure proper coordination to complete their Work per schedule.

Request for Proposals Page 12 of 17 © 2024 Barton Malow March 12, 2024

Q. A survey of the site will be conducted, and documented by the Contractor, to determine current site conditions. The Contractor shall be responsible to repair any damage to the site, which occurs during this Project.

R. Contractors and their Sub Contractors shall park their work vehicles in the area(s) designated for parking. Contractors and their Sub Contractors shall not park or drive on sidewalks or grassy areas.

S. Contractors will submit daily report of all activities in the format approved by The Owner. Report will document site location, Work complete, commissioning checklists (if applicable), staffing levels (onsite and total), open issues, photos of completed Work, etc.

T. Contractors will attend all meetings required by the Owner including planning meetings, coordination meetings, construction meetings, progress meetings (anticipate weekly during planning and implementation), etc.

U. Contractors will attend construction meetings facilitated by the construction manager when the work is part of a larger construction/renovation project.

19. ACCEPTANCE AND REJECTIONS OF BID-PROPOSALS

A. It is the intent of the Owner to award a contract to the lowest responsible Bidder whose Bid Proposal meets the criteria of the evaluation committee, provided the bid proposal has been submitted in accordance with the requirements of the RFP and does not exceed the funds available. The Owner has not had the opportunity to review all of the products listed in this RFP, during the post-bid proposal process the Owner will also review products bid to evaluate product suitability, initial cost, and ongoing costs.

B. Although cost must be considered (for both eligible and non-eligible goods and services), other factors will influence the awarded Bidder. The Owner, at its sole discretion, shall determine whether particular Bidders have the qualifications to perform the scope of Work. In determining whether a Bidder possesses the basic qualifications Owner may consider, but not be limited to:

references, whether provided by the Bidder or acquired independently by the Owner; Bidder and manufacturer’s reputation for performance and service; product availability; longevity of service (number of years); previous experience with similar projects; years of continuous business;

commitment to schedule and completion date; financial condition; Bidder’s current workload;

product availability; features and benefits of the proposed solution; alternates and voluntary alternates; product life cycle; warranty, etc.

C. The Owner reserves the right to make awards within 3 months after the date bid proposals are due during which time Bid Proposals may not be withdrawn, unless the Bidder distinctly states in its bid proposal that acceptance thereof must be made within a shorter specified time.

D. Owner reserves the right to negotiate further with the successful Bidder.

E. The Owner reserves the right to accept or reject any and all bid proposals. The Owner also reserves the right to reject for cause any bid proposal in whole or in part; to waive technical defects; qualifications; irregularities; and omissions if in its judgment the best interest of the Owner will be served.

F. Bid proposals are considered irregular and may be rejected for any of the following reasons unless otherwise provided by law:

1. If bid proposal form furnished is not used, altered, or incomplete.

2. If there are unauthorized additions, qualifications, conditions or irregularities of any kind this may make the bid proposal incomplete, indefinite or ambiguous as to its meaning.

3. If Bidder adds any provisions reserving right to accept or reject any award of contract.

4. If unit or lump sum prices or alternates contained in the bid schedule are obviously unbalanced either in excess of, or below, reasonable cost analysis values.

Request for Proposals Page 13 of 17 © 2024 Barton Malow March 12, 2024

5. If Bidder fails to complete bid proposal form in any other particulars where information is requested so bid proposal form may be properly evaluated.

6. If bid security does not accompany bid proposal form.

7. If the Familial Disclosure Affidavit, Criminal Background Check Affidavit, or the Iran Economic Sanction Affidavit does not accompany bid proposal form.

G. Bidder’s lack of responsibility as revealed by submitted information on either experience, or equipment statements.

H. Bidder’s lack of expertise as shown by past work and judged from the standpoint of workmanship and performance history.

I. If any pertinent instructions to bidders are not fully complied with.

J. The Owner shall have the right to waive any informality or irregularity in any bid proposal or bid proposals received and to accept bid proposal or bid proposals which, in their judgment, is in their best interest.

K. The Owner shall have the right to accept alternates in any order or combination and to determine the low Bidder based on the sum of the base bid proposal and the alternates accepted.

20. GUARANTEES BY THE CONTRACTOR

The Contractor guarantees:

A. Their products against defective material or workmanship and to repair or replace any damaged material/equipment or marring occasioned in transit or assembly when installation is specified.

B. That all delivered material/equipment shall be as bid. No substitutions will be accepted unless prior to delivery material/equipment has been inspected by the Owner and found to be equal to the item specified.

C. That all material/equipment or furniture offered is standard, new, latest model of regular stock product or as required by the Contract Documents, with parts regularly available for the type of equipment or furniture offered; also that no attachment or part has been submitted or applied contrary to manufacturer's recommendations and standard practice. All equipment must be guaranteed against faulty material and workmanship, and a manufacturer's warranty indicating the warranty or guarantee period must be available at time of delivery or acceptance.

D. That he/she has carefully checked the enclosed figures and understands that he/she shall be responsible for any error of omission in this Bid Proposal.

E. Contractor’s employees assigned to provide Work hereunder shall be fully certified, licensed and approved as necessary to lawfully perform the Work.

21. ON-SITE SAFETY AND LOSS CONTROL PROGRAM

A. General Requirements:

1. In addition to the requirements set forth below, the Contractor shall comply with all terms, conditions and provisions of all applicable laws.

2. The Contractor shall assign an individual to act as Safety Representative who will have the responsibility of resolving safety matters and acting as a liaison among Contractor, and the Owner. The Safety Representative must be a person who is capable of identifying existing and predictable hazards in surroundings that are unsanitary, hazardous or dangerous to employees, and has the authority to take prompt corrective measures to eliminate them. The Safety Representative must meet the standards for a competent person under applicable law when required (scaffolding, confined spaces, etc.) and be on site full time.

Request for Proposals Page 14 of 17 © 2024 Barton Malow March 12, 2024

3. Contractor shall inform The Owner immediately of the arrival of any federal or state inspector or compliance officer prior to touring the site. Any reports, citations, or other documents related to the inspection shall be provided promptly to The Owner.

4. Contractor shall be responsible for payment of all safety-related citations, fines and/or claims arising out of or relating to its Work levied against the Owner, or any of their respective employees or affiliates.

5. Contractor must follow all OSHA, MIOSHA, and code requirements.

Request for Proposals Page 15 of 17 © 2024 Barton Malow March 12, 2024

22. HAZARDOUS MATERIALS

A. When use or storage of flammable, volatile or other Hazardous Materials or System(s) or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. As used in this RFP, “Hazardous Materials” means asbestos; cadmium; chlorofluorocarbons; chromium VI;

hydrochlorofluorocarbons; lead; mercury; nickel; polybrominated biphenyls; polychlorinated biphenyls and terphenyls; azo colorants, aromatic amines and azo dyes; halogenated flame retardants and additives; tributyl tin, tributyl tin oxide and triphenyl tin; polychlorinated naphthalene; antimony; arsenic; beryllium; bismuth; phthalates; selenium; ozone depleting substances; chloroparaffins; polyvinyl chloride; halogenated plastics or polymers; expanded polystyrene foam; any materials containing such substances; compounds of such substances, including, but not limited to, their ethers and oxides; molds; and any other chemical, material, or substance subject to regulation as a hazardous material, hazardous substance, toxic substance, or otherwise, under applicable federal, state, or local law, and any other chemical, material, or substance that may have adverse effects on human health or the environment.

B. Contractor must provide OSHA/EPA certified hazardous material awareness training (notably asbestos and lead) for all employees working onsite that will be disturbing the existing surfaces.

C. Each Contractor shall be constantly aware of the possible discovery of Hazardous Materials.

Should Contractor encounter any Hazardous Material or suspected Hazardous Material, the Contractor shall immediately stop Work in the area affected and report the condition.

D. If the Contractor encounters any Hazardous Material or suspected Hazardous Material, the Contractor agrees to immediately initiate the required procedures of the Environmental Protection Agency (EPA), and/or state or local agencies having jurisdiction to protect any and all persons exposed to the affected areas or adjacent areas affected.

E. Contractor is fully responsible for all Hazardous Materials it creates or releases in connection with, or brings to, the Project.

F. Each Contractor shall be responsible to bind ALL of its personnel and its Subordinate Parties to the provisions in the Contract Documents related to hazardous materials and to instruct each employee of its own duty to report any and all suspected Hazardous Materials and to comply with all applicable laws.

G. Absolutely no material shall be brought on or to the Project Site that does not have a manufacturer’s label stating contents.

H. The Contractor shall comply with all applicable federal and state laws, rules, ordinances and regulations regarding transportation, storage, spills, releases, and disposal of Hazardous Materials.

I. No asbestos or asbestos-containing material will be brought to the jobsite or incorporated into the Work by Contractor or its Subordinate Parties.

23. EQUAL EMPLOYMENT OPPORTUNITY

A. It is the Owner’s policy not to discriminate against any employee, applicant for employment, contractor, or material supplier, because of race, religion, national origin, ancestry, or sex.

B. Contractor understands that any agreement with the Owner shall be in consideration of maintaining the above mentioned non-discrimination policy.

C. Contractor understands that they may be required to submit further information covering the race, color and work classification for our employees and those of subcontractors to be employed on this Project.

Request for Proposals Page 16 of 17 © 2024 Barton Malow March 12, 2024

PART II – ATTACHED DOCUMENTS

The following documents are included with the bid documents:

The following documents are included with the bid documents:

1. Affidavit of Compliance – Iran Economic Sanctions Act

2. Affidavit of Compliance – Criminal Background Checks

3. Familial Disclosure Affidavit

4. Insurance Requirements

Request for Proposals Page 17 of 17 © 2024 Barton Malow March 12, 2024

PART III – DRAWINGS AND SPECIFICATIONS

This Request for Proposal includes the following drawings and specifications. Specifications are intended to define the level of quality and performance of the requested equipment/service and not to be restrictive. All variations from the specified items shall be fully explained and included with the bid proposal. Manufacturer names and manufacturer product numbers are to be used in all cases. All prices quoted shall be on a unit basis. The determination of the Bid Evaluation Committee as to what alternates are equal shall be final and conclusive.

A. Specifications

27 0000 General Technology Requirements 27 1000 General Cabling Requirements 27 1500 Data Horizontal Cabling 28 2300 Video Surveillance

B. Drawings

T4.11 Milan High School Composite 1st Floorplan T4.12 Milan High School Composite 2nd Floorplan T4.21 Milan Middle School Composite 1st Floorplan T4.31 Paddock Elementary Composite 1st Floorplan T4.41 Symons Elementary Composite 1st Floorplan T4.51 Transportation / Concessions Composite 1st Floorplan T4.61 Athletic Field Press Box Composite 1st Floorplan