Mike Harris SOI.pdf

PDF 107 KB Posted

Attached to
Mike Harris Bridge Replacement
Solicitation number
1240lt24R0041
Issued by

About this file

This document appears to be a Schedule of Items for the Mike Harris Bridge Replacement project, a federal contract opportunity issued by the Department of Agriculture Forest Service R4-Intermountain Region. The project requires the removal and disposal of an existing timber bridge, as well as the construction of a new 70-foot long by 24-foot wide prefabricated bridge superstructure. Additional scope items include roadway excavation and embankment, aggregate surface course, placed riprap, and object markers. The Schedule of Items lists the various pay items, quantities, and methods of measurement. The contract includes two options, Option A and Option B, which provide variations to the roadway excavation and embankment, aggregate surface course, and asphalt quantities. Pricing is required for each pay item, and payment will be made based on actual work performed. No bond premiums are to be included separately, as they are to be incorporated into the Mobilization pay item.

View the file

Other files

File Type Posted
SOW_Mike Harris_Final.pdf PDF
MIKE HARRIS FSSS_Final.pdf PDF
Wage Determination Teton County Idaho.txt TXT text file
1240LT24R0041.pdf PDF
G-090 MIKE HARRIS BRIDGE FINAL 3_5_24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Mike Harris Bridge

Item No. Description Method of

Measurement Unit Quantity

15101 Mobilization LSQ Lump Sum 1

15221 Construction Survey and Staking LSQ Lump Sum 1

15713 Soil erosion and pollution control LSQ Lump Sum 1

20102 Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs (f), Logs (i), and Stumps (f)

LSQ Lump Sum 1

20305 Removal of Existing Timber Bridge, Disposal Method (a) LSQ Lump Sum 1

20400 Roadway Excavation and Embankment, Placement Method 6 (Suitable Excavation or Commercial Source)

LSQ Lump Sum 1

20806 Structure Excavation and Backfill LSQ Lump Sum 1

25101 Placed Riprap, Class 4 (Commercial Source) CQ Cubic Yard 170

30100 Aggregate surface course, Grading (S), Compaction (B), (Commercial Source)

CQ Cubic Yard 134

55201 26'x18"x30" Precast Concrete Grade Beam CQ Each 2

57102 70' Long x 24' Wide Prefabricated Bridge Superstructure, Design, Fabricate, LSQ Lump Sum 1

63306 Object Markers (Type 3) CQ Each 4

OPTION A (Shall not be awarded with Option B)

40401 Minor Hot Asphalt, wearing surface on deck & approaches, Sta 1+30 to 2+40. See specifications.

CQ Ton 68

20401

Delete and replace Item 20400. Roadway Excavation and Embankment, Placement Method 2 (Suitable Excavation or Commercial Source)

LSQ Lump Sum 1

30101

Delete and replace Item 30100. Aggregate surface course, Grading (S), Compaction (B), (Commercial Source). Compaction

(D) under asphalt sections.

CQ Cubic Yard 108

Schedule of Items

Item No. Description Method of

Measurement Unit Quantity OPTION B (Shall not be awarded with Option A)

40402 Minor Hot Asphalt, wearing surface on deck & approaches, Sta 0+25 to 2+80. See specifications.

CQ Ton 131

20402

Delete and replace Item 20400. Roadway Excavation and Embankment, Placement Method 2 (Suitable Excavation or Commercial Source)

LSQ Lump Sum 1

30102

Delete and replace Item 30100. Aggregate surface course, Grading (S), Compaction (B), (Commercial Source). Compaction

(D) under asphalt sections.

CQ Cubic Yard 108

The offeror shall insert a quote in each Bid Schedule opposite each pay name listed in the Schedule. A quote is not to be tendered for any item not listed. All other items not listed are indirect to one of the above items above.

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

Schedule of Items