MI DNR Seney Fld Office Elect Upgrade SOW.pdf
PDF 174 KB Posted
- Solicitation number
- RFQ - 751 - 240000000195
- Issued by
- Schoolcraft County, Michigan
About this file
The provided document is a Statement of Work (SOW) for the Seney Office Electrical Upgrade project, issued by the Michigan Department of Natural Resources (MI DNR) for Schoolcraft County. The contractor shall furnish all necessary personnel, material, equipment, services, and permits to abandon the existing wiring in the offices, bathroom, and workbench areas, and rewire the facility using surface-mounted metal conduit. New outlets will be added in the radio charging area, and all electrical components will be grounded per the National Electrical Code. The contractor is responsible for obtaining all required permits, including a Plan Review by the Michigan Department of Licensing and Regulatory Affairs (LARA). A pre-bid meeting is scheduled for February 1st, 2023, between 10 am and 2 pm, where contractors can visit the Seney Office.
The pricing terms and other salient details are not provided in the SOW. However, a related state and local contract opportunity has been issued, which includes a revised Bid Form to correct the bid due date. The contract opportunity is specific to Schoolcraft County, Michigan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seney Office Electrical Upgrade
Statement of Work
The contractor shall furnish, but is not necessarily limited to, all necessary personnel, material, equipment, services and permits required for the sa�sfactory comple�on of all items at the project site as indicated.
Abandon the exis�ng wiring in both offices, bathroom and workbench areas and rewire in surface mount metal conduit. New outlets will be added in the radio charging area to accommodate ample charging capability. All conduit, devices, light fixtures and non-current carrying raceways shall be grounded per the Na�onal Electrical Code. Ground Fault protec�on for personnel shall be installed where required.
Background/Purpose
The wiring at the Seney office is original/outdated. There are areas within the office that do not have enough capacity (radio charging area). The office was upgraded to a 200-amp service and new panel in 2020.
Special Requirements
The contractor is responsible for obtaining all permits including Plan Review by LARA.
Pre-Bid Mee�ng
A sketch of the Seney Office is provided in the bid materials, contractors wishing to look at the building on-site can stop at the Seney Office on February 1st between 10 am and 2 pm.