Industry_Day_QandAs.pdf
PDF 143 KB Posted
- Attached to
- Manufacturing Housing Monitoring Services
- Solicitation number
- Not on record
About this file
Q&A's
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2017_Industry_Day_Monitoring_Svcs_Slides.pdf | ||
| MHMS_Industry_Day_Agenda.pdf | ||
| Industry_Day_Attendee_Final_List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Day Q&A’s
Question 1: Will the transition plan be included in the RFP?
Answer 1: We will consider including the incumbent transition out plan in the RFP.
Question 2: What is the number of documents in the design library?
Answer 2: Currently, there are approximately 1 million designs stored on microfilm and approximately 6.5 million hard copy design pages that are stored digitally. (see page
25 of the Draft PWS).
Question 3: Is the software for the design library HUD owned?
Answer 3: The Department owns the data and the contractor owns the processing program.
Question 4: How will the design library documents be delivered?
Answer 4: In electronic and hardcopy format.
Question 5: Who owns the labels database and how is it transitioned to the next contractor?
Answer 5: Label data is owned by HUD. Any software used by the incumbent is not owned by HUD. Transfer of files will be electronic and hard copy.
Question 6: Is the min 10% sampling of the newly submitted or the total 80 million does? Is there a record of the reviewed designs?
Answer 6: There are approximately 8 Million pages in the design library. Refer to §
3282.451(e) for sampling details. The incumbent will receive copies of the prior design reviews during the transition.
Question 7: What is the response date for proposals?
Answer 7: The anticipated response date for proposals is January 19, 2018.
Question 8: Can an IPIA and DAPIA bid on these requirements?
Answer 8: Yes, provided the Conflict of Interest as will be described in the solicitation in HUDAR clauses 2452.209-70, Potential Organizational Conflicts of Interest, and
2452.209-71, Limitation on Future Contracts, is avoided.
Question 9: When is the contract solicitation expected to be released?
Answer 9: The anticipated release date for the solicitation is December 29, 2017.
Question 10: Will there be a separate statement of proposal evaluation criteria and will that be published? If so, when?
Answer 10: Yes. The anticipated release date for the solicitation is December 29, 2017.
Question 11: Are installation manual reviews going to be part of the DAPIA monitoring services? Or will they be handled as part of a separate contract?
Answer 11: The DAPIA Monitoring Contractor will be responsible to review installation manuals for all aspects addressed in 24 CFR 3280 (see page 20 of the PWS). A separate contractor is responsible to review installation manuals under 24 CFR 3285.