MHAFBWaterAnalysis_DRAFT.pdf
PDF 290 KB Posted
- Attached to
- RFI - Water Analysis at Mountain Home AFB, ID
- Solicitation number
- FA489725RFI001P
About this file
This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide water sample analysis services for Mountain Home Air Force Base (MHAFB) in Idaho. The contractor shall provide all personnel, labor, and supplies necessary to prepare and analyze water samples in compliance with EPA and Air Force regulations. Key requirements include maintaining EPA/state certification, providing sample media and containers, conducting analyses for specified elements, and reporting results to the EPA, Idaho DEQ, and the base Bioenvironmental Engineering flight. The contractor must comply with environmental, security, and record-keeping requirements. Quality control and assurance measures are included. This PWS is associated with a pre-solicitation Request for Information (RFI) seeking sources with the capability to perform this work under a future contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number
Performance Work Statement (PWS)
For Water Analysis Mountain Home AFB (MHAFB), ID
27 Aug 2024
1. GENERAL INFORMATION.
1.1. Description of Work. The contractor shall provide all personnel, labor, supervision, management, supplies, tools, equipment, parts, materials, and all other items and services necessary to provide a service to prepare an application for water sample analysis for Mountain Home AFB, Idaho. All work shall be accomplished in accordance with this Performance Work Statement (PWS), all applicable federal, state, local laws, regulations, manufacturer’s specifications, and commercial practices.
1.2. Contract Changes/Additional Work. At future dates, the government reserves the right to incorporate, add, remove, and/or modify quantities of work within the scope of this requirement.
At times, due to the nature of work, it may be necessary to modify this requirement on an as-needed basis. Additionally, there may be a need for ‘one-time’ requirements or special sub-contracting opportunities in order to fulfill the requirement needs. Any future changes to this requirement will be negotiated and incorporated in the contact via contract modification, whether by negotiation, or based on priced line items currently incorporated within the contract.
1.3. Publications. The contractor shall perform all work associated with this requirement detailed within this PWS, in accordance with the applicable publications below. The latest editions of the following publications and standards shall apply:
1.3.1. Maintain compliance with U.S. Environmental Protection Agency’s (EPA) rule 40 CFR parts 121 and 141, 100% of the time.
1.3.2. Maintain compliance with DAFI48-144, Drinking Water Surveillance Program, 100% of the time.
1.3.3. Maintain compliance with Sampling, Analysis, and Monitoring (SAM) Plan established by Bioenvironmental Engineering (BE) flight for annual testing, 100% of the time.
1.4. Hours of Operation. The contractor shall be available between Monday through Friday 7:30 am to 4:30 pm (local) time (MST). These are the “normal” hours of operation. Weekends or holidays shall not be counted as a business day.
1.4.1. Holidays. The contractor shall not be required to provide normal services/work during federal holidays. Federal holidays are defined as follows:
New Year’s Day Juneteenth Veteran’s Day Martin Luther King’s Birthday Independence Day (July 4th) Thanksgiving Day President’s Day Memorial Day
Labor Day Columbus Day
Christmas Day
NOTE: Holidays occurring on Saturday will be observed the preceding Friday. Those occurring on Sunday will be observed the following Monday.
1.4.2. Safety. Contractor shall comply with all applicable OSHA standards.
2. REQUIREMENTS. The contractor shall perform all work associated with the requirement based on this section:
2.1.1. Conduct business as a laboratory, certified by Federal Environment Protection Agency (EPA) and Idaho Department of Environmental Quality (IDEQ).
2.1.2. Maintain compliance with 40 CFR parts 141/142/143, 100% of the time.
2.1.3. Provide all sample media and containers for sampling/analysis. Contractor shall provide clean sample containers (e.g., free of debris and residue, acid-washed) and will contain applicable preservatives as prescribed by appropriate EPA methods. In addition, the Contractor shall provide chain of custody forms and any other necessary processing documents as required.
If samples are required to be iced, the Contractor shall identify this to BE samplers to ensure supply iced packs and coolers for shipping are adequate for sampling preservation. Instructions for these types of samples must be provided to BE during coordination of sampling supplies and more than 24 hours in advance of sampling if possible to ensure supplies are available.
2.1.4. BE will arrange for pickup and return of these containers for analysis, and will collected samples using prescribed sampling methods. BE shall only arrange pickup and return of media and samples, when laboratory is located within a 1 hour drive from Mountain Home AFB.
Exception is if travel time is greater than 1 hour drive to laboratory, laboratory shall transport media bottles to Mountain Home AFB and collect completed samples from Mountain Home AFB. This will be performed within the required timeframe to ensure integrity of samples, that hold times are not exceeded as prescribed by each EPA Sampling Method performed.
2.1.5. Conduct analysis for elements listed in Appendix A
2.1.6. Report analysis results to Environmental Protection Agency (EPA) and Idaho Department of Environmental Quality (DEQ), via acceptable means of receiving organization, 98% of the time.
2.1.7. Report analysis results to Bio-Environmental (BE) via email, with hard copy also mailed, 98% of the time.
3. SURVEILLANCE & QUALITY ASSURANCE.
3.1. SERVICE SUMMARY. The contractor service requirements are summarized into performance objectives that relate directly to mission accomplishment. The performance threshold describes the minimum acceptable levels of service required for each objective. These thresholds are critical to mission success.
Water Analysis Services Summary
Performance Objective: PWS Ref.: Performance Threshold:
Compliant with 40 CFR parts 141/142/143
2.1.2 100% of the time
Provide all sample media/containers sampling/analysis.
2.1.3 100% of the time
For Exception of Lab outside 1 hr travel time, drop off/pick up at MHAFB should not cause samples to exceed hold times required by EPA method tested.
2.1.4 98% of the time
Report analysis results to EPA & Idaho
DEQ
2.1.6 98% of the time
Report analysis results to MTF BE 2.1.7 98% of the time
3.2. Quality Control. The contractor shall employ their commercial quality control program and procedures to identify, prevent, and ensure non-recurrence of defective services. Through implementation of the contractor’s quality control program/procedures, the Government shall receive quality services meeting the requirements of this contract. All quality control records shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
3.3. Quality Assurance. The Government may use various quality assurance methods to determine the contractor’s compliance with the PWS and the contract requirements in accordance with FAR Clause 52.212-4, Contract Terms and Conditions – Commercial Items (a) Inspection/Acceptance.
3.4. Re-Performance of Non-Conforming Work. Upon inspection of work, any work found to not be in accordance with this PWS/contract shall be re-performed by the contractor at no additional cost to the government.
4. CONTRACT ADMINISTRATION. During performance under contract, the contractor shall participate in administrative tasks inherent to the administration, surveillance, and oversight of contract performance.
4.1. Contract Employees. All contract personnel must be able to read, write, speak, and understand English fluently. Contract personnel shall present a neat appearance, and be easily identified as a contract employee. The contractor shall obtain base identification and vehicle passes for all employees who make frequent visits to, or perform work on Mountain Home AFB in accordance with the current installation access/entry requirements. Contractor personnel are required to wear or prominently display installation identification while visiting or performing work on the installation. The contractor shall not employ persons for work on this contract identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. Each employee will be easily identified by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges that contain the company name and employee name(s). The contractor shall not employ any person who is an employee of the Government, if employing that person would create a conflict of interest. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the service provider’s ability to perform; however, their absence at any time shall not constitute an excuse for non-performance under this contract.
4.2. Interferences. The contractor shall not unduly interfere with regular scheduled government operational activities in the performance of contract requirements. In the event a government supervisor so requests, the contractor shall temporarily cease work in the area and report the issue, to include the name of the government personnel involved to Contracting Officer immediately. The contractor shall notify the Contracting Officer verbally of disputes with customers or other base contractors and follow-up in writing.
4.3. Records Management. The contractor shall create, handle, and maintain records for the Air Force, regardless of medium, in accordance with the requirements established in AFRIMS Records Disposition Schedule (RDS), AFI 33-322, Records Manage Program, AFI 33-364, Records Disposition Procedures and Responsibilities, and AFM 33-363, Management of Records. Full text versions of these publications are available for free download at http://www.e-publishing.af.mil. Inquiries as to the specific actions necessary to meet the requirements established in the above referenced publication may be directed to the Mountain Home Records Management Office at 366 CS/SCOKR, Bldg. 512, Mountain Home AFB, ID, 83648.
5.0. ENVIRONMENTAL CONTROLS.
5.1. Hazardous Material Inventory and Safety Data Sheets. SDS are required as specified in the latest version of Federal Standard No. 313 for all potentially hazardous materials. SDSs must be submitted by the Contractor upon contract award to the Hazardous Materials Program Manager (366 FW/A7IE) at 208-828-1684/6351/2726 for a determination of whether or not a product is a HAZMAT and what additional requirements may be applicable/necessary.
Approval is required before bringing any hazardous materials (HAZMAT) onto the installation. The government (HAZMART personnel) 366 LRS HAZMART Pharmacy 208-828- 2690/2360 will inventory all chemicals that the Contractor brings on to Mountain Home AFB or any property under the control of Mountain Home AFB. Any products that meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from government property. The inventory will be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.
http://www.e-publishing.af.mil/
5.2. Material Storage and Use. The contractor shall follow manufacturer's guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.
5.3. Notification of Environmental Spills. If a spill occurs, the person discovering the spill will make every effort to stop the product flow (if possible), warn personnel, shut off ignition sources, contain the spill, make notifications, and begin cleanup. If the spill is considered an emergency and there is a potential life, health, fire, or other safety hazard, the MHAFB Fire Department will be notified IMMEDIATELY. Responsible units/activities will clean up small spills safety and within their capabilities to do so. Generally, a spill of only a few gallons will recovered by the responsible unit/activity using absorbent materials or a spill kit located by the site. Recovered product and contaminated materials will be packaged and staged for disposal in accordance with the installations hazardous waste procedures. Contact the Environmental Office (208-828-6351) for guidance. The liability for the spill or release of such substances rests solely with the contractor and its agent.
5.4. Waste. Identify, label, handle, store, and dispose of hazardous waste or debris in accordance with federal, state, and local regulations. Ensure all waste has undergone the appropriate hazardous waste determination and documentation is retained for these determinations. If hazardous wastes are generated the contractor will be required to setup and maintain a hazardous waste accumulation point. All hazardous waste generated must be disposed of at a RCRA permitted treatment storage or disposal facility. Do not dispose of hazardous waste on Government property. Do not discharge any waste to a sanitary sewer, storm drain, or to surface waters or conduct waste treatment or disposal on Government property without written approval of the Contracting Officer and Environmental. Consult with the Hazardous Waste Program Manager (366 FW/A7IE) at 208-828-1684/6351 prior to disposal of any waste.
5.5. Historic Preservation. MHAFB houses numerous historic properties (buildings, structures, objects, archaeological sites) managed in compliance with the National Historic Preservation Act (NHPA), and its implementing regulations at 36 CFR 800. In order to avoid inadvertent adverse effects to historic properties, coordination with 366FW A7IE Cultural Resources Manager, Ms.
Noelle Shaver (828-8003/6351) is required prior to implementation.
6. SECURITY, OPSEC, & ANTITERRORISM. The contractor shall comply with all requirements and procedures IAW AF FAR 5353.242-9000, Contractor Access to Air Force Installations included herein. All contract employees shall carry contractor photo identification at all times. Contractor employees shall comply with any base security measures implemented at all times. This includes, but is not limited to, vehicle and goods searches and identification checks during times of increased security.
6.1. Operations Security: The contractor shall comply with 366 FW OPSEC requirements and countermeasures to protect critical information as defined in AFI 10-701, Operations Security.
Contractors shall receive unit-specific OPSEC training within 90 days of assignment to a contract. Training documentation must be completed by the respective unit OPSEC coordinator.
The unit OPSEC personnel will provide guidance on protecting critical information, training materials and other instructions as needed. The contractor will comply with the 366 FW OPSEC
Policy that imposes a 100% shred requirement of all government related paper products using NSA approved devices only.
Appendix A
Coliform (TCR)
TTHM/HAA5
Lead/Copper Nitrate Radium 226 & 228 Remedial Sampling SOCS - Group Arsenic and Soudium IOC - Fluoride IOCS - Phase 2 and 5 VOCS - Group IOC - Asbestos PFAS - Method 537 PFAS - Method 533
| 1. GENERAL INFORMATION. |
| 3. SURVEILLANCE & QUALITY ASSURANCE. |
| Water Analysis Services Summary |
| 5.0. ENVIRONMENTAL CONTROLS. |
File details come from the government source that posted it. Updated .