MGED 37 South Main Prequal Legal Advertisement Final 25.03.20.docx

DOCX document 15 KB Posted

Attached to
Request for Qualification for Trade Contractor Packages
Solicitation number
BD-25-1296-02346-MGED1-114299
Issued by
Plymouth County, Massachusetts

About this file

This is a Legal Advertisement Notice to Trade Contractors from the Middleborough Gas & Electric Department (MGED) for a Construction Manager at Risk (CM at Risk) project located in Middleborough, Massachusetts. The department is seeking Trade Contractor Statements of Qualifications for 15 different work categories, with estimated construction costs ranging from $48,200 to $1,293,600, including masonry, electrical, HVAC, plumbing, and other specialized trades. Qualified contractors must submit their qualifications by 11:00 am on Thursday, April 10, 2025, with work on site scheduled to begin in May 2025. The project involves partial demolition and renovation of an existing electrical operations building, including preservation of the historical brick facade, construction of new offices, meeting rooms, and site work such as driveways, sidewalks, landscaping, and security fencing.

The total estimated project cost is approximately $18,200,000, with a construction duration of 18 months. The project will be subject to Massachusetts Prevailing Wage Laws and will be procured through M.G.L. Chapter 149A. Key project team members include Daniel O'Connell's Sons as Construction Manager, Skanska USA Building Inc. as Owner's Project Manager (OPM), and Weston & Sampson Engineers, Inc. as the Project Designer. The prequalification process will be managed by MGED's Trade Contractor Prequalification Committee, and only pre-qualified firms will be permitted to submit bids for their specific work categories.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGAL ADVERTISEMENT

NOTICE TO TRADE CONTRACTORS

Middleborough Gas & Electric Department 32 S Main Street Middleborough, MA 02346

Request for Qualifications for Trade Contractor Packages

Trade Contractor Statement of Qualifications Forms from interested Trade Contractors are sought for the following categories of work: Masonry (ECC $625,000), Miscellaneous and Ornamental Iron (ECC $218,900), Waterproofing, Damp-Proofing, Caulking (ECC $164,600), Roofing and Flashing (ECC $222,600), Metal Windows (ECC $242,200), Tiling (ECC $48,200), Acoustical Ceilings (ECC $133,600), Resilient Flooring (ECC $73,100), Painting (ECC $83,300), Elevators (ECC $198,000), Fire Protection (ECC $227,100), Plumbing (ECC $386,400), Heating, Ventilation & Air-Conditioning (ECC $811,400), Electrical (ECC $1,293,600).

Middleborough Gas & Electric Department requests that qualified and experienced Trade Contractors submit Trade Contractor Statements of Qualifications Forms no later than 11:00 am, Thursday, April 10, 2025. The RFQ may be obtained by sending an email to bids@mged.com beginning Wednesday, March 26, 2025, or by contacting Alexandra Golz, MGED at 508-947-1371 Ext. 106.

PROJECT DESCRIPTION: The Middleborough Gas & Electric Department will be performing a construction project which involves the partial demolition and renovation of and construction of an addition to the existing electrical operations building. The project entails the preservation of the existing building’s historical brick façade. The construction includes the building of new offices, meeting rooms, a kitchen, lockers, material stockrooms, as well as vertical transportation between the existing and new buildings. Site work including new driveways, sidewalks, landscaping, and security fencing will be completed as well. Work on site will begin in May 2025.

The project is composed of multiple bid packages, including early packages to initiate site work, demo, foundations, and structural steel in advance of the architectural, mechanical, electrical, plumbing, fire protection, and related work of the electrical operations building.

The project will be subject to the minimum wage rates set under the Massachusetts Prevailing Wage Laws. The total estimated cost of the Project is approximately $18,200,000 and the construction duration is approximately six (18) months.

This Request for Qualifications (RFQ) will be used for the procurement process as set forth in M.G.L. Chapter 149A. The Middleborough Gas and Electric Department, through its Trade Contractor Prequalification Committee, is pre-qualifying firms interested in providing public Trade Contractor services on this Public Construction Manager at Risk (CM at Risk) Project for the MGED Customer Service Renovations project through this RFQ process. Information on the prequalification process, evaluation format and evaluation criteria are provided in the RFQ. Only pre-qualified firms will be permitted to submit bids for the category of work in which they were pre-qualified. The Construction Manager for the project is Daniel O’Connell’s Sons, the OPM is Skanska USA Building Inc., and the Project Designer is Weston & Sampson Engineers, Inc.

File details come from the government source that posted it. Updated .