MEXIS_APP.BC_CONST_NOTICE_ADMIN.pdf

PDF 8 MB Posted

Attached to
Bridge Rehab
Solicitation number
D265865
Issued by
Richmond County, New York

About this file

This is a construction proposal document issued by the New York State Department of Transportation (NYSDOT) for a bridge rehabilitation project. The project involves the rehabilitation of the West Shore Expressway over Woodrow Road in Richmond County (Staten Island), New York, with two structures identified: Bridge Identification Number (BIN) 1075121 (southbound) and BIN 1075122 (northbound). The contract is identified as D265865 and will be let on December 16, 2026, at 10:30 A.M. The proposal book contains comprehensive contract documents including standard specifications, drawings, supplemental information files, and special notes. Bidders must be registered with the New York State Department of Labor prior to submission. The contract documents are available digitally through the NYSDOT website, with supplemental materials including CADD drawings, record plans, survey information, bridge inspection reports, utility plates, and asbestos assessment documentation. The document specifies that amendments may be issued and bidders are responsible for incorporating all amendments into their bids.

This contract includes set-asides for Minority Business Enterprise (MBE) at 8%, Women's Business Enterprise (WBE) at 7%, and Service-Disabled Veteran-Owned Business (SDVOB) at 2% participation goals. Bids must include performance bonds and labor and material bonds for the full contract amount, with bid security required in the form of a bond, certified check, or cashier's check. The New York State Surety Bond Assistance Program is available to eligible small business and M/WBE contractors. Environmental compliance requirements include adherence to Executive Order 22 regarding embodied carbon in construction materials, procurement of low-embodied carbon concrete for projects over $3,000,000, and submission of Environmental Product Declarations (EPDs) for asphalt mixtures, concrete, and steel meeting specified thresholds. Asbestos abatement is required prior to commencement of demolition or construction activities, with the contractor responsible for obtaining proper New York State licensing and certifications. The contractor must also comply with temporary lane closure restrictions on major holidays, implement work zone camera monitoring, and coordinate with ITS facilities to avoid interference and damage. Fuel and asphalt price adjustment provisions apply based on posted indices at the time of bid letting.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL

Book 2 of 2

D265865

Submitted in accordance with the Highway Law and with the Standard Specifications and Standard Sheets officially finalized and adopted on September 1, 2026 as posted on the Department's website.

US CUSTOMARY UNITS

Proposal Description:

BRIDGE REHABILITATION - West Shore Expressway over Woodrow Road in Staten Island.

Letting of 12/16/2026 @ 10:30 A.M.

50 Wolf Road, Albany, NY 12232

0790 1 of 3 Per Contract Management

05/01/25

IMPORTANT BIDDER INFORMATION

1. Familiarize Yourself with the Standard Specifications. Make sure to use the current version of the

NYSDOT Standard Specifications, as stipulated on the front cover of this Project Proposal.

Standard Specifications may be accessed at:

www.dot.ny.gov/main/business-center/engineering/specifications/busi-e-standards-usc.

2. Upcoming Projects/Contract Documents/Letting Results.

Advertisements are available at: www.dot.ny.gov/doing-business/opportunities/const-highway, Contract Documents at: www.dot.ny.gov/doing-business/opportunities/const-notices, and Letting Results at: www.dot.ny.gov/doing-business/opportunities/const-results.

3. Procurement Lobbying Law. NYS Finance Law restricts communication with NYSDOT personnel on procurements; contact can only be made with designated persons.

Contact with non-designated persons or other involved Agencies may result in disqualification.

Project-related technical questions or comments must be submitted through the NYSDOT website at:

www.dot.ny.gov/doing-business/opportunities/const-notices.

All other questions should be submitted through the website or directed to the Assistant Director/

Director of the Office of Contract Management, (518) 457-2124.

4. DOL Contractor Certification. Contractors must be registered with the NYS Dept. of Labor (DOL) prior to submitting a bid. Bids from unregistered Contractors shall be declared Informal.

www.dol.ny.gov/public-work-contractor-and-subcontractor-registry-landing.

5. DBE/MBE/WBE/SDVOB Goals. Federally funded contracts have a Disadvantaged Business

Enterprise (DBE) goal, and 100% State funded contracts have Minority Business Enterprise (MBE), Women’s Business Enterprise (WBE) and Service-Disabled Veteran-Owned Business (SDVOB) goals.

Effective as of February 20, 2025, for Federally funded contracts, all Bidders are required to submit a complete DBE Participation Package, which includes a Summary of DBE Commitments, DBE confirmations, and Good Faith Effort documentation (if required) with their bid, as well as a Bidder’s

List (i.e., a completed CONR 80 form with information about all quotes from DBE and non-DBE

Subcontractors received prior to letting).

MBE/WBE/SDVOB Participation Packages must be submitted to the Office of Construction in accordance with §102-12 DBE/MBE/WBE/SDVOB Participation. Solicitation of DBEs, MBEs, WBEs, and SDVOBs should begin as soon as the contract is advertised for letting.

6. Bonds. Statutes require that a low bidder file both a Performance Bond and a Labor and Material Bond for the full amount of the contract. Arrangements should be made with a Surety prior to submitting a bid. Failure to secure bonding could result in the loss of your bid deposit. See §103-03 Contract Bonds.

7. Bid Security. Every bid must be accompanied by a bid bond, certified check or bank cashier's check payable to the NYS Department of Transportation, in the sum of the amount shown on the proposal title page. Bonds must be on form CONR 391. Electronic bids must include an electronic bid bond.

D265865 https://www.dot.ny.gov/main/business-center/engineering/specifications/busi-e-standards-usc http://www.dot.ny.gov/doing-business/opportunities/const-highway http://www.dot.ny.gov/doing-business/opportunities/const-notices http://www.dot.ny.gov/doing-business/opportunities/const-results http://www.dot.ny.gov/doing-business/opportunities/const-notices http://www.dol.ny.gov/public-work-contractor-and-subcontractor-registry-landing

0790 2 of 3 Per Contract Management

8. New York State Can Help You Secure Surety Bonding. The NYS Surety Bond Assistance Program

(NYSBAP) provides technical and financial assistance to help New York State small business or

M/WBE contractors secure bonding. Contractors may be eligible to receive a guarantee of up to 30% to secure a surety bond line, bid bond or a performance and payment bond on State projects. Training is also available to contractors requiring technical support on how to become bond-ready.

For more information visit:

https://esd.ny.gov/doing-business-ny/new-york-state-surety-bond-assistance-program or contact Ms. Huey-Min Chuang at Empire State Development, (212) 803-3238, BAP@esd.ny.gov.

9. The Contractor is Responsible for Ensuring that All Amendments Have Been Incorporated into

Its Bid. Amendments are posted at: www.dot.ny.gov/doing-business/opportunities/const-notices.

Do not alter the Bid Proposal unless directed to do so by Amendment. Unauthorized alterations could lead to your bid being declared Informal (§102-05 Proposal Submission).

Zero-dollar bids are not allowed for any item.

Bid on all items and sign the bid. (§102-04 Proposal Content).

10. Bids Should Be Submitted through Bid Express or in a Sealed Envelope (a.k.a., a Paper Bid).

For a Paper Bid, the Sealed Envelope should be prominently labeled “BID ENCLOSED”, with the Contractor Name, Address, Federal Identification Number, Contract D#/ Project Identification

Number (PIN) and Project Description on the envelope.

Paper Bid submittals must be addressed to NYSDOT, Office of Contract Management, 50 Wolf

Road, First Floor, Suite 1CM, Albany NY 12232 and delivered prior to the proposal due date and time, during normal business hours (Monday through Friday, 7:00 am to 4:00 pm).

The same Federal Identification number should be used on both the envelope and contractor requests to be added to the Planholders List.

Low bidders must have a current NYS For-Profit Construction Vendor Responsibility Questionnaire

(CCA-2) on file or submit one within 10 days of receipt of the contract. Questionnaires are available at: www.dot.ny.gov/bids-and-lettings/construction-contractors/general-info.

Please call (518) 457-2124 if a reasonable accommodation is needed to participate in the Letting.

D265865 https://esd.ny.gov/doing-business-ny/new-york-state-surety-bond-assistance-program mailto:BAP@esd.ny.gov http://www.dot.ny.gov/doing-business/opportunities/const-notices http://www.dot.ny.gov/bids-and-lettings/construction-contractors/general-info

0790 3 of 3 Per Contract Management

THIS PAGE

INTENTIONALLY LEFT BLANK

D265865

REQUIRED CONTRACT PROVISIONS

EEO Goals

DBE/ MBE /WBE/SDVOB Goals

Form CONR 9

Electronic Bidding

Federal Aid Contract Provisions

Insurance Coverage

List of Additional Insured

Railroad Insurance

New York State Uniform Contracting Questionnaire

NOTE: This form was developed for repetitive use throughout all contract proposals and may identify items not applicable to this specific project.

D265865 53

0820 Page 1 of 2 Per Construction 2/21/2023

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY (EXECTIVE ORDER 11246)

1. The Bidder’s attention is called to the “Equal Opportunity Clause” and “Standard Federal Equal Employment Specifications” set forth herein. The Contractor shall also follow the requirements of §102-11 Equal Employment Opportunity Requirements.

2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, which is the county or counties in which the work is located, are as follows:

GOALS FOR PARTICIPATION OF MINORITIES

COUNTY % COUNTY % COUNTY %

Albany 3.2 Herkimer 2.1 Richmond Table

Allegany 6.3 Jefferson 2.5 Rockland 22.6 Broome 1.1 Kings Table St. Lawrence 2.5 Bronx Table Lewis 2.5 Saratoga 3.2 Cattaraugus 6.3 Livingston 5.3 Schenectady 3.2 Cayuga 2.5 Madison 3.8 Schoharie 2.6 Chautauqua 6.3 Monroe 5.3 Schuyler 1.2 Chemung 2.2 Montgomery 3.2 Seneca 5.9 Chenango 1.2 Nassau 5.8 Steuben 1.2 Clinton 2.6 New York Table Suffolk 5.8 Columbia 2.6 Niagara 7.7 Sullivan 17.0 Cortland 2.5 Oneida 2.1 Tioga 1.1 Delaware 1.2 Onondaga 3.8 Tompkins 1.2 Dutchess 6.4 Ontario 5.3 Ulster 17.0 Erie 7.7 Orange 17.0 Warren 2.6 Essex 2.6 Orleans 5.3 Washington 2.6 Franklin 2.5 Oswego 3.8 Wayne 5.3 Fulton 2.6 Otsego 1.2 Westchester 22.6 Genesee 5.9 Putnam 22.6 Wyoming 6.3 Greene 2.6 Queens Table Yates 5.9

Hamilton 2.6 Rensselaer 3.2

(45 FR 65976 – 10/3/1980)

GOALS FOR PARTICIPATION OF MINORITIES

BRONX, KINGS, NEW YORK, QUEENS AND RICHMOND COUNTIES

Electricians 9.0 to 10.2 Bricklayers 13.4 to 15.5

Carpenters 27.6 to 32.0 Asbestos workers 22.8 to 28.0

Steam fitters 12.2 to 13.5 Roofers 6.3 to 7.5 Metal lathers 24.6 to 25.6 Iron workers (ornamental) 22.4 to 23.0 Painters 26.0 to 28.6 Cement masons 23.0 to 27.0 Operating engineers 25.6 to 26.0 Glaziers 16.0 to 20.0 Plumbers 12.0 to 14.5 Plasterers 15.8 to 18.0 Iron workers (structural) 25.9 to 32.0 Teamsters 22.0 to 22.5

Elevator constructors 5.5 to 6.5 Boilermakers 13.0 to 15.5 All others 16.4 to 17.5

GOAL FOR PARTICIPATION OF WOMEN

The goal for the participation of women is 6.9%. (43 FR 14888 – 4/7/1978)

D26586554

0820 Page 2 of 2 Per Construction 2/21/2023

These goals are applicable to all the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of New York State, it shall apply the goals established for the geographical area where the work is actually performed. With regard to this second area, the Contractor is subject to the goals for both its federally involved and non-federally involved construction.

The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.

3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.

4. As used in this Notice, and in the contract resulting from this solicitation, the “covered area” is described on the Project Title Sheet located in the Contract Proposal.

D265865 55 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.ecfr.gov%2Fcurrent%2Ftitle-41%2Fpart-60-4&data=05%7C01%7CErica.Gundrum%40dot.ny.gov%7Cf178ce0c498b4f9d647808dae3952e99%7Cf46cb8ea79004d108ceb80e8c1c81ee7%7C0%7C0%7C638072527110257055%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=LB74SvETbNgRz4yzBwI6zw%2FLzCzXAP1ZsskTXFEdEcY%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.ecfr.gov%2Fcurrent%2Ftitle-41%2Fsection-60-4.3%23p-60-4.3(a)&data=05%7C01%7CErica.Gundrum%40dot.ny.gov%7Cf178ce0c498b4f9d647808dae3952e99%7Cf46cb8ea79004d108ceb80e8c1c81ee7%7C0%7C0%7C638072527110257055%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=ZGKeAfwMKsE5Kv6JJ2RyHRidmjwvjclnxdEcuCCJ1RU%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.ecfr.gov%2Fcurrent%2Ftitle-41%2Fpart-60-4&data=05%7C01%7CErica.Gundrum%40dot.ny.gov%7Cf178ce0c498b4f9d647808dae3952e99%7Cf46cb8ea79004d108ceb80e8c1c81ee7%7C0%7C0%7C638072527110257055%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=LB74SvETbNgRz4yzBwI6zw%2FLzCzXAP1ZsskTXFEdEcY%3D&reserved=0

DBE/MBE/WBE/SDVOB PARTICIPATION GOALS

The Department has established the following participation goal(s) for this contract, expressed as a percentage of the total contract bid amount.

The DBE program applies to Federal-Aid contracts; the MBE, WBE, and SDVOB programs apply to Non-Federal-Aid contracts. For more information see Standard Specifications §102-12 or call the Office of Construction Pre-Award Unit at (518) 457-6472.

Disadvantaged Business Enterprise (DBE) Goal % (Federal-Aid Only)

Minority Business Enterprise (MBE) Goal % (Non Federal-Aid Only)

Women's Business Enterprise (WBE) Goal % (Non Federal-Aid Only)

Service-Disabled Veteran-Owned Business (SDVOB) Goal % (Non Federal-Aid Only)

The NYSUCP DBE Directory is located at: https://nysucp.newnycontracts.com/

The NYS M/WBE Directory is located at: https://ny.newnycontracts.com/

The NYS SDVOB Directory is located at: https://online.ogs.ny.gov/SDVOB/search

D26586556 https://nysucp.newnycontracts.com/ https://ny.newnycontracts.com/ https://online.ogs.ny.gov/SDVOB/search

Project PIN: D265865

DETAILS

Provided

Digital Digital Digital Digital Digital Digital Digital

Provided Digital Digital Digital Digital Digital Digital Digital Digital

Provided Digital Digital Digital Digital

Provided Digital

Not Provided Not Provided

Provided Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital

X096.34_CADD Drawings 1of7.zip Microstation DGN Files

X096.34_CADD Drawings 6of7.zip Microstation DGN Files X096.34_CADD Drawings 5of7.zip Microstation DGN Files X096.34_CADD Drawings 4of7.zip Microstation DGN Files X096.34_CADD Drawings 3of7.zip Microstation DGN Files X096.34_CADD Drawings 2of7.zip Microstation DGN Files

X096.34_CADD Drawings 7of7.zip Microstation DGN Files

X09634_fea_rwy_og_brd.dtm Original Ground Surface - Bridge - DTM X09634_fea_rwy_og.dtm Original Ground Surface - At-Grade - DTM

2. CADD SURFACES 1

X096.34_est_hwy_comp_sheets.xls Highway Estimate Computation Sheets

Final Ground Surface - LandXML

Project Geometry - Temporary Road - XMLX09634_fea_rwy_temp.xml

3. CADD ALIGNMENTS 1

X09634_fea_rwy_fg.dtm Final Ground Surface - DTM

1. CADD DRAWINGS 1

7. RECORD PLANS

X09634_fea_rwy_WR.xml Project Geometry - Woodrow Road - XML

4. QUANTITY WORKUPS 2

X09634_fea_rwy_fg.xml

X09634_fea_rwy_fg_temp.dtm

X09634_fea_rwy_fg_temp.xml Tempoary Ground Surface - LandXML

Temporary Ground Surface - DTM

X09634_fea_rwy_og_brd.xml Original Ground Surface - Bridge - LandXML X09634_fea_rwy_og.xml Original Ground Surface - At-Grade - LandXML

X09634_fea_rwy_CL.xml Project Geometry - Centerline -XML X09634_fea_rwy_BL.xml Project Geometry - Survey Baseline -XML

SUPPLEMENTAL INFORMATION AVAILABLE TO BIDDERS

Project Description:

https://www.dot.ny.gov/doing-business/opportunities/const-notices/

Bridge Rehabilitation of West Shore Expressway over Woodrow Road in Richmond County, NYC

X096.34

DESCRIPTIONFILE NAME (Including File Format) Per HDM section 21.8 all supplemental information files should begin with the project identification number (PIN)

Contract Number:

SUPPLEMENTAL INFORMATION IS AVAILABLE FOR THIS CONTRACT

The information listed as “Digital” on this form is available at the Contract Documents tab within the Construction Contracting section of the Business Center on the Department’s web site. The information listed as “Inspection Only” on this form is available at the Regional Office having jurisdiction for this project, as identified in the advertisement for bids, for inspection and review prior to the letting date.

The bidder’s signature on this proposal certifies that they have made themselves aware of the availability of the information indicated below:

5. UNSEALED LAYERED PDF or 3D PDF

6. CROSS SECTIONS

X096.34_Record Plans_FAWSE 70-1_Part2of12.pdf Record Plans FAWSE 70-1 X096.34_Record Plans_FAWSE 70-1_Part1of12.pdf Record Plans FAWSE 70-1 X096.34_Record Plans_D262419.pdf Record Plans D262419 X096.34_Record Plans_D257161_Part3of3.pdf Record Plans D257161

X096.34_Record Plans_FAWSE 70-1_Part4of12.pdf Record Plans FAWSE 70-1

X096.34_Record Plans_D96452_Part2of2.pdf Record Plans D96452 X096.34_Record Plans_D96452_Part1of2.pdf Record Plans D96452

X096.34_Record Plans_D257161_Part2of3.pdf Record Plans D257161 X096.34_Record Plans_D257161_Part1of3.pdf Record Plans D257161 X096.34_Record Plans_D256826_Part2of2.pdf Record Plans D256826 X096.34_Record Plans_D256826_Part1of2.pdf Record Plans D256826 X096.34_Record Plans_D254560.pdf Record Plans D254560

X096.34_Record Plans_FAWSE 70-1_Part3of12.pdf Record Plans FAWSE 70-1

CONR9 REV 8/5/22 Page 1 D265865_R11_CONR9

D265865 57 https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/doing-business/opportunities/const-notices/ https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business https://www.dot.ny.gov/business

DETAILSDESCRIPTIONFILE NAME (Including File Format) Digital Digital Digital Digital Digital Digital Digital Digital

Provided Digital

Provided Digital Digital Digital Digital Digital

Provided Digital

Provided Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital

Not Provided 1 Required for all projects 3R and above 2 Required for all projects 3 Required for all new, replacement and superstructure replacement projects 4 File is available upon request from plansales@dot.ny.gov

X096.34_Sign Face Layout.pdf Sign Face Layout

X096.34_Exist Sbsurfce Expln Logs_5of5.pdf Subsurface Exploration Logs

X096.34_Record Plans_FAWSE 70-1_Part12of12.pdf Record Plans FAWSE 70-1

9. SUBSURFACE INFORMATION

X096.34_DAD.pdf Design Approval Document

8. SIGN FACE LAYOUTS

X096.34_Record Plans_FAWSE 70-1_Part11of12.pdf Record Plans FAWSE 70-1 X096.34_Record Plans_FAWSE 70-1_Part10of12.pdf Record Plans FAWSE 70-1 X096.34_Record Plans_FAWSE 70-1_Part9of12.pdf Record Plans FAWSE 70-1

12. BRIDGE INFORMATION3

10. ANTICIPATED CONSTRUCTION SCHEDULE

11. SPECIAL REPORTS OR OTHER INFORMATION

X096.34_Anticipated Construction Schedule.pdf Anticipated Construction Schedule

X096.34_Utility Plates.zip Utility Plates X096.34_Pavement Cores.pdf Pavement Cores

X096.34_BV Forms.pdf Best Value Fillable Forms X096.34_NYCDOT DSL Standard Drawings.pdf NYCDOT DSL Standard Drawings X096.34_CONR5.pdf CONR5 Blank Fillable Form

X096.34_Median Boring Logs.pdf Median Boring Logs

X096.34_Bridge Isnp Rpt.zip Bridge Inspection Reports

X096.34_PLA.pdf

Asbestos Reports & Blanket Variances

Project Labor Agreement

X096.34_Project Location.kmz Project Location or Information (KMZ)

X096.34_FW General Permit.pdf Freshwater Wetlands General Permit

Survey Control ReportX096.34_Survey Control Reports.zip X096.34_Asbestos Report & Blanket Variances.zip

X096.34_OCMC Permit.pdf OCMC Permit X096.34_SWPPP.zip Stormwater Pollution Prevention Plan

X096.34_Record Plans_FAWSE 70-1_Part8of12.pdf Record Plans FAWSE 70-1 X096.34_Record Plans_FAWSE 70-1_Part7of12.pdf Record Plans FAWSE 70-1 X096.34_Record Plans_FAWSE 70-1_Part6of12.pdf Record Plans FAWSE 70-1 X096.34_Record Plans_FAWSE 70-1_Part5of12.pdf Record Plans FAWSE 70-1

X096.34_Exist Sbsurfce Expln Logs_4of5.pdf Subsurface Exploration Logs X096.34_Exist Sbsurfce Expln Logs_3of5.pdf Subsurface Exploration Logs X096.34_Exist Sbsurfce Expln Logs_2of5.pdf Subsurface Exploration Logs X096.34_Exist Sbsurfce Expln Logs_1of5.pdf Subsurface Exploration Logs

CONR9 REV 8/5/22 Page 2 D265865_R11_CONR9

D26586558

NYSDOT ELECTRONIC BIDDING

AASHTOWARE PROJECT BIDS AND BID EXPRESS

ELECTRONIC BIDDING RESOURCES:

• PROJECT BIDS - Project Bids allows bidders to receive electronic proposal bid item information from the Department's web site and Bid Express to produce an electronic bid.

Project Bids is provided free of charge and can be used on almost any Windows-compatible PC.

Benefits may include:

o Project Bids computes item and overall bid totals as estimators work through the list, and alerts estimators if an item is accidentally omitted.

o Electronic files of item bid data will be posted to the NYSDOT website and Bid Express to coincide with advertising and contract document publication dates.

o When an amended item bid data is downloaded, recognition of changes is automatic.

o Electronic bids are processed faster than paper bids, decreasing the time needed for verification of bids by NYSDOT.

• BID EXPRESS - Bid Express allows secure, encrypted bid submittal over the internet. It integrates with Project Bids and includes electronic bid bond verification. Bid Express is a fee-based service.

Benefits may include:

o Real-time bid submittal from any location.

o No concerns about driving bids to Albany or mail services arriving after the deadline.

o The ability to submit a "safety bid" early while continuing to solicit better quotes from subs and suppliers and to overwrite the safety bid with a new bid right up to the submission deadline.

o As data accumulates on Bid Express, there is the ability to search and analyze bids on prior contracts for specific work items, and/or by specific competitors, etc.

o The ability to solicit and receive quotes from subcontractors through the Small Business Network on Bid Express.

o Contractors who use Bid Express do not submit a paper bid.

ALL ELECTRONIC BIDDERS SHOULD:

• Enter prices for all bid items in the Schedule of Items.

• Enter DBE Participation Package and upload required documents (Federal-Aid contracts).

• Enter days for the B portion(s) of A + B bids on the A+B Days tab (if applicable).

• Enter the required info in the JURAT and Disclosure of Lobbying Activity folders.

• Complete the Contract Document Bid-Ability Survey (optional).

• Enter the required info in the Bid Bond folder if submitting a bid through Bid Express and click

Verify to verify the bid bond.

All bids submitted through Bid Express should be 100% complete as noted at the top of the page and all required tabs marked with a green check showing completion. Submitting a bid that is less than 100% complete through Bid Express could lead to the bid being declared informal.

D265865 59

FIRST TIME ELECTRONIC BIDDERS SHOULD:

• Allow at least seven business days to obtain a digital ID and password for bidding through Bid Express.

• Follow the procedures in "Download AASHTOWare Project Bids", which are posted at http://www.dot.ny.gov/bids-and-lettings/construction-contractors/electronic-bid-system

• Enter the Agency as NYSDOT.

• Use the appropriate Federal-ID and firm name. Federal-ID must be in the format 12-3456789.

Joint ventures must create a new digital ID. Joint ventures must also send evidence of the authority of the agent or attorney-in-fact for the joint venturers to act on behalf of all joint venturers to the Office of Contract Management prior to the Letting.

PAPER BID DOCUMENTS:

• NYSDOT recommends and encourages contractors to bid electronically with Bid Express because of its many advantages, but contractors are not required to bid electronically.

• If NYSDOT receives both a Bid Express bid and a paper bid from the same contractor, the Bid Express bid will prevail.

• Bidders who do not use Bid Express are encouraged to submit an electronic bid file on a flash drive with their paper bid.

• NYSDOT will not accept electronic bids on any media without a paper bid.

• If there is any discrepancy between an electronic file submitted with the paper bid and the paper bid, the paper bid will prevail.

• When submitting an electronic bid file with your paper bid, include only one .EBSX (Project

Bids) file on the flash drive. This should be the only file on the flash drive.

AMENDMENTS:

Contractors are solely responsible for recognizing and responding to changes by amendment. Not all amendments will involve changes to item bid data, however, if an amendment involves changes to item bid data, an amended Project Bids file will be posted to the Department's website and to Bid Express. This file must be applied to your electronic bid.

If there is any discrepancy in the itemized proposals published in paper and electronic formats, in either the contract pay items or quantities, the Department will evaluate the bids based only on that portion that is common to all formats. For example, if an item is missing from any format, the bids will be evaluated excluding that item and if item quantities are different in any format, the bids will be evaluated using the lowest item quantity.

Please notify the Department through the Contract Documents/Contact Us tab for that project, located at https://www.dot.ny.gov/portal/page/portal/doing-business/opportunities/const-notices, if you find any such discrepancies.

FOR ASSISTANCE:

• NYSDOT 518-457-2124 or 518-457-3583

• Bid Express Help Desk (888) 352-2439 or (352) 381-4888

• Third-party Software - Contact the vendor of the software. The Department is neither authorized nor able to assist with any software package.

D26586560 https://www.dot.ny.gov/bids-and-lettings/construction-contractors/electronic-bid-system https://www.dot.ny.gov/portal/page/portal/doing-business/opportunities/const-notices

INSURANCE COVERAGE

Insurance requirements are set forth in Standard Specifications §107-06 – Insurance.

When there are changes to the scope of work, the insurance requirements shall be reviewed, and the Contractor shall secure proper coverage and provide proof of coverage to the Department.

Acceptable proof of all applicable insurances shall be provided before commencing work.

Required Insurances The following insurances are required on all contracts, as set forth in Standard Specifications §107-06 – Insurance:

● Workers’ Compensation ● Disability

● Commercial General Liability ● Commercial Automobile

● Umbrella or Excess Liability ● Special Protective and Highway Liability

Proof of the Contractor’s Workers’ Compensation insurance and Disability insurance is required to be provided with the contract agreement.

Additional Required Insurances The following coverage (as identified by checkmark) shall be provided based on the contract documents; the Contractor shall be responsible for any insurance set forth in Standard Specifications §107-06 and otherwise required in performance of the contract, whether based on the nature of the work or the Contractor’s means and methods regardless of whether identified below:

Professional Liability Insurance Required due to professional service requirements associated with one or more of the following:

• Item 202.XX Demolition of Buildings and Structures

• Item 211.XX Internally Stabilized Cut Structures

• Item 551.30 & Item 551.31 Micropiles (Contractor Designed)

• Item 553.01 & Item 553.02 Cofferdams

• Item 570.15nnnn Class A Containment

• Item 585.XX Structural Lifting

• Item 619.05nn Temporary Structures and Approaches

• Item 625.03, Item 625.04, Item 625.05, & Item 625.06 Right of Way/Survey Markers

• Item 650.XX Trenchless Installation of a Casing

• Other:

Marine Protection and Indemnity Coverage

Required due to contract work associated with one or more of the following:

• Work from watercraft on navigable waters at a known location

• A rescue boat/skiff is required (e.g., there will be contract work over water ≥ 5 feet deep, contract work over swift moving water ≥ 2 feet deep, or other situations described in §107-05I – Working Over or Near Water)

X

D265865 61

Railroad Protective Liability Coverage

Required due to contract work meeting conditions stated in §105-09 – Work Affecting Railroads. Policies shall be subject to the approval of named railroad companies.

Name of Affected Railroad:

Coverage for Bodily Injury Liability and/or Property Damage shall not be less than Each Occurrence: $ Annual Aggregate Limit: $

Pollution Liability Coverage

Required due to contract work associated with one or more of the following:

• Item 205.XX Contaminated Soil Operations

• Item 210.XX Removal & Disposal of Asbestos-Containing Material (buildings, bridges, and highways)

• Item 570.XX Paint Removal Operations

• Item 571.XX Disposal of Paint Removal Waste

• Item 629.XX Petroleum Storage Tank Closure Operations

• Other:

Unmanned Aircraft Systems Liability Insurance

Required due to contract work specifically stipulating use of unmanned aircraft.

Minimum Required Policy Limit: $

Builders’ Risk Policy

If the total contract bid amount is $25M or higher, the structure described below shall be insured under a Builders’ Risk policy.

Minimum Required Policy Limit: $ Structure to be Insured:

X

D26586562

LIST OF ADDITIONAL INSURED PARTIES

In accordance with Standard Specifications §107-06A.4 applicable insurance policies shall be endorsed to provide coverage to:

• The State of New York

• The City of New York

• New York State Department of Transportation (NYSDOT)

• New York City Department of Transportation (NYCDOT)

• Any consultants working for or on the project

• Agents or employees of the above listed parties

As any new locations of work are defined or added to the Contract, the Contractor shall extend coverage to any new parties that warrant coverage as per §107-06A.4. Proof of coverage for the new additional insured parties shall be provided to the Department.

Coverage shall be extended to the following known additional insured parties:

• None

5/21/2021 L 9/1/2021

D265865 63

1100 1 of 1 Per Contracts

L01/10/13 Rev. 2/27/23

New York State Vendor Responsibility Questionnaire For-Profit Construction

(CCA-2)

In accordance with Standard Specification Section 105-05 VENDOR RESPONSIBILITY, “The

Contractor shall at all times during the contract term remain responsible.” Failure to maintain and provide responsibility documentation may result in non-payment or suspension of work.

A New York State Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) is the primary tool used to perform this review. An approved CCA-2 must be on file with

NYSDOT to be considered for the award of a contract or for the approval of a subcontract. An approved CCA-2 covers NYSDOT work for one calendar year.

Forms are available at: http://osc.state.ny.us/vendrep/forms_vendor.htm#Construction.

Firms may file either electronically through the OSC site or can print out the CCA-2, and mail a signed and notarized original copy to:

New York State Department of Transportation

Contract Management

50 Wolf Road, 1st Floor, Suite 1CM

Albany, NY 12232

Whichever method of submission is selected, the Contractor must complete and include

Attachments A, B and C. Further information can be found at: https://www.dot.ny.gov/bids-and-lettings/construction-contractors/general-info.

Please note if you file online through the OSC site, a responsibility review must still be completed by NYSDOT before work can start. Therefore, once certified on-line, you must notify NYSDOT via email at VendorResponsibility@dot.ny.gov which will initiate the review process. If you file online and do not notify NYSDOT within 3 months, it may be necessary for you to resubmit and recertify, restarting the process.

If you are not currently performing work for NYSDOT but anticipate bidding or subcontracting during the next 12 months, you should complete and submit a CCA-2. Please do not wait until you are scheduled to work on a project.

Questions may be sent to VendorResponsibility@dot.ny.gov.

D26586564 http://osc.state.ny.us/vendrep/forms_vendor.htm#Construction https://www.dot.ny.gov/bids-and-lettings/construction-contractors/general-info https://www.dot.ny.gov/bids-and-lettings/construction-contractors/general-info mailto:VendorResponsibility@dot.ny.gov mailto:VendorResponsibility@dot.ny.gov

3400 Per DQAB

L09/04/14

SPECIAL NOTES

Location Maps

Landscape Development Notes

R.O.W.

Thruway

Canal

Funding

Asphalt and Fuel Price Adjustments

Other Special Notes

Other Project Special Notes

NOTE: This form was developed for repetitive use throughout all contract proposals and may identify items not applicable to this specific project.

D265865 65

SPECIAL NOTE

TEMPORARY LANE/SHOULDER CLOSURE RESTRICTIONS FOR MAJOR

HOLIDAYS

EI 17-010 Page 1 of 1 L 05/01/18 or earlier

There shall be no temporary lane/shoulder closures on roadway facilities owned and/or maintained by NYSDOT on the major holidays listed below.

Construction activities that will result in temporary lane/shoulder closures shall be suspended to minimize travel delays associated with road work for major holidays as follows:

Exceptions can only be made under the following conditions:

• Emergency work.

• Work within long-term stationary lane/shoulder closures.

• Safety work that does not adversely impact traffic mobility and has been authorized by the Regional Traffic Engineer.

Note: The Department reserves the right to cancel any work operations, including lane closures and/or total road closures, that would create traffic delays by unforeseen events. The Contractor would be notified at least seven (7) calendar days prior to the proposed work.

Holiday Falls on Temporary lane closures are NOT allowed from

New Year’s Day Independence Day Christmas Day

Sunday or Monday

6:00 AM Friday before to 6:00 AM Tuesday after

Tuesday 6:00 AM Saturday before to 6:00 AM Wednesday after (starting at 6:00 AM Friday before to 6:00 AM Wednesday after for Christmas Day)

Wednesday 6:00 AM Tuesday before to 6:00 AM Thursday after (starting at 6:00 AM Saturday before to 6:00 AM Thursday after for Christmas Day)

Thursday 6:00 AM Thursday to 6:00 AM Monday after (starting at 6:00 AM Wednesday before to 6:00 AM Monday after for Christmas Day)

Friday or Saturday

6:00 AM Thursday before to 6:00 AM Monday after

Holiday Falls on Temporary lane closures are NOT allowed from

Memorial Day Labor Day

Monday 6:00 AM Friday before to 6:00 AM Tuesday after

Thanksgiving Day Thursday 6:00 AM Wednesday before to 6:00 AM Monday after

D26586566

3407 Page 1 of 1 01/24/2025

EI 25-002

SPEED LIMIT SIGN IN WORK ZONE

For any work zone traffic control set-up with a duration of over one hour on a freeway or parkway, a regulatory speed limit sign (one of R2-1 or NYR2-2 through NYR2-6) is required halfway between the 1st and 2nd advance warning signs unless:

• a regulatory speed limit reduction is authorized, and those signs have been installed or

• a regulatory speed limit sign exists between those advanced warning signs.

This provision is applicable to the following standard sheets:

• 619-316 (2 std. sheets)

• 619-416 (2 std. sheets)

The cost for this sign shall be included in the price bid for one of the Work Zone Traffic

Control items 619.01 or 619.0101.

D265865 67

3408 Page 1 of 1 Sept. 2026 L 01/01/2024

USE OF WORK ZONE CAMERAS

Camera setup in each work zone is subject to the nature of the work and available locations which do not pose a hazard or conflict with the safe operation of proposed work and equipment. Cameras and associated equipment should not be placed in an area where they could be struck by traffic or moving equipment, or where they pose sight distance restrictions or other safety concerns.

Cameras should be positioned to have full view of traffic activity within the work zone and will be used primarily to record video of flaggers (or other traffic controlling devices) and traffic entering and exiting the work zone. The location of the camera installation is to be recommended by the contractor and approved by the Engineer for each camera setup. Additionally:

• Mount cameras on a stationary base so the recorded video produces a clear and consistent image.

•A minimum of two (2) cameras shall be used at each work zone and positioned so that one camera captures a direct view of vehicles entering the work zone and the other camera captures a direct view of vehicles departing the work zone.

• Direct cameras toward the approach and flagger station if one exists.

• Direct at least one camera toward the work crew when they are working adjacent to live traffic and no positive protection is provided.

General Requirements for the use of Work Zone Cameras:

1) “WORK ZONE CAMERA” sign shall be placed within the advance warning sign setup according to the details shown in the contract documents. Sign size shall be in accordance with the MUTCD for warning signs for the applicable roadway type.

2) Work Zone Cameras are not to be used as a substitute for any other safety device or work zone requirement.

3) All video and audio recordings shall be the property of the State of New York and shall not be used for any purpose outside those deemed acceptable by the State.

4) If there is any work zone intrusion, hostile encounter, or event where law enforcement is called, the Engineer and the Regional Construction Safety Coordinator shall be immediately notified. The contractor will transfer the video to the Engineer or another NYSDOT representative. The contractor will then immediately replace the removable video storage device, if applicable, with a new device and turn on the camera again. NYSDOT staff shall prepare and submit a Construction Incident

Report through the Department’s current incident reporting software and attach any relevant documentation inclusive of video, photo, and/or witness statements.

D26586568

AUTOMATED WORK ZONE SPEED ENFORCEMENT (AWZSE)

The Contractor is hereby notified that the Department may elect to deploy an automated speed enforcement unit at certain times during the project. Project locations that qualify for the deployment of automated speed unit must meet the following criteria:

• Limited Access Highways only

• No mobile work zones

• Workers must be present

The automated unit may consist of a trailer mounted unit, a free-standing unit, or one contained within a work vehicle. The unit will be deployed and operated by a private vendor under the direction of the Department and the Engineer. The “Speed Photo Enforcement Warning Sign” will be provided by the AWZSE vendor. If necessary, the contractor shall provide a temporary regulatory speed limit sign within half mile ahead of the start of the work zone. The cost of this extra sign shall be included as part of the Basic Work Zone Traffic Control item.

The contractor shall coordinate with the Engineer and the speed enforcement vendor to find a safe location for the unit within the work zone that does not interfere with on-going work. The vendor will set up and take down/remove their unit and sign(s) each day they are deployed.

D265865 69

ENVIRONMENTAL PRODUCT DECLARATIONS (EPDs)

EB 26-022 Page 1 of 2 L 09/01/2026

Projects must comply with all applicable New York State (NYS) laws and policies to reduce the embodied carbon of buildings and infrastructure projects. This includes:

▪ New York State Executive Order 22 (2022) o Executive Order 22 Embodied Carbon Guidance (2025 or current version)

▪ Buy Clean Concrete guidelines (2023 or current version) pursuant to State Finance Law § 136-d.

These laws and policies require entities subject to their application to disclose the embodied carbon that will result from construction projects utilizing specified construction materials, and to procure low-embodied carbon concrete on certain contracts. To comply with these requirements, NYSDOT is requiring Contractors to submit

EPDs for certain building and construction materials supplied to NYSDOT contracts. EPDs must be Product-specific, Facility-specific, or Supply chain-specific, Type III (Third Party Reviewed), in adherence with ISO

14025 Environmental Labels and Declarations, ISO 14044 Environmental Management – Life Cycle

Assessment, and ISO 21930 Core Rules for Environmental Product Declarations of Construction Products and

Services. Industry-wide EPDs are not acceptable.

For permanently incorporated construction materials manufactured for, and supplied to state construction projects, the Contractor shall obtain and submit EPDs for asphalt mixtures, concrete mixtures (excluding precast concrete), and steel, when certain thresholds are met. The Embodied Carbon Guidance document identifies the covered construction materials and quantity thresholds, which are summarized for NYSDOT projects below.

When the quantity of any covered materials supplied to the project meets or exceeds the quantity thresholds listed below, EPDs for those materials must be submitted to the Department.

▪ Asphalt Mixtures 8,000 Tons (per individual mix design)

▪ Concrete Mixtures 200 Cubic Yards (per individual mix design) *

▪ Steel Category * o Rebar - 20,000 lbs o Hollow Structural Sections - 15,000 lbs o Fabricated Steel Plate - 15,000 lbs o Hot Rolled Sections - 15,000 lbs o Cold-Formed & Galvanized - 15,000 lbs

* When multiple covered materials are included in a single pay item, each covered material quantity is counted separately. For example, a single pay item for steel-reinforced concrete includes both concrete and steel, and each material quantity is tracked individually. If the concrete amount meets the requirements for an EPD, but the steel amount does not, a concrete EPD is required but a steel EPD is not.

One goal of Executive Order 22 (EO-22) is to reduce the embodied carbon content of common construction materials. Since it is the Contractor’s responsibility to select material suppliers, and since different suppliers may provide similar materials but produced in different locations using different equipment, the quantity thresholds established in EO-22 Embodied Carbon Guidance must be determined by individual mix design or steel material category and supplier. If one mix design or steel category is used for multiple different pay items within a contract, the total quantity of that specific mix design or steel category supplied to the project (summed across all pay items) is counted. Conversely, if multiple different mix designs are installed for the same pay item (for example, a multi-location paving project supplied by multiple different local asphalt plants), an EPD is only required for the mix designs that meet or exceed 8,000 tons for the contract.

The Buy Clean Concrete Guidelines require transportation construction projects with contract values at award

D26586570 https://www.governor.ny.gov/sites/default/files/2022-09/EO_22.pdf https://ogs.ny.gov/system/files/documents/2025/12/1.-eo22-guidance-on-embodied-carbon_v3-jan-2025.pdf https://ogs.ny.gov/system/files/documents/2025/12/1.-eo22-guidance-on-embodied-carbon_v3-jan-2025.pdf https://ogs.ny.gov/system/files/documents/2025/07/nys-buy-clean-concrete-guidelines_updated-july-2025_0.pdf

ENVIRONMENTAL PRODUCT DECLARATIONS (EPDs)

EB 26-022 Page 2 of 2 L 09/01/2026 over $3,000,000 to procure concrete with Global Warming Potential (GWP) below the maximum values specified below:

Specified compressive strength

(PSI)

Maximum Global Warming Potential Limits for Low Embodied Carbon Concrete

(kilograms of carbon dioxide equivalent per cubic yard [kg CO2e/y3] )

0 - 2500 275

2501 - 3000 302

3001 - 4000 360

4001 - 5000 434

5001 – 6000 458

6001 – 8000 541 These limits reflect 150% of the Eastern Region average GWP figures from the National Ready Mix Concrete

Associations’ “A Cradle-to-Gate Life Cycle Assessment of Ready-Mixed Concrete Manufactured by NRMCA

Members – Version 3.2 “(Jul 2022), page 62-66.

Contractors doing work involving low embodied carbon concrete shall certify, upon completion of the project, that all procured low embodied carbon concrete utilized on the project meets the minimum standards in these guidelines, by providing: 1) an acceptable EPD, and 2) a document stating the GWP of the concrete mix used

(indicating comparison to New York State’s concrete GWP limit), to demonstrate that the GWP of the concrete mix is lower than New York State’s GWP limit for concrete.

The Contractor must submit the required EPD(s) to the NYSDOT Main Office Materials Bureau, in accordance with Materials Procedure MP 106-01.

D265865 71 https://www.dot.ny.gov/divisions/engineering/technical-services/materials-bureau-repository/mp106-01.pdf

06/12/2025

ASPHALT WITH CRUSHED GLASS

SCOPE. This specification covers the requirements for the addition of crushed glass to asphalt mixtures. The provisions of Section 404 - Asphalt Pavements 406 – Asphalt Pavements with Fibers applies except that the Contractor has the option of blending of the crushed glass in the following mixes:

37.5 Nominal Max. Size

25.0 Nominal Max. Size

19.0 Nominal Max. Size

Truing and Leveling Course

If the Contractor chooses the crushed glass option, the following modifications to the Standard

Specifications shall apply:

MATERIAL REQUIREMENTS

Crushed glass shall be subject to the approval of the Regional Materials Engineer prior to its use. The crushed glass shall contain no more than 1% (by weight) contaminants and shall meet the following gradation:

Sieve Size Percent Passing

3/8 inch 100

1/4 inch 90 - 100

No. 30 0 - 20

Note: The gradation requirements may be modified upon approval by the Regional Materials Engineer.

Crushed glass may be included in the mixture up to 5%, maximum, of the total aggregate weight. The crushed glass, aggregate, and Performance-Graded Binder (PGB) shall meet the requirements specified in the Standard Specification §401-2.01 Asphalt Mixture Designs, §401-2.02 Aggregates, and §401-2.04

Performance-Graded Binder.

CONSTRUCTION DETAILS

The crushed glass shall be proportioned from a separate feed bin approved by the Regional Materials

Engineer. In addition, all requirements pertaining to aggregate shall apply to crushed glass including the equipment requirements for automatic proportioning and recording as stipulated for aggregate in §401-

3.08 Asphalt Mixing Plant.

METHOD OF MEASUREMENT. The provisions of §404-4, Method of Measurement, shall apply.

BASIS OF PAYMENT. The provisions of §404-5 and 406-5, Basis of Payment, shall apply.

D26586572

SPECIAL NOTE:

USE OF RECLAIMED ASPHALT SHINGLES (RAS) IN THE PRODUCTION OF

ASPHALT MIXTURES

3445 Page 1 of 2

03/20/2025

DESCRIPTION. The specification covers the requirements for the use of Reclaimed Asphalt

Shingles (RAS) in the production of asphalt mixtures. The provisions of Sections 401, Section

404, and 406 of the NYS Standard Specifications apply except as modified herein.

MATERIAL REQUIREMENTS

The Contractor has the option of using the following:

• Manufactured Waste (MW) RAS may be used in shim, base, binder, and top courses

(excluding 6.3 Top Course Asphalt Mixtures, Waterproofing Bridge Deck Overlay, and

Ice Retardant mixtures).

• Post Consumer Waste (PCW) RAS and may be used in shim, base and binder courses.

The RAS must be stockpiled at the plant facility and shall be subject to the approval of the

Regional Materials Engineer (RME) prior to its use. RAS shall meet the following requirements:

• Shall be from a source that has obtained a beneficial use determination (BUD) from the

NYS Department of Environmental Conservation (DEC) as specified in 6 NYCRR 360-

1.15.

• Shall be certified to be asbestos free.

• Shall be completely free of nails. In addition, it shall contain no more than 1% by weight of other deleterious materials such as glass, wood, plastic, etc.

• Shall meet the following gradation:

Sieve Size Percent Passing

Min. Max.

¼ inch (6.3 mm) 100 -

#4 (4.75 mm) 90 100

#8 (2.36 mm) 75 90

#16 (1.18 mm) 50 70

#30 (0.600 mm) 30 55

#50 (0.300 mm) 15 40

#100 (0.150 mm) 5 25

#200 (0.075 mm) - 15

The maximum RAS allowed in the mixture is 2% by weight of the total mixture. A Control

Plan for using shingles in asphalt mixtures shall be developed and submitted to the RME detailing the control and testing of the stockpiles. RAS shall be uniformly blended with RAP to reduce clumping and must be stockpiled separate from other stockpiles. Other methods of reducing RAS clumping can be utilized with the approval of the RME.

D265865 73

SPECIAL NOTE:

USE OF RECLAIMED ASPHALT SHINGLES (RAS) IN THE PRODUCTION OF

ASPHALT MIXTURES

3445 Page 2 of 2

03/20/2025

Rejuvenator. A rejuvenator shall be added to PCW RAS using a pugmill or similar equipment to pre-blend and stockpile the rejuvenated PCW RAS. Alternatively, a spray system may be used to spray the rejuvenator onto the PCW RAS prior to its introduction into the plant mixer. The rejuvenator shall meet the requirements of ASTM D 4552, Standard Classification of Hot-Mix

Recycling Agents. Other liquid products or methods which facilitate softening of the PCW RAS binder may be used with the approval of the RME. The application rate shall be as recommended by the rejuvenator supplier.

Mixture Design. Prior to production of the asphalt mixture, the mixture design shall be developed to meet all the requirements in the latest Materials Method (MM) 5.16, Asphalt

Mixture Design and Mixture Verification Procedures, available on the Department’s website.

The mixture design shall also meet the performance test criteria listed in the table below. The testing must be performed by an AASHTO Materials Reference Laboratory (AMRL) approved laboratory that has the capability of performing these tests.

This is the start of the file's text. The full file is on GovTribe.