This document is a plumbing specification and design plan for the Fiber Innovation Center Reactor Room project at Gaston College in Belmont, North Carolina. The plumbing contractor is responsible for furnishing all materials, labor, tools, and equipment necessary for a complete and operational plumbing system, including the installation of plumbing fixtures, piping, drainage systems, compressed air systems, and related equipment as indicated on the construction drawings. The scope of work encompasses sanitary and storm drainage piping (both above and below grade), hot and cold water supply lines with appropriate isolation valves, vent piping, compressed air service connections, and water hammer arrestors. All work must comply with applicable local codes and regulations, and the plumbing contractor must obtain all necessary permits and arrange for required inspections and approvals prior to project completion. The contractor is required to submit shop drawings at least two weeks prior to fabrication and to provide as-built drawings within 60 days of project completion.
The specification establishes detailed requirements for piping materials, including cast iron piping for sanitary sewers and grease waste applications, PVC piping for specific drainage scenarios, and copper type L piping for water service lines. Pipe hangers and supports must conform to specific manufacturer standards (such as NVENT Caddy models) with maximum spacing requirements varying by pipe diameter and material type. The contractor bears full responsibility for construction safety, coordination with all trades, daily cleanup, and protection of work from weather damage. All plumbing equipment and materials must be new unless otherwise specified, and a one-year warranty covering defects in materials and workmanship is required, with extended warranties on refrigeration compressors extending to five years. The contractor must coordinate with the project's Construction Manager regarding scheduling of utility interruptions, equipment connections, and any noise-producing work such as core drilling or cutting, with premium time costs included in the bid as necessary.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH ALL
APPLICABLE ORDINANCES, CODES AND REGULATIONS OF ALL
AUTHORITIES HAVING JURISDICTION. ALL PLUMBING WORK SHALL BE
INSPECTED AND APPROVED BY THE LOCAL AUTHORITY HAVING
JURISDICTION. THE PLUMBING CONTRACTOR SHALL PROVIDE ALL
NECESSARY FEES AND PERMITS, INCLUDING THE CERTIFICATE OF
PLUMBING INSPECTION.
B. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR
CONSTRUCTION SAFETY. ARCHITECT AND/OR ENGINEER SHALL
ASSUME NO RESPONSIBILITY FOR WORKMAN'S, OR PEDESTRIAN'S
SAFETY. NOTHING IN THE CONTRACT DOCUMENTS SHALL BE
CONSTRUED TO INSTRUCT PROCEDURES OR COMPONENTS FOR
PROJECT SAFETY.
C. NOTHING CONTAINED IN THE CONTRACT DOCUMENTS SHALL BE
CONSTRUED TO CONFLICT WITH ANY NATIONAL, STATE, MUNICIPAL, OR
LOCAL LAWS OR REGULATIONS GOVERNING THE WORK INDICATED OR
SPECIFIED. ALL SUCH REQUIREMENTS SHALL BE SATISFIED BY THE
PLUMBING CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER.
D. WHERE A CONFLICT ARISES BETWEEN PLANS, SPECIFICATIONS,
DETAILS, SCHEDULES, APPLICABLE CODES OR REGULATIONS; THE
MOST STRINGENT SHALL APPLY.
E. THE CONTRACT DOCUMENTS ARE COMPRISED OF DRAWINGS AND
SPECIFICATIONS. EACH PLUMBING BIDDER SHALL VISIT SITE TO
DETERMINE EXISTING CONDITIONS PRIOR TO SUBMITTING BID
PROPOSAL. BIDS SHALL BE BASED ON THE COMPLETE EXAMINATION
OF THE DRAWINGS, SPECIFICATIONS AND EXISTING CONDITIONS. NO
CONSIDERATION WILL BE GIVEN ANY CONTRACTOR WHO FAILS TO DO
SO.
F. THE WORK UNDER THIS CONTRACT SHALL INCLUDE THE
FURNISHING OF ALL NECESSARY MATERIALS, TOOLS, AND LABOR FOR
A COMPLETE, AND WORKING INSTALLATION AS DEFINED BY THE PLANS
AND SPECIFICATIONS. THE PLUMBING CONTRACTOR SHALL WARRANT
THE WORK INDICATED AND SPECIFIED. THE WORK SHALL FUNCTION AS
INTENDED, BE COMPLETE IN ALL DETAILS, AND SHALL INCLUDE ALL
INDICATED, SPECIFIED, OR REQUIRED ACCESSORIES FOR A
FUNCTIONING SYSTEM.
G. PLUMBING CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL
OTHER TRADES.
H. CONTRACTOR SHALL REMOVE DEMOLITION DEBRIS COMPLETELY.
CONTRACTOR SHALL SCHEDULE WITH THE CONSTRUCTION MANAGER
THE TIME, LOCATION, ELEVATOR AND HAULING ROUTE.
I. THE PLUMBING CONTRACTOR SHALL CLEAN UP ALL DEBRIS AT THE
END OF EACH WORK DAY.
J. HORIZONTAL DRAINAGE PIPING SHALL BE INSTALLED IN UNIFORM
ALIGNMENT AT UNIFORM SLOPES NOT LESS THAN 1/4 INCH PER FOOT
FOR THREE (3) INCH DIAMETER AND LESS, AND NOT LESS THAN 1/8
INCH PER FOOT FOR DIAMETERS OF FOUR (4) INCHES OR MORE.
K. ALL PIPING IS SCHEMATIC; SUPPORTS, UNIONS, VIBRATION
ISOLATION, VALVES, INSULATION, ETC. SHALL BE AS REQUIRED FOR A
COMPLETE AND OPERATING SYSTEM.
L. ALL PIPING IS TO BE CONCEALED IN WALLS OR ABOVE CEILING
UNLESS NOTED OTHERWISE.
M. THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE
GENERAL CONTRACTOR PRIOR TO AND FOR SCHEDULING ANY
INTERRUPTION OF ANY BUILDING UTILITY.
N. ALL EQUIPMENT PROVIDED OR INSTALLED BY THIS CONTRACTOR
SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
O. ALL PIPING SHALL BE RUN AT THE SLOPES INDICATED. WHERE
ELEVATIONS ARE NOT INDICATED, COORDINATE THE PIPE ROUTING
WITH THE DUCT ROUTING INDICATED ON THE MECHANICAL PLANS, AS
WELL AS ALL OTHER TRADES.
P. FINAL LOCATION OF ALL PLUMBING FIXTURES, SINKS, ELECTRIC
WATER COOLERS, CLEANOUTS, AND THE LIKE, SHALL BE VERIFIED AND
COORDINATED WITH THE ARCHITECTURAL DRAWINGS.
Q. ALL WORK SHOWN ON THE PLUMBING DRAWINGS SHALL BE BY THE
PLUMBING CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.
R. ALL SANITARY PIPING CONNECTIONS TO FIXTURES SHALL BE SIZED
AS SCHEDULED. ALL OTHER SANITARY PIPING SHALL BE 4" UNLESS
NOTED OTHERWISE.
S. ALL INVERT ELEVATIONS SHOWN ON THE DRAWINGS ARE
APPROXIMATE AND MUST BE VERIFIED BY THE CONTRACTOR PRIOR
TO INSTALLATION.
T. PROVIDE CLEANOUTS AT LEAST EVERY 100 FT IN SANITARY PIPING
IN ADDITION TO THOSE SHOWN ON THE DRAWINGS. PROVIDE A
CLEANOUT AT EACH CHANGE IN DIRECTION OF 90 DEGREES IN A
SINGLE FITTING.
U. PROVIDE A CLEAN OUT AT EACH CHANGE IN DIRECTION GREATER
THEN 45 DEGREES.
V. ALL VENT PIPING CONNECTIONS TO FIXTURES SHALL BE SIZED AS
SCHEDULED. ALL OTHER VENT PIPING SHALL BE 2" UNLESS NOTED
OTHERWISE.
W. PROVIDE 1/4 TURN STOP VALVES AT ALL FIXTURES.
X. PROVIDE APPROPRIATE BACKFLOW PREVENTION DEVICES WHERE
REQUIRED BY CODE.
Y. SEE SPECIFICATION SECTION 011000 FOR TIMING OF ALL WORK AND
COORDINATE.
PLUMBING SYSTEM NOTESPLUMBING SYMBOLS
CA
PD
PS
NO
GW
MCA
LPG
LV
LA
FD
N
TW
ST
ST
SAN
SAN
RWC
ORC
G
140° HWR
DI
140°
GW
AW
AV
SANITARY SEWER BELOW GRADE
SANITARY SEWER ABOVE GRADE
SANITARY VENT PIPING
PRESSURE SANITARY SEWER
PUMP DISCHARGE
ACID WASTE
ACID VENT
STORM SEWER ABOVE GRADE
STORM SEWER BELOW GRADE
RAIN WATER CONDUCTOR
OVERFLOW RAIN CONDUCTOR
FOUNDATION DRAIN
GREASE LADEN WASTE ABOVE GRADE
GREASE LADEN WASTE BELOW GRADE
COLD WATER
HOT WATER SUPPLY (120°)
HOT WATER RETURN (120°)
TEMPERED WATER
HOT WATER SUPPLY (140°)
HOT WATER RETURN (140°)
DEIONIZED WATER
EXISTING TO BE REMOVED
COMPRESSED AIR
GAS
LABORATORY AIR
LABORATORY VACUUM
LIQUEFIED PETROLEUM GAS (PROPANE)
MEDICAL COMPRESSED AIR
NITROGEN GAS
NITROUS OXIDE GAS
BALL VALVE
CHECK VALVE
MIXING VALVE
BALANCING VALVE
CAPPED CONNECTION
PIPE DROP PIPE UP
P-TRAP
AIR VENT
BUTTERFLY VALVE
BACKFLOW PREVENTER
GAS PRESSURE
REGULATOR
GATE VALVE
PRESSURE GAUGE
PRESSURE
REGULATING VALVE
RELIEF VALVE
VALVE IN RISER
HOSE BIBB
WALL HYDRANT
MEDICAL COMPRESSED AIR OUTLET
MEDICAL VACUUM OUTLET W/SLIDE
OXYGEN OUTLET
FIRE HYDRANT
MANHOLE
GAS VALVE BOX
WATER VALVE BOX
AREA DRAIN (No. indicates type)
FLOOR DRAIN (No. indicates type)
FLOOR SINK (No. indicates type)
ROOF DRAIN
CLEAN OUT
FLOOR CLEANOUT
WATER HAMMER ARRESTOR
CLINIC SERVICE SINK
DRINKING FOUNTAIN (No. indicates type)
EMERGENCY SHOWER
EMER SHOWER/EYEWASH COMBINATION
EMERGENCY EYEWASH
LAVATORY (No. indicates type)
MOP RECEPTOR
MIXING VALVE (No. indicates type)
NON-FREEZE ROOF HYDRANT
COUNTER SINK (No. indicates type)
URINAL (No. indicates type)
VALVE CABINET
WATER CLOSET (No. indicates type)
WASHING MACHINE SUPPLY & DRAIN
MEDICAL GAS ZONE VALVE BOX
CONNECT TO EXISTING PIPING
Z.V.B.
WMSD
WC
V.C.
UR
S
NFRH
MV
MR
L
EEW
ES/EW
ES
DF
CSS
WHA
CO
CO
RD
FS
FD
AD
WV
GV
MH
FH
WH
HB
P.G.
V.
ICE MAKER OUTLET BOX (No. indicates type)IMOB
SHOWER (No. indicates type)SH
OVERFLOW RAIN CONDUCTORORC
ROOF DRAIN (No. indicates type)RD
ELECTRIC WATER COOLER (No. indicates type)EWC
DECK DRAIN (No. indicates type)DD
VENT THRU ROOFVTR
ACID VENT THRU ROOFAVTR
PLUG VALVE
EXISTINGEX
NON-FREEZE WALL HYDRANTNFWH
NON-FREEZE WALL HYDRANTNFWH
WASTEW
VENTV
SANITARYSAN
BFP
STRAINER
SOLENOID VALVE
THERMOMETER
T.
VAC VACUUM LINE
UNION
IA INSTRUMENT AIR
O2 MEDICAL OXYGEN GAS
WAGD WASTE ANESTHETIC GAS DISPOSAL
MVAC MEDICAL VACUUM / SUCTION
V
INSULATION WHERE
SPECIFIED SHALL COVER
PIPE
HANGER
INSULATION WHERE
SPECIFIED SHALL COVER
PIPE
HANGER
LOCKING NUT
EYE SOCKET
HEAVY DUTY
CLEVIS HANGER
HANGER ROD
WELDED BEAM
ATTACHMENT
LOCKING NUT
ADJUSTABLE
BAND HANGER
HANGER ROD
ADJUSTABLE
BEAM CLAMP
STRUCTURAL STEEL
BEAM. SEE PROJECT
PLANS FOR SIZES.
STEEL BEAM
STEEL BEAM
STRUCTURAL STEEL
BEAM. SEE PROJECT
PLANS FOR SIZES.
Project No.
Checked
Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM &
CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8514 McAlpine Park Drive, Suite 280 Charlotte, NC 28211
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
FOR CONSTRUCTION
NTS
Autodesk Docs://10324-0003 - Gaston College FIC Reactor Room/MEP_Gaston College FIC Reactor Room.rvt
GASTON COLLEGE
FIC REACTOR
ROOM
2025-11-07
10324-0003
BS
BS
BS
BS
P001
P L
U M
B
IN
G S
Y M
B O
L S
N
O T
E S
A N
D A
B B
R E
V
IA
T
IO
N S
G A
S T
O N
C O
L L
E G
E
K
IM
B R
E L
L C
A M
P U
S
W
IL
K
IN
S O
N B
O U
L E
V A
R D
B E
L M
O N
T
N C
BS
BS
BS
2025-11-07
10324-0003
SCALE: NTS
PIPE HANGER DETAIL
SCALE: NTS
COMPRESSED AIR SERVICE DROP
PLUMBING SPECIFICATIONS
A. GENERAL
1. FURNISH ALL EQUIPMENT, MATERIALS, LABOR, TOOLS, ETC., FOR THE COMPLETE PLUMBING SYSTEM. INSTALL COMPLETE AND PLACE IN
OPERATION.
2. CONFORM TO ALL GENERAL AND SPECIAL CONDITIONS OF CONTRACT AS SPECIFIED BY ARCHITECT AND/OR OWNER.
3. PRODUCTS AND INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES, GOVERNMENT REGULATIONS, UTILITY COMPANY
REQUIREMENTS, ETC. OF ALL AUTHORITIES HAVING JURISDICTION. WHERE CONFLICTS EXIST BETWEEN CODES, STANDARDS OR THIS SPECIFICATION THE MOST STRINGENT SHALL APPLY. DEVIATIONS FROM THE CONTRACT DOCUMENTS REQUIRED BY THE ABOVE AUTHORITIES SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. OBTAIN PERMITS AND PAY ALL FEES. ARRANGE FOR ALL REQUIRED INSPECTIONS AND APPROVALS. CONFIRM ALL UTILITY COMPANY REQUIREMENTS AND CONNECTION POINTS IN THE FIELD, PRIOR TO
STARTING WORK.
4. ALL SPECIFICATIONS AND DRAWINGS, I.E., ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. ANY INFORMATION CONFLICTS WITHIN THE
SPECIFICATIONS AND DRAWINGS SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION.
5. VISIT SITE, CHECK FACILITIES AND CONDITIONS. MAKE ALL NECESSARY OBSERVATIONS, MEASUREMENTS, NOTE CONDITIONS UNDER
WHICH WORK IS TO BE PERFORMED, AND TAKE ALL ITEMS INTO CONSIDERATION IN BID.
6. THE CONTRACTOR SHALL PROVIDE FOR THEIR OWN CLEAN-UP, REMOVAL AND LEGAL DISPOSAL OF ALL RUBBISH DAILY. CONTRACTORS SHALL PROTECT THEIR WORK AND EXISTING OR ADJACENT PROPERTY AGAINST WEATHER, TO MAINTAIN THEIR WORK, MATERIALS, APPARATUS AND FIXTURES FREE FROM INJURY OR DAMAGE. ANY WORK DAMAGED BY FAILURE TO PROVIDE THE PROTECTION REQUIRED
SHALL BE REMOVED AND REPLACED WITH NEW WORK AT THE CONTRACTOR'S EXPENSE.
7. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER’S PROJECT MANAGER PRIOR TO, AND FOR, SCHEDULING ANY INTERRUPTION OF
ANY BUILDING UTILITY.
8. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND
THE SAFETY OF WORKMEN.
9. NO PIPING, CONTROLS, ETC., SHALL BE INSTALLED OR ROUTED ABOVE ELECTRICAL PANELS AND EQUIPMENT OR THROUGH ELEVATOR
MACHINE ROOMS.
10. ALL EQUIPMENT AND MATERIAL FOR THIS PROJECT WILL BE NEW UNLESS SPECIFICALLY INDICATED OTHERWISE.
11. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. THE CONTRACTOR SHALL COORDINATE AND OBTAIN A WRITTEN
LISTING OF ELECTRICAL CHARACTERISTICS OF ALL PLUMBING EQUIPMENT FROM THE ELECTRICAL CONTRACTOR PRIOR TO THE ORDERING OF EQUIPMENT. NO ADDITIONAL PAYMENT WILL BE MADE FOR LACK OF CONTRACTOR COORDINATION OF ELECTRICAL
CHARACTERISTICS.
12. PROVIDE SLEEVES EXTENDING 2” MINIMUM ABOVE FINISHED FLOOR AND FIRE STOP ALL FLOOR PENETRATIONS.
13. WORK RELATED TO THE EXISTING BUILDING SHALL BE COORDINATED TO MINIMIZE THE INTERFERENCE OR INTERRUPTION OF NORMAL
BUILDING USE BY OWNER. REFER TO ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS.
14. IN CASES OF DOUBT AS TO THE WORK INTENDED, OR IN THE EVENT OF NEED FOR EXPLANATION THEREOF, THE CONTRACTOR SHALL
REQUEST SUPPLEMENTARY INSTRUCTIONS FROM THE ENGINEER. NO CHANGES ARE TO BE MADE TO THE WORK OF THIS CONTRACT WITHOUT PRIOR KNOWLEDGE AND APPROVAL OF THE ENGINEER. THE CONTRACTOR SHALL HOLD THE OWNER AND ITS CONSULTANTS HARMLESS AGAINST ALL CLAIMS AND JUDGEMENTS ARISING OUT OF THE CONTRACTOR’S PERFORMANCE OF THE WORK OF THIS CONTRACT. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK IN WHICH ADDITIONAL COMPENSATION IS EXPECTED BEYOND THE CONTRACT AMOUNT WITHOUT WRITTEN AUTHORIZATION FROM THE APPROPRIATE AUTHORITY. FAILURE TO OBTAIN SUCH
AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION.
15. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO INSTALL ALL SYSTEMS SO AS TO INSURE QUIET OPERATION. NO VIBRATION OR SOUND SHALL BE TRANSMITTED TO THE BUILDING, STRUCTURE OR OCCUPIED AREAS. THE DECISION OF THE ENGINEER AS TO THE QUIETNESS OF THE SYSTEM AND EQUIPMENT SHALL BE FINAL. IT SHALL BE THIS CONTRACTOR’S RESPONSIBILITY TO CORRECT OR
REPLACE ANY NOISY SYSTEM OR EQUIPMENT AS REQUIRED.
16. OBTAIN PERMITS AND PAY ALL FEES. ARRANGE FOR ALL REQUIRED INSPECTIONS AND APPROVALS.
17. ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ACI 301 “SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS”, LATEST EDITION. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60, EXCEPT TIES, WHICH MAY BE GRADE
40. ALL REINFORCING BARS SHALL BE FABRICATED AND PLACED IN ACCORDANCE WITH ACI 315 AND CONCRETE REINFORCING STEEL INSTITUE RECOMMENDATIONS. CONCRETE CURING PROCEDURES SHALL BE IN ACCORDANCE WITH ACI 301. CONCRETE SHALL BE NORMAL
WEIGHT CONCRETE WITH 3500 PSI MINIMUM 28 DAY COMPRESSION STRENGTH.
B. DRAWINGS
1. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY THE SCOPE AND GENERAL ARRANGEMENT OF WORK. CONFIRM ALL
DIMENSIONS BY FIELD MEASUREMENT.
2. THE EXACT LOCATIONS FOR APPARATUS, FIXTURES, EQUIPMENT AND PIPING WHICH IS NOT COVERED BY DRAWINGS, SHALL BE OBTAINED
FROM THE ARCHITECT OR THEIR REPRESENTATIVE IN THE FIELD, AND THE WORK SHALL BE LAID OUT ACCORDINGLY.
3. ALL OFFSETS, RISES, TRANSITIONS AND DROPS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER.
4. LOCATIONS OF TERMINAL DEVICES, PLUMBING FIXTURES, ETC., ARE APPROXIMATE. LOCATE PER THE ARCHITECTURAL DRAWINGS AND
TO AVOID OTHER TRADE'S WORK. COORDINATE LOCATIONS WITH OTHER TRADES. CONSULT ARCHITECT/ENGINEER FOR CLARIFICATION
IF CONFLICTS OCCUR.
5. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE SUPPLEMENTARY. ANY MATERIALS, LABOR OR SERVICES REQUIRED BY EITHER IS
TO BE CONSIDERED AS REQUIRED FOR THE PROJECT.
6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS WITHIN 60 DAYS OF PROJECT COMPLETION.
E. CUTTING, PATCHING AND DRILLING
1. ALL CUTTING AND PATCHING OF THE BUILDING CONSTRUCTION REQUIRED FOR THE DIVISIONS OF THE WORK SHALL BE BY THE
RESPECTIVE CONTRACTOR REQUIRING SAME UNLESS THIS WORK IS INDICATED ON ARCHITECTURAL DRAWINGS AND CONFIRMED AS TO SIZE AND LOCATION PRIOR TO NEW CONSTRUCTION. CUTTING SHALL BE IN A NEAT AND WORKMANLIKE MANNER SO AS TO MINIMIZE
PATCHING.
2. NEATLY SAW CUT ALL RECTANGULAR OPENINGS, SET SLEEVE THROUGH OPENING, AND FINISH PATCH OR PROVIDE TRIM FLANGE AROUND
OPENING.
3. NEATLY SAW CUT FLOORS FOR SEWER INSTALLATION AND PATCH FLOOR TO MATCH EXISTING, INCLUDING FLOOR COVERING OR FINISH.
4. CORE DRILL AND SLEEVE OPENINGS.
5. DO NOT CUT ANY STRUCTURAL COMPONENTS WITHOUT THE ARCHITECT’S APPROVAL.
6. PATCH AND FINISH TO MATCH ADJACENT AREAS THAT HAVE BEEN CUT, DAMAGED OR MODIFIED AS A RESULT OF THE INSTALLATION OF
PLUMBING EQUIPMENT. FIRE STOP ALL PENETRATIONS OF FIRE RATED CONSTRUCTION IN A CODE APPROVED MANNER.
7. THE CONTRACTOR SHALL CONFIRM WITH OWNER, PRIOR TO BID, TIMES AVAILABLE FOR NOISE PRODUCING WORK SUCH AS CUTTING AND
CORE DRILLING OF FLOORS, WALLS, ETC., AS WELL AS TIMES FOR WORK WHICH REQUIRE ACCESS INTO ADJOINING TENANT SPACES.
INCLUDE ANY REQUIRED PREMIUM TIME TO COMPLY WITH THESE TIMES IN BID.
8. INFORMATION REGARDING REQUIRED PIPE OR OTHER OPENINGS IN WALLS, FLOORS, CHASES, ETC., AND CONCRETE EQUIPMENT PADS OR FOUNDATIONS ARE TO BE PROVIDED TO THE GENERAL CONTRACTOR BY THIS CONTRACTOR PRIOR TO THE CONSTRUCTION PERIOD.
IF THIS CONTRACTOR FAILS TO COMPLY WITH THIS REQUEST, OR PROVIDES INCORRECT INFORMATION, THIS CONTRACOTR WILL BE RESPONSIBLE FOR ALL CORRECTIVE COSTS FOR ALL NECESSARY CUTTING, PATCHING OR OTHER CORRECTION WHICH WILL BE
PERFORMED BY THE GENERAL CONTRACTOR.
F. WARRANTY
1. INCLUDED AS A PART OF THE WORK UNDER EACH PLUMBING, MECHANICAL, OR ELECTRICAL SECTION, ALL MATERIALS, APPARATUS, AND
EQUIPMENT INSTALLED AND SERVICES TO BE PROVIDED ARE WARRANTED FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP. ANY PORTION OF THE WORK WHICH MAY PROVE DEFECTIVE WITHIN A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF THE WORK BY THE OWNER, SHALL BE REPLACED OR REPAIRED IN AN APPROVED MANNER WITHOUT ADDITIONAL COST TO THE OWNER. IN ADDITION TO THIS ONE (1) YEAR WARRANTY, REFRIGERATION COMPRESSORS WILL BE GUARANTEED FOR A TOTAL PERIOD OF FIVE (5)
YEARS FROM ACCEPTANCE.
2. WITHOUT REGARD TO THE TIME OF DISCOVERY, ANY AND ALL PORTIONS OF THE WORK FOUND NOT IN COMPLIANCE WITH THE CONTRACT SHALL BE REPLACED OR REPAIRED IN AN APPROVED MANNER WITHOUT ADDITIONAL COST TO THE OWNER. SAID REPAIR OR REPLACEMENT SHALL BE REQUIRED AS THE SPECIFIC PERFORMANCE OF THE CONTRACT AND IS NOT TO BE CONSIDERED AS WAIVING
ANY OTHER RECOURSE OR REMEDIES AVAILABLE TO THE OWNER.
G. SHOP DRAWING SUBMITTALS
1. SUBMIT SHOP DRAWINGS FOR PLUMBING EQUIPMENT, PIPING SYSTEMS AND EQUIPMENT AS APPLICABLE WITH ADEQUATE DETAILS AND
SCALES TO CLEARLY INDICATE CONSTRUCTION. INDICATE THE OPERATING CHARACTERISTICS FOR EACH REQUIRED ITEM. CLEARLY IDENTIFY EACH ITEM ON THE SUBMITTAL AS TO MARK, LOCATION AND USE, USING SAME IDENTIFICATION AS PROVIDED ON DESIGN
DRAWINGS. STRIKE OUT ALL ITEMS THAT DO NOT APPLY TO THIS PROJECT.
2. THE CONTRACTOR SHALL ALLOW SUFFICIENT TIME (2 WEEKS) FOR SHOP DRAWING REVIEWS BY THE ENGINEER TO MEET THE OWNER’S
CONSTRUCTION SCHEDULE.
3. CONTRACTOR SHALL REVIEW AND INDICATE APPROVAL OF EACH SHOP DRAWING PRIOR TO SUBMITTAL FOR REVIEW. ALL COSTS FOR STARTING WORK OR FABRICATION PRIOR TO SHOP DRAWING REVIEW AND RETURN TO THE CONTRACTOR ARE THE RESPONSIBILITY OF
THE CONTRACTOR.
4. SUBMITTALS WILL BE REVIEWED ONLY FOR GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS AND NOT FOR DIMENSIONS OR QUANTITIES. THE SUBMITTAL REVIEW DOES NOT WAIVE THE CONTRACTOR'S RESPONSIBILITY FOR PURCHASE OF ANY ITEM OR COMPLETE
COMPLIANCE WITH THE CONTRACT DOCUMENTS.
5. WHERE SUBMITTALS VARY FROM THE CONTRACT REQUIREMENTS, THE CONTRACTOR SHALL CLEARLY INDICATE THE NATURE AND
REASON FOR VARIATIONS ON SUBMITTAL OR ACCOMPANYING DOCUMENTS.
6. THE CONTRACTOR MUST CHECK THE APPLICATION OF EQUIPMENT AND CERTIFY AT TIME OF SHOP DRAWING SUBMITTAL THAT EQUIPMENT HAS BEEN PROPERLY APPLIED AND CAN BE INSTALLED, SERVICED AND MAINTAINED WHERE INDICATED ON DRAWINGS.
ADVISE ENGINEER IN WRITING WITH SUBMITTAL DRAWINGS OF ANY POTENTIAL PROBLEMS. WHERE CERTIFICATION IS NOT EXPRESSED, SUBMITTAL IMPLIES CERTIFICATION.
H. RECORD DRAWINGS (AS-BUILTS)
1. EACH CONTRACTOR OR SUBCONTRACTOR SHALL KEEP ONE (1) COMPLETE SET OF THE CONTRACT WORKING DRAWINGS ON THE JOB SITE
AND REGULARLY RECORD ANY DEVIATIONS OR CHANGES FROM SUCH CONTRACT DRAWINGS MADE DURING CONSTRUCTION.
2. THESE DRAWINGS SHALL RECORD THE LOCATION OF ALL CONCEALED EQUIPMENT, PIPING, SEWERS, SANITARY PIPING, VENTS, AND
OTHER PIPING, BY MEASURED DIMENSIONS TO EACH SUCH ITEM FROM READILY IDENTIFIABLE AND ACCESSIBLE WALLS OR CORNERS OF THE BUILDING. PLANS ALSO SHALL SHOW INVERT ELEVATION OF SEWERS AND TOP ELEVATION OF ALL OTHER BELOW-GRADE PIPING.
3. RECORD DRAWINGS SHALL BE KEPT CLEAN AND UNDAMAGED AND SHALL NOT BE USED FOR ANY PURPOSE OTHER THAN RECORDING
DEVIATIONS FROM WORKING DRAWINGS AND EXACT LOCATIONS OF CONCEALED WORK.
4. AT PROJECT COMPLETION, THESE SETS OF DRAWINGS SHALL BE DELIVERED WITHIN 60 DAYS OF PROJECT COMPLETION TO THE ARCHITECT OR OWNER, AS DIRECTED, IN GOOD CONDITION, AS A PERMANENT RECORD OF THE INSTALLATION AS ACTUALLY
CONSTRUCTED.
I. PLUMBING SYSTEMS SCOPE
1. PROVIDE PLUMBING FIXTURES, EQUIPMENT AND MATERIAL INDICATED AND SHOWN ON DRAWINGS AND PLACE IN PROPER OPERATION.
J. CAST IRON PIPING
1. CAST IRON PIPING SHALL BE USED FOR SANITARY SEWERS (NO-HUB JOINTS FOR ABOVE GROUND AND NEOPRENE COMPRESSION JOINTS
FOR BELOW GROUND) IN AREAS WHERE HOT WATER ABOVE 140 DEGREES IS DISCHARGED INTO THE DRAINAGE SYSTEM.
2. CAST IRON PIPING SHALL BE USED FOR GREASE WASTE SEWERS (NO-HUB JOINTS FOR ABOVE GROUND AND NEOPRENE COMPRESSION
JOINTS FOR BELOW GROUND).
3. SEWER AND VENT MATERIAL SHALL BE AS FOLLOWS:
4. BELOW GRADE STORM AND SANITARY INSIDE THE BUILDING:
1. SERVICE WEIGHT: CAST IRON PIPE AND FITTINGS; ASTM A-74 WITH ASTM C-564 NEOPRENE COMPRESSION JOINTS. ALL CAST IRON SOIL PIPE AND FITTINGS SHALL BE MARKED WITH THE COLLECTIVE TRADEMARK OF THE CAST IRON SOIL PIPE INSTITUTE
(CISPI) AND BE LISTED BY NSF INTERNATIONAL.
2. PVC – ASTM D 1785 SCH 40 SOLID WALL PIPE WITH ASTM D 2665 PVC DWV FITTINGS AND SOLVENT WLED JOINTS. PIPE AND FITTINGS SHALL CONFORM TO NSF INTERNATIONAL STANDARD 14. INSTALLATION SHALL BE IN ACCORDNACE WITH ASTM D 231 AND ASTM F 1668. SOLVENT CEMENT PRIMER SHALL CONFORM TO ASTM D 2564. NOT FOR USE IN AREAS THAT RECEIVE HOT
WATER ABOVE 140 DEGREES F.
b. ABOVE GRADE VENTS AND SANITARY –
1. NO-HUB CAST IRON PIPE CISPI 1-301 (FOR PIPE SIZES 3” AND LARGER):
a. ALL CAST IRON SOIL PIPE AND FITTINGS SHALL BE MARKED WITH THE COLLECTIVE TRADEMARK OF THE CAST IRON SOIL PIPE
INSTITUTE (CISPI) AND BE LISTED BY NSF INTERNATIONAL.
b. NO-HUB COUPLINGS:
1. HEAVY DUTY, 4 BAND, SHIELDED FOR 4" AND SMALLER.
2. HEAVY DUTY, 6 BAND, SHIELDED FOR 5" AND LARGER.
K. WATER PIPING
1. INCLUDE UNIONS, OR OTHER DISCONNECT MEANS, STOPS OR VALVES FOR ISOLATION OF FIXTURES AND EQUIPMENT. VALVES SHALL BE
FULLY COMPATIBLE WITH PIPING FOR THE SERVICE INTENDED. AS MANUFACTURED BY APOLLO, NIBCO, CRANE OR OTHER APPROVED MANUFACTURER. INCLUDE HOSE OR DRAIN VALVES AT LOW POINTS WHERE FIXTURES CANNOT BE USED FOR DRAINAGE.
2. INSTALL SHOCK ABSORBERS AT EACH FIXTURE OR WHERE REQUIRED TO PREVENT WATER HAMMER.
3. HANGERS ON INSULATED PIPE SHALL BE OUTSIDE OF INSULATION, SIZED ACCORDINGLY AND WITH SUFFICIENT SADDLE TO PROTECT
INSULATION.
5. WATER PIPING ABOVE GRADE SHALL BE (CHOOSE ONLY ONE OF THE THREE OPTIONS BELOW)
a. TYPE "L" HARD COPPER ASTM B 88-832 WITH WROUGHT COPPER FITTINGS ASTM B 16.22 1980 AND NON-LEAD OR ANTIMONY SOLDER
JOINTS.
b. FLUSH, VENT ALL WATER PIPING UPON COMPLETION. COMPLY WITH PLUMBING CODE REQUIREMENTS FOR SANITIZATION. SUBMIT
WRITTEN VERIFICATION OF PIPING SANITIZATION.
P. COMPRESSED AIR SYSTEM
1. EXTEND COMPRESSED AIR PIPING FROM EXISTING MAIN, INCLUDING TAP TO MAIN, PRESSURE REGULATOR, AS INDICATED ON DRAWINGS
AND CONNECT TO ALL COMPRESSED AIR USING EQUIPMENT.
2. PROVIDE COMPRESSED AIR SYSTEM INCLUDING REGULATORS, PIPING, HANGERS, TERMINATIONS AND CONNECTIONS TO EQUIPMENT
USING COMPRESSED AIR.
3. COMPRESSED AIR CONNECTIONS AT EQUIPMENT SHALL INCLUDE PRESSURE REGULATOR AND CONNECTIONS.
4. PIPING SHALL BE PREVOST 100% ALUMINUM PIPING SYSTEM.
S. CHECK, TEST, START, ADJUST, BALANCE AND INSTRUCTIONS
1. AFTER INSTALLATION, CHECK ALL EQUIPMENT, AND PERFORM START UP IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS, AND REQUIREMENTS OF THE SPECIFICATIONS. COORDINATE STARTUP WITH OWNER FOR OPERATION OF EQUIPMENT.
2. PIPING SHALL BE TESTED AND FREE OF LEAKS. MAKE REPAIRS NEEDED FOR LEAK FREE SYSTEMS.
3. CONCEALED OR INSULATED WORK SHALL REMAIN UNCOVERED UNTIL REQUIRED INSPECTIONS, AND TESTS HAVE BEEN COMPLETED. IF
THE CONSTRUCTION SCHEDULE REQUIRES IT, ARRANGE FOR PRIOR TESTS ON PARTS OF SYSTEM AS APPROVED BY THE TENANT.
T. INSULATION
1. INSULATE ABOVE-GRADE COLD WATER PIPING WITH ONE (1") INCH THICK MOLDED FIBERGLASS HAVING TYPE ASJ JACKET AND
MANUFACTURED BY OWENS-CORNING FIBERGLASS COMPANY.
2. AT PIPE HANGERS, PROVIDE SOLID INSULATION COUPLING SYSTEM TO PREVENT INSULATION DAMAGE OR COMPRESSION. INSULATION
COUPLINGS SHALL BE THE KLO-SHURE INSULATION COUPLING SYSTEM AS MANUFACTURED BY ANVIL-STRUT.
3. REPAIR DAMAGED SECTIONS OF EXISTING PIPING INSULATION, EITHER PREVIOUSLY DAMAGED OR DAMAGED DURING THIS
CONSTRUCTION PERIOD. USE INSULATION OF THE SAME THICKNESS AS SPECIFIED, INSTALL NEW JACKET LAPPING AND SEALED OVER
EXISTING.
U. HANGERS AND SUPPORTS
1. HANGERS FOR BLACK STEEL PIPE SHALL BE MANUFACTURED BY NVENT CADDY, MODEL NO. 100, OR APPROVED EQUAL.
2. HANGERS FOR CAST IRON PIPE SHALL BE MANUFACTURED BY NVENT CADDY, MODEL NO. 400, OR APPROVED EQUAL.
3. HANGERS FOR COPPER TUBING SHALL BE MANUFACTURED BY NVENT CADDY, MODEL NO. 102-A, OR APPROVED EQUAL.
4. TRAPEZE HANGERS OF A TYPE APPROVED BY THE ENGINEER. MAINTAIN PIPE INSULATION AT PIPE ANCHORS. PROVIDE INSULATION
COUPLERS AS SPECIFIED ABOVE.
5. CONTRACTOR SHALL PROVIDE INSULATION HANGER WITH PROTECTIVE SHIELDS, SUCH AS NVENT CADDY, MODEL NO. 103, OR APPROVED
EQUAL. 5 INCH LONG SECTION OF 1/2 INCH THICK CALCIUM SILICATE SECTIONAL PIPE INSULATION WITH FACTORY LONGITUDINAL LAP SHALL BE PROVIDED AT HANGER POINTS. BUTT JOINTS SHALL BE SEALED WITH INSULATING CEMENT.
6. STRAP HANGERS SHALL NOT BE PERMITTED.
7. CONTRACTOR SHALL PROVIDE SIDE BEAM CLAMPS FOR SUPPORTING PIPING FROM STRUCTURAL STEEL MEMBERS. BEAM CLAMPS SHALL
BE MANUFACTURED BY NVENT CADDY, MODEL 300 OR APPROVED EQUAL.
8. WHERE OTHER MEANS OF SUPPORT PIPING ARE REQUIRED OR DESIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE
ENGINEER'S APPROVAL PRIOR TO INSTALLING THOSE SUPPORTS.
9. HANGER SHALL BE PROVIDED AT EACH CHANGE OF DIRECTION.
10. HANGERS AND SUPPORTS SHALL BE SPACED AT INTERVALS WHICH WILL PREVENT SAGGING AND REDUCE STRAIN ON VALVES AND
SPECIALTIES. HANGER SPACING SHALL BE NO GREATER AND ROD SIZE SHALL BE NO SMALLER THAN THAT SHOWN IN THE FOLLOWING
TABLE. HANGERS SHALL ALLOW FOR EXPANSION AND CONTRACTION.
11. FERROUS PIPING AND COPPER TUBING:
DIAMETER OF PIPE MAXIMUM SPACING ROD SIZE
1/2" THRU 1 1/2" 6 FT. 3/8"
2" THRU 3" 10 FT 1/2"
4" 12 FT 5/8"
6" AND LARGER 16 FT 3/4”
15. CAST IRON PIPING:
DIAMETER OF PIPE MAXIMUM SPACING ROD SIZE
1 1/2" THRU 3" EACH JOINT 3/8"
4" EACH JOINT 1/2"
6" AND 8" EACH JOINT 3/4"
10" THRU 15" EACH JOINT 3/4"
(TWO HANGERS)
16. PVC PIPING:
DIAMETER OF PIPE MAXIMUM SPACING ROD SIZE
1 1/2” 4 FT 3/8”
2” THRU 3” 4 FT 1/2”
4” 4 FT 5/8”
6” AND LARGER 4 FT 3/4”
W. VALVES
1. BALL VALVES 2-INCHES AND SMALLER SHALL BE 150 PSI SWP, 600 PSI WOG, BRONZE, 2-PIECE DESIGN, WITH PTFE TEFLON SEATS AND
SEALS, AND BLOW-OUT PROOF STEMS MADE OF LEAD-FREE BRONZE. VALVES SHALL HAVE SOLDER OR PRESS-FIT ENDS FOR USE IN COPPER TUBING. BALL VALVES SHALL BE WATTS NO. LFFBV-4 OR AN APPROVED EQUAL FOR THREADED OR SOLDERED ENDS AND WATTS NO. LFFBV-3 OR AN APPROVED EQUAL FOR PRESS-FIT ENDS. PROVIDE THERMA-SEAL INSULATING TEE HANDLES FOR VALVES USED IN
LINES WHICH ARE TO BE INSULATED.
2. PROVIDE 2 INCH EXTENSION NECKS ON ALL VALVES INSTALLED IN INSULATED LINES.
3. LEVER TYPE HANDLE OPERATORS SHALL BE PROVIDED ON VALVES UP TO 4 INCHES IN SIZE. GEAR OPERATORS SHALL BE PROVIDED ON
VALVES OVER 4 INCHES IN SIZE, AND ON VALVES REQUIRING CHAIN OPERATION. VALVES USED FOR BALANCING SHALL HAVE INFINITE
POSITION LEVER OR GEAR OPERATORS WITH ADJUSTABLE, OPEN POSITION "MEMORY" STOP.
4. STOP AND DRAIN BALL VALVES 1” AND SMALLER SHALL BE 150 PSI SWP, 600 WOG, BRASS, 2-PIECE DESIGN, WITH PTFE VALVE SEATS AND SEALS, AND BLOW-OUT PROOF STEMS MADE OF LEAD-FREE COPER SILICON ALLOY. VALVES SHALL HAVE THREADED OR SOLDER ENDS FO RUSE IN COPPER TUBING. VALVES SHALL BE WATTS LFIT6300 OR AN APPROVED EQUAL FOR THREADED ENDS AND WATTS LFIS6301 OR AN APPOROVED EQUAL FOR SOLDER ENDS. PROVIDE THERMA-SEAL INSULATING TEE HANDLES FOR VALVES USED IN LINES WHICH ARE TO BE
INSULATED.
5. VALVES AND ASSOCIATED FITTINGS SHALL BE OF THE SAME SIZE AS THE PIPING OF WHICH THEY ARE INSTALLED.
6. PROVIDE VALVE TAGS AND VALVE CHART PER ASME A13.1 SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS. VALVE CHART SHALL
BE GIVEN TO THE FACILITY OWNER FOR PERMANENT RECORD.
X. PIPE IDENTIFICATION
1. CONTRACTOR SHALL PROVIDE IDENTIFICATION LABELS, TAGS, ETC., FOR PLUMBING AS INDICATED ON THE DRAWINGS AND AS SPECIFIED
HEREIN.
2. THE IDENTIFICATION OF PLUMBING PIPING SHALL BE IN ACCORDANCE WITH ANSI STANDARD A13.1, EXCEPT AS HEREINAFTER SPECIFIED.
3. PRESSURE SENSITIVE PIPE MARKERS SHALL BE MANUFACTURED BY THE BRADY CO., OR APPROVED EQUAL. PIPE MARKERS SHALL BE A
MANUFACTURER’S STANDARD PRODUCT.
Project No.
Checked
Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM &
CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8514 McAlpine Park Drive, Suite 280 Charlotte, NC 28211
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
FOR CONSTRUCTION
12" = 1'-0"
Autodesk Docs://10324-0003 - Gaston College FIC Reactor Room/MEP_Gaston College FIC Reactor Room.rvt
GASTON COLLEGE
FIC REACTOR
ROOM
2025-11-07
10324-0003
BS
BS
BS
BS
P010
P L
U M
B
IN
G S
P E
C
IF
IC
A
T
IO
N S
G A
S T
O N
C O
L L
E G
E
K
IM
B R
E L
L C
A M
P U
S
W
IL
K
IN
S O
N B
O U
L E
V A
R D
B E
L M
O N
T
N C
BS
BS
BS
2025-11-07
10324-0003
FS
FS
FS
FS FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
F S
W o rk
B e n c h
/P a c k S to ra g e
A
W o rk
B e n c h
1'-9 5_
20'-6 1_
2'
6"
FS
FS
FS
F S
W o rk
B e n c h /P a c k S to ra g e
A
W o rk
B e n c h
1'-9 5_
20'-6 1_
2'
6"
2.8 4.73.6 4.33.2 3.9
C
D
B
A
4321 5 6 7 82.8 4.73.6 4.33.2 3.9
EX. FD
EX. FD
EX 3" CA EX 3" CA
E X
/2
C
A
E X
/2
C
A
EX 3" DHW EX 3" DHW
E X
/2
C
A
E X
/2
C
A
E X
/2
C
A
E X
/2
C
A
E X
/2
C
A
EX 3" CA
EX 3" DHW
EX 3" DCW
EX 3" DCW EX 3" DCW
EX 3" DHW
E X
/4
C A
EX 2" DCW
E X
/4
D
H W
R
EX 3" CA
EX 3/4" DCW
EX 1 1/2" DHW
EX 3/4" DCW
EX 1 1/4" DHW
EX 3" CA
E X
D C
W
EX 3/4" DCW
EX 1" DHW
E X
D C
W
E X
D H
W
E X
/2
C
A
E X
C A
E X
/2
C
A
E X
/4
C
A
EX 3" CA
CAT-2
OW-1
DR-1ME-1CAT-1
P200
C
D
B
6 7 8
EX. FD
EX 3" DHW
E X
/4
C A
EX 2" DCW
EX 3" CA
EX 1" DCW
EX 2" DHW
EX 3" CA
E X
C A
E X
D H
W E
X
/2
D
C W
3/4" CA
3/4" DCW
SMALL
CLEANING
OVEN
ULTRA SONIC
SMALL PET REACTOR
LARGE OVEN
LARGE REACTOR
PALLETIZER
SMALL REACTOR
3/4" DCW
SOAK TANK
Project No.
Checked
Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM &
CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8514 McAlpine Park Drive, Suite 280 Charlotte, NC 28211
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
FOR CONSTRUCTION
As indicated
Autodesk Docs://10324-0003 - Gaston College FIC Reactor Room/MEP_Gaston College FIC Reactor Room.rvt
GASTON COLLEGE
FIC REACTOR
ROOM
2025-11-07
10324-0003
BS
BS
BS
BS
P200
P L
U M
B
IN
G
L E
V E
L
P
IP
IN
G
P L
A N
G A
S T
O N
C O
L L
E G
E
K
IM
B R
E L
L C
A M
P U
S
W
IL
K
IN
S O
N B
O U
L E
V A
R D
B E
L M
O N
T
N C
BS
BS
BS
2025-11-07
10324-0003
SCALE: 1/16" = 1'-0"
PLUMBING FIRST FLOOR PLAN
SCALE: 1/8" = 1'-0"
ENLARGED PLUMBING PLAN
GENERAL NOTES
A. SEE P010 FOR SPECIFICATIONS.
B. SEE P001 FOR DETAILS.
C. PIPE ROUTING IS SHOWN DIAGRAMMATICALLY. PIPES SHALL NOT BE ROUTED DIRECTLY
OVER EQUIPMENT.
D. CONTRACTOR SHALL NOTE STRUCTURAL DECK ABOVE IS APPROXIMATELY 30 FT AFF.
HORIZONTAL PIPING SHALL BE SUPPORTED ABOVE LIGHTS, APPROXIMATELY 16 FT AFF.
E. COORDINATE CONNECTIONS TO EQUIPMENT WITH FINAL EQUIPMENT LOCATIONS IN
FIELD.
NEW WORK KEYED NOTES
1. PROVIDE 3/4" COMPRESSED AIR SERVICE DROP FROM EX 3"CA MAIN. REGULATOR SHALL
BE MOUNTED AGAINST WALL BEHIND OVEN AT 4 FT AFF. EXTEND FROM OUTLET OF
REGULATOR TO EQUIPMENT.
2. EXTEND 3/4"CA FROM EXISTING PIPE TO NEW REGULATOR AT 4 FT AFF (DO NOT BLOCK
WINDOW WITH REGULATOR). EXTEND PIPING FROM REGULATOR TO EQUIPMENT
OVERHEAD AT MINIMUM 12 FT AFF.
3. EXTEND 1/2"CW FROM EX MAIN TO EQUIPMENT. PROVIDE SHUTOFF VALVE AT
CONNECTION TO CW MAIN AND AT CONNECTION TO EQUIPMENT.
4. EXTEND 3/4"CW FROM EX MAIN TO HEADER ALONG WALL BEHIND EQUIPMENT. PROVIDE
SHUTOFF VALVE AT CONNECTION TO CW MAIN AND AT EACH EQUIPMENT CONNECTION.
EXTEND PIPE FROM HEADER TO EACH PIECE OF EQUIPMENT, COORDINATE SIZE WITH
EQUIPMENT CONNECTION.
5. EXTEND 3/4"CW FROM EX MAIN TO EQUIPMENT. PROVIDE SHUTOFF VALVE AT
CONNECTION TO CW MAIN AND AT CONNECTION TO EQUIPMENT.
6. ROUTE 2" DR FROM EQUIPMENT TO FLOOR DRAIN. ROUTE TIGHT ALONG BACK WALL.
ROUTE DIRECT AS POSSIBLE FROM WALL TO FLOOR DRAIN. FASTEN TO FLOOR SLAB TO
PREVENT PHYSICAL DAMAGE FROM TRAFFIC. PAINT YELLOW WHEN CROSSING TO FLOOR
DRAIN. PROVIDE ELBOW ON EACH DRAIN AT DISCHARGE TO FLOOR DRAIN.
7. CUT HOLE IN EXISTING DRAIN GRATE TO FIT NEW DRAIN PIPING.
8. DRAIN PIPING SHOWN OFFSET FOR CLARITY. INTENT IS TO GROUP DRAINS TIGHT AS
POSSIBLE AGAINST WALL TO AVOID TRIP HAZARD. COORDINATE ROUTING WITH
EQUIPMENT LOCATIONS AND NEW POWER CONNECTIONS/RECEPTACLE LOCATIONS.
9. EACH PIECE OF EQUIPMENT HAS 2" DRAIN CONNECTION AND 1-1/2" OVERFLOW DRAIN
CONNECTION. HEADER 2" DRAIN CONNECTIONS TOGETHER AND 1-1/2" OVERFLOW
CONNECTIONS TOGETHER TO 2" LINE.