MEP_Gaston College FIC Carding Rm Equip.pdf
PDF 21 MB Posted
- Solicitation number
- 98-31280
- Issued by
- Gaston County, North Carolina
About this file
This is a mechanical, electrical, and plumbing (MEP) design document prepared by McKim & Creed for Gaston College's Kimbrell Campus in Belmont, North Carolina (Project #10663-0002). The project involves providing multiple new compressed air drops with piping connections to support textile carding machinery equipment in the Fiber Innovation Center (FIC) Carding Room during Phase III of construction. The work includes installation of new compressed air piping, pressure regulators, moisture traps, shut-off valves, pressure gauges, hangers, supports, and all associated appurtenances necessary for a complete and operational compressed air system. The piping must match the existing Prevost 100% aluminum compressed air piping system currently in place. All new compressed air connections require coordination with the equipment manufacturer for final sizing, connection types, and required operating pressures ranging from approximately 72.5 to 125 PSIG based on equipment specifications detailed in the plans. The work scope includes horizontal and vertical piping runs with schematic details showing multiple connection points throughout the first floor, with a project start date of February 13, 2026, and a bid set status as of June 12, 2026.
The specifications require the plumbing contractor to furnish all equipment, materials, labor, and tools for a complete installation in compliance with the 2018 North Carolina State Plumbing Code and applicable local ordinances. The contractor must obtain all permits and fees, arrange required inspections and approvals, and coordinate work with all trades involved in the project. Key specifications include pipe hanger details with maximum spacing requirements based on pipe diameter and material type, proper support systems to prevent sagging and strain on valves, and all piping to be tested for leaks prior to concealment or insulation. The contractor is responsible for as-built documentation within 60 days of project completion, daily cleanup, and a one-year warranty on all materials and workmanship, with extended five-year guarantees on refrigeration compressors if applicable. No specific bid due date, award date, or contract term is identified in the document; instead, it functions as the technical specifications and construction drawings for bidders to use in preparing their proposals for this North Carolina state project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FIC Carding Room Plumbing CA Ph III.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GASTON COLLEGE FIC CARDING ROOM EQUIPMENT
MCKIM & CREED PROJECT # 10663-0002, GASTON COLLEGE ID# 31280
GASTON COLLEGE, KIMBRELL CAMPUS
7224 WILKINSON BOULEVARD
BELMONT, NC 28012
GASTON COLLEGE KIMBRELL CAMPUS
GENERALS
G001 COVER SHEET
G002 APPENDIX B
G003 APPENDIX B
LIST OF DRAWINGS ENGINEER - MEP
8020 Tower Point Dr, Charlotte, North Carolina 28277 Phone: (704) 841-2588
NC License# F-1222 www.mckimcreed.com
BID SET
COVER SHEET G001
06/12/2026
VICINITY MAP
NOT TO SCALE
PLUMBING
P001 PLUMBING DATA SHEET
P010 PLUMBING SPECIFICATIONS
P101 PLUMBING SUPPLY - FIRST FLOOR PLAN
P401 PLUMBING ENLARGED PLANS
PHASE III PLUMBING CONNECTIONS - COMPRESSED AIR
6/15/26
Project No.
Checked Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM & CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8020 Tower Point Dr, Charlotte, NC 28227
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
2026-02-13 10663-0002
BID SET
Autodesk Docs://10663-0002 - Gaston College FIC Carding Rm Equip/MEP_Gaston College FIC Carding Rm Equip.rvt
GASTON COLLEGE
FIC CARDING ROOM -
PHASE III PLUMBING
CA CONNECTIONS
2026-06-12
10663-0002
CJH
TDR
BS
TR
G002
A
PP
EN
D
IX
B
G A
ST
O
N C
O
LL
EG
E, K
IM
B R
EL
L
C A
M
PU
S
W
IL
K
IN
SO
N B
O U
LE
VA
R D
B
EL
M O
N T, N C
TDR
BS
CJH
NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE
NOT APPLICABLENOT APPLICABLENOT APPLICABLENOT APPLICABLE
GASTON COLLEGE FIC CARDING ROOM EQUIPMENT - PHASE III
7224 WILKINSON BOULEVARD BELMONT 28012
McKim & Creed Brian Shassian 704.841.2588 BShassian@mckimcreed.com056538
Project No.
Checked Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM & CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8020 Tower Point Dr, Charlotte, NC 28227
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
2026-02-13 10663-0002
BID SET
Autodesk Docs://10663-0002 - Gaston College FIC Carding Rm Equip/MEP_Gaston College FIC Carding Rm Equip.rvt
GASTON COLLEGE
FIC CARDING ROOM -
PHASE III PLUMBING
CA CONNECTIONS
2026-06-12
10663-0002
CJH
TDR
BS
TR
G003
A
PP
EN
D
IX
B
G A
ST
O
N C
O
LL
EG
E, K
IM
B R
EL
L
C A
M
PU
S
W
IL
K
IN
SO
N B
O U
LE
VA
R D
B
EL
M O
N T, N C
TDR
BS
CJH
NOT APPLICABLENOT APPLICABLE
HOSE BIBB
WALL HYDRANT
MEDICAL COMPRESSED AIR OUTLET
MEDICAL VACUUM OUTLET W/SLIDE
OXYGEN OUTLET
FIRE HYDRANT
MANHOLE
GAS VALVE BOX
WATER VALVE BOX
AREA DRAIN (No. indicates type)
FLOOR DRAIN (No. indicates type)
FLOOR SINK (No. indicates type)
ROOF DRAIN (No. indicates type)
CLEAN OUT PLUG
FLOOR CLEANOUT
SHOCK ARRESTOR
FCO
RD
FS
FD
AD
WV
GV
MH
FH
WH
HB
PLUMBING SYMBOLS
TW
140° HWR
DI
140°
COLD WATER PIPING
HOT WATER PIPING
HOT WATER RETURN PIPING
TEPID WATER PIPING
HOT WATER PIPING (140°)
HOT WATER RETURN PIPING (140°)
DEIONIZED WATER PIPING
CW
HW
HWR
SAN
SAN
SANITARY SEWER PIPING BELOW GRADE
SANITARY SEWER PIPING ABOVE GRADE
SANITARY VENT PIPING
ST
ST
RWC
ORWC
STORM SEWER PIPING BELOW GRADE
STORM SEWER PIPING ABOVE GRADE
RAIN WATER CONDUCTOR ABOVE GRADE
OVERFLOW RAIN CONDUCTOR ABOVE GRADE
G
COMPRESSED AIR PIPING
NATURAL GAS
BALL VALVE
CHECK VALVE
UNION
MIXING VALVE
BALANCING VALVE
CAPPED CONNECTION
PIPE DOWN
PIPE UP
P-TRAP
AIR VENT
BUTTERFLY VALVE
BACKFLOW PREVENTER
GAS PRESSURE REGULATOR
GATE VALVE
PRESSURE GAUGE
PRESSURE REGULATING VALVE
RELIEF VALVE
SOLENOID VALVE
STRAINER
THERMOMETER
VALVE IN RISER
V.
S
PLUG VALVE
CA
ACID VENT THRU ROOFAVTR
CLINIC SERVICE SINKCSS
DECK DRAIN (No. indicates type)DD
EMERGENCY SHOWER (No. indicates type)
EMERGENCY SHOWER/EYEWASH COMBINATION
EMERGENCY EYEWASH (No. indicates type)EEW
ES/EW
ES
ELECTRIC WATER COOLER (No. indicates type)EWC
EXISTINGEX
DISCONNECT FROM EXISTING PIPING
LAVATORY (No. indicates type)
MOP BASIN (No. indicates type)
MIXING VALVE (No. indicates type)
NON-FREEZE ROOF HYDRANT
SINK (No. indicates type)
URINAL (No. indicates type)
WATER CLOSET (No. indicates type)
WASHER FILLER ASSEMBLY
MEDICAL GAS ZONE VALVE BOX (No. indicates type)ZVB
WFA
WC
UR
S
NFRH
MV
MB
L
SHOWER (No. indicates type)SH
OVERFLOW RAIN WATER CONDUCTORORWC
ROOF DRAIN (No. indicates type)RD
VENT THRU ROOFVTR
NON-FREEZE WALL HYDRANTNFWH
WASTEW
VENTV
SANITARYSAN
OUTLET BOX (No. indicates type)OB
VACUUM SLIDEVS
WASTE ANESTHESIA GAS DISPOSALWAGD
FUNNEL DRAIN (No. indicates type)
CONNECT TO EXISTING PIPING
KEYED NOTES
V
MA
VAC
OX
CO
SA-X
OS&Y VALVE
EXISTING COMPRESSED AIR PIPINGCA
TEE DOWN
HOT WATER CIRCULATION PUMPA.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
W.
X.
Y.
Z.
ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH ALL
APPLICABLE ORDINANCES, CODES AND REGULATIONS OF ALL
AUTHORITIES HAVING JURISDICTION. ALL PLUMBING WORK SHALL
BE INSPECTED AND APPROVED BY THE LOCAL AUTHORITY HAVING
JURISDICTION. THE PLUMBING CONTRACTOR SHALL PROVIDE ALL
NECESSARY FEES AND PERMITS, INCLUDING THE CERTIFICATE OF
PLUMBING INSPECTION.
THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR
CONSTRUCTION SAFETY. ARCHITECT AND/OR ENGINEER SHALL
ASSUME NO RESPONSIBILITY FOR WORKMAN'S, OR PEDESTRIAN'S
SAFETY. NOTHING IN THE CONTRACT DOCUMENTS SHALL BE
CONSTRUED TO INSTRUCT PROCEDURES OR COMPONENTS FOR
PROJECT SAFETY.
NOTHING CONTAINED IN THE CONTRACT DOCUMENTS SHALL BE
CONSTRUED TO CONFLICT WITH ANY NATIONAL, STATE,
MUNICIPAL, OR LOCAL LAWS OR REGULATIONS GOVERNING THE
WORK INDICATED OR SPECIFIED. ALL SUCH REQUIREMENTS SHALL
BE SATISFIED BY THE PLUMBING CONTRACTOR AT NO ADDITIONAL
EXPENSE TO THE OWNER.
WHERE A CONFLICT ARISES BETWEEN PLANS, SPECIFICATIONS,
DETAILS, SCHEDULES, APPLICABLE CODES OR REGULATIONS; THE
MOST STRINGENT SHALL APPLY.
THE CONTRACT DOCUMENTS ARE COMPRISED OF DRAWINGS AND
SPECIFICATIONS. EACH PLUMBING BIDDER SHALL VISIT THE SITE
TO DETERMINE EXISTING CONDITIONS PRIOR TO SUBMITTING BID
PROPOSAL. BIDS SHALL BE BASED ON THE COMPLETE
EXAMINATION OF THE DRAWINGS, SPECIFICATIONS AND EXISTING
CONDITIONS. NO CONSIDERATION WILL BE GIVEN TO ANY
CONTRACTOR WHO FAILS TO DO SO.
THE WORK UNDER THIS CONTRACT SHALL INCLUDE THE
FURNISHING OF ALL NECESSARY MATERIALS, TOOLS, AND LABOR
FOR A COMPLETE, AND WORKING INSTALLATION AS DEFINED BY
THE PLANS AND SPECIFICATIONS. THE PLUMBING CONTRACTOR
SHALL WARRANT THE WORK INDICATED AND SPECIFIED. THE
WORK SHALL FUNCTION AS INTENDED, BE COMPLETE IN ALL
DETAILS, AND SHALL INCLUDE ALL INDICATED, SPECIFIED, OR
REQUIRED ACCESSORIES FOR A FUNCTIONING SYSTEM.
PLUMBING CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL
OTHER TRADES.
CONTRACTOR SHALL REMOVE DEMOLITION DEBRIS COMPLETELY.
CONTRACTOR SHALL SCHEDULE WITH THE CONSTRUCTION
MANAGER THE TIME, LOCATION, ELEVATOR AND HAULING ROUTE.
THE PLUMBING CONTRACTOR SHALL CLEAN UP ALL DEBRIS AT
THE END OF EACH WORK DAY.
HORIZONTAL DRAINAGE PIPING SHALL BE INSTALLED AT UNIFORM
SLOPES NOT LESS THAN 1/4 INCH PER FOOT FOR THREE (3) INCH
DIAMETER AND LESS, AND NOT LESS THAN 1/8 INCH PER FOOT
FOR DIAMETERS OF FOUR (4) INCHES OR MORE.
ALL PIPING IS SCHEMATIC; SUPPORTS, UNIONS, VIBRATION
ISOLATION, VALVES, INSULATION, ETC. SHALL BE AS REQUIRED
FOR A COMPLETE AND OPERATING SYSTEM.
ALL PIPING IS TO BE CONCEALED IN WALLS OR ABOVE CEILING
UNLESS NOTED OTHERWISE.
THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE
GENERAL CONTRACTOR PRIOR TO AND FOR SCHEDULING ANY
INTERRUPTION OF ANY BUILDING UTILITY.
ALL EQUIPMENT PROVIDED OR INSTALLED BY THIS CONTRACTOR
SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
ALL PIPING SHALL BE RUN AT THE SLOPES INDICATED. WHERE
ELEVATIONS ARE NOT INDICATED, COORDINATE THE PIPE
ROUTING WITH THE DUCT ROUTING INDICATED ON THE
MECHANICAL PLANS, AS WELL AS ALL OTHER TRADES.
FINAL LOCATION OF ALL PLUMBING FIXTURES, SINKS, ELECTRIC
WATER COOLERS, CLEANOUTS, AND THE LIKE, SHALL BE VERIFIED
AND COORDINATED WITH THE ARCHITECTURAL DRAWINGS.
ALL WORK SHOWN ON THE PLUMBING DRAWINGS SHALL BE BY
THE PLUMBING CONTRACTOR UNLESS SPECIFICALLY NOTED
OTHERWISE.
ALL SANITARY PIPING CONNECTIONS TO FIXTURES SHALL BE
SIZED AS SCHEDULED. ALL OTHER SANITARY PIPING SHALL BE 4"
UNLESS NOTED OTHERWISE.
ALL INVERT ELEVATIONS SHOWN ON THE DRAWINGS ARE
APPROXIMATE AND MUST BE VERIFIED BY THE CONTRACTOR
PRIOR TO INSTALLATION.
PROVIDE CLEANOUTS AT LEAST EVERY 100 FT IN UNDERGROUND
SANITARY/STORM PIPING IN ADDITION TO THOSE SHOWN ON THE
DRAWINGS. PROVIDE A CLEANOUT AT EACH CHANGE IN
DIRECTION OF 90 DEGREES IN A SINGLE FITTING. PROVIDE A
CLEANOUT AT THE BASE OF ALL STACKS.
IN ALLEGHENY COUNTY, PROVIDE CLEANOUTS FOR
UNDERGROUND SANITARY/STORM PIPING AT EVERY 50 FT
INTERVALS FOR DRAINS FOUR (4) INCH IN DIAMETER AND AT
EVERY 100 FT INTERVALS FOR DRAINS SIX (6) INCH IN DIAMETER.
PROVIDE A CLEAN OUT AT EACH CHANGE IN DIRECTION GREATER
THAN 45 DEGREES.
ALL VENT PIPING CONNECTIONS TO FIXTURES SHALL BE SIZED AS
SCHEDULED. ALL OTHER VENT PIPING SHALL BE 2" UNLESS NOTED
OTHERWISE.
PROVIDE 1/4 TURN STOP VALVES AT ALL FIXTURES.
PROVIDE APPROPRIATE BACKFLOW PREVENTION DEVICES WHERE
REQUIRED BY CODE.
SEE SPECIFICATION SECTION 011000 FOR TIMING OF ALL WORK
AND COORDINATE.
PLUMBING GENERAL NOTES
1.
2.
3.
4.
5.
THIS PROJECT IS GOVERNED BY THE NORTH CAROLINA STATE BUILDING
CODES INCLUDING, BUT NOT LIMITED TO:
2018 NORTH CAROLINA STATE ENERGY CONSERVATION CODE
(BASED ON 2015 IECC WITH AMENDMENTS)
2018 NORTH CAROLINA STATE FUEL GAS CODE (BASED ON 2015
IFGC WITH AMENDMENTS)
2018 NORTH CAROLINA STATE EXISTING BUILDING CODE
(BASED ON 2015 IEBC WITH AMENDMENTS)
2018 NORTH CAROLINA STATE BUILDING CODE (BASED ON 2015
IBC WITH AMENDMENTS)
2018 NORTH CAROLINA STATE PLUMBING CODE (BASED ON
2015 IPC WITH AMENDMENTS)
CODE SUMMARY
PIPE
VAPOR BARRIER INSULATION, USE GALVANIZED PROTECTION SHIELD (12"
MIN LENGTH, 1/2 PIPE CIRCUMFERENCE)
LOCKING NUT
HANGER ROD
HEAVY DUTY CONCRETE STEEL INSERT WITH ELONGATED SLOT
(OR EXPANSION SHIELD), FOR EXISTING CONSTRUCTION USE SPECIFIED
CONCRETE ARCH OR, FOR WOOD JOIST CONSTRUCTION USE SPECIFIED SIDE
BEAM ANGLE CLIPS
CONCRETE SLAB
INSERT NUT
NOTE:
REFER TO SPECIFICATIONS FOR HANGER ROD SIZES & SPACING. THE
SPACING SHOWN IN SPECIFICATIONS IS MAXIMUM SPACING PIPE WALL
SPAN. THE HANGER SUPPORTS & STRUCTURAL ELEMENTS OF THE BUILDING
SHOULD BE CHECKED FOR LOAD SUPPORT. SPACING MAY HAVE TO BE
REDUCED TO LIGHTEN LOAD ON CERTAIN HANGER SUPPORTS. DERATE EXP.
INSERTS 50% WHERE USED.
BUILDING SYSTEM
UP TO COMPRESSED AIR
LUBRICATION ADJUSTMENT
C A
NOTE:
SERVICE DROP.
BALL VALVE
3/4" COMPRESSED AIR
MOISTURE TRAP FOR
MANUAL DRAINING.
PC SHALL COORDINATE SERVICE DROP BALL VALVE ELEVATION WITH OWNER
UNIVERSAL QUICK DISCONNECT
COUPLER AND PLUG ASSEMBLY
INLET
INTEGRAL SAFETY
LOCKOUT VALVE
INTEGRAL MOISTURE
SEPARATOR
DRAIN VALVE
PRESSURE REGULATOR OUTLET
ADJUSTMENT KNOB, PROVIDED
BY PC
INTEGRAL LUBRICATION / AIR
FILTER
OUTLET PRESSURE GAUGE
OUTLET
P
Project No.
Checked Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM & CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8020 Tower Point Dr, Charlotte, NC 28227
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
2026-02-13 10663-0002
BID SET
As indicated
Autodesk Docs://10663-0002 - Gaston College FIC Carding Rm Equip/MEP_Gaston College FIC Carding Rm Equip.rvt
GASTON COLLEGE
FIC CARDING ROOM -
PHASE III PLUMBING
CA CONNECTIONS
2026-06-12
10663-0002
CJH
TDR
BS
Approver
P001
PL
U
M B
IN
G
D A
TA
S
H
EE
T G
A
ST
O N
C O
LL
EG
E, K
IM
B
R
EL
L C
A M
PU
S
W
IL
K
IN
SO
N
B O
U
LE
VA
R
D B
EL
M
O N
T, N
C
TDR
BS
CJH
NOT TO SCALE
PIPE HANGER DETAIL1 NOT TO SCALE
COMPRESSED AIR SERVICE DROP DETAIL2
A.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
7.
8.
1.
2.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
PLUMBING SPECIFICATIONS
GENERAL
FURNISH ALL EQUIPMENT, MATERIALS, LABOR, TOOLS, ETC., FOR THE COMPLETE PLUMBING SYSTEM. INSTALL COMPLETE AND PLACE IN
OPERATION.
CONFORM TO ALL GENERAL AND SPECIAL CONDITIONS OF CONTRACT AS SPECIFIED BY ARCHITECT AND/OR OWNER.
PRODUCTS AND INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES, GOVERNMENT REGULATIONS, UTILITY COMPANY REQUIREMENTS, ETC. OF ALL AUTHORITIES HAVING JURISDICTION. WHERE CONFLICTS EXIST BETWEEN CODES, STANDARDS OR THIS SPECIFICATION THE MOST STRINGENT SHALL APPLY. DEVIATIONS FROM THE CONTRACT DOCUMENTS REQUIRED BY THE ABOVE AUTHORITIES SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. OBTAIN PERMITS AND PAY ALL FEES. ARRANGE FOR ALL REQUIRED INSPECTIONS AND APPROVALS. CONFIRM ALL UTILITY COMPANY REQUIREMENTS AND CONNECTION POINTS IN THE FIELD, PRIOR TO
STARTING WORK.
ALL SPECIFICATIONS AND DRAWINGS, I.E., ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. ANY INFORMATION CONFLICTS WITHIN THE
SPECIFICATIONS AND DRAWINGS SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION.
VISIT SITE, CHECK FACILITIES AND CONDITIONS. MAKE ALL NECESSARY OBSERVATIONS, MEASUREMENTS, NOTE CONDITIONS UNDER
WHICH WORK IS TO BE PERFORMED, AND TAKE ALL ITEMS INTO CONSIDERATION IN BID.
THE CONTRACTOR SHALL PROVIDE FOR THEIR OWN CLEAN-UP, REMOVAL AND LEGAL DISPOSAL OF ALL RUBBISH DAILY. CONTRACTORS SHALL PROTECT THEIR WORK AND EXISTING OR ADJACENT PROPERTY AGAINST WEATHER, TO MAINTAIN THEIR WORK, MATERIALS, APPARATUS AND FIXTURES FREE FROM INJURY OR DAMAGE. ANY WORK DAMAGED BY FAILURE TO PROVIDE THE PROTECTION REQUIRED
SHALL BE REMOVED AND REPLACED WITH NEW WORK AT THE CONTRACTOR'S EXPENSE.
THE CONTRACTOR SHALL COORDINATE WITH THE OWNER ’S PROJECT MANAGER PRIOR TO, AND FOR, SCHEDULING ANY INTERRUPTION OF
ANY BUILDING UTILITY.
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND
THE SAFETY OF WORKMEN.
NO PIPING, CONTROLS, ETC., SHALL BE INSTALLED OR ROUTED ABOVE ELECTRICAL PANELS AND EQUIPMENT OR THROUGH ELEVATOR
MACHINE ROOMS.
ALL EQUIPMENT AND MATERIAL FOR THIS PROJECT WILL BE NEW UNLESS SPECIFICALLY INDICATED OTHERWISE.
ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. THE CONTRACTOR SHALL COORDINATE AND OBTAIN A WRITTEN LISTING OF ELECTRICAL CHARACTERISTICS OF ALL PLUMBING EQUIPMENT FROM THE ELECTRICAL CONTRACTOR PRIOR TO THE ORDERING OF EQUIPMENT. NO ADDITIONAL PAYMENT WILL BE MADE FOR LACK OF CONTRACTOR COORDINATION OF ELECTRICAL
CHARACTERISTICS.
PROVIDE SLEEVES EXTENDING 2 ” MINIMUM ABOVE FINISHED FLOOR AND FIRE STOP ALL FLOOR PENETRATIONS.
WORK RELATED TO THE EXISTING BUILDING SHALL BE COORDINATED TO MINIMIZE THE INTERFERENCE OR INTERRUPTION OF NORMAL
BUILDING USE BY OWNER. REFER TO ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS.
IN CASES OF DOUBT AS TO THE WORK INTENDED, OR IN THE EVENT OF NEED FOR EXPLANATION THEREOF, THE CONTRACTOR SHALL REQUEST SUPPLEMENTARY INSTRUCTIONS FROM THE ENGINEER. NO CHANGES ARE TO BE MADE TO THE WORK OF THIS CONTRACT WITHOUT PRIOR KNOWLEDGE AND APPROVAL OF THE ENGINEER. THE CONTRACTOR SHALL HOLD THE OWNER AND ITS CONSULTANTS HARMLESS AGAINST ALL CLAIMS AND JUDGEMENTS ARISING OUT OF THE CONTRACTOR ’S PERFORMANCE OF THE WORK OF THIS CONTRACT. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK IN WHICH ADDITIONAL COMPENSATION IS EXPECTED BEYOND THE CONTRACT AMOUNT WITHOUT WRITTEN AUTHORIZATION FROM THE APPROPRIATE AUTHORITY. FAILURE TO OBTAIN SUCH
AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION.
IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO INSTALL ALL SYSTEMS SO AS TO INSURE QUIET OPERATION. NO VIBRATION OR SOUND SHALL BE TRANSMITTED TO THE BUILDING, STRUCTURE OR OCCUPIED AREAS. THE DECISION OF THE ENGINEER AS TO THE QUIETNESS OF THE SYSTEM AND EQUIPMENT SHALL BE FINAL. IT SHALL BE THIS CONTRACTOR ’S RESPONSIBILITY TO CORRECT OR
REPLACE ANY NOISY SYSTEM OR EQUIPMENT AS REQUIRED.
OBTAIN PERMITS AND PAY ALL FEES. ARRANGE FOR ALL REQUIRED INSPECTIONS AND APPROVALS.
ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ACI 301 “SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS”, LATEST EDITION. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60, EXCEPT TIES, WHICH MAY BE GRADE
40. ALL REINFORCING BARS SHALL BE FABRICATED AND PLACED IN ACCORDANCE WITH ACI 315 AND CONCRETE REINFORCING STEEL INSTITUE RECOMMENDATIONS. CONCRETE CURING PROCEDURES SHALL BE IN ACCORDANCE WITH ACI 301. CONCRETE SHALL BE NORMAL
WEIGHT CONCRETE WITH 3500 PSI MINIMUM 28 DAY COMPRESSION STRENGTH.
B. DRAWINGS
DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY THE SCOPE AND GENERAL ARRANGEMENT OF WORK. CONFIRM ALL
DIMENSIONS BY FIELD MEASUREMENT.
THE EXACT LOCATIONS FOR APPARATUS, FIXTURES, EQUIPMENT AND PIPING WHICH IS NOT COVERED BY DRAWINGS, SHALL BE OBTAINED FROM THE ARCHITECT OR THEIR REPRESENTATIVE IN THE FIELD, AND THE WORK SHALL BE LAID OUT ACCORDINGLY.
ALL OFFSETS, RISES, TRANSITIONS AND DROPS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER.
LOCATIONS OF TERMINAL DEVICES, PLUMBING FIXTURES, ETC., ARE APPROXIMATE. LOCATE PER THE ARCHITECTURAL DRAWINGS AND TO AVOID OTHER TRADE'S WORK. COORDINATE LOCATIONS WITH OTHER TRADES. CONSULT ARCHITECT/ENGINEER FOR CLARIFICATION
IF CONFLICTS OCCUR.
DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE SUPPLEMENTARY. ANY MATERIALS, LABOR OR SERVICES REQUIRED BY EITHER IS
TO BE CONSIDERED AS REQUIRED FOR THE PROJECT.
CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS WITHIN 60 DAYS OF PROJECT COMPLETION.
E. CUTTING, PATCHING AND DRILLING
ALL CUTTING AND PATCHING OF THE BUILDING CONSTRUCTION REQUIRED FOR THE DIVISIONS OF THE WORK SHALL BE BY THE RESPECTIVE CONTRACTOR REQUIRING SAME UNLESS THIS WORK IS INDICATED ON ARCHITECTURAL DRAWINGS AND CONFIRMED AS TO SIZE AND LOCATION PRIOR TO NEW CONSTRUCTION. CUTTING SHALL BE IN A NEAT AND WORKMANLIKE MANNER SO AS TO MINIMIZE
PATCHING.
NEATLY SAW CUT ALL RECTANGULAR OPENINGS, SET SLEEVE THROUGH OPENING, AND FINISH PATCH OR PROVIDE TRIM FLANGE AROUND
OPENING.
NEATLY SAW CUT FLOORS FOR SEWER INSTALLATION AND PATCH FLOOR TO MATCH EXISTING, INCLUDING FLOOR COVERING OR FINISH.
CORE DRILL AND SLEEVE OPENINGS.
DO NOT CUT ANY STRUCTURAL COMPONENTS WITHOUT THE ARCHITECT ’S APPROVAL.
PATCH AND FINISH TO MATCH ADJACENT AREAS THAT HAVE BEEN CUT, DAMAGED OR MODIFIED AS A RESULT OF THE INSTALLATION OF PLUMBING EQUIPMENT. FIRE STOP ALL PENETRATIONS OF FIRE RATED CONSTRUCTION IN A CODE APPROVED MANNER.
THE CONTRACTOR SHALL CONFIRM WITH OWNER, PRIOR TO BID, TIMES AVAILABLE FOR NOISE PRODUCING WORK SUCH AS CUTTING AND CORE DRILLING OF FLOORS, WALLS, ETC., AS WELL AS TIMES FOR WORK WHICH REQUIRE ACCESS INTO ADJOINING TENANT SPACES.
INCLUDE ANY REQUIRED PREMIUM TIME TO COMPLY WITH THESE TIMES IN BID.
INFORMATION REGARDING REQUIRED PIPE OR OTHER OPENINGS IN WALLS, FLOORS, CHASES, ETC., AND CONCRETE EQUIPMENT PADS OR FOUNDATIONS ARE TO BE PROVIDED TO THE GENERAL CONTRACTOR BY THIS CONTRACTOR PRIOR TO THE CONSTRUCTION PERIOD.
IF THIS CONTRACTOR FAILS TO COMPLY WITH THIS REQUEST, OR PROVIDES INCORRECT INFORMATION, THIS CONTRACOTR WILL BE RESPONSIBLE FOR ALL CORRECTIVE COSTS FOR ALL NECESSARY CUTTING, PATCHING OR OTHER CORRECTION WHICH WILL BE
PERFORMED BY THE GENERAL CONTRACTOR.
F. WARRANTY
INCLUDED AS A PART OF THE WORK UNDER EACH PLUMBING, MECHANICAL, OR ELECTRICAL SECTION, ALL MATERIALS, APPARATUS, AND EQUIPMENT INSTALLED AND SERVICES TO BE PROVIDED ARE WARRANTED FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP. ANY PORTION OF THE WORK WHICH MAY PROVE DEFECTIVE WITHIN A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF THE WORK BY THE OWNER, SHALL BE REPLACED OR REPAIRED IN AN APPROVED MANNER WITHOUT ADDITIONAL COST TO THE OWNER. IN ADDITION TO THIS ONE (1) YEAR WARRANTY, REFRIGERATION COMPRESSORS WILL BE GUARANTEED FOR A TOTAL PERIOD OF FIVE (5)
YEARS FROM ACCEPTANCE.
WITHOUT REGARD TO THE TIME OF DISCOVERY, ANY AND ALL PORTIONS OF THE WORK FOUND NOT IN COMPLIANCE WITH THE CONTRACT SHALL BE REPLACED OR REPAIRED IN AN APPROVED MANNER WITHOUT ADDITIONAL COST TO THE OWNER. SAID REPAIR OR REPLACEMENT SHALL BE REQUIRED AS THE SPECIFIC PERFORMANCE OF THE CONTRACT AND IS NOT TO BE CONSIDERED AS WAIVING
ANY OTHER RECOURSE OR REMEDIES AVAILABLE TO THE OWNER.
G. SHOP DRAWING SUBMITTALS
SUBMIT SHOP DRAWINGS FOR PLUMBING EQUIPMENT, PIPING SYSTEMS AND EQUIPMENT AS APPLICABLE WITH ADEQUATE DETAILS AND SCALES TO CLEARLY INDICATE CONSTRUCTION. INDICATE THE OPERATING CHARACTERISTICS FOR EACH REQUIRED ITEM. CLEARLY IDENTIFY EACH ITEM ON THE SUBMITTAL AS TO MARK, LOCATION AND USE, USING SAME IDENTIFICATION AS PROVIDED ON DESIGN
DRAWINGS. STRIKE OUT ALL ITEMS THAT DO NOT APPLY TO THIS PROJECT.
THE CONTRACTOR SHALL ALLOW SUFFICIENT TIME (2 WEEKS) FOR SHOP DRAWING REVIEWS BY THE ENGINEER TO MEET THE OWNER ’S
CONSTRUCTION SCHEDULE.
CONTRACTOR SHALL REVIEW AND INDICATE APPROVAL OF EACH SHOP DRAWING PRIOR TO SUBMITTAL FOR REVIEW. ALL COSTS FOR STARTING WORK OR FABRICATION PRIOR TO SHOP DRAWING REVIEW AND RETURN TO THE CONTRACTOR ARE THE RESPONSIBILITY OF
THE CONTRACTOR.
SUBMITTALS WILL BE REVIEWED ONLY FOR GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS AND NOT FOR DIMENSIONS OR QUANTITIES. THE SUBMITTAL REVIEW DOES NOT WAIVE THE CONTRACTOR'S RESPONSIBILITY FOR PURCHASE OF ANY ITEM OR COMPLETE
COMPLIANCE WITH THE CONTRACT DOCUMENTS.
WHERE SUBMITTALS VARY FROM THE CONTRACT REQUIREMENTS, THE CONTRACTOR SHALL CLEARLY INDICATE THE NATURE AND
REASON FOR VARIATIONS ON SUBMITTAL OR ACCOMPANYING DOCUMENTS.
THE CONTRACTOR MUST CHECK THE APPLICATION OF EQUIPMENT AND CERTIFY AT TIME OF SHOP DRAWING SUBMITTAL THAT EQUIPMENT HAS BEEN PROPERLY APPLIED AND CAN BE INSTALLED, SERVICED AND MAINTAINED WHERE INDICATED ON DRAWINGS.
ADVISE ENGINEER IN WRITING WITH SUBMITTAL DRAWINGS OF ANY POTENTIAL PROBLEMS. WHERE CERTIFICATION IS NOT EXPRESSED, SUBMITTAL IMPLIES CERTIFICATION.
H. RECORD DRAWINGS (AS-BUILTS )
EACH CONTRACTOR OR SUBCONTRACTOR SHALL KEEP ONE (1) COMPLETE SET OF THE CONTRACT WORKING DRAWINGS ON THE JOB SITE AND REGULARLY RECORD ANY DEVIATIONS OR CHANGES FROM SUCH CONTRACT DRAWINGS MADE DURING CONSTRUCTION.
THESE DRAWINGS SHALL RECORD THE LOCATION OF ALL CONCEALED EQUIPMENT, PIPING, SEWERS, SANITARY PIPING, VENTS, AND OTHER PIPING, BY MEASURED DIMENSIONS TO EACH SUCH ITEM FROM READILY IDENTIFIABLE AND ACCESSIBLE WALLS OR CORNERS OF THE BUILDING. PLANS ALSO SHALL SHOW INVERT ELEVATION OF SEWERS AND TOP ELEVATION OF ALL OTHER BELOW-GRADE PIPING.
RECORD DRAWINGS SHALL BE KEPT CLEAN AND UNDAMAGED AND SHALL NOT BE USED FOR ANY PURPOSE OTHER THAN RECORDING
DEVIATIONS FROM WORKING DRAWINGS AND EXACT LOCATIONS OF CONCEALED WORK.
AT PROJECT COMPLETION, THESE SETS OF DRAWINGS SHALL BE DELIVERED WITHIN 60 DAYS OF PROJECT COMPLETION TO THE ARCHITECT OR OWNER, AS DIRECTED, IN GOOD CONDITION, AS A PERMANENT RECORD OF THE INSTALLATION AS ACTUALLY
CONSTRUCTED.
1.
1.
2.
3.
4.
1.
2.
1.
a.
b.
1.
2.
I. PLUMBING SYSTEMS SCOPE
PROVIDE PLUMBING FIXTURES, EQUIPMENT AND MATERIAL INDICATED AND SHOWN ON DRAWINGS AND PLACE IN PROPER OPERATION.
J. CAST IRON PIPING
CAST IRON PIPING SHALL BE USED FOR SANITARY SEWERS (NO-HUB JOINTS FOR ABOVE GROUND AND NEOPRENE COMPRESSION JOINTS FOR BELOW GROUND) IN AREAS WHERE HOT WATER ABOVE 140 DEGREES IS DISCHARGED INTO THE DRAINAGE SYSTEM.
CAST IRON PIPING SHALL BE USED FOR GREASE WASTE SEWERS (NO-HUB JOINTS FOR ABOVE GROUND AND NEOPRENE COMPRESSION
JOINTS FOR BELOW GROUND).
SEWER AND VENT MATERIAL SHALL BE AS FOLLOWS:
BELOW GRADE STORM AND SANITARY INSIDE THE BUILDING:
SERVICE WEIGHT: CAST IRON PIPE AND FITTINGS; ASTM A-74 WITH ASTM C-564 NEOPRENE COMPRESSION JOINTS. ALL CAST IRON SOIL PIPE AND FITTINGS SHALL BE MARKED WITH THE COLLECTIVE TRADEMARK OF THE CAST IRON SOIL PIPE INSTITUTE
(CISPI) AND BE LISTED BY NSF INTERNATIONAL.
PVC – ASTM D 1785 SCH 40 SOLID WALL PIPE WITH ASTM D 2665 PVC DWV FITTINGS AND SOLVENT WLED JOINTS. PIPE AND FITTINGS SHALL CONFORM TO NSF INTERNATIONAL STANDARD 14. INSTALLATION SHALL BE IN ACCORDNACE WITH ASTM D 231 AND ASTM F 1668. SOLVENT CEMENT PRIMER SHALL CONFORM TO ASTM D 2564. NOT FOR USE IN AREAS THAT RECEIVE HOT
WATER ABOVE 140 DEGREES F.
b. ABOVE GRADE VENTS AND SANITARY –
NO-HUB CAST IRON PIPE CISPI 1-301 (FOR PIPE SIZES 3 ” AND LARGER):
ALL CAST IRON SOIL PIPE AND FITTINGS SHALL BE MARKED WITH THE COLLECTIVE TRADEMARK OF THE CAST IRON SOIL PIPE
INSTITUTE (CISPI) AND BE LISTED BY NSF INTERNATIONAL.
NO-HUB COUPLINGS:
HEAVY DUTY, 4 BAND, SHIELDED FOR 4" AND SMALLER.
HEAVY DUTY, 6 BAND, SHIELDED FOR 5" AND LARGER.
1.
2.
3.
a.
b.
1.
2.
3.
4.
1.
2.
3.
1.
2.
3.
K. WATER PIPING
INCLUDE UNIONS, OR OTHER DISCONNECT MEANS, STOPS OR VALVES FOR ISOLATION OF FIXTURES AND EQUIPMENT. VALVES SHALL BE FULLY COMPATIBLE WITH PIPING FOR THE SERVICE INTENDED. AS MANUFACTURED BY APOLLO, NIBCO, CRANE OR OTHER APPROVED MANUFACTURER. INCLUDE HOSE OR DRAIN VALVES AT LOW POINTS WHERE FIXTURES CANNOT BE USED FOR DRAINAGE.
INSTALL SHOCK ABSORBERS AT EACH FIXTURE OR WHERE REQUIRED TO PREVENT WATER HAMMER.
HANGERS ON INSULATED PIPE SHALL BE OUTSIDE OF INSULATION, SIZED ACCORDINGLY AND WITH SUFFICIENT SADDLE TO PROTECT
INSULATION.
5. WATER PIPING ABOVE GRADE SHALL BE (CHOOSE ONLY ONE OF THE THREE OPTIONS BELOW) TYPE "L" HARD COPPER ASTM B 88-832 WITH WROUGHT COPPER FITTINGS ASTM B 16.22 1980 AND NON-LEAD OR ANTIMONY SOLDER
JOINTS.
FLUSH, VENT ALL WATER PIPING UPON COMPLETION. COMPLY WITH PLUMBING CODE REQUIREMENTS FOR SANITIZATION. SUBMIT
WRITTEN VERIFICATION OF PIPING SANITIZATION.
P. COMPRESSED AIR SYSTEM
EXTEND COMPRESSED AIR PIPING FROM EXISTING MAIN, INCLUDING TAP TO MAIN, PRESSURE REGULATOR, AS INDICATED ON DRAWINGS
AND CONNECT TO ALL COMPRESSED AIR USING EQUIPMENT.
PROVIDE COMPRESSED AIR SYSTEM INCLUDING REGULATORS, PIPING, HANGERS, TERMINATIONS AND CONNECTIONS TO EQUIPMENT
USING COMPRESSED AIR.
COMPRESSED AIR CONNECTIONS AT EQUIPMENT SHALL INCLUDE PRESSURE REGULATOR AND CONNECTIONS.
PIPING SHALL BE PREVOST 100% ALUMINUM PIPING SYSTEM.
S. CHECK, TEST, START, ADJUST, BALANCE AND INSTRUCTIONS
AFTER INSTALLATION, CHECK ALL EQUIPMENT, AND PERFORM START UP IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS, AND REQUIREMENTS OF THE SPECIFICATIONS. COORDINATE STARTUP WITH OWNER FOR OPERATION OF EQUIPMENT.
PIPING SHALL BE TESTED AND FREE OF LEAKS. MAKE REPAIRS NEEDED FOR LEAK FREE SYSTEMS.
CONCEALED OR INSULATED WORK SHALL REMAIN UNCOVERED UNTIL REQUIRED INSPECTIONS, AND TESTS HAVE BEEN COMPLETED. IF THE CONSTRUCTION SCHEDULE REQUIRES IT, ARRANGE FOR PRIOR TESTS ON PARTS OF SYSTEM AS APPROVED BY THE TENANT.
T. INSULATION
INSULATE ABOVE-GRADE COLD WATER PIPING WITH ONE (1") INCH THICK MOLDED FIBERGLASS HAVING TYPE ASJ JACKET AND
MANUFACTURED BY OWENS-CORNING FIBERGLASS COMPANY.
AT PIPE HANGERS, PROVIDE SOLID INSULATION COUPLING SYSTEM TO PREVENT INSULATION DAMAGE OR COMPRESSION. INSULATION COUPLINGS SHALL BE THE KLO-SHURE INSULATION COUPLING SYSTEM AS MANUFACTURED BY ANVIL-STRUT.
REPAIR DAMAGED SECTIONS OF EXISTING PIPING INSULATION, EITHER PREVIOUSLY DAMAGED OR DAMAGED DURING THIS CONSTRUCTION PERIOD. USE INSULATION OF THE SAME THICKNESS AS SPECIFIED, INSTALL NEW JACKET LAPPING AND SEALED OVER
EXISTING.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.
2.
3.
4.
5.
6.
1.
2.
3.
U. HANGERS AND SUPPORTS
HANGERS FOR BLACK STEEL PIPE SHALL BE MANUFACTURED BY NVENT CADDY, MODEL NO. 100, OR APPROVED EQUAL.
HANGERS FOR CAST IRON PIPE SHALL BE MANUFACTURED BY NVENT CADDY, MODEL NO. 400, OR APPROVED EQUAL.
HANGERS FOR COPPER TUBING SHALL BE MANUFACTURED BY NVENT CADDY, MODEL NO. 102-A, OR APPROVED EQUAL.
TRAPEZE HANGERS OF A TYPE APPROVED BY THE ENGINEER. MAINTAIN PIPE INSULATION AT PIPE ANCHORS. PROVIDE INSULATION
COUPLERS AS SPECIFIED ABOVE.
CONTRACTOR SHALL PROVIDE INSULATION HANGER WITH PROTECTIVE SHIELDS, SUCH AS NVENT CADDY, MODEL NO. 103, OR APPROVED EQUAL. 5 INCH LONG SECTION OF 1/2 INCH THICK CALCIUM SILICATE SECTIONAL PIPE INSULATION WITH FACTORY LONGITUDINAL LAP SHALL BE PROVIDED AT HANGER POINTS. BUTT JOINTS SHALL BE SEALED WITH INSULATING CEMENT.
STRAP HANGERS SHALL NOT BE PERMITTED.
CONTRACTOR SHALL PROVIDE SIDE BEAM CLAMPS FOR SUPPORTING PIPING FROM STRUCTURAL STEEL MEMBERS. BEAM CLAMPS SHALL
BE MANUFACTURED BY NVENT CADDY, MODEL 300 OR APPROVED EQUAL.
WHERE OTHER MEANS OF SUPPORT PIPING ARE REQUIRED OR DESIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE
ENGINEER'S APPROVAL PRIOR TO INSTALLING THOSE SUPPORTS.
HANGER SHALL BE PROVIDED AT EACH CHANGE OF DIRECTION.
HANGERS AND SUPPORTS SHALL BE SPACED AT INTERVALS WHICH WILL PREVENT SAGGING AND REDUCE STRAIN ON VALVES AND SPECIALTIES. HANGER SPACING SHALL BE NO GREATER AND ROD SIZE SHALL BE NO SMALLER THAN THAT SHOWN IN THE FOLLOWING
TABLE. HANGERS SHALL ALLOW FOR EXPANSION AND CONTRACTION.
FERROUS PIPING AND COPPER TUBING:
DIAMETER OF PIPE MAXIMUM SPACING ROD SIZE
1/2" THRU 1 1/2" 6 FT. 3/8"
2" THRU 3" 10 FT 1/2"
4" 12 FT 5/8"
6" AND LARGER 16 FT 3/4”
15. CAST IRON PIPING:
DIAMETER OF PIPE MAXIMUM SPACING ROD SIZE
1 1/2" THRU 3" EACH JOINT 3/8"
4" EACH JOINT 1/2"
6" AND 8" EACH JOINT 3/4"
10" THRU 15" EACH JOINT 3/4"
(TWO HANGERS)
16. PVC PIPING:
DIAMETER OF PIPE MAXIMUM SPACING ROD SIZE
1 1/2” 4 FT 3/8”
2” THRU 3” 4 FT 1/2”
4” 4 FT 5/8”
6” AND LARGER 4 FT 3/4”
W. VALVES
BALL VALVES 2-INCHES AND SMALLER SHALL BE 150 PSI SWP, 600 PSI WOG, BRONZE, 2-PIECE DESIGN, WITH PTFE TEFLON SEATS AND SEALS, AND BLOW-OUT PROOF STEMS MADE OF LEAD-FREE BRONZE. VALVES SHALL HAVE SOLDER OR PRESS-FIT ENDS FOR USE IN COPPER TUBING. BALL VALVES SHALL BE WATTS NO. LFFBV-4 OR AN APPROVED EQUAL FOR THREADED OR SOLDERED ENDS AND WATTS NO. LFFBV-3 OR AN APPROVED EQUAL FOR PRESS-FIT ENDS. PROVIDE THERMA-SEAL INSULATING TEE HANDLES FOR VALVES USED IN
LINES WHICH ARE TO BE INSULATED.
PROVIDE 2 INCH EXTENSION NECKS ON ALL VALVES INSTALLED IN INSULATED LINES.
LEVER TYPE HANDLE OPERATORS SHALL BE PROVIDED ON VALVES UP TO 4 INCHES IN SIZE. GEAR OPERATORS SHALL BE PROVIDED ON VALVES OVER 4 INCHES IN SIZE, AND ON VALVES REQUIRING CHAIN OPERATION. VALVES USED FOR BALANCING SHALL HAVE INFINITE
POSITION LEVER OR GEAR OPERATORS WITH ADJUSTABLE, OPEN POSITION "MEMORY" STOP.
STOP AND DRAIN BALL VALVES 1 ” AND SMALLER SHALL BE 150 PSI SWP, 600 WOG, BRASS, 2-PIECE DESIGN, WITH PTFE VALVE SEATS AND SEALS, AND BLOW-OUT PROOF STEMS MADE OF LEAD-FREE COPER SILICON ALLOY. VALVES SHALL HAVE THREADED OR SOLDER ENDS FO RUSE IN COPPER TUBING. VALVES SHALL BE WATTS LFIT6300 OR AN APPROVED EQUAL FOR THREADED ENDS AND WATTS LFIS6301 OR AN APPOROVED EQUAL FOR SOLDER ENDS. PROVIDE THERMA-SEAL INSULATING TEE HANDLES FOR VALVES USED IN LINES WHICH ARE TO BE
INSULATED.
VALVES AND ASSOCIATED FITTINGS SHALL BE OF THE SAME SIZE AS THE PIPING OF WHICH THEY ARE INSTALLED.
PROVIDE VALVE TAGS AND VALVE CHART PER ASME A13.1 SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS. VALVE CHART SHALL
BE GIVEN TO THE FACILITY OWNER FOR PERMANENT RECORD.
X. PIPE IDENTIFICATION
CONTRACTOR SHALL PROVIDE IDENTIFICATION LABELS, TAGS, ETC., FOR PLUMBING AS INDICATED ON THE DRAWINGS AND AS SPECIFIED
HEREIN.
THE IDENTIFICATION OF PLUMBING PIPING SHALL BE IN ACCORDANCE WITH ANSI STANDARD A13.1, EXCEPT AS HEREINAFTER SPECIFIED.
PRESSURE SENSITIVE PIPE MARKERS SHALL BE MANUFACTURED BY THE BRADY CO., OR APPROVED EQUAL. PIPE MARKERS SHALL BE A
MANUFACTURER’S STANDARD PRODUCT.
Project No.
Checked Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM & CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8514 McAlpine Park Drive, Suite 280 Charlotte, NC 28211
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
FOR CONSTRUCTION
12" = 1'-0"
Autodesk Docs://10663-0002 - Gaston College FIC Carding Rm Equip/MEP_Gaston College FIC Carding Rm Equip.rvt
GASTON COLLEGE
FIC CARDING ROOM
- PHASE III
PLUMBING CA
CONNECTIONS
2026-06-12
10663-0002
CJH
TDR
BS
BS
P010
PL
U
M B
IN
G
S
PE
C
IF
IC
A
TI
O
N S
G A
ST
O
N C
O
LL
EG
E, K
IM
B R
EL
L
C A
M
PU
S
W
IL
K
IN
SO
N B
O U
LE
VA
R D
B
EL
M O
N T, N C
TDR
BS
CJH
2026-06-12
10663-0002
2.8 4.73.6 4.33.2 3.92.8 4.73.6 4.33.2 3.9
TRUETZSCHLER
P401
Sim
04'8'12'16' 16' 32' 1/16"=1'-0"
Project No.
Checked Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM & CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8020 Tower Point Dr, Charlotte, NC 28227
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
2026-02-13 10663-0002
BID SET
1/16" = 1'-0"
Autodesk Docs://10663-0002 - Gaston College FIC Carding Rm Equip/MEP_Gaston College FIC Carding Rm Equip.rvt
GASTON COLLEGE
FIC CARDING ROOM -
PHASE III PLUMBING
CA CONNECTIONS
2026-06-12
10663-0002
CJH
TDR
BS
Approver
P101
PL
U
M B
IN
G
S U
PP
LY
FI
R
ST
FL
O
O R
P
LA
N G
A
ST
O N
C O
LL
EG
E, K
IM
B
R
EL
L C
A M
PU
S
W
IL
K
IN
SO
N
B O
U
LE
VA
R
D B
EL
M
O N
T, N
C
TDR
BS
CJH
SCALE: 1/16" = 1'-0"
PRESSURE FIRST FLOOR PLAN1
2.8 3.6 4.33.2 3.9
200 SCFM @ 125 PSIG FOR
TRUETZCHLER
1 SCFM @
95 PSIG
1 SCFM @
95 PSIG
1 SCFM @
95 PSIG
1 SCFM @
95 PSIG 1 SCFM @
95 PSIG
1 SCFM @
95 PSIG
1 SCFM @
95 PSIG
1 SCFM @ 95 PSIG
1 SCFM @
95 PSIG
0.14 SCFM @
110 PSI
0.14 SCFM @
110 PSI
2 SCFM @
100 PSI
0.28 SCFM @
100 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
0.08 SCFM @
105 PSI
.01 SCFM @
72.5 PSIG
0.03 SCFM @
105 PSI
0.59 SCFM @
105 PSI
2 2
23/4" CA1/2" CA
1/2 " C
A
2" CA 2" CA
2" C
A 1/2
" C A1 1
/2" C
A
1/2 " C
A
1/2" CA
1/2 " C
A
3" CA
1/2 " C
A
1/2 " C
A
3" CA 3" CA
3" C
A
1/2" CA
1/2" CA
3/4 " C
A
1/2" CA
3" CA3" CA3" CA3" CA3" CA3" CA
1 1 /4"
C A
1/2" CA
1/2 " C
A
1/2 " C
A
1/2 " C
A
1/2 " C
A
11/2 " C
A
1" C
A
1 1 /4"
C A
Project No.
Checked Designed Drawn
Date
THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND
INFORMATION THEREON IS THE PROPERTY OF McKIM & CREED, INC.
ANY REPRODUCTION, ALTERATION OR USE FOR OTHER THAN THE
INTENDED PROJECT WITHOUT WRITTEN CONSENT OF McKIM & CREED, INC. IS EXPRESSLY FORBIDDEN. COPYRIGHT 2025, McKIM &
CREED, INC.
8020 Tower Point Dr, Charlotte, NC 28227
704.841.2588 (Voice)
704.841.2567 (Fax)
NC License # F-1222
DESCRIPTION DATE
REVISIONS
SCALE
DRAWING NUMBER
PROJ. MGR
REV.
REVISION
CHECKED
DESIGNED
DRAWN
MCE PROJ. #
PROJ START DATE:
STATUS:
2026-02-13 10663-0002
BID SET
1/4" = 1'-0"
Autodesk Docs://10663-0002 - Gaston College FIC Carding Rm Equip/MEP_Gaston College FIC Carding Rm Equip.rvt
GASTON COLLEGE
FIC CARDING ROOM -
PHASE III PLUMBING
CA CONNECTIONS
2026-06-12
10663-0002
CJH
TDR
BS
Approver
P401
PL
U
M B
IN
G
E N
LA
R
G
ED
P
LA
N S
G A
ST
O
N C
O
LL
EG
E, K
IM
B R
EL
L
C A
M
PU
S
W
IL
K
IN
SO
N B
O U
LE
VA
R D
B
EL
M O
N T, N C
TDR
BS
CJH
SCALE: 1/4" = 1'-0"
PRESSURE FIRST FLOOR PLAN1
GENERAL NOTES:
1.
2.
NEW WORK KEY NOTES:
EXISTING COMPRESSED AIR DROP TO EXISTING HAND TOOL TO REMAIN.
NEW COMPRESSED AIR DROP FOR EQUIPMENT COORDINATE FINAL CONNECTION WITH
EQUIPMENT MANUFACTURERS DETAILS, REFER TO COMPRESSED AIR SERVICE DROP
DETAIL ON SHEET P001.
| G001 - COVER SHEET |
| G002 - APPENDIX B |
| G003 - APPENDIX B |
| P001 - PLUMBING DATA SHEET |
| P010 - PLUMBING SPECIFICATIONS |
| P101 - PLUMBING SUPPLY - FIRST FLOOR PLAN |
| P401 - PLUMBING ENLARGED PLANS |
File details come from the government source that posted it. Updated .