Memorandum for Turnkey.pdf

PDF 185 KB Posted

Attached to
6525--SEP 2022 Consolidation
Solicitation number
36A79723Q0001
Issued by

View the file

Other files

File Type Posted
542B20008 - 573B25061 TS - Updated.zip ZIP file
573B25062 - 589B22014 TS - Updated.zip ZIP file
646B22018 - 664B20041 TS - Updated.zip ZIP file
36A79723Q0001 0001.docx DOCX document
612B29010 - 646B22017 TS - Updated.zip ZIP file
675B27019 - 695B28024 TS - Updated.zip ZIP file
Amendment 0001 - Continuation Page.pdf PDF
SEP 22 Consolidation Schedule of Line Items with QAs - Updated 1-4-23.xlsx XLSX spreadsheet
101EH2016 - 442B20020 TS - Updated.zip ZIP file
459B26000 - 502B25034 TS - Updated.zip ZIP file
502B25035 - 541B22039 TS - Updated.zip ZIP file
589B22052 - 612B29007 TS - Updated.zip ZIP file
VA Directive 6550 - New Appendix A - published Jun. 2019.pdf PDF
612B29007 - 618B29010 TS.zip ZIP file
546B20028 - 565B29015 TS.zip ZIP file
SEP 22 Consolidation Schedule of Line Items - Updated 11-16-22.xlsx XLSX spreadsheet
SEP 2022 Consolidation Schedule.pdf PDF
Vendor Folders.zip ZIP file
678B22042 - 691B20028 TS.zip ZIP file
671B20153 - 674B20162 TS.zip ZIP file
664B20036 - 671B20145 TS.zip ZIP file
646B22017 - 660B20013 TS.zip ZIP file
640B24005 - 646B22016 TS.zip ZIP file
580B20047 - 589B22007 TS.zip ZIP file
573B25061 - 575B26005 TS.zip ZIP file
534B22056 - 546B20027 TS.zip ZIP file
672FC2007 - 757B29014 BM.zip ZIP file
541B20056 - 564B20017 BM.zip ZIP file
565B29018 - 573B25060 TS.zip ZIP file
503B20037 - 531B24004 TS.zip ZIP file
499B29019 - 499B29060 TS.zip ZIP file
101EH2016 - 405B28008 TS.zip ZIP file
672FC2005 BM.zip ZIP file
640B24002 - 659B29007 BM.zip ZIP file
605B20041 - 637B29004 BM.zip ZIP file
578B28011 - 605B20040 BM.zip ZIP file
36A79723Q0001_1.docx DOCX document
Memorandum for Training.pdf PDF
MAX Drive HTME User Guide.pdf PDF
Vendor Workup Spreadsheet - 36A79723Q0001.xlsx XLSX spreadsheet
691B20030 - 695B28027 TS.zip ZIP file
674B20168 - 678B22036 TS.zip ZIP file
660B20014 - 664B20035 TS.zip ZIP file
623B24014 - 637B29017 TS.zip ZIP file
595B29023 - 612B29006 TS.zip ZIP file
589B22008 - 590B20027 TS.zip ZIP file
499B29061 - 503B20036 TS.zip ZIP file
436B20017 - 499B29018 TS.zip ZIP file
659B29011 - 672FC2004 BM.zip ZIP file
499B29015 - 541B20055 BM.zip ZIP file
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turnkey Specifications

In accordance with FAR 22.401, “Construction, alteration, or repair” means all types of work done by laborers and mechanics employed by the construction contractor or construction subcontractor on a particular building or work at the site thereof, including without limitations—

(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off-site;

(2) Painting and decorating;

(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work;

(4) Transportation of materials and supplies between the site of the work within the meaning of paragraphs (1)(i) and (ii) of the “site of the work” definition of this section, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the “site of work” definition of this section; and

(5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the “site of the work” definition in paragraph (1)(ii) of this section, and the physical place or places where the building or work will remain (paragraph (1)(i) in the “site of the work” definition of this section).

FAR 22.4 implements statutes which prescribe labor standards for non-construction contracts involving some construction work, in excess of $2,000.00. HTME contracts are supply contracts for high-tech medical equipment, therefore they do not contain the FAR 22.4 statutes, terms and conditions. As a result, turnkey modifications that involve construction and are valued at over $2,000.00 fail to meet the mandated FAR requirements.

In accordance with FAR 22.402(b)(2), the requirements of FAR 22.4 do not apply if—

“(i) The construction work is incidental to the furnishing of supplies, equipment, or services (for example, the requirements do not apply to simple installation or alteration at a public building or public work that is incidental to furnishing supplies or equipment under a supply contract;

however, if a substantial and segregable amount of construction, alteration, or repair is required, such as for installation of heavy generators or large refrigerator systems or for plant modification or rearrangement, the requirements of this subpart apply); or

(ii) The construction work is so merged with non-construction work or so fragmented in terms of the locations or time spans in which it is to be performed, that it is not capable of being segregated as a separate contractual requirement.”

Effective immediately, to ensure compliance with mandatory FAR guidelines, all turnkey modification requests will be thoroughly reviewed to ensure added work is only that which is required for the proper installation and operation of the equipment. Requests will be limited to that work which is incidental to the furnishing of equipment and is not capable of being segregated as a separate contractual requirement. Any construction work required above and beyond this (e.g. HVAC, painting, building of restrooms and/or waiting rooms) must be completed as a separate requirement by a contracting office that has the proper authority to write construction contracts.

THE FOLLOWING APPLY TO ALL MODALITIES:

INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO

EXTENDED/TURNKEY INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO

File details come from the government source that posted it. Updated .