Memorandum for Turnkey.pdf

PDF 185 KB Posted

Attached to
6525--SEP 2021 Consolidation Federal contract opportunity
Solicitation number
36A79722Q0004
Issued by
Department of Veterans Affairs National Acquisition Center

View the file

Other files for this federal contract opportunity

Other files attached to 6525--SEP 2021 Consolidation, newest first.
File Type Posted
36A79722Q0004 0002.docx DOCX document
Amendment 0002 - Continuation Page.pdf PDF
508B12031 - 635B20000.zip ZIP file
September 2021 Consolidation - Schedule of Line Items with QAs - Updated 1-10-22.xlsx XLSX spreadsheet
36A79722Q0004 0001.docx DOCX document
September 2021 Consolidation - Schedule of Line Items with QAs - Updated 12-29-21.xlsx XLSX spreadsheet
508B12013 - 657B12024 BM.zip ZIP file
546B10067 - 549B10599 TS.zip ZIP file
Amendment 0001 - Continuation Page.pdf PDF
549B10608 - 549B10621 TS.zip ZIP file
549B10622 - 573B15074 TS.zip ZIP file
674B10142 - 695B18017 TS.zip ZIP file
573B15081 - 598B10083 TS.zip ZIP file
657B12016 - 673B12044 TS.zip ZIP file
648B12180 - 657B12015 TS.zip ZIP file
September 2021 Consolidation - Schedule of Line Items.xlsx XLSX spreadsheet
526B10008 - 541B13059 BM.zip ZIP file
534B12077 - 546B10065 TS.zip ZIP file
548B15022 - 549B10581 TS.zip ZIP file
593B10035 - 598B10075 TS.zip ZIP file
598B10088 - 621B13007 BM.zip ZIP file
621B13008 BM.zip ZIP file
648B12179 - 648B13009 TS.zip ZIP file
691B10018 - 695B18026 TS.zip ZIP file
521B12024 - 526B10006 BM.zip ZIP file
405B18016 - 508B12023 BM.zip ZIP file
496B11005 - 512B11019 TS.zip ZIP file
546B10066 - 548B15021 TS.zip ZIP file
598B10076 - 598B10085 TS.zip ZIP file
621B13010 - 657B12024 BM.zip ZIP file
650B11035 - 652B10029 TS.zip ZIP file
664B10044 - 674B10157 TS.zip ZIP file
652B10030 - 658B10006 TS.zip ZIP file
688B10014 - 691B10014 TS.zip ZIP file
672FC1004 - 695B18025 BM.zip ZIP file
Memorandum for Training.pdf PDF
558B10064 - 565B10099 TS.zip ZIP file
549B10619 - 558B10019 TS.zip ZIP file
549B10593 - 549B10618 TS.zip ZIP file
598B10086 - 635B10010 TS.zip ZIP file
678B12058 BM.zip ZIP file
Vendor Folders.zip ZIP file
Vendor Workup Spreadsheet - 36A79722Q0004.xlsx XLSX spreadsheet
VA Directive 6550 - New Appendix A - published Jun. 2019.pdf PDF
RFQ Instructions to Offerors - September 2021 Consolidation.pdf PDF
September 2021 Consolidation Schedule.pdf PDF
508B12028 - 521B12016 BM.zip ZIP file
512B11020 - 534B12076 TS.zip ZIP file
544B12052 - 565B10084 BM.zip ZIP file
405B18013 - 496B11004 TS.zip ZIP file
Show all 50

6525--SEP 2021 Consolidation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turnkey Specifications

In accordance with FAR 22.401, “Construction, alteration, or repair” means all types of work done by laborers and mechanics employed by the construction contractor or construction subcontractor on a particular building or work at the site thereof, including without limitations—

(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off-site;

(2) Painting and decorating;

(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work;

(4) Transportation of materials and supplies between the site of the work within the meaning of paragraphs (1)(i) and (ii) of the “site of the work” definition of this section, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the “site of work” definition of this section; and

(5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the “site of the work” definition in paragraph (1)(ii) of this section, and the physical place or places where the building or work will remain (paragraph (1)(i) in the “site of the work” definition of this section).

FAR 22.4 implements statutes which prescribe labor standards for non-construction contracts involving some construction work, in excess of $2,000.00. HTME contracts are supply contracts for high-tech medical equipment, therefore they do not contain the FAR 22.4 statutes, terms and conditions. As a result, turnkey modifications that involve construction and are valued at over $2,000.00 fail to meet the mandated FAR requirements.

In accordance with FAR 22.402(b)(2), the requirements of FAR 22.4 do not apply if—

“(i) The construction work is incidental to the furnishing of supplies, equipment, or services (for example, the requirements do not apply to simple installation or alteration at a public building or public work that is incidental to furnishing supplies or equipment under a supply contract;

however, if a substantial and segregable amount of construction, alteration, or repair is required, such as for installation of heavy generators or large refrigerator systems or for plant modification or rearrangement, the requirements of this subpart apply); or

(ii) The construction work is so merged with non-construction work or so fragmented in terms of the locations or time spans in which it is to be performed, that it is not capable of being segregated as a separate contractual requirement.”

Effective immediately, to ensure compliance with mandatory FAR guidelines, all turnkey modification requests will be thoroughly reviewed to ensure added work is only that which is required for the proper installation and operation of the equipment. Requests will be limited to that work which is incidental to the furnishing of equipment and is not capable of being segregated as a separate contractual requirement. Any construction work required above and beyond this (e.g. HVAC, painting, building of restrooms and/or waiting rooms) must be completed as a separate requirement by a contracting office that has the proper authority to write construction contracts.

THE FOLLOWING APPLY TO ALL MODALITIES:

INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO

EXTENDED/TURNKEY INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO

File details come from the government source that posted it. Updated .