Melvindale Field House Paving Bid Plans 2025-06-10.pdf

PDF 6 MB Posted

Attached to
Melvindale Civic Arena Field House Parking Lot Rehabilitation
Solicitation number
92033
Issued by
Wayne County, Michigan

About this file

The document is a set of construction plans prepared by Hennessey Engineers for the City of Melvindale's Civic Arena Field House Parking Lot Rehabilitation project in Wayne County, Michigan. The project involves rehabilitating the existing asphalt parking lot by pulverizing the current surface and overlaying it with new asphalt, replacing full-depth concrete driveways and sidewalks on the building's south side, adjusting utility structures, adding concrete collars around structures, and re-striping the parking lot. The project is scheduled to begin on July 15, 2025, with substantial completion by August 29, 2025, and final completion by September 12, 2025. Bids will be received by the Melvindale City Clerk until Tuesday, June 24, 2025, at 10:00 a.m., with a bid deposit of 5% required and contract documents available for download from BidNet starting June 10, 2025.

The bid documents specify that bidders may not withdraw their bid within 90 days of the bid opening, and the city reserves the right to waive information or reject any and all bids. Bidders must submit a 5% bid bond, completed itemized bid sheets, a signed Exhibit "A" Proposal, and an Affidavit of Compliance for Iran Economic Sanctions Act. All Requests for Information (RFI) must be submitted to Nick Yuvan at nryuvan@hengineers.com by June 17, 2025, at 4:00 p.m. (EST), with responses provided by June 20, 2025, at 4:00 p.m. (EST). The project plans include detailed site plans, existing conditions maps, grading plans, and site-specific construction details for elements such as sidewalks, curbs, and ADA ramps.

View the file

Other files

File Type Posted
Melvindale Field House Paving Bid Specs 2025-06-10.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HENNESSEY ENGINEERS NOTES:

KNOW WHAT'S BELOW SHEET

DRAWN BY:

CHECKED BY:

APPROVED BY:

SCALE:

DATE:

DESIGNED BY:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

REVISIONS

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

SHEET

PROJECT NUMBER:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

N O

RT

H

M

AI

N S

T

SU

IT

E

M

IL

FO

RD

M

IC

HI

GA

N

(2

4-

N.T.S.

CE1

CO

VE

R

SH

EE

T

92033

06-06-2025

NRY

M

EL

VI

N

DA

LE

C

IV

IC

A

RE

N

A

FI

EL

D

HO

U

SE

CI

TY

O

F M

EL

VI

N

DA

LE

W

AY

N

E

CO

U N

TY

, M

IC

HI

GA

N

CONSdRhCdION�W>�NS

>OC�dION�M�W

NO�SC�>E

>OC�dION

4300 S DEARBORN STREET

MELVINDALE

WAYNE COUNTY, MICHIGAN

CE1 COVER SHEET

CE2 EXISTING CONDITIONS MAP

CE3 SITE PLAN

CE4 GRADING PLAN

CE5 SITE DETAILS

SHEEd�IN�Ey

MELVINDALE CIVIC ARENA FIELD HOUSE

�ESIGN�ENGINEER

HENNESSEY ENGINEERS, INC.

13500 REECK ROAD

SOUTHGATE, MICHIGAN 48195

(734) 759-1600

CONTACT: NICK YUVAN, PE

NRYUVAN@HENGINEERS.COM

SITE

�EW�RdMENd�O&�Wh�>IC�tOR<S

3315 GREENFIELD ROAD

MELVINDALE, MICHIGAN 48122

(313) 429-1080

DIRECTOR: LARRIE ORDUS

HE

NN

ES

SE

Y

PREPARED UNDER THE SUPERVISION OF:

NICHOLAS R. YUVAN

REGISTERED PROFESSIONAL ENGINEER

MICHIGAN REGISTRATION NO. 6201068868

SEAL

PARKING LOT REHABILITATION

I-9

AL

LE

N R

OAD

DEARBORN STREET

GREENFIELD ROAD

OAKWOOD BOULEVARD

RA

UP

P

RO

AD

DI

X

RO

AD

SCHAEFER ROAD

OAKWOOD BOULEVARD

GREENFIELD ROAD

BM #2

BM #3

RIVER ROUGE

S DEARBORN ST.

(100 FT WIDE)

HENNESSEY ENGINEERS NOTES:

KNOW WHAT'S BELOW

TOPOGRAPHIC LEGEND

BENCHMARKS

SHEET

DRAWN BY:

CHECKED BY:

APPROVED BY:

SCALE:

DATE:

DESIGNED BY:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

REVISIONS

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

SHEET

PROJECT NUMBER:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

N O

RT

H

M

AI

N S

T

SU

IT

E

M

IL

FO

RD

M

IC

HI

GA

N

(2

4-

1"=40'

CE2

EX

IS

TI

N

G C

O N

DI

TI

O N

S

AP

VI

N

DA

LE

C

IV

IC

A

RE

N

A

FI

EL

D

HO

U

SE

CI

TY

O

F M

EL

VI

N

DA

LE

W

AY

N

E

CO

U N

TY

, M

IC

HI

GA

N

RIVER ROUGE

S DEARBORN ST.

(100 FT WIDE)

HENNESSEY ENGINEERS NOTES:

KNOW WHAT'S BELOW

TOPOGRAPHIC LEGEND

BENCHMARKS

SHEET

DRAWN BY:

CHECKED BY:

APPROVED BY:

SCALE:

DATE:

DESIGNED BY:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

REVISIONS

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

SHEET

PROJECT NUMBER:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

N O

RT

H

M

AI

N S

T

SU

IT

E

M

IL

FO

RD

M

IC

HI

GA

N

(2

4-

1"=40'

CE3

SI

TE

P

LA

VI

N

DA

LE

C

IV

IC

A

RE

N

A

FI

EL

D

HO

U

SE

CI

TY

O

F M

EL

VI

N

DA

LE

W

AY

N

E

CO

U N

TY

, M

IC

HI

GA

RIVER ROUGE

S DEARBORN ST.

(100 FT WIDE)

HENNESSEY ENGINEERS NOTES:

KNOW WHAT'S BELOW

TOPOGRAPHIC LEGEND

BENCHMARKS

SHEET

DRAWN BY:

CHECKED BY:

APPROVED BY:

SCALE:

DATE:

DESIGNED BY:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

REVISIONS

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

SHEET

PROJECT NUMBER:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

N O

RT

H

M

AI

N S

T

SU

IT

E

M

IL

FO

RD

M

IC

HI

GA

N

(2

4-

1"=40'

CE4

G

RA

DI

N

G P

LA

VI

N

DA

LE

C

IV

IC

A

RE

N

A

FI

EL

D

HO

U

SE

CI

TY

O

F M

EL

VI

N

DA

LE

W

AY

N

E

CO

U N

TY

, M

IC

HI

GA

N

RAMP GRADING DETAIL 1

RAMP GRADING DETAIL 2

HENNESSEY ENGINEERS NOTES:

KNOW WHAT'S BELOW

SHEET

DRAWN BY:

CHECKED BY:

APPROVED BY:

SCALE:

DATE:

DESIGNED BY:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

REVISIONS

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

SHEET

PROJECT NUMBER:

TI

TL

E

HE

NN

ES

SE

Y

H E N G

IN

E E R S .C

O M

EN

GI

N

EE

RS

RE

EC

K

RD

SO

U

TH

GA

TE

M

IC

HI

GA

N

(7

) 7

-1

N O

RT

H

M

AI

N S

T

SU

IT

E

M

IL

FO

RD

M

IC

HI

GA

N

(2

4-

N.T.S.

CE5

SI

TE

D

ET

AI

LS

VI

N

DA

LE

C

IV

IC

A

RE

N

A

FI

EL

D

HO

U

SE

CI

TY

O

F M

EL

VI

N

DA

LE

W

AY

N

E

CO

U N

TY

, M

IC

HI

GA

N

SIDEWALK DETAIL

THICKENED EDGE

CONCRETE DRIVE CROSS SECTION

6" CURB (DETAIL "F")

6" REVERSE CURB (DETAIL "F")

SAWCUT PER FIELD ENGINEER

SAWCUT PER FIELD ENGINEER

CATCH BASIN CONCRETE PAD ADA RAMP

CONCRETE WALK CROSS SECTION

3.5" ASPHALT CROSS SECTION5" ASPHALT CROSS SECTION

92033_FIELD_HOUSE_SITE-COV
Sheets and Views
COV
92033_FIELD_HOUSE_SITE-EX COND
Sheets and Views
EX COND
92033_FIELD_HOUSE_SITE-SITE
Sheets and Views
SITE
92033_FIELD_HOUSE_SITE-GRADING
Sheets and Views
GRADING
92033_FIELD_HOUSE_SITE-DETAILS
Sheets and Views
DETAILS

File details come from the government source that posted it. Updated .