Culvert Replacement Project Melvin Hill Road over Tributary to Canandaigua Outlet
Solicitation number
2140052
Issued by
Oneida County, New York

About this file

Summary of Melvin Hill Road Culvert Replacement Project Plans

This is a set of professional engineering plans and specifications prepared by Ravi Engineering & Land Surveying, P.C. for the Town of Phelps Highway Department in Ontario County, New York (Project No. 60-24-294). The project involves the removal of an existing concrete culvert and replacement with a precast 4-sided rigid concrete box structure (12-foot span × 6-foot 6-inch rise) over a tributary to the Canandaigua Outlet on Melvin Hill Road. Associated work includes full-depth and mill-and-resurface reconstruction of the roadway and shoulders along a 2.25-mile section, installation of box beam guide railings with transition bridge railing, concrete aprons with cut-off walls, erosion and sediment control measures, and establishment of a signed off-site detour using CR 23 and Griffith Road to maintain traffic during construction. The plans contain comprehensive detail sheets covering site survey information, typical sections, culvert design and hydraulic data, bridge rail specifications, pavement markings, and erosion control measures with an estimated project length of approximately 300 linear feet of roadway improvement.

The project is governed by New York State Department of Transportation (NYSDOT) standard specifications and includes contracting goals requiring 6.00% Service-Disabled Veteran-Owned Business (SDVOB), 7.00% Minority Business Enterprise (MBE), and 11.00% Women Business Enterprise (WBE) participation. The work is subject to applicable Section 404 and Section 401 permits from the U.S. Army Corps of Engineers and New York State Department of Environmental Conservation. The contractor is responsible for maintaining creek flow and sediment control throughout the project duration, coordinating with utility companies (NYSEG and RG&E), and performing temporary waterway diversion and streambed material management. The plans specify precast concrete box culvert construction with load ratings under AASHTO standards, steel bridge railings fabricated to ASTM specifications, asphalt paving layers with tack coat application, and completion by October 15, 2026.

View the file

Other files

File Type Posted
PIN 4BNY94 Melvin Hill Road Proposal Book.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2110 South Clinton Avenue, Suite 1

Rochester, NY 14618

NYS Certificate of Authority Engineering: 21194 Surveying: 20790

(585) 223-3660TEL: FAX: (585) 697-1764

PREPARED AND RECOMMENDED BY:APPROVED BY:

DATEDATE

NEW YORK STATE LOCATION

REGIONS

LAKE ONTARIO

SYRACUSE

UTICA

ROCHESTER

BUFFALO

HORNELL

WATERTOWN

STATE OF NEW YORK

MAP OF THE

SHOWING

BINGHAMTON

POUGHKEEPSIE

ALBANY

PENNSYLVANIA

V E

R M

O N

T

LONG ISLAND

SOUND

NEW

JERSEY

LAKE

ERIE

C A N

A D

A

CANADA

CANADA

P E

N N

C O

N N

M A

S S

LOCATION

CONTRACT

N.T.S.

EDUCATION LAW.

BE MADE IN ACCORDANCE WITH ARTICLE 145 - SUBSECTION 7209 OF THE NEW YORK STATE

IN ANY WAY. IF ALTERATIONS TO THESE PLANS ARE REQUIRED, THE ALTERATIONS SHALL

LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT

ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT, PROFESSIONAL ENGINEER,

IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION LAW FOR ANY PERSON, UNLESS

N.T.S.

LOCATION MAP

STANDARD SPECIFICATIONS AND SHEETS:

WARNING:

THE APPLICABLE STANDARD SHEETS UNLESS OTHERWISE SPECIFIED IN THE CONTRACT DOCUMENTS.

ANY ADDITIONAL WORK OR ITEMS ENCOUNTERD DURING THE COUNTRACT ARE SUBJECT TO

STANDARD SHEETS UNLESS OTHERWISE SPECIFICED IN THE CONTRACT DOCUMENTS.

ALL WORK AND ITEMS CONTAINED IN THE CONTRACT ARE SUBJECT TO THE APPLICABLE

COVER, SHALL BE CONSIDERED TO BE IN EFFECT.

CURRENT AS OF THE STANDARD SPECIFICATIONS ADOPTION DATE SHOWN ON THE PROPOSAL

THE LATEST REVISIONS OF THE STANDARD SHEETS MAINTAINED BY NYSDOT, WHICH ARE

EXCEPT AS MODIFIED ON THESE PLANS AND IN THE ITEMIZED PROPOSAL.

MATERIALS (U.S. CUSTOMARY UNITS) AS OF JANUARY 1, 2025 WITH ALL CURRENT AGENDA,

CONFORMITY WITH THE N.Y.S.D.O.T. STANDARD SPECIFICATIONS, CONSTRUCTION AND

ALL WORK CONTEMPLATED UNDER THIS CONTRACT IS TO BE COVERED BY AND IN

RAVI ENGINEERING & LAND SURVEYING, P.C.

RICHARD PAPAJ, P.E., DIRECTION OF TRANSPORTATION

TOWN OF PHELPS HIGHWAY DEPARTMENT

PHIL FRERE, HIGHWAY SUPERINTENDENT

ONTARIO COUNTY

TOWN OF PHELPS

TRIB. CANANDAIGUA OUTLET

MELVIN HILL ROAD OVER

PIN 4BNY94 D041641

TOWN OF PHELPS, ONTARIO COUNTY

CANANDAIGUA OUTLET CULVERT REPLACEMENT

MELVIN HILL ROAD OVER TRIBUTARY TO

10/15/2026 10/15/2026 date of such alteration, and a specific description of and notation "altered by" followed by his signature and engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OFX

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

E

EMH

G

GP

GSB

GV

HYD

LP

LPG

PP

SA

SMH

ST

T

TCB

TELBOX

TEL P

TMH

CTV

W

WSB

WV

AHEAD

AZIMUTH

BACK

BASELINE

BEARING

CENTERLINE

CURVE TO SPIRAL

SUPERELEVATION RATE (CROSS SLOPE)

EQUALITY

EXTERNAL

HORIZONTAL CONTROL LINE

HEADLIGHT SIGHT DISTANCE

LENGTH OF CIRCULAR CURVE

LENGTH OF SPIRAL

LENGTH OF VERTICAL CURVE

CENTER CORRECTION OF VERTICAL CURVE

MAIN LINE

POINT OF CURVATURE

POINT OF INTERSECTION

POINT ON LINE

PASSING SIGHT DISTANCE

POINT OF TANGENT

POINT OF VERTICAL CURVE

POINT OF VERTICAL INTERSECTION

POINT OF VERTICAL TANGENT

RADIUS

SPIRAL TO CURVE

STOPPING SIGHT DISTANCE

SPIRAL TO TANGENT

STATION

TANGENT LENGTH

THEORETICAL GRADE LINE

TANGENT TO SPIRAL

VERTICAL CURVE

ELECTRIC

ELECTRIC MANHOLE

GAS

GUY POLE

GAS SERVICE BOX (HOUSE LINE)

GAS VALVE (MAIN LINE)

HYDRANT

LIGHT POLE

LOW PRESSURE GAS

POWER POLE

SANITARY SEWER

SANITARY MANHOLE

STORM SEWER

TELEPHONE

TRAFFIC CONTROL BOX

TELEPHONE BOX

TELEPHONE POLE

TELEPHONE MANHOLE

CABLE TELEVISION

WATER

WATER SERVICE BOX (HOUSE LINE)

WATER VALVE (MAIN LINE)

ALIGNMENT

SUBSURFACE EXPLORATION

HAND AUGER

DRILLING MUD

HOLLOW FLIGHT AUGER

POWER AUGER

PROBE

PERCOLATION TEST HOLE

TO BE DEFINED AT THE TIME OF EXPLORATION

SEISMIC POINT

TEST PIT

BRIDGE

CUT

DAM

FILL

CULVERT

WALL

AH

CP

DA

DM

DN

FH

PA

PH

PT

SP

B

C

D

F

K

W

X

IS MADE

BE DEFINED AT THE TIME THE EXPLORATION

TO BE USED IF ONE OF THE ABOVE CANNOT

ABUT

AOBE

ASPH

BDY

BLDG

BM

CC

CONC

CONST

CR

D

DM

DWY

EP

ES

FP

FD

FL

GAR

GR

HO

HWY

IP

MB

MON

N&W

OG

O/H

P

PAV'T

PE

PED POLE

p

POR

RR

RTE

ROW

FEE WO/A

ABUTMENT

AS ORDERED BY ENGINEER

ASPHALT

BOUNDARY

BUILDING

BENCH MARK

CENTER TO CENTER

CONCRETE

CONSTRUCTION

COUNTY ROAD

DEED DISTANCE

DIRECT MEASUREMENT

DRIVEWAY

EDGE OF PAVEMENT

EDGE OF SHOULDER

FENCE POST

FOUNDATION

FENCE LINE

GARAGE

GRAVEL

HOUSE

HIGHWAY

IRON PIN OR IRON PIPE

MAILBOX

MONUMENT

NAIL AND WASHER

ORIGINAL GROUND

OVERHEAD

PARCEL

PAVEMENT

PERMANENT EASEMENT

PEDESTRIAN POLE

PROPERTY LINE

PORCH

RAILROAD

ROUTE

RIGHT OF WAY

TOPOGRAPHY (MISCELLANEOUS)

RW

SH

SHLDR

RETAINING WALL

STATE HIGHWAY

SHOULDER

BOTTOM OF BANK (STREAM)

BOTTOM OF CURB

BOTTOM OF OPENING

CORRUGATED ALUMINUM PIPE

CATCH BASIN

CAST IRON PIPE

CENTERLINE OF STREAM

CORRUGATED METAL PIPE

CONCRETE PIPE

BB

BC

BO

CAP

CB

CIP

CMP

CP

CORRUGATED STEEL PIPE

CULVERT

DIAMETER

DRAINAGE MANHOLE

DRAINAGE STRUCTURE PIPE

DITCH CROSSING

EXTREME HIGH WATER

ELEVATION

ELEVATION

EXTREME LOW WATER

END SECTION

HEADWALL

INVERT

MANHOLE

MEAN HIGH WATER

ORDINARY HIGH WATER

ORDINARY LOW WATER

REINFORCED CONCRETE PIPE

TOP OF BANK (STREAM)

TOP OF CURB

TOP OF GRATE

VITRIFIED CLAY PIPE

CSP

CULV

DIA

DMH

DS

D'XING

EHW

EL

ELEV

ELW

ES

HW

INV

MH

MHW

OHW

OLW

RCP

TB

TC

TG

VCP

SPK

ST

STK

STY

SW

TE

TO

U/G

WW

SPIKE

STREET

STAKE

STORY

SIDEWALK

TEMPORARY EASEMENT

TEMPORARY OCCUPANCY

UNDERGROUND

WING WALL

AH

AZ

BK

b

BRG

c

CS

e

EQ

EXT

HCL

HSD

L

LS

LVC

E f

PC

PI

POL

PSD

PT

PVC

PVI

PVT

R

SC

SSD

ST

STA

T

TGL

TS

VC

FEE ACQUISITION WITHOUT ACCESS

FEE FEE ACQUISITION

ABBR. DESCRIPTION

REPLACE ABBREVIATION "AB" WITH:

ABBR. DESCRIPTION

ABBR. DESCRIPTION ABBR. DESCRIPTION

ABBR. DESCRIPTION

UTILITIES

TOPOGRAPHY (DRAINAGE)

4 INCHES CASED DRILL HOLE

1 INCH SAMPLER (RETRACTABLE PLUG)

2¼ INCHES CASED DRILL HOLE

SICPP SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE

STRMc

RP

TP

SQUARE FEET

GALLON

mi lb LB

MI

(PLANS)

SYMBOL

STANDARD

(SPECS/PROPOSAL)

NOMENCLATURE:

EQUIVALENT

ftq

YDr CUBIC YARDCY

MILES

ACRES

LINEAR FEET

TON TON TON

GAL

POUND

GAL

SF

AC AC

QUANTITIES SHEET

ESTIMATE OF

ITEM PAYMENT UNIT:

" - INCHES

YDq SQUARE YARDSY

LF

CONE PENTROMETER

DA, DM, DN, AND FH WITH:

ABBREVIATION "C" IN CATEGORIES:

INDEX AND ABBREVIATIONS

2 INDEX

AC CONTROL (CENTERLINE)

CB

CBPR

EBLHS

ECT

EDMC

CURTAIN, TURBIDITY

BASELINE

BASELINE, PROJECTION

SHEET PILING

EFNS

EFNV

EWFS

EWM

EWS WETLAND, STATE

WETLAND, MITIGATION AREA

WETLAND, FEDERAL

FENCE, VEGETATION

FENCE, SILT

LABL

LAHR

LAPB

LAWA

LAWE

LFNC

LTRC

LTRD

LWR

LWS

AREA, BRUSH LINE

AREA, HEDGE ROW

AREA, PLANTING BED

AREA, WATERS EDGE

FENCE

TREE ROW, CONIFEROUS

WALL, RETAINING

TREE ROW, DECIDUOUS

WALL, STONE

MDL

MEE

HIGHWAY BOUNDARY

EASEMENT, EXISTING

DEED LINE

RG

RRPSS

BROKEN LINE

TCSW SIGNAL, SPAN WIRE

SM

SSO

SSOC

MULTIPLE POST

STRUCTURE, OVERHEAD

RRS RUMBLE STRIP

STB*

EWF

BR RAIL

BSHT

FENCE, SILT & VEGETATIONEFNSV

WETLAND, FEDERAL AND STATE

SBLB BILLBOARDS

STRUCTURE, OVHD. CANTILEVER

AREA, WOODED AREA OUTLINE

LWH WALL, H PILE

MHB

MHBA HIGHWAY BOUNDARY, APPROX.

MHBW HWY BOUNDARY, FACE OF WALL

MHBWOA HIGHWAY BOUNDARY, W/O ACCESS

MJC JURISDICTION, CITY

MJCY JURISDICTION, COUNTY

MJHD JURISDICTION, HISTORIC DISTRICT

MJLL JURIS., (GREAT, MILITARY) LOT LINE

MJN JURISDICTION, NATION

MJPB JURISDICTION, PUBLIC LANDS

MJS JURISDICTION, STATE

MJT JURISDICTION, TOWN

MJV JURISDICTION, VILLAGE

MPL PROPERTY LOT LINE

PROPERTY LOT LINE, APPROXIMATEMPLA

MSL SUB LOT LINE

GUIDE RAIL, MISCELLANEOUS

RGB GUIDE RAIL, BOX BEAM

RGBM GUIDE RAIL, BOX BEAM, MEDIAN

RGC GUIDE RAIL, CABLE

RGCB GUIDE RAIL, CONCRETE BARRIER

RGW GUIDE RAIL, W BEAM

RGWM GUIDE RAIL, W BEAM, MEDIAN

RPB PARKING BUMPER

RRC RAIL ROAD, CATENARY

RRER RAIL ROAD, 3RD RAIL

RAIL, PHOTO, SMALL SCALE

RRSSS RAIL, SURVEY, SMALL SCALE

DOUBLE BROKEN LINESTDB*

STDL* DOTTED LINE LONG

STDS* DOTTED LINE SHORT

STFB* FULL BARRIER LINE

STH* HATCH LINE

STRCT ROUNDABOUT, CAT TRACKS

STRYL ROUNDABOUT, YIELD LINE

STSB STOP BAR

X WALK, LADDER LINE

* = W (WHITE) OR Y (YELLOW)

BALE, STRAW

MHA HISTORICAL, ACQUISITION

STXLB X WALK, LADDER BAR LINE

STXL

DAM, COFFER

DCP

DCP_P CULVERT PIPE (DIR)

CULVERT PIPE

UC

DSSD SLOTTED DRAIN

CONDUIT, UNDERGROUND

UCH CONDUIT, HANGING

UCO CONDUIT, OVERHEAD

UE ELECTRIC LINE, UNDERGROUND

UEH ELECTRIC LINE, HANGING

UEO ELECTRIC LINE, OVERHEAD

UESS ELECTRIC, SUBSTATIONS

UFO FIBER OPTIC, UNDERGROUND

UFOH FIBER OPTIC, HANGING

UFOO FIBER OPTIC, OVERHEAD

UG GAS, UNDERGROUND

UGH GAS, HANGING

UGO GAS, OVERHEAD

UIC INFORM CABLE, UNDERGROUND

UICH INFORM CABLE, HANGING

OIL LINE, UNDERGROUNDUO

UOH OIL LINE, HANGING

UPBP POLE, BRACE, PUSH BRACE

POLE, GUY WIRE

USA

USAH SANITARY SEWER, HANGING

SANITARY SEWER, UNDERGROUND

UT TELEPHONE, UNDERGROUND

UTH TELEPHONE, HANGING

UTO TELEPHONE, OVERHEAD

UUU UNKNOWN, UNDERGROUND

UUH UNKNOWN, HANGING

UUO UNKNOWN, OVERHEAD

UW WATER LINE, UNDERGROUND

UWH WATER LINE, HANGING

UWO WATER LINE, OVERHEAD

UETO ELECTRIC TRANSMISSION, OVERHEAD

USAF SANITARY SEWER, FORCE MAIN, UGND

USAFH SANITARY SEWER, FORCE MAIN, HANG

UTV

UTVH

UTVO

CABLE TV, UNDERGROUND

CABLE TV, HANGING

CABLE TV, OVERHEAD

UPGW

UNDERDRAINDUD_P

date of such alteration, and a specific description of and notation "altered by" followed by his signature and engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OF

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

6.

5.

4.

3.

2.

1.

HAVE CORRESPONDING EXISTING FEATURES.

FEATURES SHOWN AT THE HEAVIER WEIGHT ARE PROPOSED ONLY AND DO NOT

BE LABELED ON THE PLANS.

SYMBOLOGY (SUCH AS THE PAVEMENT EDGE, PAVEMENT EDGE OF TRAVEL WAY) AND SHOULD

MAPPING FEATURES NOT INCLUDED ON THE LEGEND SHEET DO NOT HAVE A UNIQUE

DRAWINGS).

LINE WEIGHT. LINE WEIGHT FOR PROPOSED FEATURES IS THICKER (0.015 in ON B SIZE

PROPOSED FEATURE SYMBOLOGY IS IDENTICAL TO EXISTING FEATURE SYMBOLOGY EXCLUDING

CORRESPONDING PROPOSED FEATURES.

FEATURES SHOWN ON THE LEGEND AS EXISTING FEATURES ALSO HAVE

UTILITY LINES, ETC.) OR POINT (SIGN, UTILITY POLE, ETC.).

FEATURES ARE SHOWN AS EITHER LINEAR (ROADWAY GUIDERAIL, ROADWAY SIDEWALK,

THE LEGEND ILLUSTRATES MAPPING FEATURES (EXISTING AND PROPOSED).

ALIGNMENT

CONTROL

DRAINAGE

ENVIRONMENTAL

LANDSCAPE

ROW MAPPING

STRIPING

TRAFFIC CONTROL

AD_P

AT_P

DETOUR

DDG_P

DDP_P

DDS_P

DFL_P FLOW LINE

DITCH, STONE LINED

DITCH, PAVED INVERT

DITCH, GRASS LINED

EWAA_P WETLAND, ADJACENT AREA

EDMEC_P

EDMPC_P

EDMSC_P

LFILL_P FILL LIMIT

RRPLS_P

RRSLS_P

TRANSITION CONTROL

SIGNS

STYLE NAME DESCRIPTION

BRIDGE

DESCRIPTIONNAMESTYLE

MEP_P EASEMENT, PERMANENT

MEPA_P EASEMENT, PERMANENT, APPROX.

MET_P EASEMENT, TEMPORARY

META_P EASEMENT. TEMPORARY, APPROX.

MF_P

MFA_P FEE ACQUISITION, APPROXIMATE

MFS_P FEE ACQUISITION, SHAPE

ROADWAY

DESCRIPTIONNAMESTYLE

GUIDE POST

RAIL, PHOTO, LARGE SCALE

RAIL, SURVEY, LARGE SCALE

RGP_P

STPB* PARTIAL BARRIER LINE

SOLID, EDGE

UTILITIES

FEE ACQUISITION, W/ ACCESS

LCUT_P CUT LIMIT

STYLE NAME DESCRIPTION

STSE*

RCZ_P

BARRIER, TEMPORARY

TRAFFIC WORK ZONE

TWZBT_P

CHANNELIZING DEVICETWZCD_P

TWZPMRC_P

TWZBTWL_P

MFWOA_P FEE ACQUISITION, W/O ACCESS

CLEAR ZONE

EDMGSC_P

LIGHTS

BARRIER, TEMPORARY, W/ WARNING

COVERING

PAVEMENT MARKING REMOVAL OR

DAM, EARTHEN CHECK

DAM, GRAVEL BAG/SAND BAG CHECK

DAM, PREFABRICATED CHECK

DAM, STONE CHECK

LINE SYMBOLOGY

LEGEND

3 LEG-1

CBP

CBPOL

CBSP

CBTP

ACC

ACOGO

ACS

AEQNAHD

AEQNBK

AEVT

APC

APCC

API

APOB

APOC

APOE

APOL

APOS

APOT

APOVC

APOVT

APORC

APT

APVC

APVCC

APVI

APVRC

APVT

ASC

ASPI

ASTS

AVEVT

AVHIGH

AVLOW

CENTER OF CURVATURE

COGO

CURVE TO SPIRAL

EQUATION AHEAD

EQUATION BACK

EVENT STATION

SPIRAL TO CURVE

SPIRAL TO SPIRAL

SPIRAL TO TANGENT

TANGENT TO SPIRAL

WETLAND FLAG

DRILL HOLE

ELEVATION, SPOT

FLAG POLE

MAILBOX

PAPER BOX

ROCK, BOULDER

SHRUB, CONIFEROUS

SHRUB, DECIDUOUS

TREE, CONIFEROUS

TREE, DECIDUOUS

TREE, STUMP

SINGLE POST

DELINEATORS

REFERENCE MARKERS

EWFG

GDH

LELS

LFP

LMB

LPB

LPST

LRB

LSHC

LSHD

LTC

LTD

LTS

LUKP

SDEL

SRM

S

CABINET & PAD

CCTV SITE

CDPD TRANSCEIVER

CELL PHONE TOWER

CONDUIT JACK OR BORING

CONTROLLER CABINET

COMMUNICATION PULL BOX

CONDUIT TURNING DOWN

CONDUIT TURNING UP

DEFAULT

TRANSMITTAL READER

FUSION SPLICE

HAR ADVISORY SIGN

HAR SITE

LOAD CENTER

MECHANICAL SPLICE

PEDESTRIAN SIGNAL HEAD

RAMP METER

SOLAR PANEL

WEIGHT IN MOTION DETECTOR

WIRELESS VIDEO REPEATER

WIRELESS VIDEO RECEIVER

WIRELESS VIDEO TRANSMITTER

PERM. OVERHEAD VMS

PERM. VMS

ACCOU. SPEED/COUNT SNSR.SIASCTS

ICABPAD

ICCTV

ICDPD

ICELLT

ICJB

ICNTLCAB

ICPB

ICTD

ICTU

ICVTRT

IEZR

IEZTR

IFOXCAB

IFUSSPL

IHARADV

IHARST

IMECSPL

IMSCS

IMSCTS

IMT

IOVHVMS

IPASCS

IPEDS

IPSS

IPVMS

IRM

IRWIS

ISP

ISST

ITDB

ITP

IVTRT

IWIMD

IWVR

IWVTT

IWVRC

ILC

SPM PARKING METER

SPREAD SPECT. TRANSCEIVER

TELEPHONE DEMARCATION BLK

SUBSURFACE TEMP. PROBE

MICRO SPEED & COUNT SENSOR

A

B

POST, SINGLE

PT., WALL LOCATION

PT., TREE W/ WIRE

PT., STAKE

PT., RAILROAD SPIKE

PT., SPIKE

PT., NAIL

PT., MONUMENT, MISC.

PT., MONUMENT

PT., IRON ROD

PT., IRON PIPE

PT., FENCE LOCATION

PT., DRILL HOLE

HISTORICAL, BLDG. CORNERS

HIGHWAY BNDRY., APPROX.

HIGHWAY BNDRY, PT.

DEED LINE, TYPE 1

DEED LINE, TYPE 2

DEED LINE, TYPE 3

DEED LINE, TYPE 4

DEED LINE, TYPE 5

EASEMENT, EXISTING

BOX, JUNCTION

BOX, PULL BOX

BOX, SPLICE

MICROCOMPUTER CABINET

PED POLE

SIGNAL HEADS

SIGNAL POLE

MDL1P

MHBCP

MPCC

MPDH

MPF

MPIP

MPIR

MPM

MPMM

MPN

MPRS

MPSP

MPST

MPTW

MPWL

TCMC

TCPP

TCSH

TCSP

C

MJCP PT., JURIS. CITY

PT., CROSS CUT

IDEFAULT

POINT OF CURVATURE

POINT OF INTERSECTION

POINT OF BEGINNING

POINT OF CURVATURE

POINT OF END

POINT ON LINE

POINT ON SPIRAL

POINT ON TANGENT

POINT ON VERTICAL CURVE

POINT ON VERTICAL TANGENT

POINT ON REVERSE CURVE

POINT OF TANGENCY

POINT OF VERTICAL CURVATURE

POINT OF VERT. INTERSECTION

POINT OF VERT. REVERSE CURVE

POINT OF VERTICAL TANGENCY

SPIRAL POINT OF INTERSECTION

VERTICAL EVENT POINT

VERTICAL HIGH POINT

BASELINE, POINT

BASELINE, POINT ON LINE

UNKNOWN POINT

RFM

A

COMM. VEH. ROAD TRANSCEIVER

E-ZPASS READER

MICROWAVE TRANSCEIVER

PORT. ACCOU. SPD & CNT. SENSOR

VEHICLE TO RDWY TRANSCEIVER

PORT. SPEED & COUNT SENSOR

FIBER OPTIC X-CONNECT CABINET

PAVEMENT SURFACE SENSOR

RDWY WEATHER INFO. SENSOR

GUIDE RAIL, ANCHOR

GUIDE POST, SINGLE

RGA

RGP

CPBM BENCHMARK

POINT, HORIZ. PHOTOGRAMMETRY

POINT, SURVEY MARKER, PERM.

CPSV

CPSM

CPH

ATS

AST

MDL2P

MDL3P

MDL4P

MDL5P

MEEP

MHBP

TCBJ

TCBP

TCBS

POINT OF C0MPOUND CURVATURE

POINT OF VERT. CMPND CURVE

VERTICAL LOW POINT

BASELINE, SPUR POINT

BASELINE, TIE POINT

MHBAP

POINT, VERT., PHOTOGRAMMETRY

DINV

DS STRUCTURE, RECTANGULAR

INVERT ANTENNASIANT P

GAS, METER

GAS, MANHOLE

GAS, LINE MARKER

GAS/FUEL PUMP

GAS, VALVE

GAS, VENT

LIGHTING, POLE

LIGHTING, POLE, MEDIAN

LIGHTING, POLE, PED.

MISC. FILLER CAP

OIL, LINE MARKER

TELEPHONE, LINE MARKER

TELEPHONE, MANHOLE

CABLE TV, LINE MARKER

CABLE TV, PULL BOX

UNKNOWN, MANHOLE

UNKNOWN, VALVE

WATER, FIRE HYDRANT

WATER, METER

WATER, MANHOLE

WATER, VALVE

WATER, WELL

UGM

UGMH

UGLM

UGP

UGV

UGVT

ULP

ULPM

ULPP

UMFC

UOLM

UP

UPD

UPL

USMH

UTB

UTLM

UTMH

UTVPB

UUJB

UUMH

UUVL

UWFH

UWM

UWMH

UWV

UWW

G

G

O

P

T

C

C

W

W

UNKNOWN, JUNCTION BOX

UTVLM

FP

S

T

W

UUB UNKNOWN, BOX

UUPB UNKNOWN, PULL BOX

UUVT UNKNOWN, VENT

U UUW UNKNOWN, WELL

ELECTRIC, BOX

ELECTRIC, METER

ELECTRIC, MANHOLE

ELECTRIC, POLE, TRANS.

UEB

UEM

UEMH

UEPT

E

E

E

DSMTXX_P

G

A

A

P

LC

PM

M

VMS

PA

PVMS

RWIS

POLE, WITH UTILITY

POLE, DEAD (NO UTILITY)

POLE, WITH LIGHT

SANITARY SEWER MANHOLE

TELEPHONE, BOOTH

DSI STRUCTURE, INVERT

DSM STRUCTURE, MANHOLE

DSR STRUCTURE, ROUND

DST"X"CB P

STRUCTURE, RECT., TYPE "X"

DST"X" P

WIM

"XX" = 48, 60, 72, 96

TYPE "XX"

STRUCTURE, MANHOLE,

TYPE "X"

STRUCTURE, RECT., WITH CURB

"X" = I, K, L, M, O, P, U

"X" = F, G, N, O, P, R date of such alteration, and a specific description of and notation "altered by" followed by his signature and engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OFX

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BYAEQN EQUATION

ALIGNMENT

BRIDGE, SCUPPER

TRAP, SEDIMENT

LANDSCAPE

GEOTECHNICAL

ENVIRONMENTAL

ITS

EASEMENT, PERM., SHAPE

EASEMENT, PERM., APPROX.

ROW MAPPING

TRAFFIC CONTROL

UTILITIES

EASEMENT, PERM., BACK LINEEASEMENT, PERM., BACK LINE

MEPAP_P

EIOP_P

ETRS_P

ADPI_P

CDPD

C

C

EZ

EZ-T

XC

H

M R

M

SS

TC

TP

WVR

V

V

CELL DESCRIPTION CELL CELL CELLDESCRIPTION DESCRIPTION DESCRIPTION

DETOUR, POINT OF INTERSECT.

DETOUR, POINT ON LINE

BSC

RISER, CONCRETE BOXERCB

LTW P TREE, WELL OR WALL

SINGLE POST, PROPOSED

BACK TO BACK, PROPOSED

NAMENAME NAME NAME

SRSC3

SRSC4

SRSCT2

SRSCT4

SRSI

SRSN2

SRSN3

SRSS2

SRSS3

SRSS4

A

A

FEE ACQUISITION, SHAPE

MPBC PT., BUILDING CORNER

DESCRIPTIONNAMECELLCELL NAME DESCRIPTION

ROW ACQUISITION

MFS_P_T

PE

MEPS_P_T EASEMENT, PERMANENT

TE

METS_P_T EASEMENT, TEMPORARY

TO

METS_P_T OCCUPANCY, TEMPORARY

MFS_P_T

FEE WO/A

P1

M1

M1

P1

M1

P1

M1

P1

M1

P1

FEE

FEE ACQUISITION

BRIDGE

CONTROL

TRAFFIC WORK ZONE

TWZBCD_P

ROADWAY

RES P ELEVATION, SPOT

SIGNS

TWZCMS_P CHANGEABLE MESSAGE SIGN (PVMS)

TWZFLG_P FLAGGER

TWZFT_P FLAG TREE

TWZIA_P

TWZSDT_P

TWZAP_P ARROW PANEL

TWZAPC_P ARROW PANEL, CAUTION MODE

TWZAPT_P ARROW PANEL, TRAILER OR SUPPORT

TWZWVA_P

SYMBOL, DIRECTION OF TRAFFIC

TWZSDTD_P

LUMINAIRE (TEMPORARY)

TWZSGN_P SIGN (TEMPORARY)

TWZSIG_P

TWZWL_P WARNING LIGHT

TWZWV_P WORK VEHICLE

BARRICADE (TYPE III)

TWZLUM_P

GB

SF

H/S

PRFB

CULV

DRAINAGE

S_P

SB_P

SHLD, INTERSTATE

SHLD, NATIONAL, 2 DIG.

SHLD, NATIONAL, 3 DIG.

SHLD, STATE, 2 DIG.

SHLD, STATE, 3 DIG.

SHLD, STATE, 4 DIG.

SHLD, CTY, 123 DIG.

SHLD, CTY, 4 DIG.

SHLD, CTY TOUR, 1-2 DIG.

SHLD, CTY TOUR, 3-4 DIG.

STR., INLET PROT., GRAVEL BAG

STR., INLET PROT., HAY/STRAW

STR., INLET PROT., PREFAB.

STR., INLET PROT., SILT FENCE

STR., INLET, OUTLET PROT.

MEPP_P

MEPSP_P

MFAP_P

MFP_P

MFSP_P

EIPGB_P

EIPHS_P

EIPP_P

EIPSF_P

ADPL_P

FEE ACQUISITION, BACK LINE

FEE ACQUISITION, APPROX.

FEE ACQUISITION W/O ACCESS

CRASH CUSHION (TEMPORARY)

IMPACT ATTENUATOR /

TRAFFIC DETOUR

SYMBOL, DIRECTION OF TEMPORARY

(TEMPORARY)

SIGNAL, TRAFFIC OR PEDESTRIAN

MOUNTED ATTENUATOR

WORK VEHICLE WITH TRUCK

v CORRESPONDING EXISTING FEATURES.

6. FEATURES SHOWN AT THE HEAVIER WEIGHT ARE PROPOSED ONLY AND DO NOT HAVE

v SHOULD BE LABELED ON THE PLANS.

v SYMBOLOGY (SUCH AS THE PAVEMENT EDGE, PAVEMENT EDGE OF TRAVEL WAY) AND

5. MAPPING FEATURES NOT INCLUDED ON THE LEGEND SHEET DO NOT HAVE A UNIQUE

v (0.015 in ON B SIZE DRAWINGS).

v EXCLUDING LINE WEIGHT. LINE WEIGHT FOR PROPOSED FEATURES IS THICKER

4. PROPOSED FEATURE SYMBOLOGY IS IDENTICAL TO EXISTING FEATURE SYMBOLOGY

v CORRESPONDING PROPOSED FEATURES.

3. FEATURES SHOWN ON THE LEGEND AS EXISTING FEATURES ALSO HAVE

v UTILITY LINES, ETC.) OR POINT (SIGN, UTILITY POLE, ETC.).

2. FEATURES ARE SHOWN AS EITHER LINEAR (ROADWAY GUIDERAIL, ROADWAY SIDEWALK,

1. THE LEGEND ILLUSTRATES MAPPING FEATURES (EXISTING AND PROPOSED).

POINT SYMBOLOGY

LEGEND

LEG-24

engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OF

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

DESCRIPTIONITEM UNIT

203.02 CY

203.03 EMBANKMENT IN PLACE

CY 304.12 SUBBASE COURSE, TYPE 2

TON

TON

TON

407.0102 DILUTED TACK COAT

DESCRIPTIONITEM

418.7603 ASPHALT PAVEMENT JOINT ADHESIVE LF

LF

NOTES:UNIT

606.10

SY

404.0982

404.1989

404.3789

9.5 F2 TOP COURSE ASPHALT, 80 SERIES COMPACTION

19 F9 BINDER COURSE ASPHALT, 80 SERIES COMPACTION

37.5 F9 BASE COURSE ASPHALT, 80 SERIES COMPACTION

ITEM 304.12

12" SUBBASE

(NOTE 2)

ITEM 418.7603

JOINT ADHESIVE

T.G.L

H.C.L

ITEM 404.1989

2" BINDER COURSE

ITEM 404.0982

1½" TOP COURSE

ITEM 610.1605

PERFORMANCE (TYP.)

4" TURF ESTABLISHMENT

ITEM 606.10 (SEE NOTE 3)

BOX BEAM GUIDE RAIL (TYP.)

TRAVEL LANE TRAVEL LANE

2.0%

FULL DEPTH RECONSTRUCTION

ITEM 404.3789

6" BASE COURSE

TYPICAL SECTION

2.0%

STA. 1+15 TO STA. 1+85

610.1605

BOX BEAM GUIDE RAILING

TURF ESTABLISHMENT PERFORMANCE

10 0 10

1" = 10'

SCALE: 1" = 10'

VARIES

SCALE: 1" = 10'

ITEM 404.1989

2" BINDER COURSE

ITEM 404.0982

1½" TOP COURSE

ITEM 606.10 (SEE NOTE 3)

BOX BEAM GUIDE RAIL (TYP.)

ITEM 610.1605

PERFORMANCE (TYP.)

4" TURF ESTABLISHMENT

4'-0"11'-0"11'-0"4'-0"2'-3"

TRAVEL LANE TRAVEL LANE

2.0% 2.0%

2.0% 2.0%

2 (MAX.)

T.G.L

H.C.L(NOTE 2)

ITEM 418.7603

JOINT ADHESIVE

2 (MAX.)

STA. 0+75 TO STA. 1+15 & STA. 1+85 TO 2+25

SHOULDER RECONSTRUCTION & RESURFACING

SHLDR

VARIES

SHLDRSHLDRV.C.S. V.C.S.

2.0%

2.0%

VARIES VARIES

2 (MAX.)

2 (MAX.)

V.C.S. SHLDR V.C.S.

ITEM 203.03 (TYP.)

ITEM 203.03 (TYP.)

ITEM 404.3789

6" BASE COURSE (TYP.)

6.

5. THE CONTRACTOR SHALL PROVIDE THE VEGETATION CONTROL STRIP (V.C.S.) TO BE AN EXTENSION OF THE 9.5 F2 TOP COURSE ASPHALT, 80 SERIES COMPACTION.

4. SUBGRADE SLOPE SHALL MATCH THE PAVEMENT SLOPE.

3. SEE DWG. NO. MST-1 AND ST-8 FOR GUIDE RAIL LIMITS AND RAILING LAYOUT.

2. ASPHALT PAVEMENT JOINT ADHESIVE SHALL BE PLACED ON ALL TOP COURSE PAVEMENT JOINTS OR A.O.B.E.

1. ITEM 407.0102 - DILUTED TACK COAT TO BE PLACED BETWEEN ALL LIFTS. SEE SPECIFICATION FOR APPLICATION RATES.

ITEM 490.30

MISC. COLD MILLING

CY 490.30 MISC. COLD MILLING

UNCLASSIFIED EXCAVATION AND DISPOSAL

ITEM 203.02 (TYP.)

ITEM 627.50140008

@ BEGIN/END FULL DEPTH RECONSTRUCTION

CUTTING PAVEMENT

ITEM 203.02 (TYP.)

5 TYP-1

SY

GAL

ITEM 627.50140008

CUTTING PAVEMENT (TYP.)

ROUND 4' V.C. (TYP.)

ROUND 4' V.C. (TYP.)

EXISTING GROUND

EXISTING GROUND

2'-3" 4'-0" 11'-0"11'-0" 4'-0" 2'-3"

2'-3"

(DAYLIGHT WHERE POSSIBLE)

ITEM 304.12

SUBBASE (TYP.)

(DAYLIGHT WHERE POSSIBLE)

ITEM 304.12

SUBBASE (TYP.)

engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OF

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

(30" x 24")

M4-9RBR

DETOUR

DETOUR

(30" x 24")

M4-9LBR

A

B

C

H

D

I road CLOSED

(60"x12")

D3-1*

(48"x18")

M4-10R

LOCAL TRAFFIC ONLY

(48"x18")

M4-10L

(60"x12")

D3-1*

(24"x18")

M4-8a

(60"x12")

D3-1*

(60"x12")

D3-1*

ROAD CLOSED

LOCAL TRAFFIC ONLY

F

E

J

GRID

NORTH

(SEE WZP-2 FOR CLOSURE DETAILS)

PROJECT LOCATION

FLASHERS

INTENSITY

WITH LOW

(60"x30")

R11-3b

FLASHERS

INTENSITY

WITH LOW

(60"x30")

R11-3b

(30"x24")

M4-9

ON TYPE III BARRICADE

ON TYPE III BARRICADE

ON TYPE III BARRICADES

NOT TO SCALE

DETOUR PLAN

MILES AHEAD2

MILES AHEAD2

G

CLOSED

ROAD

FLASHERS

INTENSITY

WITH LOW

(48"x30")

R11-2 (MOD)

MELVIN HILL ROAD DETOUR PLAN

TRAFFIC CONTROL SIGN FACE TABLE

MELVIN HILL ROAD WORK ZONE

D A

O R

L

LI

H

NI

V

L E

M

DETOURDETOUR

DETOURDETOUR

DETOURDETOUR

DETOUR

END

Melvin Hill Rd

Melvin Hill Rd

Melvin Hill Rd

Melvin Hill Rd

A

I

A

L

L

L

M E

L V

IN

H

IL

L

R O

A D

32-RC

DAOR HTIFFIRG

A

T O

L L

R O

A D

32-RC

CASE ROAD

JO

N

E S

R O

A D

DAOR HTIFFIRG

M E L

V

IN

IL

L

R

O A

D

J

BL

CL

K

B

K

(36"x36")

W20-2

1000 FT

DETOUR

C

C

D

B

D

K

K

L

1000'

1000'

1000' 1000'

1000'

G

F

E

G

F

E

A

SIGN (TEMPORARY)

WORK ZONE TRAFFIC CONTROL LEGEND

WORK AREA

FLASHERS

INTENSITY

WITH LOW

(36"x36")

W20-3

5. A PERMIT FROM ONTARIO COUNTY WILL BE NEEDED FOR THE PORTION OF THE DETOUR USING CR 23 AND IS THE RESPONSIBILITY OF THE CONTRACTOR.

4. ALL SIGNS AND DEVICES SHALL BE PLACED WITHIN THE RIGHT OF WAY.

3. (*) TYPEFACE IS TO BE "FHWA SERIES D" IN ACCORDANCE WITH "STANDARD ALPHABETS FOR TRAFFIC CONTROL DEVICES."

2. "MELVIN HILL RD" SIGNS TO BE WHITE ON GREEN.

1. SEE NYSDOT STANDARD SHEET 619.503 SHEET 2 OF 3 FOR SIGN PLACEMENT DISTANCES.

NOTES:

A

500 FT

CLOSED

road

1000 FT

CLOSED

road

1500 FT

CLOSED

road

FLASHERS

INTENSITY

WITH LOW

(36"x36")

W20-3

FLASHERS

INTENSITY

WITH LOW

(36"x36")

W20-3

(60" x 36")

R11-3a (MOD)

L

A

I

J

6 WZP-1

CR23 AND GRIFFITH ROAD

CLOSED BETWEEN

MELVIN HILL ROAD

L.820, P.298

TMP# 61.00-1-65

BEVERLY J. TIFFANY

DONALD W. TIFFANY &

LANDS N/F

L.802, P.121

TMP# 61.00-1-68.1

JANICE E. TALLY

LANDS N/F

L.1352, P.154

TMP# 61.00-1-67.131

FARMS LLC

DeBOOVER FAMILY

LANDS N/F

L.411, P.531

TMP# 61.00-1-67.132

HORACE J. RICHMOND

LANDS N/F

date of such alteration, and a specific description of and notation "altered by" followed by his signature and engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OFX

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

(66' WIDE)

MELVIN HILL ROAD

(66' WIDE)

MELVIN HILL ROAD

(SEE NOTE 3)

W20-3

(SEE NOTE 2)

ITEM 619.04 (TYP.)

WITH WARNING LIGHTS

TYPE III CONSTRUCTION BARRICADES

(SEE NOTE 2)

ITEM 619.04 (TYP.)

WITH WARNING LIGHTS

TYPE III CONSTRUCTION BARRICADES

WORK ZONE - ROAD CLOSURE AND RECONSTRUCTION AREA

TEMPORARY SIGN

WORK ZONE TRAFFIC CONTROL LEGEND

TEMPORARY POSITIVE BARRIER WITH WARNING LIGHTS (SEE NOTE 2)

SHALL BE INCLUDED UNDER ITEM 619.01.

ADDITIONAL SIGNINGS, FLAGGERS, OR TRAFFIC CONTROL DEVICES

THE 619 SERIES OF NYSDOT STANDARD SHEETS. PAYMENT FOR ANY

LANE AND SHOULDER CLOSURE, REFER TO THE APPLICABLE SHEETS IN

FOR ADDITIONAL DETAILS ON WORK ZONE TRAFFIC CONTROL, SUCH AS1.

GENERAL NOTES CONTINUEDGENERAL

NYSDOT STANDARD SHEETS FOR WORK ZONE TRAFFIC CONTROL

CONTRACTOR VEHICLES AND WORK AREA

NOTIFICATIONS AND EMERGENCY ACCESS

(TYP.)

(SEE NOTE 3)

W20-3

TYPE "A" FLASHER PAYMENT UNDER ITEM 619.04

TYPE III BARRICADE (ITEM 619.04) WITH WARNING LIGHT (SEE NOTE 2)

(SEE NOTE 3)

W20-3

(SEE NOTE 3)

W20-3

WORK ZONE TRAFFIC CONTROL - APPROACH SIGNS / ROAD CLOSURE DETAIL

NOT TO SCALE

CONTROL

WORK ZONE TRAFFIC

G

R I D

N O

R T

H

WORK ZONE TRAFFIC CONTROL ITEM 619.01.

NECESSARY. THE COST OF ANY RADIO OR FIELD TELEPHONES USED SHALL BE INCLUDED IN THE PRICE BID FOR BASIC

ONE (1) FLAGGER IS NOT VISIBLE TO THE OTHER, OR IF IN THE OPINION OF THE ENGINEER, THIS COMMUNICATION IS

BE REQUIRED TO USE RADIO OR FIELD TELEPHONE CONTACT WHEN THEY ARE MAINTAINING ONE-WAY TRAFFIC AND

WHENEVER TRAFFIC IS LIMITED TO ONE-WAY OPERATION, FLAGGERS SHALL BE UTILIZED. THE FLAGGERS WILL8.

SURFACE DURING NON WORKING HOURS OR A.O.B.E.

THE CONTRACTOR SHALL SCHEDULE OPERATIONS SO THAT TRAFFIC WILL BE MAINTAINED ON A PAVED AND/OR GRAVEL7.

FLOODLIGHTS.

OPERATION IS NECESSARY BEYOND DAYLIGHT HOURS, THE FLAGGERS AND WORK ZONE SHALL BE ILLUMINATED BY

LIGHTS SHALL BE PROVIDED BY THE CONTRACTOR AND PLACED AS DIRECTED BY THE ENGINEER. IF A FLAGGING

OPERATIONS COMMENCE PRIOR TO DAWN OR CONTINUE BEYOND DUSK, FLASHING BEACONS AND STEADY BURNING

WHEN THE VISIBILITY OF THE TRAVELING PUBLIC IS RESTRICTED DUE TO WEATHER CONDITIONS AND/OR THE WORK6.

NECESSARY TO ENSURE THAT SAFE ACCESS IS PROVIDED AND USED.

WHEN THERE IS ANY INDICATION THAT WORK SITE ACCESS IS A SAFETY CONCERN, SPECIFIC PROVISIONS MAY BE5.

SUPPLY/DELIVERY VEHICLES ENTERING OR DEPARTING THE WORK SITE MUST BE PROVIDED AT ALL TIMES.

TO FACILITATE SAFE ACCESS, ADEQUATE SIGHT DISTANCE FOR CONSTRUCTION WORKERS, EQUIPMENT, AND4.

BE PLACED THAT DAY.

NO MATERIAL IS TO BE STORED WITHIN 30 FEET FROM THE EDGE OF PAVEMENT, EXCEPT THAT WHICH IS TO3.

WHERE EXISTING PAVEMENT OBSTRUCTIONS ARE CLOSER TO THE ROADWAY.

PROVIDE A 30 FOOT CLEAR ZONE OFFSET FROM THE EDGE OF THE ROADWAY. THE CLEAR ZONE OFFSET MAY BE REDUCED

CONSTRUCTION EQUIPMENT SHALL BE REMOVED FROM THE ROADSIDE AREA DURING ALL NON-WORKING HOURS.2.

THEIR MATERIALS WHERE IT IS DEEMED A HAZARD TO TRAFFIC BY THE ENGINEER.

ENVIRONMENTALLY SENSITIVE AREAS. THE CONTRACTOR SHALL NOT PARK EQUIPMENT OR STORE

THE PAVEMENT OR SHOULDERS ALONG A ROADWAY BEING USED BY THE GENERAL PUBLIC NOR ON

VEHICLES BELONGING TO OR USED BY THE CONTRACTOR OR WORKERS SHALL NOT BE PARKED ON1.

(SEE NOTE 4)

R11-2 (MOD)

UTILITIES

ENSURE THAT THERE ARE NO TRAFFIC CONTROL CONFLICTS.

WORK OR OTHER CONSTRUCTION OPERATION IN THE AREA, TO

ANY UTILITY WORK, SUBCONTRACTOR WORK, PUBLIC MAINTENANCE

THE CONTRACTOR SHALL COORDINATE ALL CONTRACT WORK WITH1.

(SEE NOTE 2)

ITEM 619.1711

CATEGORY 1 (PINNING PROHIBITED)

TEMPORARY POSTIVE BARRIER -

500'500'

(TYP.)

(SEE NOTE 3)

W20-3

(SEE NOTE 3)

W20-3

(TYP.)

500'

COORDINATION WITH THE TOWN OF PHELPS AND ONTARIO COUNTY DEPARTMENT OF PUBLIC WORKS. 2.

CLOSURE.

THE TOWN OF PHELPS WILL NOTIFY PUBLIC SCHOOLS AND EMERGENCY SERVICES ONE (1) WEEK PRIOR TO THE ROAD

THE CONTRACTOR SHALL NOTIFY THE TOWN OF PHELPS AT LEAST TWO (2) WEEKS IN ADVANCE OF THE ROAD CLOSURE.1.

STANDARD SPECIFICATIONS.

ALL DROP OFFS SHALL BE PROTECTED AS OUTLINED IN SECTION 619 OF THE8.

SATISFACTION OF THE ENGINEER) AT THEIR SOLE COST AND EXPENSE.

CONTRACTOR, SHALL BE RESTORED, REPLACED OR REPAIRED (TO THE

THAT ARE NOT SCHEDULED TO BE REPLACED, AND ARE DAMAGED BY THE

SIDEWALKS, AND OTHER APPURTENANCES LOCATED WITHIN THE CONTRACT LIMITS

DEEMS NECESSARY OR A.O.B.E.. LOCAL STREET PAVEMENTS, CURBS, VEGETATIONS,

SUCH HANDLING OF EQUIPMENT, AND TAKE SUCH PROTECTIVE MEASURES AS HE

AND REGULATIONS, AND DIRECTIONS OF THE LOCAL MUNICIPALITIES RELATIVE TO

THROUGH LOCAL STREETS. THE CONTRACTOR SHALL OBSERVE ALL OF THE RULES

PAVEMENT, CURBS AND SIDEWALKS WHEN IT IS NECESSARY TO MOVE EQUIPMENT

THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO AVOID DAMAGING EXISTING 7.

MAY ORDER ADDITIONAL DEVICES AND/OR METHODS TO MEET FIELD CONDITIONS.

RECOMMENDED METHODS AND CONTROL DEVICES NECESSARY. THE ENGINEER

THE WORK ZONE TRAFFIC CONTROL SCHEMES SHOWN IN THESE PLANS DESCRIBE THE 6.

NYSDOT 619 STANDARD SHEETS.

CONTROL DEVICES, SECTION 619 OF THE NYSDOT STANDARD SPECIFICATIONS AND

DEVICES", THE NEW YORK STATE SUPPLEMENT TO THE "MANUAL OF UNIFORM TRAFFIC

ACCORDANCE WITH THE 11TH EDITION OF THE "MANUAL OF UNIFORM TRAFFIC CONTROL

TEMPORARY TRAFFIC CONTROL DEVICES, DELINEATOR SIGNS, AND BARRICADES IN

THE CONTRACTOR WILL BE REQUIRED TO PROVIDE, ERECT, AND MAINTAIN NECESSARY5.

ZONE TRAFFIC CONTROL.

TEMPORARY SIGN SUPPORT SHALL BE INCLUDED IN PRICE BID FOR ITEM 619.01-BASIC WORK

SIGN SUPPORT BEHIND THE TYPE III BARRICADES AT A MOUNTING HEIGHT OF 5 FEET. COST OF

THE CONTRACTOR SHALL INSTALL THE "BRIDGE CLOSED" (R11-2 (MOD)) SIGN ON ITS OWN TEMPORARY4.

ALL SIGNS AND DEVICES SHALL BE PLACED WITHIN THE RIGHT OF WAY.3.

INCLUDED IN THE COST OF 619.01 - BASIC WORK ZONE TRAFFIC CONTROL.

MOVING AND RESETTING THE TYPE III BARRICADES AND TEMPORARY POSITIVE BARRIERS SHALL BE

TEMPORARY POSITIVE BARRIER AND TYPE III BARRICADES FOR DAILY OPERATIONS. THE COST OF

PLACEMENT OF THE ITEMS, NO EXTRA PAYMENT WILL BE MADE FOR MOVING AND RESETTING THE

THE TYPE III BARRICADES AND TEMPORARY POSITIVE BARRIER WILL ONLY PAY FOR THE INITIAL

THE LOCATION OF THE TEMPORARY POSITIVE BARRIER IS TO BE DETERMINED BY THE ENGINEER.2.

LATEST VERSION OF THE NYSDOT STANDARD SHEETS OR AS SHOWN ON THIS SHEET.

THE SIGN PANEL DIMENSIONS SHALL BE AS LISTED IN THE SIGN TABLE FOR SECTION 619 OF THE1.

1500 FT

CLOSED

ROAD

1000 FT

CLOSED

ROAD

500 FT

CLOSED

ROAD

500 FT

CLOSED

ROAD

1000 FT

CLOSED

ROAD

1500 FT

CLOSED

ROAD

CLOSED

ROAD

THE CONTRACTOR SHALL REFERENCE STANDARD SHEET 619-503 FOR ADDITIONAL GUIDANCE.13.

A.0.B.E.

CURVES AND TAPERS WITHIN THE PROJECT. CLOSER SPACING MAY BE REQUIRED IN OTHER AREAS, OF 30 FEET. THE CONTRACTOR SHALL REDUCE THE SPACING TO 15 FEET THROUGH ALL HORIZONTAL

CHANELIZING DEVICES CONFORMING TO NYSDOT REQUIREMENTS SHALL BE SPACED AT A DISTANCE12.

DIRECTING TRAFFIC SHALL BE COVERED.

TO OPERATIONS DURING ANY ONE PHASE. FINAL SIGNS IN PLACE BUT NOT IN USE FOR

TAKEN TO ENSURE THAT FINAL SIGNING AND PAVEMENT MARKINGS WILL NOT BE CONTRADICTORY

PORTIONS OF THE PROJECT. TO ACCOMMODATE FINAL AND/OR DETOUR PATTERN, CARE MUST BE

APPROPRIATE. ALL SIGNS AND MARKINGS MUST BE IN PLACE BEFORE THE OPENING OF ANY

PROGRESS WITH THE INSTALLATION OF PERMANENT SIGNING AND PAVEMENT MARKINGS AS11.

ENGINEER IN CHARGE.

EFFORTS TOWARD PROTECTION OF TRAFFIC AND PERSONNEL SHALL BE THE

OPERATIONS. THE SOLE JUDGE OF THE EFFECTIVENESS OF THE CONTRACTOR'S

ARE IN PLACE AND IN GOOD CONDITION PRIOR TO COMMENCING ANY CONSTRUCTION

BE RESPONSIBLE FOR MAKING SURE ALL SIGN, CONES, DRUMS, BARRICADES, ETC.

IN ORDER TO MAINTAIN EFFECTIVE TRAFFIC CONTROL, THE CONTRACTOR SHALL 10.

AND WITH THAT OF THE AFFECTED UTILITY COMPANIES.

OPERATIONS SO AS TO BE IN CONFORMANCE WITH THE TRAFFIC CONTROL PLANS,

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THEIR CONSTRUCTION 9.

7 WZP-2

ELEV 614.31'

E 689,979.243

N 1,071,210.963

REBAR W/ RAVI CAP

CP 20 (STA 15+00.09)

ELEV 617.70'

E 689,778.008

N 1,071,668.778

REBAR W/ RAVI CAP

CP 30 (STA 10+00.00)

ELEV 619.16'

E 690,042.558

N 1,071,029.426

REBAR W/ RAVI CAP

CP 10 (STA 16+92.35)

TIES NOT TO SCALE

GRASS

CP 30 STA. 10+00.00

EASTING 689,778.008

NORTHING 1,071,668.778

NYSPCS NAD 83(2011) CENTRAL ZONE

CP 20

CP 30

GRASS

GRASS

TIES NOT TO SCALE

CP 20 STA. 15+00.09

EASTING 689,979.243

NORTHING 1,071,210.963

NYSPCS NAD 83(2011) CENTRAL ZONE

CP 30

CP 20

CP 10

GRASS GRASS

GRASS

EASTING 690,042.558

NORTHING 1,071,029.426

NYSPCS NAD 83(2011) CENTRAL ZONE

CP 10 STA. 16+92.35

TIES NOT TO SCALE

CP 20

CP 10

POLE

DEAD UTILITY

#19A

HEADWALL

DELAP CONC

M E T

A L

C U

LV

E R T

OTTCO 45

NYSEG 20A

CONC HEADWALL

INV. 613.99'

P

11+00 12+00

13+00 14+00

15+00 16+00

2025 SURVEY BASELINE

2025 SURVEY BASELINE

APPROX. 230 FEET WEST OF CULVERT.

BONNET BOLT OF FIRE HYDRANT LOCATED

BENCHMARK IS A CHISELED "X" ON THE EASTERLY

BM #1 ELEV=616.06'

LOCATED APPROX. 35 FEET EAST OF CULVERT.

EASTERLY FACE OF UTILITY POLE NYSEG 20A

BENCHMARK IS A RAILROAD SPIKE SET ON THE

BM #2 ELEV=611.14'

date of such alteration, and a specific description of and notation "altered by" followed by his signature and engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OFX

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

PIPE

IRON

A S P

H A

LT

DITCH

DITCH

MELVIN HILL ROAD

#1898

MB

2025 SURVEY BASELINE

IN FRONT 1 STORY RANCH HOUSE NUMBER 1898.

SIDE OF MELVIN HILL ROAD IN THE GRAVEL SHOULDER

CP 30 IS A REBAR W/RAVI CAP SET ON THE WESTERLY

.6

46.9'

21.2'

DITCH DITCH

AGRICULTURAL FIELD

EDGE OF TREES

2025 SURVEY BASELINE

2025 SURVEY BASELINE

MELVIN HILL ROAD

TREES

OF

EDGE

25.2'

1.4

HDWL

NE COR

OTTCO 45

NYSEG 20A

.5

MILLINGS

DITCH

AGRICULTURAL FIELD

DITCH

MARKER

GAS LINE

MARKER

GAS LINE

WITNESS POST

8' WOOD

MELVIN HILL ROAD

2025 SURVEY BASELINE

METAL CULVERT HEADWALL.

NYSEG 20A LOCATED APPROX. 25 FEET SOUTHERLY FROM

SIDE OF MELVIN HILL ROAD ADJACENT TO UTILITY POLE

CP 20 IS A REBAR W/RAVI CAP SET ON THE EASTERLY

FROM METAL CULVERT HEADWALL.

TRACTOR PATH LOCATED APPROX. 217 FEET SOUTHERLY

SIDE OF MELVIN HILL ROAD ADJACENT TO GRAVEL

CP 10 IS A REBAR W/RAVI CAP SET ON THE EASTERLY

21.

0'

18.2'

.0

SURVEY CONTROL

100 100 2000

1" = 100'

OF IMPROVEMENTSc

0+00 1+00 2+00 3+00

.0

P O

B

.0

P O

E

.0

P I

.0

P I

8 SCS-1

OTHERWISE NOTED. COORDINATES REPORTED ARE GRID.

ALL DISTANCES AND COORDINATES IN THE U.S. SURVEY FEET UNLESS

NOTES

TRIGONOMETRIC MEASUREMENTS.

BENCHMARKS BY A COMBINATION OF GPS SURVEY METHODS AND

DATUM. ELEVATIONS WERE ESTABLISHED FOR A BASELINE AND PROJECT

THE ELEVATIONS SHOWN HEREON ARE REFERENCED TO N.A.V.D. 88

VERTICAL CONTROL

SURVEY METHODS AND CONVENTIONAL METHODS.

COORDINATES WERE ESTABLISHED BY A COMBINATION OF GPS

TRANSVERSE MERCATOR PROJECTION, WESTERN ZONE. BASELINE

NEW YORK STATE PLANE COORDINATE SYSTEM, N.A.D. 83(2011)

THE HORIZONTAL DATUM SHOWN HEREON IS REFERENCED TO THE

HORIZONTAL CONTROL

engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OF

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

MISCELLANEOUS TABLES

GRAVEL DRIVEWAY

N.T.S.

ITEM 203.02

DISPOSAL PAYMENT LIMIT

UNCLASSIFIED EXCAVATION AND

GROUND

EXISTING

11' FROM CENTERLINE

NO CHANGES WILL BE MADE TO THE MAINTENANCE JURISDICTION AS A RESULT OF THIS PROJECT.3.

FOR RAILING LAYOUT AND PAVEMENT MARKING PLAN PLEASE SEE DWG. NO. ST-8.2.

SEE GENERAL PLAN SHEET FOR DRIVEWAY LOCATION.1.

NOTES:

ITEM 304.12

9" THICK DRIVEWAY

14'-0" c

9 MST-1

6" LINDEN

8" LINDEN

8" LINDEN

CHERRY

10"

CHERRY

10"

WALNUT

24"

COTTONWOOD

16"

COTTONWOOD

16"

COTT.

36"

LINDEN

6"

PINE

24"

ASH

16" WILLOW

10"

COTT.

36"

LINDEN

16"

LINDEN

8"

WALNUT

16"

COTTONWOOD

24"

8" CHERRY

MULTI BOLE

CRABAPPLE

6"

GRASS

GRASS

GRASS

GRASS GRASS

GRASS

#1909

PR86

OTTCO 45

NYSEG 20A

date of such alteration, and a specific description of and notation "altered by" followed by his signature and engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OFX

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

0+00 1+00 2+00 3+00

STONE WALL

MB

MARKER

DRIVEWAY

PLASTIC

ASPHALT

16"

DITCH

DITCH

DITCH

DITCH

AGRICULTURAL FIELD

AGRICULTURAL FIELD

G R

A V E L

EDGE OF TREES

E D

G E

O F

T R E E S

EDGE OF TREES

EDGE O

F TREES

(66' WIDE)

MELVIN HILL ROAD

(66' WIDE)

MELVIN HILL ROAD

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

G R I D

N O

R T

H

40'0'

1" = 40'

80'

GENERAL EROSION AND SEDIMENT CONTROL NOTES:

SLOPE PROTECTION MATERIALS, A.O.B.E.

AND SHALL REMAIN IN PLACE UNTIL THE NEW SLOPES ARE STABILIZED WITH SEED AND/OR

ALL CONTROL MEASURES SHALL BE PLACED PRIOR TO STARTING EARTH WORK OPERATIONS 12.

ITEMS SHOWN.

WATER POLLUTION CONTROL DEVICES SHALL BE PAID FOR UNDER THE APPROPRIATE

THE COST OF INSTALLING, CLEANING AND REMOVING TEMPORARY SOIL EROSION AND 11.

UPLAND AREAS FOR DISPOSAL.

COMPLETELY REMOVED FROM THE BED AND BANKS OF ALL WATER AREAS TO APPROVED

ANY DEBRIS OR EXCESS MATERIALS FROM CONSTRUCTION SHALL BE IMMEDIATELY AND 10.

ON A REGULAR BASIS.

BE RINGED BY SILT FENCE AND ALL CONCRETE MATERIAL SHALL BE CLEANED OUT

SITES SHALL BE LOCATED AWAY FROM ANY STREAMS OR WETLANDS. THE AREA SHALL

THE CONTRACTOR SHALL PROVIDE CONCRETE TRUCK WASHOUT SITES, A.O.B.E. THESE 9.

DISCHARGE POINTS BECOME OPERATIONAL.

ALL STORM DRAINAGE OUTLETS SHALL BE STABILIZED, AS REQUIRED, BEFORE THE 8.

CONTROL DEVICES WILL BE NECESSARY, A.O.B.E.

AFTER EACH STORM EVENT. PERIODIC CLEANING OF THE SOIL EROSION AND SEDIMENT

CONTRACT SHALL BE CHECKED AND REPAIRED AS NECESSARY, ON A WEEKLY BASIS AND

THE TEMPORARY SOIL EROSION AND SEDIMENT CONTROL DEVICES SPECIFIED IN THIS 7.

CONSTRUCTION AND CONSTRUCTION PROCEDURES.

COATINGS, CONCRETE LEACHATE OR ANY OTHER POLLUTANT ASSOCIATED WITH

STREAM OR WATERWAY BY SILT, SEDIMENT, FUELS, SOLVENTS, LUBRICANTS, EPOXY

ALL NECESSARY PRECAUTIONS SHALL BE TAKEN TO PREVENT CONTAMINATION OF ANY 6.

SECTION 209 OF THE NYSDOT STANDARD SPECIFICATIONS.

TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL AS REQUIRED BY

TO THE ENGINEER IN CHARGE HIS WRITTEN SCHEDULE AND PROPOSED MEASURES FOR

AT THE PRE- CONSTRUCTION MEETING, THE CONTRACTOR SHALL SUBMIT FOR APPROVAL 5.

WORK SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER IN CHARGE.

ALL METHODS AND EQUIPMENT PROPOSED BY THE CONTRACTOR TO ACCOMPLISH THE 4.

OF ENGINEERS.

AND/OR FRESHWATER WETLANDS PERMIT INCLUDING BUT NOT LIMITED TO ARMY CORPS

DEPARTMENT OF ENVIRONMENTAL CONSERVATION WATER QUALITY CERTIFICATION

THE CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF ANY APPLICABLE N.Y.S. 3.

ENTER THE WATERS OF THE STATE OF NEW YORK.

SHALL BE USED DURING CONSTRUCTION IN ANY AREA WHERE FINE MATERIALS MAY

THE ELEMENTS ON THIS DRAWING KNOWN AS "EROSION AND SEDIMENT CONTROL PLAN" 2.

CERTIFICATION PRIOR TO STARTING CONSTRUCTION.

AND NO. 14 (TRANSPORTATION) PERMITS AND NYSDEC SECTION 401 WATER QUALITY

THAT RELATE TO THE APPROPRIATE USACE SECTION 404, NWP NO. 3 (MAINTENANCE)

THE CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE PROJECT PERMITS1.

LEGEND

SILT FENCE, ITEM 209.13

EROSION CONTROL PLAN

AND NOTES

EROSION CONTROL PLAN

SCALE: 1" = 40'

ITEM 209.13

SILT FENCE - TEMPORARY (TYP.)

TEMPORARY WATERWAY DIVERSION (ITEM 553.030001)

FILL LIMIT LINE

ITEM 553.030001

TEMPORARY WATERWAY DIVERSION

TO REDUCE SEDIMENT RELEASE DOWNSTREAM.

THE CONTRACTOR'S METHOD FOR WATERWAY DIVERSIONS/BYPASS/COFFERDAM SHALL BE CONDUCTED22.

CHECK DAM POOL AT UPSTREAM END OF TEMPORARY WATERWAY DIVERSION STRUCTURE.21.

INSTALLATION GUIDE WHEN INSTALLING EROSION, AND SEDIMENT CONTROL MEASURES OR A.O.B.E.

THE CONTRACTOR SHALL COMPLY WITH THE APPROPRIATE NYSDOT STANDARD SHEET, AND MANUFACTURER'S20.

TYPICALLY, SILT FENCE SHALL BE INSTALLED ALONG EXISTING/PROPOSED CONTOUR LINES.19.

CONTRACT DOCUMENTS.

SIGNIFICANT FIELD CHANGES TO THE EROSION AND SEDIMENT CONTROL MEASURES INDICATED IN THE

CONSTRUCTION METHODS, AND/OR ACTUAL FIELD CONDITIONS. THE ENGINEER SHALL BE NOTIFIED OF ANY

DOCUMENTS MAY REQUIRE FIELD ADJUSTMENT DEPENDING ON THE SEQUENCE OF CONSTRUCTION ACTIVITIES, THE LOCATIONS OF EROSION AND SEDIMENT CONTROL MEASURES AS INDICATED IN THE CONTRACT 18.

OR GROUND COVER.

STOCKPILES EXPOSED FOR LONGER THAN TWO WEEKS SHALL BE STABILIZED WITH A TEMPORARY SEEDING

OF THE PILE. ALL SILT FENCE SHALL BE INSTALLED ON THE CONTOUR WITH A GRADE OF 2% OR LESS.

ENCLOSE ANY TEMPORARY STOCKPILES OF TOPSOIL OR FILL WITH SILT FENCE TO PREVENT EROSION17.

PAYMENT FOR ADDITIONAL WORK SHALL BE PAID UNDER THE APPROPRIATE ITEM IN THE CONTRACT.

OTHER EROSION CONTROL MEASURES MAY BE REQUIRED A.O.B.E. IN ADDITION TO SCHEMES SHOWN.16.

GRADING IS COMPLETE, TEMPORARY GRADING SHALL ALSO BE SEEDED AND MULCHED A.O.B.E.

IF CONSTRUCTION ACTIVITIES ARE DISCONTINUED IN AREAS OF SOIL DISTURBANCES BEFORE FINAL

APPROVED PERENNIAL GRASS SEED AND MULCHED WITH STRAW WITHIN ONE WEEK OF FINAL GRADING.

ALL AREAS OF SOIL DISTURBANCES RESULTING FROM THIS PROJECT SHALL BE SEEDED WITH AN15.

ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING STORM DRAINS, DITCHES OR WATER COURSES.14.

AREAS OR INTO INLETS OF OTHER DRAINAGE SYSTEMS.

DISTURBED AREAS MUST PASS THROUGH SILTATION FENCE BEFORE DISCHARGE BEYOND DISTURBED

RUNOFF IS DIVERTED TO SOIL EROSION AND SEDIMENT CONTROL FACILITIES. STORM WATER FROM

THE SITE SHALL, AT ALL TIMES, BE GRADED AND MAINTAINED SUCH THAT ALL STORM WATER13.

ITEM 209.110103

CHECK DAM (DITCH BOTTOM WIDTH > 6' TO 10'), STONE-TEMPORARY (TYP.)

10 ECP-1

M E T A L

C

U L V E R T

12851284

4" PVC

date of such alteration, and a specific description of and notation "altered by" followed by his signature and engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OF

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

(66' WIDE)

MELVIN HILL ROAD

(66' WIDE)

MELVIN HILL ROAD

G R

A V E L

EDGE O

F TREES

LOCATED APPROX. 35 FEET EAST OF CULVERT.

EASTERLY FACE OF UTILITY POLE NYSEG 20A

BENCHMARK IS A RAILROAD SPIKE SET ON THE

BM #2 ELEV=611.14'

E D

G E

O F

T R E E S

DITCH

DITCH

DITCH

EDGE OF TREES

DITCH

MB

EDGE OF TREES

AGRICULTURAL FIELD

AGRICULTURAL FIELD

16"

B-2 EL. 614.29

B-1 EL. 614.66

STONE WALL

L.820, P.298

TMP# 61.00-1-65

BEVERLY J. TIFFANY

DONALD W. TIFFANY &

LANDS N/F

L.411, P.531

TMP# 61.00-1-67.132

HORACE J. RICHMOND

LANDS N/F

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

0'

G R I D

N O

R T

H

1" = 20'

20' 40'

PLAN

SCALE: 1" = 20'

EXISTING STRUCTURE

COMPLETELY REMOVE

LA

N

E

SH

L D

R

PROPOSED BRIDGE RAIL (TYP.)

IMPROVEMENTSc

FLATTER

1:2 OR

BRIDGE RAIL (TYP.)

PROPOSED TRANSITION

(TYP.)

BOX BEAM RAIL

PROPOSED

GENERAL PLAN NOTES:

GENERAL PLAN

1+00 2+00

OF WATER (TYP.)

SURVEYED EDGE

FLATTER

1:2 OR

FLATTER

1:2 OR

FLATTER

1:2 OR

AZ=160°20'01.8"

OF SLOPE (TYP.)

SILT FENCE @ TOE

TOP OF SLOPE

TOE OF SLOPE

TOP OF SLOPE

TOE OF SLOPE

TOP OF SLOPE

TOE OF SLOPE

TOP OF SLOPE

TOE OF SLOPE

BEGINS STA. 1+44.00

STRUCTURE OPENING

STA. 0+75.00

SHOULDER RECONSTRUCTION

BEGIN MILLING &

ENDS STA. 1+56.00

STRUCTURE OPENING STA. 2+25.00

SHOULDER RECONSTRUCTION

END MILLING &

12'-0"

OPENING

LA

N

E

SH

L D

R

ITEM 562.04

CONCRETE APRON WITH CUT-OFF WALL

OPERATIONS AND POSSIBLE UTILITY LINE AND POLE CONFLICTS.

ENGINEER UPON AWARD OF PROJECT TO DETERMINE LIFTING

CONTRACTOR TO COORDINATE WITH TOWN, RG&E ELECTRIC AND 5.

PLAN AND NOTES FOR THIS PROJECT.

SEE EROSION AND SEDIMENT CONTROL PLAN (DWG. ECP-1) FOR4.

AND BENCHMARKS.

INFORMATION ON THE HORIZONTAL ALIGNMENT, SURVEY BASELINE

SEE THE SURVEY CONTROL SHEET (DWG SCS-1) FOR ADDITIONAL3.

INFORMATION.

SEE THE CULVERT PLANS (ST-1 TO ST-12 DWGS.) FOR ADDITIONAL 2.

REGARDING NEW BOX BEAM GUIDE RAILING.

SEE GUIDE RAIL TABLE ON DWG. MST-1 FOR ADDITIONAL INFORMATION 1.

ITEM 209.110103

CHECK DAM (DITCH BOTTOM WIDTH > 6' TO 10'), STONE-TEMPORARY

ITEM 553.030001

TEMPORARY WATERWAY DIVERSION

STA. 1+15.00

BEGIN FULL DEPTH RECONSTRUCTION

END MILLING

STA. 1+85.00

END FULL DEPTH RECONSTRUCTION

BEGIN MILLING

ITEM 627.50140008

CUTTING PAVEMENT (TYP.)

FOR DETAIL

SEE DWG. MST-1

NEW GRAVEL DRIVEWAY

11 GNP-1

engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OF

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

630630

630630

0+00 1+00 2+00 3+00

E L

E V

A T

IO

N

STATION

P V

I

.0

E L

E V

.5

P V

I

.0

E L

E V

.6

P V

I

.0

E L

E V

.0

P V

I

.0

E L

E V

.5

0.05%

L - 40.00 FT.

0.57%

L - 70.00 FT.

1.45%

L - 40.00 F T.

ROADWAY PROFILE

SCALE IN FEET

16'

8'

80'40' cPROPOSED HIGHWAY cEXISTING

PROFILE OF MELVIN HILL ROADc

A N

D S

H O

U L

D E

R R

E C

O N

S T

R U

C T

IO

N

S T

A

B

E G

IN

M

IL

L

IN

G

A N

D R

E S

U R

F A

C

IN

G

B E

G

IN

F U

L L

D E

P T

H R

E C

O N

S T

R U

C T

IO

N

S T

A

E N

D M

IL

L

IN

G

A N

D R

E S

U R

F A

C

IN

G

A N

D S

H O

U L

D E

R R

E C

O N

S T

R U

C T

IO

N

B E

G

IN

M

IL

L

IN

G A

N D

R E

S U

R F

A C

IN

S T

A

E

N D

F U

L L

D E

P T

H R

E C

O N

S T

R U

C T

IO

N

R

E S

U R

F A

C

IN

G

S T

A

E

N D

M

IL

L

IN

G

MATCH EXISTINGNORMAL CROWN -2% LT/RTMATCH EXISTING

4-SIDED RIGID BOX

12' SPAN X 6'-6" RISE

PROPOSED STRUCTURETO BE REMOVED

EXISTING STRUCTURE

MATERIAL (TYP.)

NATIVE STREAMBED

S

12 PRO-1

engineer or land surveyor shall affix to the item his seal of an engineer or land surveyor is altered, the altering alter an item in any way. If an item bearing the seal

Law, Article 145, Section 7209, Special Provision 2, for any

WARNING: It is a violation of the New York State Education the alteration.

Licensed Professional Engineer or Land Surveyor to person unless he is acting under the direction of a

DRAWING ALTERATION

DESIGNED BY:

PHELPS, NY 14532

63 MILL STREET

HIGHWAY DEPARTMENT

TOWN OF PHELPS

SHEET

AR

DRAWN BY:EMF/WD

CHECKED BY:RJP/AR

OFX

DAWING NO.

SCALE:AS NOTED

DATE:XX/XX/2026

PROJECT NO.60-24-294

CANANDAIGUA OUTLET

OVER TRIBUTARY TO

MELVIN HILL ROAD

DRAWING TITLE:

CLIENT:

PROJECT:

DATE REVISIONS BY

(66' WIDE)

MELVIN HILL ROAD

(66' WIDE)

MELVIN HILL ROAD

G R

A V E L

EDGE O

F TREES

E D

G E

O F

T R E E S

EDGE OF TREES

MB

EDGE OF TREES

STONE WALL

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

PLAN

SCALE: 1" = 20'

ELEVATION A-A

ITEM 568.51

STEEL BRIDGE RAIL (FOUR RAIL)

ITEM 568.70

TRANSITION BRIDGE RAILING (TYP.)

EXISTING STRUCTURE

COMPLETELY REMOVE

HYDRAULIC DATA

DRAINAGE AREA 1.72 SQ. MILES

RECURRENCY INTERVAL

PEAK DISCHARGE /

POINT OF MAX. BACKWATER

HIGH WATER ELEVATION AT EXISTING

PROPOSED

FLOOD

BASIC

FLOOD

DESIGN

100 50 (YEARS)

S)

(FT. 200.2 181.5

609.26 609.17

610.37 610.21

AVG. VELOCITY THRU STRUCT. @ DESIGN FLOOD 4.21 FT./SEC.

ITEM 620.04

(MEDIUM) (TYP.)

2'-0" STONE FILLING

FINISHED GRADE

G R I D

N O

R T

H

1+00 2+00

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

T R

IB

T O

C

A N

A N

D A

IG

U A

O

U T L E T

EXISTING STRUCTURE

COMPLETELY REMOVE

LA

N

E S

H L

D R

PROPOSED BRIDGE RAIL (TYP.)

IMPROVEMENTSc

FLATTER

1:2 OR

BRIDGE RAIL (TYP.)

PROPOSED TRANSITION

(TYP.)

BOX BEAM RAIL

PROPOSED

FLATTER

1:2 OR

FLATTER

1:2 OR

FLATTER

1:2 OR

AZ=160°20'01.8"

TOP OF SLOPE

TOE OF SLOPE

TOP OF SLOPE

TOE OF SLOPE

TOP OF SLOPE

TOE OF SLOPE

TOP OF SLOPE

TOE OF SLOPE

BEGINS STA. 1+44.00

STRUCTURE OPENING

STA. 0+75.00

SHOULDER RECONSTRUCTION

BEGIN MILLING &

ENDS STA. 1+56.00

STRUCTURE OPENING STA. 2+25.00

SHOULDER RECONSTRUCTION

END MILLING &

12'-0"

OPENING

LA

N

E

SH

L D

R

SURVEYED EDGE OF WATER (TYP.)

DATUM 600.00 DATUM 600.00

OHW EL. 609.04'

PLAN AND ELEVATION

12'-0" OPENING

R

IS

E

O U T T

O O

U T

ELEV. 604.76

ELEV. 601.59

ITEM 562.04

CONCRETE APRON WITH CUT-OFF WALL

ITEM 562.04

CONCRETE APRON WITH CUT-OFF WALL

NOT TO SCALE

ITEM…