Meister_Way_Improvement_Project_-_Bear_Paw_Drive_to_Lone_Tree_Road_(Addendum_#4_Revision).pdf
PDF 353 KB Posted
- Solicitation number
- 4656
- Issued by
- Sacramento County, San Francisco City, California
About this file
This is a Notice to Contractors issued by Sacramento County for the Meister Way Improvement Project, Contract #4656, located between Bear Paw Drive and Lone Tree Road. The project involves comprehensive roadway improvements including clearing and grubbing, pavement grinding and removal, roadway excavation, aggregate base, asphalt pavement, slurry seal, traffic striping, curb and gutter construction, sidewalk and curb ramps, drainage facility and waterline installation, sanitary sewer work, traffic signal installation, and roadway signage. The bid is scheduled for release on August 28, 2025, with questions due by October 7, 2025, and bid submissions required electronically by October 16, 2025, at 2:00 pm. The estimated construction cost is $9,500,000, and a General Engineering Contractor (Class A) license is required.
The bid includes a detailed pricing proposal with over 119 line items across multiple categories such as general work, roadway construction, pavement delineation, storm drain and utility installations, water pipe and valve work, and electrical/signal installations. Bidders must submit a bid guarantee of at least 10% of the total bid amount, which can be in the form of a bid bond, certified check, or cash. Additional requirements include compliance with the California Labor Code, Department of Industrial Relations registration, and Advanced Clean Fleets regulations for vehicles over 8,500 lbs. Contractors must also complete various forms including a non-collusion declaration, subcontractor designation, and Iran Contracting Act disclosure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO CONTRACTORS
MEISTER WAY IMPROVEMENT PROJECT - BEAR PAW DRIVE TO
LONE TREE ROAD
County of Sacramento
9660 Ecology Lane
Sacramento, CA 95827
RELEASE DATE: August 28, 2025
DEADLINE FOR QUESTIONS: October 7, 2025
RESPONSE DEADLINE: October 16, 2025, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/%7bproject.government.code%7d
County of Sacramento
NOTICE TO CONTRACTORS
Meister Way Improvement Project - Bear Paw Drive to Lone Tree Road
1. Introduction
2. Notice to Contractors
3. Pricing Proposal
4. Vendor Submissions
Attachments:
A - Ctr 4656 - Meister Way - Plan Set
B - Ctr 4656 - Meister Way - Special Provisions
C - Ctr 4656 - Informational Handout - Tensar
Notice to Contractors #4656 Title: Meister Way Improvement Project - Bear Paw Drive to Lone Tree Road
1. Introduction
1.1. Summary
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.
1.2. Contact Information
Project Contact:
Gabriel Flores
Associate Civil Engineer
Email: floresga@saccounty.gov
Phone: (916) 875-1612
Procurement Contact:
Jesse Sanchez
Sr. Contract Services Officer
Email: sanchezj@saccounty.gov
Phone: (916) 876-6378
Department:
DGS: CAPSD - Construction
Department Head:
Joshua Green
Department Director
1.3. Timeline
Release Project Date August 28, 2025
Question Submission Deadline October 7, 2025, 4:00pm
Bid Submission Deadline October 16, 2025, 2:00pm
Bid Opening October 16, 2025, 2:01pm mailto:floresga@saccounty.gov tel:(916)875-1612 mailto:sanchezj@saccounty.gov tel:(916)876-6378
2. Notice to Contractors
2.1. ADVERTISEMENT SUMMARY
Notice is hereby given that the Board of Supervisors of the County of Sacramento will receive sealed bids for the following project:
BID DATE: Thursday, October 16, 2025
SUBMIT BIDS TO: COUNTY OF SACRAMENTO. SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO
COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT
THEIR BID ONLINE NO LATER THAN 2:00 PM ON THE DAY OF THE BID. BID OPENING(S) WILL BE ONLINE
AT 2:00 PM AT THE FOLLOWING LINK: SACCOUNTYEBIDS.
Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to SacCountyEbids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder’s submission. See this training guide for assistance in entering your online response.
FOR: Meister Way Improvement Project - Bear Paw Drive to Lone Tree Road
CONTRACT NUMBER: 4656
ESTIMATED CONSTRUCTION COST: $9,500,000.00
CONTRACTOR LICENSE REQUIRED: General Engineering Contractor, Class A
PRE-BID QUESTIONS DUE VIA Q&A: Date: Tuesday, October 7, 2025 No later than: 4:00 pm
PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: clearing & grubbing, pavement grinding, pavement removal, roadway excavation, aggregate base, asphalt pavement, slurry seal, traffic striping, construction of curb, gutter, and sidewalk, sidewalk curb ramps, installation of drainage facilities, waterline, and sanitary sewer, traffic signal installation, roadway signage, and doing all other work specified on the plans and in the specifications.
BASIS FOR AWARD: The basis for award shall be base bid only, with no additive or deductive items, or no consideration of additive or deductive items.
CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to
Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the
Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project.
• Contract Documents are available at: SacCountyEbids
• The Standard Construction Specifications, which are incorporated by reference in the Contract
Documents, may be downloaded at: https://saccountyspecs.saccounty.gov/Pages/default.aspx.
https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training https://secure.procurenow.com/portal/saccounty https://saccountyspecs.saccounty.gov/Pages/default.aspx
2.2. PRE-BID MEETING
There is no pre-bid meeting for this project.
2.3. BID GUARANTEES
Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the
Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.
2.4. BONDS
The successful bidder shall be required to execute a material and labor Payment Bond and Performance
Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.
Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The
Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract.
2.5. LICENSE REQUIREMENTS
Award of this contract requires a valid California contractor's license with the classification identified above.
Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor’s license number on the bid form.
No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5.
2.6. LABOR COMPLIANCE PROGRAM
The County of Sacramento received final approval from the Director of California Department of
Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor
Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work.
This is a Construction project in accordance with Labor Code section 1771.5.
Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the
Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700
Goethe Road, Suite D, Sacramento, CA 95827, and are also available at http://www.dir.ca.gov/DLSR/PWD.
2.7. ADVANCED CLEAN FLEETS REGULATION
Vehicles with a gross vehicle weight rating greater than 8,500 lbs. and light-duty package delivery vehicles operated in California may be subject to the California Air Resources Board
(CARB) Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of air pollutants. For more information, see CARB Advanced
Clean Fleets and Advanced Clean Fleets Regulation & Advisories | California Air Resources
Board.
The apparent low bidder shall provide copies of valid Certificates of Reported Compliance as described in California Code of Regulations, title 13, ("13 CCR") section 2449(n) for the bidder’s fleet, and fleets of any listed subcontractors, of vehicles subject to 13 CCR section 2449 which may be use in performance of this project.
If the apparent low bidder’s fleet, or any subcontractor’s fleet, is exempt or is not subject to the regulation bidder shall clearly indicate the applicable exemption in the bidder’s response. For more information, see CARB Advanced Clean Fleets Regulation Exemptions and Extensions
Overview | California Air Resources Board.
Certificates of Reported Compliance and/or exemptions must be submitted by the apparent low bidder by 4:00PM on Monday following Bid Opening and must be received by the County prior to contract award.
2.8. QUESTIONS
Direct pre-bid questions to the Project Manager, Gabriel Flores, via the Q&A tab in the portal. ALL PRE-
BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Tuesday, October 7, 2025 BY 4:00
pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents.
The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.
By order of the Board of Supervisors of the County of Sacramento, Sacramento County, California, dated: June 10, 2025.
Clerk of the Board
County of Sacramento https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview
3. Pricing Proposal
BASE BID
Line Item Description Quantity Unit of
Measure Unit Cost Total
GENERAL
1 Portable Changeable Message Signs 2 EA
2 California Licensed Land Surveyor or
California Registered Civil Engineer 1 Allowance $10,000.00
3 Mobilization 1 LS
4 Staging and Traffic Control 1 LS
5 Clearing and Grubbing 1 LS
6 Storm Water Pollution Prevention
Plan (SWPPP) 1 Allowance $10,000.00
7 Water Pollution Control
Implementation 1 Allowance $50,000.00
8 Dewatering 1 Allowance $150,000.00
9 Permanent Hydroseed 151,875 SF
10 Survey Monument Wells 4 EA
11 Remove Snake Wall 77 LF
ROADWAY
12 Roadway Excavation 17,400 CY
13 Hot Mix Asphalt (LG) 9,859 TN
14 Rubberized Hot Mix Asphalt (RHMA-
G)
3,673 TN
15 Aggregate Base (Class 2) 11,753 CY
Line Item Description Quantity Unit of
Measure Unit Cost Total
16 Cold Plane Asphalt Concrete
Pavement
40,545 SF
17 Geogrid 28,140 SY
18 Slurry Seal (Type 2) 26,072 SF
19 AC Dike (Type A) (Painted White) 601 LF
20 PCC Curb & Gutter (Type 2) 4,035 LF
21 PCC Curb & Gutter (Type 2
Reinforced)
864 LF
22 PCC Curb & Gutter (Modified Type 2) 103 LF
23 PCC Curb (Type 3) 384 LF
24 PCC Curb (Type 4/4A/Modified Type
4)
2,420 LF
25 PCC Curb (Type 5) 541 LF
26 PCC Median (Colored) 916 SF
27 PCC Sidewalk 5,606 SF
28 Stamped Colored Concrete 930 SF
29 Detectable Warning Surface (3' x 4') 26 EA
PAVEMENT DELINEATION & SIGNAGE
30 Detail 9 - Thermoplastic Striping 3,585 LF
31 Detail 22 - Thermoplastic Striping 1,749 LF
32 Detail 27B - Thermoplastic Striping 2,462 LF
33 Detail 38 - Thermoplastic Striping 1,296 LF
34 Detail 38A - Thermoplastic Striping 839 LF
Unit Cost Total
35 Detail 39 - Thermoplastic Striping 7,958 LF
36 Detail 39A - Thermoplastic Striping 733 LF
37 Detail 41 - Thermoplastic Striping 220 LF
38 Detail A (12" Solid White) -
Thermoplastic Striping
2,390 LF
39 6" White - Thermoplastic Striping 717 LF
40 Pavement Markings - Thermoplastic 847 SF
41 Retroflective Pavement Markers
(Type H)
125 EA
42 Omega Post 46 EA
43 Install Roadside Sign 59 EA
44 Relocate Roadside Sign 4 EA
45 Sidewalk Barricade 15 EA
46 Street Closure Barricade 9 EA
47 Double Pipe Gate 2 EA
STORM DRAIN, OTHER UTILITIES, UTILITY RELOCATIONS
48 Sewer Pipe (8" PVC C900 DR-14) 1,125 LF
49 Sewer Pipe (8" VCP) - High Strength 68 LF
50 Sewer Pipe (10" PVC C900 DR-14) 83 LF
51 Sewer Pipe (12" VCP) 20 LF
52 Sewer Pipe (12" PVC C900 DR-14) 656 LF
53 Sewer Manhole (48") 7 EA
Unit Cost Total
54 Inside Drop 1 EA
55 Sewer Cut Off Wall (Trench Dam) 8 EA
56 Sewer Cleanout 3 EA
57 Sewer Flusher Branch (8") 3 EA
58 Sewer Flusher Branch (10") 1 EA
59 Backwater Valve 2 EA
60 Connect to Existing Sewer 3 EA
61 Lower Sanitary Sewer Manhole Frame and Cover
1 EA
62 Adjust Sanitary Sewer Manhole to
Grade
7 EA
63 Drainage Inlet (Type B) 7 EA
64 Drainage Inlet (Type B with Type C
Hood)
2 EA
65 Drainage Inlet (Type I) - 24" Diameter 2 EA
66 Drainage Inlet (Type I) - 42" Diameter 4 EA
67 Drainage Inlet (Type I) - 54" Diameter 5 EA
68 Drainage Inlet (Type J) 10 EA
69 Storm Drain Manhole (60") 2 EA
70 Storm Drain Manhole (72") 2 EA
71 Storm Drain Manhole (84") 2 EA
72 Storm Drain Manhole (Flat Top
Junction Box)
8 EA
Unit Cost Total
73 Lower Storm Drain Manhole Frame and Cover
3 EA
74 Adjust Storm Drain Manhole to Grade 10 EA
75 Storm Drain Pipe (12") 267 LF
76 Storm Drain Pipe (12") - PVC 270 LF
77 Storm Drain Pipe (15") - PVC 426 LF
78 Storm Drain Pipe (18") - PVC 105 LF
79 Storm Drain Pipe (18") - RCP 26 LF
80 Storm Drain Pipe (24") - PVC 83 LF
81 Storm Drain Pipe (24") - RCP 60 LF
82 Storm Drain Pipe (30") 859 LF
83 Storm Drain Pipe (30") - PVC 34 LF
84 Storm Drain Pipe (30") - RCP 48 LF
85 Storm Drain Pipe (66") - RCP 56 LF
86 Flared End Section 1 EA
87 ** Deleted *** 0 EA
88 Erosion Control Blanket 756 SF
89 Rock Slope Protection Fabric (Class 8) 770 SF
90 Rock Slope Protection (20 LB, Class I, Method B)
85 TN
91 Filter Fabric 377 SF
92 PCC Overland Release 752 SF
Unit Cost Total
93 Water Pipe (8" DIP) 176 LF
94 Water Pipe (10" DIP) 146 LF
95 Water Pipe (12" PVC) 693 LF
96 Water Pipe (12" DIP) 1,732 LF
97 Water Pipe (16" PVC) 289 LF
98 Water Pipe (16" DIP) 805 LF
99 Butterfly Valve (10" In-Line) 2 EA
100 Butterfly Valve (12" In-Line) 10 EA
101 Butterfly Valve (16" In-Line) 3 EA
102 Blow-Off Valve (4" In-Line) 4 EA
103 Blow-Off Valve (4" Temporary) 9 EA
104 Air Release Valve (2") 4 EA
105 Relocate Blow Off Valve 6 EA
106 Adjust Water Valve to Grade 31 EA
107 Adjust Locating Wire Station to Grade 2 EA
108 Fire Hydrant Assembly 4 EA
109 Relocate Fire Hydrant Assembly 1 EA
110 Cut-In to Existing 2 EA
111 Remove BOV Assembly and Connect to Existing
6 EA
112 Remove ARV Assembly 3 EA
113 6" Fire Water Service 2 EA
Unit Cost Total
114 2" Domestic Water Service 2 EA
115 1.5" Irigation Water Service 2 EA
116 Post Indicator Valve 1 EA
ELECTRICAL, SIGNALS, LIGHTING
117 Traffic Signal Installation (Meister
Way at Metro Air Pkwy)
1 LS
118 Traffic Signal Conduit and Pull Boxes
(Future)
1 LS
119 Signal Interconnect 1 LS
TOTAL
4. Vendor Submissions
4.1. What form of Bid Guarantee will Contractor be submitting?* Bid security must be a bidder bond, a certified check or cashier’s check payable to the Treasurer of the
County of Sacramento, or cash. Bids secured by personal checks or personal guarantees will be rejected.
☐ Scanned copy of Fully Executed Bid Bond
☐ E-bid Bond (Use Surety 2000)
☐ Cashier's or Certified Check
☐ Cash
*Response required
4.2. Bid Guarantee
Upload a scanned copy of your fully executed bid bond here if Contractor is submitting a scanned bid bond.
3. E-Bid Bond
Please enter your Bid Bond information from Surety2000 below If Contractor is submitting an E-Bid
Bond
4.3. Non-collusion Declaration*
The undersigned declares:
I am an authorized representative with binding authority for my company, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the date this bid is submitted.
☐ Please confirm
*Response required
4.4. Designation of Subcontractors - Unit Price Contracts*
Please download the below documents, complete, and upload.
• DESIGNATION_OF_SUBCONTRACTO...
*Response required
4.5. Bid Item Percentage Listing on Designation of Subcontractor form* Bidder shall certify that the bidder entered the PERCENTAGE OF BID ITEM SUBCONTRACTED in Column
(C) of the Designation of Subcontractor form NOT the percentage of total bid.
☐ Please confirm
*Response required
4.6. Iran Contracting Act Disclosure Form *
(California Public Contract Code, sections 2202-2208)
When responding to a bid or proposal or executing a contract or renewal for a County of Sacramento contract for goods or services of $1,000,000 or more, a vendor must either:
A. certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section
2203(b) and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS; or
B. demonstrate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code section 2203(c) or (d).
To comply with this requirement, please select one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of
$250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)
OPTION #1 - CERTIFICATION
I certify I am duly authorized to execute this certification on behalf of the vendor/financial institution, and the vendor/financial institution is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person/vendor, for 45 days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.
OPTION #2 – EXEMPTION
https://government-project.s3.us-west-2.amazonaws.com/14260/4c72069d-701a-4f52-9d88-093a99683f23_DESIGNATION_OF_SUBCONTRACTORS.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4KQVFYF5L%2F20251009%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20251009T230037Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEEYaCXVzLXdlc3QtMiJHMEUCIDpqfqg3416F4cuuLk%2B4SGvLOKhQLcHeyYtpgivtItviAiEA5yhwiDW6qEkTJHtJ4ewTb1xmow%2Bje%2BttNP57Zqe2KQIqkwUI3%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDILQtW5uHSc%2BYJGhaCrnBPuVgWRt%2BlkF8whYzzUAyKMfx3m%2F71MhCXSN%2FLx2zxMjkiELa4XoJ373fDDXI4h9RCSY05Rw2PsTxgV393s7plAO%2FvdCpwp%2BXb7ZyM77ncc51HoBNNBDYOgbQxJecl5R6RKvqS00uAU8g%2B24jfWakqTYeG1WjJjzZqtHlE0JsflADYZCDHrmPny8AfwzCdNdGxO5YKyDq46OzYVwSkrtRSictIRKhG0rYuxBvasR%2FjTz3qIzZcOtfSSvXjuAmrGuhBFzh4s8SI2BI0YkWq5tfo8rNXCDs1H1RUK3VxAvbl1VLAr0f0%2B%2FQZZH724kl2UqY1NmS%2B3j32nKb2e6lc3RR8n74KDd8pdn9mBwfG8vqkluMsrwzSI8Kq5xquyyRVJBGGlVxXJVTFal6Q4gNFFjMiDytYbMX8ONuy0o%2FF%2BfpAiDYpbNx5lANlUuvzDFSeFgutXiA5XGCtj6ekIh606IN9f4QOzLFtjboCVVrI1i7x%2B%2BDpNBpmJslEqFgbBbGyhVrnN43NoAK311Ce7Il6gLnak0JzTnn%2FAapvyiZDgifImDtijkBs34BrqfijkXuVS0ITHjf4dVOLZqL3p2mC7H3FgLAyUY1%2Fx9k6UcIN7h%2FRfNZELj1R8QTZ5tHWUJwjv4Jt%2F9eHqW4GytSspsfCpGs%2BeCl3vFppaPDIXAZTKWNTTMTSE3ATEpBlGwrS1zf%2F2uVFZLWWtOCNn34IdANLwefnBSwm%2BMJ3II6b%2F19QOn53zQLe7ex1sUdgMPLHHXvS3rsxPlW3fXv2du82K0AvunZaz755nApwOlzK%2FB5V54dJtPy70xwhQfDzCh5qDHBjqbAcMONkRo1GUXF6prBMAwh6sgDee5HPIXEinSpMW7prDNJWUohU7gaMoD%2F9q2t05HS1WupLGYbx5t162lulgpeeFY557Kn7Nc1zqPNAbg5LSQsQRAF1JpU557fZ35yBWmirtENakGPsQ%2BYGeKT%2B%2BPtnE%2B5TGkSaf5lPM2WO7e6iNP9n1VDolKWuVFiadhGLNhWI8qw%2FHn%2F0RLwZnd&X-Amz-Signature=8cbf1fd1bd26d2bea0ff8bf4b38da5716d1ca5c2bf4593e3c0e12be5fe269c60&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22DESIGNATION_OF_SUBCONTRACTORS.docx%22&x-id=GetObject
Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services. If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please select
"EXEMPTION" below, and attach documentation demonstrating the exemption approval with your electronic submission.
☐ Certification
☐ Exemption
*Response required
4.7. Type of Business*
☐ C Corporation
☐ S Corporation
☐ Limited Liability C Corporation
☐ Partnership
☐ Limited Liability Partnership
☐ Sole Proprietor/Individual
☐ Other
*Response required
4.8. Type your Legal Company Name Here*
State your Company's Name Here. This will be verified against the California Secretary of State's
Website.
*Response required
4.9. Contractors State License Board (CSLB) Number*
Please enter your License Number here. This will be verified against the state database
*Response required
4.10. Contractors State License Board (CSLB) License Expiration Date * Enter your CSLB license expiration date:
4.11. Contractors State License Board (CSLB) License Classifications* Enter your current CSLB license classifications:
*Response required
4.12. California Department of Industrial Relations Registration* Please enter your Public Works Contractor Registration Number. This will be verified against the state database.
4.13. Provide the full contact name, title, and e-mail of the signatory for your firm. Provide contact information for the contract manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy, if awarded.**
Signatory: name, title, email
Contract manager/admin: name, phone, email
*Response required
4.14. Bidder certifies they understand the post-bid submittals specified and required on this project and will comply with the timeline for submission. *
☐ Please confirm
*Response required
4.15. I hereby certify under penalty of perjury that the above statements are true.*
☐ Please confirm
File details come from the government source that posted it. Updated .