This combined synopsis and solicitation requests quotes for opening, inspecting, assessing the feasibility of overhauling a Caterpillar D348 emergency diesel generator engine. The United States Coast Guard Surface Force Logistics Center is seeking pricing to disassemble, clean, inspect, and assess the engine block and crankshaft of the damaged D348 engine against factory specifications. Quotes are due by January 12, 2022 and the period of performance will be determined. Interested vendors must demonstrate past experience overhauling Caterpillar D348 engines and provide documentation with their quote. The contract will be a firm-fixed price award using simplified acquisition procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MEC0238C SPENCER JAN 2022 FAR CLAUSE 52.212-5.docx | DOCX document | |
| RFQ 22 MEC0238 OPEN INSP SVS SPENCER PTOWN SF 18.docx | DOCX document | |
| DOL RATES VA JAN 2022.pdf | ||
| FBO 22 MEC0238C SM OPEN INSP CAT 348 EDG PTOWN.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work: Emergency Diesel Generator (EDG) Prime Mover, Overhaul
RFQ NR MEC0238-C CGC SPENCER
1. SCOPE
1.1 Intent. This statement of work (SOW) describes the requirements for the Contractor to take delivery of Caterpillar D348-TA serial number 36J03446 that sustained damage due to an over speed. The Coast Guard suspects the engine may have damage to the crankshaft and or crankshaft main bearing support areas of the block. Contractor to disassemble and inspect the damaged engine and assess the feasibility of completing an overhaul. Contractor to provide the Coast Guard with a report outlining the feasibility to complete the engine overhaul or if a used donor engine would be required to complete the overhaul. If approved by the contracting officer, proceed with the engine overhaul.
1.2 Government-furnished property.
Damaged Caterpillar D348-TA engine serial number 36J03446, arrangement number 3N0671
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 901 WMEC 310-8, Rev 10, Emer DSL Gen Instl & Arr Coast Guard Drawing 905 WMEC 310-8, Rev B, Emerg DSL Gen A&D Coast Guard Drawing 901 WMEC 310-9, Rev-, Emer DSL Gen LO Sys Diag Coast Guard Drawing 905 WMEC 310-9, Rev- , Emerg DSL Gen Lube Oil Sys Diag Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Coast Guard Technical Publication (TP) 2702_312, (SEBR0525) Emergency Diesel Generator (Set) Servive Manual Coast Guard Technical Publication (TP) 2821A_312B, (SEBR0525) Emergency Diesel Generator (Set) Service Manual Coast Guard Technical Publication (TP) 2821A_312_D Parts Book-EDG Coast Guard Technical Publication (TP) 2821A_312_E, Inspection and Maintenance Guidelines-EDG
Coast Guard Technical Publication (TP) 2821A, Emergency Diesel Generator-General Information Coast Guard Technical Publication (TP) 2821A_312_F, EG-B2P Governor/Actuator-EDG (82570E)
Other References ASTM International (ASTM) D3951, 2010, Standard Practice for Commercial Packaging
3. REQUIREMENTS
3.1 General. The Contractor shall accomplish all work in accordance with the requirements of SFLC Std Spec 0000, and using the Coast Guard drawings and TP listed under Section 2 (References) as guidance.
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor shall provide the services of an OEM authorized/ licensed Tech Rep for the EDG Prime Mover, (Model D348-TA Marine Engine), to accomplish the following tasks – on site at Contractor’s facility where EDG engine is undergoing overhaul and test:
· Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.
· Assist with and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, reassembly and final operational testing of the equipment/system.
3.1.2.1 Ensure the Tech Rep is an OEM Certified Representative for the system/equipment stated above and demonstrated on their résumé.
3.1.2.2 Submit the name and résumé of the Tech Rep to the COR prior to Contract start.
3.2 Overhaul requirements. The Contractor shall accomplish the following tasks for the designated EDG Prime Mover (Caterpillar PN: D348-TA/ARGMT-3N0671), in accordance with TP 2702, and the EDG manufacturer’s (Caterpillar) recommended procedures. The Contractor shall accomplish a complete overhaul of the Caterpillar engine to “like new” condition. The Contractor shall provide all labor and materials to accomplish the requirements within this SOW.
3.2.1 Removal. Package and ship the engine assembly to the Contractor’s facility.
3.2.2 Disassembly, cleaning and inspection. Disassemble, clean and inspect the engine components. Submit a CFR.
3.2.3 Bore alignment check. Measure the size, straightness, and the clearances related to the main bearing journals and cylinder blocks. Compare all measurements against the engine factory specifications in TP 2702. Submit a CFR.
3.2.4 Parts renewal. Furnish and install all parts listed in paragraph 4.1 (Contractor-furnished parts list), in place of existing parts. Validate parts list with Tech Rep prior to purchase.
3.2.5 Reassembly. Reassemble the prime mover in accordance with the applicable sections of TP 2702.
3.2.6 Testing. Test overhauled engine assembly in accordance with TP 2702 and Tech Rep’s recommendations. Test shall include a four-hour minimum dynamic test. Submit a CFR.
3.2.6.1 No-load testing. Prior to the dynamometer test, in the presence of the Coast Guard Inspector and in accordance with TP 2702, the Contractor shall run the engine for a period of 30 minutes under no load. Check the engine and all sub-assemblies, tubing, hoses, flanges, lines, fittings, joints, and plugs for leaks. Monitor the lube oil pressure and engine temperature. Submit a CFR. Correct any deficiencies and discrepancies found during testing and retest.
3.2.6.2 Dynamometer test. After all authorized repairs, the Contractor shall test the engine using an engine dynamometer in accordance with OEM recommendations. The Contractor shall correct any deficiencies and discrepancies found and retest. Submit a CFR of all test results; including RPM, torque, HP, oil pressure and temperature, jacket water pressure and temperature, fuel pressure and rate, and time of each reading. Test report shall include engine model number, serial number, date of testing, and signature of authorized tester.
3.2.6.3 Purging. After a successful Dynamometer test and acceptance by the Coast Guard Inspector; the Contractor shall purge the engine sea water and jacket water systems. The Contractor shall open and vent the sea water and jacket water systems by using the engine's petcocks, fittings and flanges to allow trapped fluid to drain from the engine, to prevent expansion damage due to possible freezing in cold weather. After the engine is drained, all external openings shall be securely capped, plugged or closed to prevent contamination of the engine or the storage container.
3.2.7 Packaging and shipping. Contractor shall arrange to receive the damaged engine from USCG Base Portsmouth and the government furnished engine block and crankshaft from the Coast Guard warehouse in Baltimore MD. After all authorized repairs are complete, package and ship engine assembly in accordance with SFLC Std Spec 0000 to SFLC Baltimore. Preserve engine assembly prior to packaging in preparation for long-term storage in temperatures ranging from -20 to 120 degrees F. All exposed metal surfaces shall be prepared and preserved in accordance with SFLC Std Spec 6310. Coat all unpainted surfaces with a light amount of grease. Plug or cap fittings, flanges and openings that can allow foreign materials to enter the engine. Drain and protect all fluid systems with appropriate preservatives. Shrink wrap engine.
A warning tag shall be attached to the engine stating the preservation action taken and method to place engine back into service.
The shipping crate shall have the following markings in 2-inch black enamel letters:
· PN: D348-TA/ARGMT-3N0671
· Caterpillar Engine, D348 Engine Serial Number # 36J03446
· U. S. Coast Guard Material
· Gross Weight ______ Cube _____
· "_A_" Condition Code
· Contract Number/Delivery Order Number _____________
· Do Not Stack
· Do Not Lift By Cover Contractor shall notify COR at least 24 hours prior to closing shipping container.
4. NOTES
4.1 Contractor-furnished parts list.
| Contractor furnished (cfe) or government furnished (gfe) |
| PART NAME |
| QTY |
| GFE |
| Used donor CAT D348 engine |
| 1 |
| CFE |
| Complete overhaul gasket kit |
| 1 |
| CFE |
| Connecting rod bearings |
| 12 |
| CFE |
| Main Bearings |
| 7 |
| CFE |
| Thrust plates |
| 2 |
| CFE |
| Fuel Injection Pumps |
| 12 |
| CFE |
| Pistons |
| 12 |
| CFE |
| Piston ring set |
| 12 |
| CFE |
| Cylinder liners |
| 12 |
| CFE |
| Rebuild jacket water pump |
| 1 |
| CFE |
| Rebuild oil pump |
| 1 |
| CFE |
| Thermostats |
| 4 |
| CFE |
| Bearings |
| 1 |
| CFE |
| Turbo Cartridges |
| 2 |
| CFE |
| Nozzles |
| 12 |
| CFE |
| Rebuild fuel injection pump |
| 1 |
| CFE |
| Overspeed Cable |
| 1 |
| CFE |
| Shut down cable |
| 1 |
| CFE |
| Service over speed assembly |
| 1 |
| CFE |
| Front Crankshaft seal |
| 1 |
| CFE |
| Rear Crankshaft seal |
| 1 |
| CFE |
| Engine oil & oil Filters |
| 8 |
| CFE |
| Fuel Filters |
| 4 |
| CFE |
| Air Filters |
| 2 |
| CFE |
| Crankcase emissions filter |
| 1 |
| CFE |
| Cylinder heads, disassemble and rebuild using new valves & springs |
| 2 |
| CFE |
| Overhaul governor actuator , Reverse activating, Woodward EBG2P |
| 1 |
| CFE |
| New Chromolox sump heater |
| 1 |