MDJ _ Legal Ad _ Invitation for DIP Pipeline .pdf
PDF 82 KB Posted
- Solicitation number
- PE-66365-NONST-2024-000000004
- Issued by
- Cobb County, Georgia
About this file
This document is an Invitation for Pre-Qualification for Ductile Iron Pipeline Contractors issued by the Cobb County - Marietta Water Authority. The Authority is pre-qualifying pipeline contractors for possible future ductile iron pipeline construction projects. Applicants must submit five hard copies of the completed application and a PDF copy on USB drive by 2:00 p.m. local time on Tuesday, December 12, 2023 at the Authority's office. The pre-qualification requirements are based on pipe laying experience with ductile iron pipe along with personnel and financial records. If prequalification requirements are met, the Authority's Board will make a final decision on pre-qualification status. Only contractors with Board-approved pre-qualification status will be able to bid on future projects with the Authority.
The document does not provide any details on pricing terms, set asides, incumbents, funding requirements or sources. It also does not mention any contract term or renewal options. The focus of this document is solely on the pre-qualification process for ductile iron pipeline contractors to be eligible for future construction projects with the Cobb County - Marietta Water Authority.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR DUCTILE IRON PIPELINE CONTRACTOR'S PRE-QUALIFICATION
For
COBB COUNTY - MARIETTA WATER AUTHORITY
The Cobb County - Marietta Water Authority is pre-qualifying pipeline contractors for possible future ductile iron pipeline construction projects. A copy of the qualification requirements can be obtained from the Cobb County - Marietta Water Authority, Attn: Mr. Austin Woodall, 1170 Atlanta Industrial Drive, Marietta, Georgia 30066, (770) 770-514-5206 or by email at awoodall@ccmwa.org. Applications for pre-qualification for bidding will be received until 2:00 p.m. local time, Tuesday, December 12, 2023, at the Cobb County - Marietta Water Authority office at 1170 Atlanta Industrial Drive, Marietta, GA 30066.
The Applicant must submit five (5) hard copies of the completed application and a PDF copy on USB drive.
The pre-qualification requirements are based on pipe laying experience with ductile iron pipe along with personnel and financial records (1 Separately Sealed Copy). Information submitted by the contractor will be reviewed by the Authority's Engineering, Transmission and Finance staff. If pre-qualification requirements are satisfactorily met, a recommendation will be made to the Water Authority Board for pre-qualification status. Final approval is strictly a Board decision. To bid on a project with the Authority, a contractor must have board approval before the date of the first public advertisement. The Owner reserves the right to reject any and all applications for pre-qualification, to waive informalities and to re-advertise.
Cobb County-Marietta Water Authority Cole E. Blackwell, General Manager
Advertise: November 3, 10, 17, 24 December 1 mailto:awoodall@ccmwa.org
File details come from the government source that posted it. Updated .