This document provides a special notice for a federal contract opportunity with the U.S. Army Corps of Engineers to perform test pile driving at the mouth of the Columbia River in Oregon. The project involves driving 18 test piles distributed along pile dike alignments using government-furnished 24-inch steel pipe piles that are 80 feet in length. The contractor will evaluate drivability through existing underwater rock fill structures up to 20 feet thick using impact and vibratory hammers with various driving tip configurations. The anticipated contract award date is June 2020 and the in-water work window is from September 15 to November 30, 2020. The government estimates the construction cost to be between $1 million and $5 million. Interested parties are requested to provide feedback on acquisition strategy and submit responses by April 6th to the identified point of contact. The response should not exceed five pages and include company and bonding information, as well as relevant experience and past project examples.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MCRSITP20_Specs 1 of 3.pdf | ||
| MCRSITP20_Specs 2 of 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vessel Name:
Reference Meets 385 1-1 Remarks
(Section) (Yes/No)
(If not applicable, or answer is contrary to requirement, explain in detail)
01.A.07
03.A.02
03.A.03
03.A.05/03.B
05.A/05.B
05.B., 05.D, 05.E, 05.H
05.J.03
05.J.04
05.C
05.J.05/06
05.K
07.A./07.B
07.B.06
09.A.04
09.A.06
09.B
Contract No.:
All wearable PFDs shall be of an international orange (or orange/red) or ANSI 107 yellow-green color
Each PFD shall be equipped with a USCG-approved automatically activated light, unless projects performed exclusively during daylight hours
At least 2 members of the crew on each watch qualified to administer first aid & CPR? (no more than 2 years old)
First aid kits available (min. 1/25 workers), of proper type and well stocked?
Items
Date of QC Inspection:
Each employer shall furnish to each of its employees, employment, and place of employment, which are free from hazards (PL 91-596).
Government Representative/Title:
Stability Letter - Date Issued:
FLOATING PLANT INSPECTION CHECKLIST
United States Coast Guard Certificate of Inspection - Expiration Date:
NOTE: This is a checklist only and does not include ALL pertinent safety requirements. For detailed requirements, refer to EM 385-1-1, 30 November 2014
Contractor's Representative/Title:
(Brief description)
Note: Paragraph references in this table refers to paragraphs in EM 385-1-1 (30 November 2014).
Emergency notification and emergency medical numbers posted?
Crew using proper eye, foot, head, hand protection?
Noise surveys performed on all equipment, all "noisy areas"?
Signs posted indicated hearing protection required and type (or noise level)?
Ring buoys, lifelines, water lights provided, properly located, in good condition?
Properly equipped life-saving skiff provided? Lifesaving drills being performed (initially, at least monthly afterwards)?
Night operations lighting plan developed and on board?
Hot work performed? Fire watch? Hot work permit used? Min.
10 lb. fire extinguisher?
Flammable materials stored properly?
All sources of ignition prohibited within 50 feet of operations with potential fire hazard?
First aid/CPR persons in the Bloodborne Pathogen Program, trained and provided protective equipment (gloves, breathing barriers, resuscitation equipment, etc.)?
Required personal protective and safety equipment based on AHA/PHA? Training in use, care and storage of PPE?(Attach training records)
Lighting requirements reviewed in AHA? Proper lighting supplied in all work areas, sites, vessels, etc. (Provide light meter/survey if unknown/questionable). Marine lighting IAW
ABS.
A6-1
DRAFT
(Section) (Yes/No) (If not applicable, or answer is contrary to requirement, explain in detail)
09.B.18
09.F.
10.A.07
10.C.03
10.E.07
11.G.01
Section 12
13.A.
13.D
14.D
15.A.01
15.A.04
15.A.05
15.B
15.D
15.D.02
15.E
16.A.02
16.A.03
16.A.13/16.G.
16.A.14
16.A.15
16.B
16.B.03.b
16.B.04
16.D
16.E.03
16.F.02
Custom designed beams, clamp, etc., tested and marked?
Standard Lift Plans being prepared for every lift/series of lifts?
Rigging Inspections performed by QR/CP each shift before use? Annually by QR or CP and documented?
Rigging Inspections performed by QR/CP each shift before use? Annually by QR or CP and documented?
Items
(Brief description)
All hand and power tools in good condition with required guards in place?
Safety Devices and Operational Aids required on all Cranes and Derricks in place, functioning?
Proper number, type of fire extinguishers provided as required?
Fully charged, operable, accessible? Inspected monthly, documented?
Qualified Rigger(s) identified, designated in writing along with rigging tasks? Only QRs perform rigging?
Running lines within 6 ft-6 in of ground or working level guarded/restricted by physical barriers to preclude injury?
Batteries stored in enclosures with outside vents or in a well-ventilated room and arranged to prevent the escape of fumes, gases or electrolyte spray into other areas?
Lockout/tagout used when systems are de-energized? Both locks and tags used? Procedures in place? Personnel assigned roles and documentation of all?
LHE Operator physical examination clearance (only clearance statement, no data), signed by MD or DO? Attach written/ signed documentation saying exam meets EM 385-1-1, 16.B.04 and ASME B30 for acceptance prior to operating LHE.
Are safety lashings and safety clips installed on all pneumatic tools and hoses?
Only alloy chain Grade 80 or higher used for rigging loads?
Housekeeping (attach most recent daily inspection report)
Rigging hardware, per ASME B30.26? Inspected each shift, at least annually?
Are positive latching devices used to secure loads?
Contractor has submitted, accepted Certificate of Compliance for all LHE on site? (Attach copy)
Structural welding on critical items performed by Certified Welders? Inspected by Certified Inspector?
Ventilation provided if welding/cutting performed in confined space?
Oxy-Fuel gas systems using cylinder-regulator-hose-torch have a reverse-flow check valve AND a flash arrestor on each hose, at torch unless manufacturer states otherwise?
Storage areas/tanks shall be surrounded by a curb, earthen dike or other equivalent means of containment of at least 6 in (0.15 m) in height
Maintenance/repairs of LHE per manufacturer, documented and available for length of contract? (Attach recent records of maintenance and repairs)
Work area control in accessible areas where equipment is rotating next to fixed structure, min 24 in clearance, to allow passage of workers without harm? Barricade swing radius to prevent worker from being struck?
LHE operators certified, qualified and designated by employer in writing, including specific LHE on site. (attach proof of qualifications and designation prior to start of work)
Inspection Criteria for LHE being performed? Attach last Monthly and Annual inspection results.
Crane Operators certified by option 2? Attach records of last audit, letter from QP saying program meets 16.B.03.b
Operational Testing IAW 16.F.02?
All slings manufactured, used, inspected and maintained according to ASME B30.9? Tagged/marked with manufacturer, WLL, #legs if more than 1?
A6-2
16.F.03
16.G.01
16.G.09-12
16.G.13 (b)
16.H
16.I.01
16.L
16.L.18
16.T
18.G.02
19.A.01
19.A.02
19.A.02
19.A.05
19.A.06
19.A.06
19.A.06
19.A.07
19.B.
19.B.02
19.E.
20.A
20.D/20.D.03
20.D.03
Machinery/mechanized equipment inspected/tested IAW manufacturer's recommendations/EM requirements? Certified in writing (Attach documents)?
Pressurized equipment and systems inspected and tested?
Attach inspection and Test logs.
Stumbling and tripping hazards painted yellow? Uncovered deck plate openings (e.g., around generators and main engines) outlined with yellow paint?
Accessible areas within the swing radius of the rear of the LHE’s rotating superstructure, either permanently or temporarily mounted, shall be barricaded to prevent an employee from being struck or crushed
Crane -Supported personnel platforms: work platform and suspension system shall be designed and certified by a registered professional engineer
Proper Marine Railings Types provided and in-place?
Compressed gas cylinders separated from flammable or combustible material by at least 40 ft.?
Operators of Uninspected Towing Vessels and Master and Pilots on radar-equipped vessels 26' or more have USCG Radar Observers endorsement on license?
All floating plant regulated by the USCG has required, current USCG documentation? Attach documents.
Fuel transfer procedures on board?
Safe access provided to and from vessels? Gangways and ramps secured at one end by at least one point on each side with lines or chains to prevent overturning?
Are all reciprocating, rotating and moving parts of winch gears and other equipment properly guarded.
Shutoff valve installed at the engine end of the fuel line?
(Unless the length of the supply pipe is < 6 feet).
Load Testing performed IAW 16.F.03?
All licensed officers and crew have current documentation?
All LHE has proper documents in cab?
Items
Additional inspection requirements for barges, pontoons, vessel or other means of flotation used to support a land crane/Derrick
Proper clearances are maintained at all times, during operation AND travel?
All critical lifts identified and planned properly? Critical lift plans submitted for acceptance prior to lift?
Project has adequate means for monitoring local weather conditions, including a wind-indicating device?
(Brief description)
Using/Have Floating Cranes/ Derricks, Crane Barges, and Auxiliary shipboard mounted Cranes? Attach Navel Architectural Analysis, floating service load chart.
Shutoff valve installed at the fuel tank connections, can be operated from outside a compartment, outside the engine room, and outside the house bulkheads?
Oxygen and gas cylinders in storage separated by firewall or by distance of 20 feet? Appropriately placarded?
Are non-slip surfaces provided on working decks, stair treads, ship ladders, platforms, catwalks, and walkways?
A6-3
20.D.07
20.D.10
21.C
21.M
24.B.09
28.A.01
34.A.04
34.A.05 (a)
34.A/34.B
34.A/34.B
34.A/34.B
Competent Person for Confined spaces has been identified?
Attach qualifications.
Inventory of confined spaces (both Permit-Required (PRCS) and Non-Permit-Required (NPRC))? Attach.
Items
Personal Fall protection Systems used at any time? Attach Competent Person for FP certification (and QP for FP if applicable).
Protective caps installed on oxygen/fuel gas cylinder when stored, in transit, or the regulator is not in place?
(Brief description)
CSE Procedures have been developed for each space?
Personnel have been trained?
Rescue plan and procedures developed?
All ladders inspected for defects? Any welding on ladders performed by certified welder?
All compressed gas cylinders stored upright at all times?
Secured against falling?
Oil spill response supplies on board and in adequate quantities?
Air monitoring equipment is on board? Who is qualified to use?
History of air monitoring documented?
PRCS and Potential PRCS have been Identified, labeled?
A6-4
Oregon Kate Brown, Governor
Department of Environmental Quality Northwest Region Portland Office/Water Quality
700 NE Mulfriomah Street/ Suite 600
Portland, OR 97232-4100
(503) 229-5263
FAX (503) 229-6957
TTY711
May 9, 2019
Elizabeth Santana US Army Corps of Engineers, Portland District 333 SW First Avenue Portland, OR 91204-3440
RE: Nationwide 401 Water Quality Certification Approval for 2019-USACE-3, Sand Island Pile Dike Repairs
The US Army Corps of Engineers (USAGE) has determined that your project will be authorized under Nationwide Permit (NWP) category #3. As described in the application package received and reviewed by the Oregon Department of Environmental Quality (DEQ), the project qualifies for the Nationwide Section 401 Water Quality Certification (WQC), subject to the conditions outlined below. If you cannot meet all conditions of this 401 WQC, you may apply for a standard individual certification. A standard individual certification will require additional informatioh and higher fees will apply.
Certification Decision: Based on information provided by USAGE and the Applicant, DEQ is reasonably assured that implementation-eligible activities under the proposed NWP will be consistent with applicable provisions of Sections 301, 302, 303, 306, and 307 of the federal Clean Water Act, state water-quality standards set forth in Oregon Administrative Rules Chapter 340 Division 41, and other appropriate requirements of state law, provided the following conditions are incorporated into the federal permit and strictly adhered to by the Applicant.
In addition to all USAGE national and regional permit conditions, the following 401 WQC conditions apply to all NWP categories that qualify for the Nationwide 401 WQC.
401 GENERAL CERTIFICATION CONDITIONS
1) Responsible parties: This 401 WQC applies to the Applicant. The Applicant is responsible for the work of its contractors and sub-contractors, as well as any other entity that performs work related to this WQC.
2) Work Authorized: Work authorized by this 401 WQC is limited to the work described in the Application or Pre-Construction Notification submitted to the USAGE and additional application materials (hereafter "the permit application materials"), unless otherwise authorized by DEQ. If the project is operated in a manner not consistent with the project description contained in the permit application materials, the Applicant is not in compliance with this 401 WQC and may be subject to enforcement.
3) A copy of this 401 WQC must be kept on the job site and readily available for reference by Applicant and its contractors, as well as by DEQ, USAGE, National Marine Fisheries Service
Project Name: Sand Island Pile Dike Repairs Project Number: 2019-USACE-3
(NMFS), Oregon Department of Fish and Wildlife (ODFW), and other appropriate state and local government officials.
4) In accordance with OAR 340-048-0050, DEQ may modify or revoke this 401 WQC if project activities are having an adverse impact on state water quality or beneficial uses, or if the Applicant is otherwise in violation of the conditions of this certification.
5) The Applicant and its contractors must allow DEQ access to the project site, staging areas, and mitigation sites to monitor compliance with these 401 WQC conditions, including:
a. Access to any records, logs, and reports that must be kept under the conditions of this
401 WQC;
b. To inspect best management practices (BMPs), monitoring or operational equipment or methods; and
c. To collect samples or monitor any discharge of pollutants.
6) Failure of any person or entity to comply with this Order may result in the issuance of civil penalties or other actions, whether administrative or judicial, to enforce its terms.
7) Land Use Compatibility Statement: In accordance with OAR 340-048-0020(2) (i), each Applicant must submit findings prepared by the local land use jurisdiction that demonstrates the activity's compliance with the local comprehensive plan. Such findings can be submitted using the appropriate section of the USAGE & DSL Joint Permit Application, signed by the appropriate local official and indicating:
a. "This project is consistent with the comprehensive plan and land use regulations;" or,
b. "This project will be consistent with the comprehensive plan and land use regulations when the following local approvals are obtained," accompanied by the obtained local approvals.
c. Rarely, such as for federal projects on federal land, "this project is not regulated by the comprehensive plan" will be acceptable.
In lieu of submitting the appropriate section of the USAGE & DSL Joint Permit Application, the Applicant may use DEQ's Land Use Compatibility Statement form found at:
http://www.oregon.aov/deq/FilterDocs/lucs.pdf
FOR PROJECTS THAT PROPOSE CONSTRUCTION, THE FOLLOWING GENERAL
CONDITIONS APPLY
8) Erosion and Sediment Control: During construction, erosion and sediment control measures must be implemented to prevent or control movement of sediment, soil or pollutants into waters of the state. The Applicant is required to develop and implement an effective erosion and sediment control plan. Any project that disturbs more than one acre is required to obtain an NPDES 1200-C construction stormwater permit from DEQ. In addition, the Applicant (or responsible party) must:
a. Where practicable, use removable pads or mats to prevent soil compaction at all construction access points through, and staging areas in, riparian or wetland areas to prevent soil compaction.
b. Demarcate wetlands not specifically authorized to be impacted to protect from disturbance and/or erosion.
c. Place dredged or other excavated material on upland areas with stable slopes to prevent materials from eroding back into waterways or wetlands. Place BMPs as necessary to stabilize and prevent erosion.
9) Spill Prevention: The Applicant must fuel, operate, maintain and store vehicles, and must store construction materials, in areas that will not impact water quality either directly or due to potential discharges.
10) Spill & Incident Reporting:
a. In the event that petroleum products, chemicals, or any other deleterious materials are discharged into state waters, the discharge must be promptly reported to the Oregon Emergency Response Service (OERS, 1-800-452-0311). Containment and cleanup must begin immediately and be completed as soon as practicable.
b. If the project operations result in distressed or dying fish, the operator must immediately: cease operations; take appropriate corrective measures to prevent further environmental damage; and immediately notify DEQ and ODFW.
11) Vegetation Protection and Site Restoration:
a. The Applicant must protect riparian, wetland, and shoreline vegetation in the authorized project area from disturbance through one or more of the following:
i. Minimization of project and impact footprint;
ii. Designation of staging areas and access points in open, upland areas;
iii. Fencing and other barriers demarking construction areas; and
iv. Use of alternative equipment (e.g., spider hoe or crane).
b. If authorized work results in any vegetative disturbance and the disturbance has not been accounted for in planned mitigation actions, the Applicant must successfully reestablish vegetation to a degree of function equivalent or better than before the disturbance.
12) The Applicant shall avoid and protect from harm, all wetlands and riparian areas located within 50 feet of USAGE jurisdictional waters, unless proposed, necessary, and approved as part of the project. If a local jurisdiction has a more stringent buffer requirement, that requirement will override this certification requirement.
FOR PROJECTS THAT PROPOSE IN-STREAM WORK IN JURISDICTIONAL WATERS
13) Fish protection/Oregon Department of Fish and Wildlife timing: The Applicant must perform in-water work only within the Oregon Department of Fish and Wildlife preferred time window as specified in the Oregon Guidelines for Timing ofln-Water Work to Protect Fish and Wildlife Resources, or as authorized otherwise under a USAGE permit and/or Department of State Lands removal/fill permit. Exceptions to the timing window must be recommended by Oregon Department of Fish and Wildlife, the National Marine Fisheries Services and/orthe US Fish and Wildlife as appropriate.
14) Aquatic life movements: Any activity that may disrupt the movement of aquatic life living in the water body, including those species that normally migrate through the area, is prohibited.
Project Number 2019-USACE-3
The Applicant must provide unobstructed fish passage at all times during any authorized activity, unless otherwise approved in the approved application.
15) Turbidity; The Applicant must implement appropriate Best Management Practices (BMPs) to minimize turbidity during in-water work. Any activity that causes turbidity to exceed 10% above natural stream turbidity is prohibited except as specifically provided below:
a. Monitoring: Turbidity monitoring must be conducted and recorded as described below. Monitoring must occur at two hour intervals each day during daylight hours when in-waterwork is being conducted. A properly calibrated turbidimeter is required unless another monitoring method is proposed and authorized by
DEQ.
i. Representative Backoround Point: The Applicant must take and record a turbidity measurement every two hours during in-water work at an undisturbed area. A background location shall be established at a representative location approximately 100 feet upcurrent of the in water activity unless otherwise authorized by DEQ. The background turbidity, location, date, tidal stage (if applicable) and time must be recorded immediately prior to monitoring downcurrent at the compliance point described below.
ii. Compliance Point: The must monitor every two hours. A compliance location shall be established at a representative location approximately 100 feet downcurrent from the disturbance at approximately mid-depth of the waterbody and within any visible plume. The turbidity, location, date, tidal stage (if applicable) and time must be recorded for each measurement.
b. Compliance: The Applicant must compare turbidity monitoring results from the compliance points to the representative background levels taken during each two -hour monitoring interval. Pursuant to OAR 340-041-0036, short term exceedances of the turbidity water quality standard are allowed as follows:
MONITORING WITH A TURBIDIMETER EVERY 2 HOURS
TURBIDITY LEVEL
0 to 4 NTU above background
5 to 29 NTU above background
30 to 49 NTU above background
50 NTU or more above background
Restrictions to Duration of Activity
No Restrictions Work may continue maximum of 4 hours. If turbidity remains 5-29 NTU above background, stop work and modify BMPs. Work may resume when NTU is 0-5 above background.
Work may continue maximum of 2 hours. If turbidity remains 30-49 NTU above background, stop work and modify BMPs. Work may resume when NTU is 0-5 above background.
Stop work immediately and inform DEQ
Project Name: Sand /s/and Pile Dike Repairs
c. Reporting: The Applicant must record all turbidity monitoring required by subsections (a) and (b) above in daily logs. The daily logs must include calibration documentation; background NTUs; compliance point NTUs; comparison of the points in NTUs; location; date; time; and tidal stage (if applicable) for each reading.
Additionally, a narrative must be prepared discussing all exceedances with subsequent monitoring, actions taken, and the effectiveness of the actions.
Applicant must make available copies of daily logs for turbidity monitoring to DEQ, USAGE, NMFS, USFWS, and ODFW upon request.
d. BMPs to Minimize In-stream Turbidity: The Applicant must implement the following BMPs, unless otherwise accepted by DEQ:
i. Sequence/Phasing of Work - The Applicant must schedule work activities so as to minimize in-water disturbance and duration of in-water disturbances;
ii. Bucket control - All in-stream digging passes by excavation machinery and placement of fill in-stream using a bucket must be completed so as to minimize turbidity. All practicable techniques such as employing an experienced equipment operator, not dumping partial or full buckets of material back into the wetted stream, adjusting the volume, speed, or both of the load, or using a closed-lipped environmental bucket must be implemented;
iii. The Applicant must limit the number and location of stream-crossing events.
Establish temporary crossing sites as necessary in the least sensitive areas and amend these crossing sites with clean gravel or other temporary methods as appropriate;
iv. Machinery may not be driven into the flowing channel, unless authorized by DEQ; and
v. Excavated material must be placed so that it is isolated from the water edge or wetlands, and not placed where it could re-enter waters of the state uncontrolled.
FOR PROJECTS THAT INCLUDE NEW IMPERVIOUS SURFACES OR REDEVELOPMENT
OF EXISTING SURFACES, THE FOLLOWING CONDITIONS APPLY
16) Post-Construction Stormwater Management: For projects which propose new impervious surfaces or the redevelopment of existing surfaces, the Applicant must submit a post-construction stormwater management plan to DEQ for review and approval prior to construction, in order to ensure compliance with water quality standards. The Applicant must implement BMPs as proposed in the stormwater management plan, including operation and maintenance. If proposed stormwater facilities change due to site conditions, the Applicant must notify DEQ.
In lieu of a complete stormwater management plan, the Applicant may submit documentation of acceptance of the stormwater into a DEQ permitted National Pollutant Discharge Elimination System (NPDES) Phase I Municipal Separate Storm Sewer System (MS4).
17) Stormwater Management & System Maintenance: The Applicant is required to implement effective operation and maintenance practices for the lifetime of the proposed facility.
Page5 of 10
Project Name: Sand /s/ancf Pile Dike Repairs
CATEGORY-SPECIFIC CONDITIONS
In addition to all national and regional conditions of the USAGE permit and the 401 Water Quality Certification general conditions above, the following conditions apply to the noted specific categories of authorized activities.
NWP 7 - Outfall Structures and Associated Intake Structures:
7.1) The following actions are denied certification:
a. Discharge outfalls that are not subject to an NPDES permit; and
b. Outfalls that discharge stormwater without pollutant removal demonstrated to meet water-quality standards prior to discharge to waters of the state.
7.2) If an Applicant cannot obtain an NPDES permit or submit an approvable stormwater management plan per DEQ's Guidelines found at:
http://www.orecion.aov/dea/FJIterDocs/401wqcertPostCon.pdf the Applicant must submit complete project information and water quality impacts analysis directly to DEQ in order to undergo individual 401 WQC evaluation and fulfill public participation requirements.
NWP 12-Utility Lines:
12.1) For proposals that include directionally-bored stream or wetland crossings:
a. All drilling equipment, drill recovery and recycling pits, and any waste or spoil produced, must be completely isolated, recovered, then recycled or disposed of to prevent entry into waters of the state.
b. In the event that drilling fluids enter a water of the state, the equipment operator must stop work, immediately initiate containment measures and report the spill to the Oregon Emergency Response System (OERS) at 800-452-0311.
c. An adequate supply of materials needed to control erosion and to contain drilling fluids must be maintained at the project construction site and deployed as necessary.
d. The Applicant must have a contingency plan in place prior to construction for the inadvertent return of drilling lubricant.
12.2) For proposals that include utility lines through wetlands, include anti-seep collars or equivalent technology to prevent draining the wetlands.
NWP 13 - Bank Stabilization:
Project Name: Sancf /s/ancf Pile Dike Repairs
13.1) Projects that do not include bioengineering are denied certification, unless a registered professional engineer provides a written statement that non-bioengineered solutions are the only means of protection.
13.2) To apply for certification for a project without bioengineering, the Applicant must submit complete project information and water quality impacts analysis directly to DEQ in order to undergo individual 401 WQC evaluation and fulfill public participation requirements.
NWP 14 - Linear Transportation:
14.1) For projects that include bank stabilization, bioengineering must be a component of the project, unless a registered professional engineer provides a written statement that non-bioengineered solutions are the only means to protect an existing structure.
14.2) To apply for certification for a project without bioengineering, the Applicant must submit complete project information and water quality impacts analysis directly to DEQ in order to undergo individual 401 WQC evaluation and fulfill public participation requirements.
NWP 16 - Return Water from Contained Upland Disposal Areas: Water-quality criteria and guidance values for toxics, per OAR 340-041-0033, are available in Tables 30, 31, and 40 at:
http://www.orecion.qov/deq/Rulemakinci%20Docs/tables303140.pdf.
16.1) Discharge of return water from contaminated dredged material that exceeds a chronic or acute toxicity water quality standard is prohibited.
16.2) Water removed with contaminated dredged material that could or does exceed chronic water-quality criteria must be contained and disposed of at an appropriately sized and sealed upland facility by evaporation or infiltration.
16.3) If a Modified Elutriate Test (MET) is performed for the known contaminants of concern (CoCs) and CoC concentrations are below DEQ chronic water-quality criteria, return water discharge is not limited.
a. The MET must be performed before dredging.
b. DEQ must approve the list of CoCs and analytical method prior to the Applicant performing the MET.
c. DEQ must review the results and provide approval of discharge from return water, in writing, prior to dredging.
NWP 20 - Response Operations for Oil and Hazardous Waste:
20.1) Coordination with DEQ's Emergency Response program is required. See:
http://www.oreqon.flov/deq/Hazards-and-Cleanup/env-cleanuD/Paaes/Emerciency-
Response.aspx.
NWP 22 - Removal of Vessels:
22.1) Coordination with DEQ's Emergency Response program is required. See:
httD://www.oreaon.ciov/dea/Hazards-and-Cleanup/env-cleanup/Pacies/Ememency-
Response.aspx.
Project Name: Sand /s/and Pile Dike Repairs
NWP 31 - Maintenance of Existing Flood Control Facilities:
31.1) Projects in streams with temperature TMDLs which result in a net reduction of riparian shade are prohibited.
NWP 38 - Cleanup of Hazardous and Toxic Waste:
38.1) For removal of contaminated material from waters, dredging method is limited to diver assisted hydraulic suction, hydraulic suction, closed-lipped environmental bucket, or excavation in the dry, unless otherwise authorized by DEQ.
a. For in-water isolation measures, the Applicant is referred to Appendix D of DEQ's Oregon Erosion and Sediment Control Manual, April 2005 (or most current version), at:
http://www.deq.state.or.us/WQ/stormwater/docs/escmanual/appxd.pdf.
38.2) Discharge to waters of the state resulting from dewatering during dredging or release of return water from an upland facility is prohibited except as provided below.
a. All water removed with sediment must be contained and disposed of at an appropriately sized and sealed upland facility by evaporation or infiltration; or,
b. A Modified Elutriate Test (MET) may be performed for the known Contaminants of Concern (CoCs) and ifCoC concentrations are below DEQ chronic water-quality criteria; return water discharge is not limited.
i. The MET must be performed before dredging.
ii. DEQ must approve the list of CoCs and analytical method prior to the Applicant performing the MET.
ill. DEQ must review the results and provide approval of discharge from dewatering and return water in writing prior to dredging.
38.3) Dredged material must be disposed of in compliance with DEQ Rules governing Hazardous Waste (see: http://www.orec)on.flov/deq/Hazards-and-
Cleanup/hw/Pages/default.aspx) or Solid Waste (see:
http://www.orecion.flov/deq/mm/swpermits/Paoes/Solid-Waste-Disposal-Sites-and- Landfill.aspx).
38.4) The new in-water surface must be managed to prevent exposure or mobilization of contaminants.
NWP 41 - Reshaping Existing Drainage Ditches:
41.1) To the extent practicable, the Applicant must work from only one bank in order to minimize disturbance to existing vegetation, preferably the bank with the least existing vegetation;
41.2) Following authorized work, the Applicant must establish in-stream and riparian vegetation on reshaped channels and side-channels using native plant species wherever practicable.
Plantings must be targeted to address water-quality improvement (e.g., provide shade to water to reduce temperature or provide bank stability through root systems to limit sediment inputs).
Page8 of 10
Planting options may include clustering or vegetating only one side of a channel, preferably the side which provides maximum shade.
NWP 42 - Recreational Facilities:
42.1) For facilities that include turf maintenance actions, the Applicant must develop and implement an Integrated Pest Management Plan (IPM) that describes pest prevention, monitoring and control techniques with a focus on prevention of chemical and nutrient inputs to waters of the state, including maintenance of adequate buffers for pesticide application near salmonid streams, or coverage under an NPDES permit, if required (information is available at:
http://www.orec)on.aov/deq/wq/wqpermits/Pages/Pesticide.aspx).
NWP 43 - Stormwater Management Facilities:
43.1) Projects that propose the following elements are denied certification:
a. In-stream or wetland stormwater facilities;
b. Discharge outfalls not subject to an NPDES permit; and,
c. Proposals that do not demonstrate pollutant removal to meet water-quality standards prior to discharge to waters of the state.
43.2) To apply for certification for a project with in-stream stormwater facilities, without an NPDES permit, or without submittal of an approvable stormwater management plan per DEQ's Guidelines (at: http://www.oreqon.qov/deq/FilterDocs/401wqcertPostCon.pdf), the Applicant must submit complete project information and water quality impacts analysis directly to DEQ in order to undergo individual 401 WQC evaluation and fulfill public participation requirements.
NWP 44 - Mining Activities:
44.1) Projects that do not obtain an NPDES 700-PM or Individual permit are denied certification.
44.2) To apply for certification for a project without an NPDES permit, the Applicant must submit complete project information and water quality impacts analysis directly to DEQ in order to undergo individual 401 WQC evaluation and fulfill public participation requirements.
NWP 51 - Land-Based Renewable Energy Generation Facilities:
51.1) For associated utility lines with directionally-bored stream or wetland crossings proposed, condition 12.1 must be applied.
NWP 54 - Living Shorelines
54.1) Projects that do not include bioengineering are denied certification, unless a registered professional engineer provides a written statement that non-bioengineered solutions are the only means of protection.
If the Applicant is dissatisfied with the conditions contained in this certification, a hearing may be requested. Such request must be made in writing to DEQ's Office of Compliance and Enforcement at 700 NE Multnomah St, Suite 600, Portland Oregon 97232, within 20 days of the mailing of this certification.
The DEQ hereby certifies that this project complies with the Clean Water Act and state rules, with the above conditions. If you have any questions, please contact Anne Kim at 503-229-5623, by email at Kim.Anne@dea.state.or.us, or at the address on this letterhead.
Sincerely
Steve Mrazik, Water Quality Manager Northwest Region ec: Elizabeth Santana (Elizabeth.A.Santana@usace.army.mil)
Attachment A. APILE and GRLWEAP Analyses
Table 1: Summary of Driveability Analyses for 24” Pipe Pile
24"X0.5” Partially
Plugged (Cored)
24"X0.5” Fully Plugged
(28 deg sand)
24"X0.5” Fully Plugged
(36 deg sand)
24"X0.75” Fully Plugged
(36 deg sand)
Hammer Analyzed Pileco D46-32 Pileco D46-32 Pileco D46-32 Pileco D46-32
Max Hammer Energy 107 kips-ft 107 kips-ft 107 kips-ft 107 kips-ft
Top Elevation 12 ft (GS= -25 ft) 12 ft (GS= -25 ft) 12 ft (GS= -25 ft) 12 ft (GS= -25 ft)
Pile Tip Elevation -65 ft -65 ft -65 ft -65 ft
Ultimate Capacity at
Estimated Tip
Elevation*
326 kips 389 kips 648 kips 648 kips
Total Blows (starting at penetration 5.0’) 180 295 592 523
Max Blows Per Foot 13 bpf 17 bpf 36 bpf 32 bpf
Max Compressive
Stress 27 ksi 27 ksi 31 ksi 29 ksi
Max Tensile Stress 2 ksi 2 ksi 3 ksi 5 ksi
Axial Capacity (kips) Sand Island Piles_24 inch OE PP_8 ft rock
D ep th ft
0 100 200 300 400 500 600 700 800 900 1000 1100
Skin Friction
Tip Resistance
Total Capacity
SAND
SAND DRAFT
Sand Island_24 inch OE Pipe pile_8 ft rock.ap7o
APILE for Windows, Version 2015.7.7
Serial Number : 161217588
A Program for Analyzing the Axial Capacity and Short-term Settlement of Driven Piles under Axial Loading.
(c) Copyright ENSOFT, Inc., 1987-2015 All Rights Reserved
This program is licensed to :
HDR, Inc.
Madison, WI
Path to file locations : P:\Transportation\Geotechnical\Projects\Sand Island Test Piles\APILE\ Name of input data file : Sand Island_24 inch OE Pipe pile_8 ft rock.ap7d Name of output file : Sand Island_24 inch OE Pipe pile_8 ft rock.ap7o Name of plot output file : Sand Island_24 inch OE Pipe pile_8 ft rock.ap7p
Time and Date of Analysis
Date: December 21, 2018 Time: 11:36:27
* INPUT INFORMATION *
Sand Island Test Piles_24 inch Pipe Pile
DESIGNER : MJS
JOB NUMBER :
METHOD FOR UNIT LOAD TRANSFERS :
- API RP 2A (American Petroleum Institute) Unfactored Unit Side Friction and Unit Side Resistance are used.
COMPUTATION METHOD(S) FOR PILE CAPACITY :
- USACE (U.S. Army Corps of Engineers) # Critical Depth Method for Sand:
10 to 20 Pile Diameter based on the Density
- API RP 2A (American Petroleum Institute)
TYPE OF LOADING :
- COMPRESSION
PILE TYPE :
Steel pipe pile or non-tapered portion of monotube pile
- Open-Ended Pile
DATA FOR AXIAL STIFFNESS :
- MODULUS OF ELASTICITY = 0.290E+08 PSI
- CROSS SECTION AREA = 36.91 IN2
CIRCULAR PILE PROPERTIES :
- OUTSIDE DIAMETER, OD = 24.00 IN.
- INTERNAL DIAMETER, ID = 23.00 IN.
- TOTAL PILE LENGTH, TL = 100.00 FT.
- PILE STICKUP LENGTH, PSL = 0.00 FT.
- ZERO FRICTION LENGTH, ZFL = 0.00 FT.
- INCREMENT OF PILE LENGTH
USED IN COMPUTATION = 1.00 FT.
- LENGTH OF ENHANCED
END SECTION = 100.00 FT.
- INTERNAL DIAMETER OF
ENHANCED END SECTION = 23.00 IN.
PLUGGED/UNPLUGGED CONDITIONS :
Internal Pile Plug Calculated by Program
SOIL INFORMATIONS :
LATERAL EFFECTIVE FRICTION BEARING
SOIL EARTH UNIT ANGLE CAPACITY
DEPTH TYPE PRESSURE WEIGHT DEGREES FACTOR
FT. LB/CF
0.00 SAND 0.80 135.00 45.00 50.00
8.00 SAND 0.80 135.00 45.00 50.00
8.00 SAND 0.80 60.00 28.00 20.00
120.00 SAND 0.80 60.00 28.00 20.00
MAXIMUM MAXIMUM UNDISTURB REMOLDED
UNIT UNIT SHEAR SHEAR BLOW UNIT SKIN UNIT END
FRICTION BEARING STRENGTH STRENGTH COUNT FRICTION BEARING
KSF KSF KSF KSF KSF KSF
0.10E+08* 0.10E+08* 0.00 0.00 0.00 0.00 0.00 0.10E+08* 0.10E+08* 0.00 0.00 0.00 0.00 0.00 0.10E+08* 0.10E+08* 0.00 0.00 0.00 0.00 0.00 0.10E+08* 0.10E+08* 0.00 0.00 0.00 0.00 0.00
* MAXIMUM UNIT FRICTION AND/OR MAXIMUM UNIT BEARING
WERE SET TO BE 0.10E+08 BECAUSE THE USER DOES NOT
PLAN TO LIMIT THE COMPUTED DATA.
LRFD FACTOR LRFD FACTOR
ON UNIT ON UNIT
DEPTH FRICTION BEARING
FT.
0.00 1.000 1.000
8.00 1.000 1.000
8.00 1.000 1.000
120.00 1.000 1.000
* COMPUTATION RESULT *
* ARMY CORPS METHOD *
PILE TOTAL SKIN END ULTIMATE
PENETRATION FRICTION BEARING CAPACITY
FT. KIP KIP KIP
0.00 0.0 0.0* 0.0
1.00 0.4 7.3* 7.6
2.00 1.4 14.9* 16.3
3.00 3.2 22.8* 26.0
4.00 5.7 31.1* 36.7
5.00 8.9 39.7* 48.6
6.00 12.8 48.7* 61.4
7.00 17.4 58.0* 75.3
8.00 22.7 67.6* 90.3
9.00 27.2 19.7* 46.9
10.00 30.8 21.7* 52.5
11.00 34.5 23.8* 58.3
12.00 38.3 26.1* 64.4
13.00 42.4 28.4* 70.8
14.00 46.7 30.7* 77.4
15.00 51.1 33.2* 84.3
16.00 55.7 35.8* 91.5
17.00 60.5 38.4* 98.9
18.00 65.5 41.2* 106.6
19.00 70.6 44.0* 114.6
20.00 76.0 46.9* 122.9
21.00 81.4 49.8* 131.2
22.00 86.8 52.7* 139.5
23.00 92.3 54.7* 146.9
24.00 97.7 57.3* 155.0
25.00 103.1 59.9* 163.0
26.00 108.5 62.5* 171.0
27.00 114.0 65.1* 179.0
28.00 119.4 67.7* 187.1
29.00 124.8 70.3* 195.1
30.00 130.2 72.9* 203.1
31.00 135.7 75.5* 211.1
32.00 141.1 78.1* 219.2
33.00 146.5 80.7* 227.2
34.00 151.9 83.3* 235.2
35.00 157.4 85.9* 243.3
36.00 162.8 88.5* 251.3
37.00 168.2 91.1* 259.3
38.00 173.7 93.7* 267.3
39.00 179.1 96.3* 275.4
40.00 184.5 98.9* 283.4
41.00 189.9 101.5* 291.4
42.00 195.4 104.1* 299.4
43.00 200.8 106.7* 307.5
44.00 206.2 109.3* 315.5
45.00 211.6 111.9* 323.5
46.00 217.1 112.4 329.5
47.00 222.5 112.4 334.9
48.00 227.9 112.4 340.3
49.00 233.3 112.4 345.8
50.00 238.8 112.4 351.2
51.00 244.2 112.4 356.6
52.00 249.6 112.4 362.0
53.00 255.1 112.4 367.5
54.00 260.5 112.4 372.9
55.00 265.9 112.4 378.3
56.00 271.3 112.4 383.8
57.00 276.8 112.4 389.2
58.00 282.2 112.4 394.6
59.00 287.6 112.4 400.0
60.00 293.0 112.4 405.5
61.00 298.5 112.4 410.9
62.00 303.9 112.4 416.3
63.00 309.3 112.4 421.7
64.00 314.8 112.4 427.2
65.00 320.2 112.4 432.6
66.00 325.6 112.4 438.0
67.00 331.0 112.4 443.4
68.00 336.5 112.4 448.9
69.00 341.9 112.4 454.3
70.00 347.3 112.4 459.7
71.00 352.7 112.4 465.2
72.00 358.2 112.4 470.6
73.00 363.6 112.4 476.0
74.00 369.0 112.4 481.4
75.00 374.4 112.4 486.9
76.00 379.9 112.4 492.3
77.00 385.3 112.4 497.7
78.00 390.7 112.4 503.1
79.00 396.2 112.4 508.6
80.00 401.6 112.4 514.0
81.00 407.0 112.4 519.4
82.00 412.4 112.4 524.9
83.00 417.9 112.4 530.3
84.00 423.3 112.4 535.7
85.00 428.7 112.4 541.1
86.00 434.1 112.4 546.6
87.00 439.6 112.4 552.0
88.00 445.0 112.4 557.4
89.00 450.4 112.4 562.8
90.00 455.8 112.4 568.3
91.00 461.3 112.4 573.7
92.00 466.7 112.4 579.1
93.00 472.1 112.4 584.5
94.00 477.6 112.4 590.0
95.00 483.0 112.4 595.4
96.00 488.4 112.4 600.8
97.00 493.8 112.4 606.3
98.00 499.3 112.4 611.7
99.00 504.7 112.4 617.1
100.00 510.1 112.4 622.5
* API RP-2A (1994) *
PILE TOTAL SKIN END ULTIMATE
PENETRATION FRICTION BEARING CAPACITY
FT. KIP KIP KIP
0.00 0.0 0.0* 0.0
1.00 0.3 2.0* 2.3
2.00 1.1 4.6* 5.7
3.00 2.6 7.6* 10.2
4.00 4.6 11.3* 15.8
5.00 7.1 15.5* 22.6
6.00 10.2 20.2* 30.5
7.00 14.0 25.5* 39.4
8.00 18.2 31.3* 49.5
9.00 21.7 25.6* 47.3
10.00 24.2 28.3* 52.5
11.00 26.8 31.1* 57.9
12.00 29.6 34.0* 63.6
13.00 32.5 37.1* 69.6
14.00 35.5 40.3* 75.8
15.00 38.6 43.6* 82.2
16.00 41.9 47.1* 88.9
17.00 45.3 50.6* 95.9
18.00 48.8 54.3* 103.1
19.00 52.4 58.1* 110.5
20.00 56.2 62.0* 118.2
21.00 60.1 66.1* 126.2
22.00 64.2 70.2* 134.4
23.00 68.3 74.5* 142.9
24.00 72.6 79.0* 151.6
25.00 77.0 83.5* 160.5
26.00 81.6 88.2* 169.7
27.00 86.2 92.9* 179.2
28.00 91.0 97.9* 188.9
29.00 96.0 102.9* 198.9
30.00 101.0 108.0* 209.1
31.00 106.2 113.3* 219.5
32.00 111.5 118.7* 230.2
33.00 117.0 124.2* 241.2
34.00 122.5 129.9* 252.4
35.00 128.2 135.6* 263.9
36.00 134.1 141.5* 275.6
37.00 140.0 147.5* 287.6
38.00 146.1 153.7* 299.8
39.00 152.3 159.9* 312.2
40.00 158.6 166.3* 325.0
41.00 165.1 172.8* 337.9
42.00 171.7 179.5* 351.1
43.00 178.4 186.2* 364.6
44.00 185.3 193.1* 378.3
45.00 192.2 200.1* 392.3
46.00 199.3 207.2* 406.5
47.00 206.6 214.4* 421.0
48.00 213.9 218.7 432.6
49.00 221.4 222.4 443.8
50.00 229.0 226.2 455.2
51.00 236.8 230.0 466.7
52.00 244.7 233.7 478.4
53.00 252.7 237.5 490.2
54.00 260.8 241.3 502.1
55.00 269.0 245.0 514.1
56.00 277.4 248.8 526.2
57.00 285.9 252.6 538.5
58.00 294.6 256.0 550.6
59.00 303.4 258.9 562.2
60.00 312.3 261.1 573.3
61.00 321.3 262.6 583.9
62.00 330.4 263.6 594.0
63.00 339.7 263.9 603.6
64.00 349.1 263.9 613.0
65.00 358.7 263.9 622.6
66.00 368.3 263.9 632.2
67.00 378.1 263.9 642.0
68.00 388.0 263.9 651.9
69.00 398.1 263.9 662.0
70.00 408.3 263.9 672.2
71.00 418.6 263.9 682.5
72.00 429.0 263.9 692.9
73.00 439.6 263.9 703.5
74.00 450.3 263.9 714.1
75.00 461.1 263.9 725.0
76.00 472.0 263.9 735.9
77.00 483.1 263.9 747.0
78.00 494.3 263.9 758.2
79.00 505.6 263.9 769.5
80.00 517.1 263.9 781.0
81.00 528.7 263.9 792.6
82.00 540.4 263.9 804.3
83.00 552.2 263.9 816.1
84.00 564.2 263.9 828.1
85.00 576.3 263.9 840.2
86.00 588.5 263.9 852.4
87.00 600.9 263.9 864.8
88.00 613.4 263.9 877.2
89.00 626.0 263.9 889.9
90.00 638.7 263.9 902.6
91.00 651.6 263.9 915.5
92.00 664.6 263.9 928.5
93.00 677.7 263.9 941.6
94.00 690.9 263.9 954.8
95.00 704.3 263.9 968.2
96.00 717.8 263.9 981.7
97.00 731.4 263.9 995.3
98.00 745.2 263.9 1009.1
99.00 759.1 263.9 1023.0
100.00 773.1 263.9 1037.0
NOTES:
- AN ASTERISK IS PLACED IN THE END-BEARING COLUMN
IF THE TIP RESISTANCE IS CONTROLLED BY THE FRICTION
OF SOIL PLUG INSIDE AN OPEN-ENDED PIPE PILE.
* COMPUTE LOAD-DISTRIBUTION AND LOAD-SETTLEMENT *
* CURVES FOR AXIAL LOADING *
T-Z CURVE NO. OF DEPTH TO CURVE LOAD TRANSFER PILE MOVEMENT
NO. POINTS FT. PSI IN.
1 10 0.0000E+00 0.0000E+00 0.0000E+00 0.9440E-01 0.1000E-01 0.1888E+00 0.2000E-01 0.3776E+00 0.4000E-01 0.5664E+00 0.6000E-01 0.7552E+00 0.8000E-01 0.8496E+00 0.9000E-01 0.9440E+00 0.1000E+00 0.9440E+00 0.5000E+00 0.9440E+00 0.2000E+01 2 10 0.4025E+01 0.0000E+00 0.0000E+00 0.3147E+00 0.1000E-01 0.6293E+00 0.2000E-01 0.1259E+01 0.4000E-01 0.1888E+01 0.6000E-01 0.2517E+01 0.8000E-01 0.2832E+01 0.9000E-01 0.3147E+01 0.1000E+00 0.3147E+01 0.5000E+00 0.3147E+01 0.2000E+01 3 10 0.7958E+01 0.0000E+00 0.0000E+00 0.4291E+00 0.1000E-01 0.8581E+00 0.2000E-01 0.1716E+01 0.4000E-01 0.2574E+01 0.6000E-01 0.3433E+01 0.8000E-01 0.3862E+01 0.9000E-01 0.4291E+01 0.1000E+00 0.4291E+01 0.5000E+00 0.4291E+01 0.2000E+01 4 10 0.8000E+01 0.0000E+00 0.0000E+00 0.3310E+00 0.1000E-01
0.6621E+00 0.2000E-01 0.1324E+01 0.4000E-01 0.1986E+01 0.6000E-01 0.2648E+01 0.8000E-01 0.2979E+01 0.9000E-01 0.3310E+01 0.1000E+00 0.3310E+01 0.5000E+00 0.3310E+01 0.2000E+01 5 10 0.6403E+02 0.0000E+00 0.0000E+00 0.1061E+01 0.1000E-01 0.2122E+01 0.2000E-01 0.4245E+01 0.4000E-01 0.6367E+01 0.6000E-01 0.8489E+01 0.8000E-01 0.9551E+01 0.9000E-01 0.1061E+02 0.1000E+00 0.1061E+02 0.5000E+00 0.1061E+02 0.2000E+01 6 10 0.1200E+03 0.0000E+00 0.0000E+00 0.1549E+01 0.1000E-01 0.3099E+01 0.2000E-01 0.6197E+01 0.4000E-01 0.9296E+01 0.6000E-01 0.1239E+02 0.8000E-01 0.1394E+02 0.9000E-01 0.1549E+02 0.1000E+00 0.1549E+02 0.5000E+00 0.1549E+02 0.2000E+01
TIP LOAD TIP MOVEMENT
KIP IN.
0.0000E+00 0.0000E+00 0.1649E+02 0.1200E-01 0.3299E+02 0.2400E-01 0.6597E+02 0.4800E-01 0.1319E+03 0.3120E+00 0.1979E+03 0.1008E+01 0.2375E+03 0.1752E+01 0.2639E+03 0.2400E+01 0.2639E+03 0.3600E+01 0.2639E+03 0.4800E+01
LOAD VERSUS SETTLEMENT CURVE
TOP LOAD TOP MOVEMENT TIP LOAD TIP MOVEMENT
KIP IN. KIP IN.
0.3137E+01 0.1611E-02 0.1374E+00 0.1000E-03 0.3155E+02 0.1615E-01 0.1374E+01 0.1000E-02 0.1599E+03 0.8170E-01 0.6872E+01 0.5000E-02 0.3037E+03 0.1624E+00 0.1374E+02 0.1000E-01 0.7403E+03 0.5578E+00 0.6647E+02 0.5000E-01 0.8491E+03 0.7194E+00 0.7897E+02 0.1000E+00 0.9199E+03 0.1199E+01 0.1498E+03 0.5000E+00 0.9673E+03 0.1752E+01 0.1972E+03 0.1000E+01 0.1018E+04 0.2808E+01 0.2476E+03 0.2000E+01
HDR Engineering Jan 02 2019
GRLWEAP Version 2010Sand Isl TP_24in OE PP_8 ft rock_D46-32
Gain/Loss 1 at Shaft and Toe 1.000 / 1.000
Ultimate End Blow Comp. Tension
Depth Capacity Friction Bearing Count Stress Stress Stroke ENTHRU ft kips kips kips blows/ft ksi ksi ft kips-ft
5.0 22.9 7.1 15.7 -1.0 0.000 0.000 0.00 0.0
10.0 53.6 25.3 28.3 1.5 15.034 -1.608 4.29 64.0
15.0 83.4 39.7 43.7 2.3 18.632 -2.274 4.74 59.9
20.0 119.3 57.3 62.0 3.6 20.773 -2.007 5.20 56.4
25.0 161.7 78.1 83.6 5.3 22.531 -0.866 5.60 53.5
30.0 210.1 102.1 108.0 7.5 23.968 -1.382 5.95 51.1
35.0 265.3 129.3 136.0 9.8 25.447 -0.710 6.35 49.5
40.0 325.6 159.7 166.0 12.9 26.714 -1.105 6.73 48.6
Total Continuous Driving Time 4.00 minutes; Total Number of Blows 180
HDR Engineering Jan 02 2019 Sand Isl TP_24in OE PP_8 ft rock_D46-32
Gain/Loss 1 at Shaft and Toe 1.000 / 1.000 GRLWEAP Version 2010
D e p th ft
0 4 8 12 16
Blow Count (blows/ft)
D e p th ft
0 100 200 300 400
Ult. Capacity (kips)
0 10 20 30 40
Tension (ksi)
0 10 20 30 40
Comp. Stress (ksi)
0.0 2.0 4.0 6.0 8.0
Stroke (ft)
0.0 20.0 40.0 60.0 80.0
ENTHRU (kips-ft)
GRLWEAP - Version 2010
WAVE EQUATION ANALYSIS OF PILE FOUNDATIONS
written by GRL Engineers, Inc. (formerly Goble Rausche Likins and Associates, Inc.) with cooperation from Pile Dynamics, Inc.
Copyright (c) 1998-2010, Pile Dynamics, Inc.
ABOUT THE WAVE EQUATION ANALYSIS RESULTS
The GRLWEAP program simulates the behavior of a preformed pile driven by either an impact hammer or a vibratory hammer. The program is based on mathematical models, which describe motion and forces of hammer, driving system, pile and soil under the hammer action. Under certain conditions, the models only crudely approximate, often complex, dynamic situations.
A wave equation analysis generally relies on input data, which represents normal situations. In particular, the hammer data file supplied with the program assumes that the hammer is in good working order. All of the input data selected by the user may be the best available information at the time when the analysis is performed. However, input data and therefore results may significantly differ from actual field conditions.
Therefore, the program authors recommend prudent use of the GRLWEAP results.
Soil response and hammer performance should be verified by static and/or dynamic testing and measurements. Estimates of bending or other local stresses (e.g., helmet or clamp contact, uneven rock surfaces etc.), prestress effects and others must also be accounted for by the user.
The calculated capacity - blow count relationship, i.e. the bearing graph, should be used in conjunction with observed blow counts for the capacity assessment of a driven pile. Soil setup occurring after pile installation may produce bearing capacity values that differ substantially from those expected from a wave equation analysis due to soil setup or relaxation. This is particularly true for pile driven with vibratory hammers. The GRLWEAP user must estimate such effects and should also use proper care when applying blow counts from restrike because of the variability of hammer energy, soil resistance and blow count during early restriking.
Finally, the GRLWEAP capacities are ultimate values. They MUST be reduced by means of an appropriate factor of safety to yield a design or working load.
The selection of a factor of safety should consider the quality of the construction control, the variability of the site conditions, uncertainties in the loads, the importance of building and other factors.
Input File: P:\TRANSPORTATION\GEOTECHNICAL\PROJECTS\SAND ISLAND TEST PILES\GRLWEAP\8 FT
ROCK\SAND ISLAND_24 IN OE PP_8 FT ROCK_PILECOD46-32.GWW
Hammer File: C:\ProgramData\PDI\GRLWEAP\2010\Resource\HAMMER2010.GW
Hammer File Version: 2003 (3/27/2015)
Input File Contents
Sand Isl TP_24in OE PP_8 ft rock_D46-32
OUT OSG HAM STR FUL PEL N SPL N-U P-D %SK ISM 0 PHI RSA ITR H-D MXT DEx
-100 0 856 0 1 0 0 0 0 3 0 0 0 0 0 0 0 0 0.000
Pile g Hammer g Toe Area Pile Size Pile Type
32.170 32.170 144.000 24.000 Unknown
W Cp A Cp E Cp T Cp CoR ROut StCp
3.800 415.000 470.0 3.500 0.800 0.010 0.0
A Cu E Cu T Cu CoR ROut StCu
0.000 0.0 0.000 0.000 0.000 0.0
LPle APle EPle WPle Peri CI CoR ROut
77.000 36.90 29000.0 492.000 6.280 0 1.000 0.010
FFatique F0 0-Bottom
0 0.000 0.000
Manufac Hmr Name HmrType No Seg-s
PILECO D46-32 1 5
Ram Wt Ram L Ram Dia MaxStrk RtdStrk Efficy
10.14 137.80 19.68 13.10 10.60 0.80
IB. Wt IB. L IB.Dia IB CoR IB RO
2.27 33.30 19.68 0.900 0.010
CompStrk A Chamber V Chamber C Delay C Duratn Exp Coeff VolCStart Vol CEnd
18.94 304.20 458.90 0.0005 0.0005 1.250 0.00 0.00
P atm P1 P2 P3 P4 P5
14.70 1425.00 1280.00 1155.00 1040.00 0.00
Stroke Effic. Pressure R-Weight T-Delay Exp-Coeff Eps-Str Total-AW
10.6000 0.8000 1425.0000 0.0000 0.0000 0.0000 0.0100 0.0000
Qs Qt Js Jt Qx Jx Rati Dept
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Research Soil Model: Atoe, Plug, Gap, Q-fac
0.000 0.000 0.000 0.000
Research Soil Model: RD-skn: m, d, toe: m, d
0.000 0.000 0.000 0.000
Res. Distribution
Dpth Rskn Rtoe Qs Qt Js Jt SU F LimD SU T
0.00 0.00 0.00 0.10 0.04 0.05 0.15 1.20 6.56 1.0
2.00 0.18 4.60 0.10 0.04 0.05 0.15 1.20 6.56 1.0
4.00 0.36 11.30 0.10 0.04 0.05 0.15 1.20 6.56 1.0
6.00 0.54 20.20 0.10 0.04 0.05 0.15 1.20 6.56 1.0
8.00 0.73 31.30 0.10 0.04 0.05 0.15 1.20 6.56 1.0
1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .