McClellan B88 Boiler Replacement Drawing Set Construction_Draft.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26127Q0101
About this file
This document is a set of construction drawings for the Building 88 Boiler & Domestic Water Heater Replacement project at McClellan VA Clinic, prepared by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management.
The project encompasses the decommissioning, removal, and replacement of heating hot water and domestic water heating infrastructure. The scope includes replacing three existing heating hot water boilers with two new 1,000 MBH dual-fuel high-efficiency boilers and replacing two existing domestic water heaters with two new 120 MBH dual-fuel high-efficiency units. The contractor must provide all labor, materials, equipment, and engineering services to deliver fully operational, integrated, commissioned, and code-compliant hydronic and domestic hot water systems. Work includes architectural and structural modifications to support new equipment, such as concrete pads and building envelope modifications; plumbing work including new domestic water heaters, recirculating systems, water softening systems, natural gas piping, and intake/flue piping; mechanical work for the primary and secondary hydronic loops with pumps and appurtenances; controls and automation integration into the existing building automation system; electrical work including power distribution, VFDs, and communication modules; testing and balancing; and comprehensive commissioning. All work must comply with 2025 California Building Standards Code (Title 24), SMAQMD Rules 411 and 414 for ultra-low NOx emissions, NFPA standards, and VA design specifications. The drawings show mechanical, plumbing, electrical, and controls layouts with equipment schedules, specifications for components including boilers, pumps, expansion tanks, water heaters, and water softeners, and coordination details across all trades.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| McClellan B88 and B98 Boiler Replacement Specifications_Draft.pdf | ||
| 36C26127Q0101.docx | DOCX document | |
| Replace B98 and B88 Boiler and Sump Pumps STATEMENT OF WORK V4.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
N/A
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
COVER SHEET
PFS TM G-001
N
U.S. Department of Veterans Affairs
Project Name: BUILDING 88 BOILER & DOMESTIC WATER HEATER REPLACEMENT
BUILDING 88
Revisions: Date:
DRAFT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
N/A
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
GENERAL NOTES
Checker Author G-002
DRAWING INDEX
G-001 COVER SHEET
G-002 GENERAL NOTES
G-003 NOTES, ABBREVIATIONS, SYMBOLS
MD-101 LEVEL 0 - MECHANICAL DEMOLITION PLAN
MH-101 LEVEL 0 - MECHANICAL PLAN
MH-102 LEVEL 0 - MECHANICAL PLAN VIEWS
MI-201 MECHANICAL SCHEDULES
MI-401 MECHANICAL CONTROLS
PD-101 LEVEL 0 - PLUMBING DEMOLITION PLAN
PQ-101 LEVEL 0 - PLUMBING PLAN
PQ-102 LEVEL 0 - PLUMBING PLAN VIEWS
PI-201 PLUMBING SCHEDULES
PI-401 PLUMBING CONTROLS
E-000 ELECTRICAL - SYMBOLS, NOTES, AND ABBREVIATIONS
ED-010 ELECTRICAL - BASEMENT (LEVEL 0) SELECTIVE REMOVALS PLAN
ED-100 ELECTRICAL - SELECTIVE REMOVALS ONE-LINE AND PANEL SCHEDULE
E-010 ELECTRICAL - NEW BASEMENT (LEVEL 0) WORK PLAN
E-100 ELECTRICAL - NEW WORK PARTIAL ONE-LINE AND PANEL SCHEDULE
SCOPE OF WORK
THIS PROJECT ENCOMPASSES THE DECOMMISSIONING, REMOVAL, AND REPLACEMENT OF THE HEATING HOT WATER AND DOMESTIC WATER HEATING INFRASTRUCTURE AT THE MCCLELLAN VA CLINIC. THE SCOPE INCLUDES REPLACING THREE (3) EXISTING HEATING HOT WATER BOILERS WITH TWO (2) NEW 1,000 MBH DUAL-FUEL HIGH-EFFICIENCY BOILERS; AND REPLACING TWO (2) EXISTING DOMESTIC WATER HEATERS WITH TWO (2) NEW 120 MBH DUAL-FUEL HIGH-
EFFICIENCY UNITS.
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND ENGINEERING SERVICES NECESSARY TO DELIVER A FULLY OPERATIONAL, INTEGRATED, COMMISSIONED, AND CODE-COMPLIANT HYDRONIC AND DOMESTIC HOT WATER PLANT. ALL WORK MUST COMPLY WITH APPLICABLE VA DESIGN STANDARDS, LOCAL CODES, AND ENVIRONMENTAL REGULATIONS.
ARCHITECTURAL & STRUCTURAL SCOPE:
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO PERFORM ARCHITECTURAL MODIFICATIONS AND STRUCTURAL ENHANCEMENTS NECESSARY TO SUPPORT THE NEW MECHANICAL AND PLUMBING
EQUIPMENT. THIS INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING:
• HOUSEKEEPING AND EQUIPMENT PADS: ENGINEERING REVIEW, MODIFICATION OF EXISTING CONCRETE HOUSEKEEPING PADS, OR INSTALLATION OF NEW REINFORCED CONCRETE EQUIPMENT PADS AS NECESSARY TO ACCOMMODATE THE FOOTPRINTS AND OPERATING WEIGHTS OF THE NEW BOILERS, WATER HEATERS, AND PUMPING PACKAGES.
• BUILDING ENVELOPE MODIFICATIONS: PERFORM ALL STRUCTURAL AND WEATHERPROOFING MODIFICATIONS TO THE BUILDING ENVELOPE (INCLUDING BUT NOT LIMITED TO ROOF PENETRATIONS, EXTERIOR WALLS, LOUVERS, AND STRUCTURAL FRAMING) REQUIRED TO ROUTE NEW INTAKE/FLUE PIPING OR TRANSPORT HEAVY EQUIPMENT INTO THE FACILITY. ALL EXTERIOR PENETRATIONS MUST BE COMPLETELY SEALED, FLASHED, AND WARRANTIED
TO MAINTAIN WATERTIGHT INTEGRITY.
• RIGGING AND LOGISTICS: THE GC SHALL SUBMIT A COMPREHENSIVE RIGGING AND LOGISTICS PLAN TO THE COR FOR REVIEW AND APPROVAL PRIOR TO THE START OF CONSTRUCTION. THE PLAN SHALL DETAIL DELIVERY SCHEDULES AND STAGING AREAS, UTILITY SHUTDOWN COORDINATION SEQUENCE, AND SEQUENCE FOR REMOVAL OF EXISTING EQUIPMENT AND INSTALLATION OF NEW EQUIPMENT.
PLUMBING SCOPE:
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO REPLACE THE EXISTING DOMESTIC WATER HEATERS AND DELIVER COMPLETE FUEL AND PLUMBING SYSTEM UPGRADES. THIS INCLUDES, BUT IS NOT
LIMITED TO:
• DOMESTIC WATER HEATERS (DWH): DECOMMISSION AND REMOVE TWO (2) EXISTING 120 MBH DOMESTIC WATER HEATERS. FURNISH AND INSTALL TWO (2) NEW 120 MBH NATURAL GAS HIGH-EFFICIENCY CONDENSING-TYPE
DOMESTIC WATER HEATERS.
• ENVIRONMENTAL COMPLIANCE: WATER HEATERS MUST COMPLY STRICTLY WITH SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT (SMAQMD) RULE 414, ACHIEVING ULTRA-LOW NOX EMISSIONS.
• CONTRACTOR TO PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS OF THE LAYOUT OF THE EQUIPMENT.
• PLUMBING APPURTENANCES: PROVIDE A COMPLETELY RENEWED DOMESTIC HOT WATER ANCILLARY LOOP, INCLUDING BUT NOT LIMITED TO A NEW DOMESTIC HOT WATER RECIRCULATING PUMP, A DIGITAL MASTER MIXING/TEMPERING VALVE STATION, AN EXPANSION TANK, AND A CENTRAL WATER SOFTENING SYSTEM TAILORED TO SYSTEM CAPACITY. CONTRACTOR TO PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS OF THE
LAYOUT OF THE EQUIPMENT.
• NATURAL GAS PIPING: MODIFY AND EXTEND THE EXISTING NATURAL GAS PIPING NETWORK TO SUPPORT THE THERMAL DEMANDS OF THE NEW BOILER AND WATER HEATER CONFIGURATIONS. PROVIDE CODE-COMPLIANT REGULATORS, SHUT-OFF VALVES, AND SEDIMENT TRAPS AT EACH UNIT CONNECTION. CONTRACTOR TO PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS OF THE LAYOUT OF THE EQUIPMENT.
• INTAKES AND FLUES: PROVIDE ALL REQUIRED INTAKE AND FLUE VENT PIPING TO SUPPORT THE INSTALLATION OF THE NEW HEATING HOT WATER BOILERS AND DOMESTIC HOT WATER HEATERS. UTILIZE AL29-4C STAINLESS STEEL OR MANUFACTURER-APPROVED PVC/CPVC CONDENSING VENT MATERIALS, TERMINATING PENETRATIONS THROUGH THE BUILDING ENVELOPE WITH CODE-COMPLIANT CAPS AND SCREENS.
MECHANICAL SCOPE:
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO REPLACE THE CENTRAL HEATING HOT WATER GENERATION PLANT. THIS INCLUDES, BUT IS NOT LIMITED TO:
• HEATING HOT WATER BOILERS: DECOMMISSION, DISCONNECT, AND SAFELY REMOVE THREE (3) EXISTING HEATING HOT WATER BOILERS AND THEIR ASSOCIATED TRIM. FURNISH AND INSTALL TWO (2) NEW 1,000 MBH HIGH-
EFFICIENCY, (NATURAL GAS) COMMERCIAL CONDENSING HEATING HOT WATER BOILERS.
• ENVIRONMENTAL COMPLIANCE: BOILERS MUST COMPLY STRICTLY WITH SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT (SMAQMD) RULE 411, ACHIEVING ULTRA-LOW NOX EMISSIONS.
• CONTRACTOR TO PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS OF THE LAYOUT OF THE EQUIPMENT.
• PRIMARY HYDRONIC LOOP: FURNISH AND INSTALL ALL APPURTENANCES REQUIRED TO ESTABLISH A HIGH-EFFICIENCY PRIMARY HYDRONIC LOOP. THIS INCLUDES NEW DEDICATED PRIMARY BOILER LOOP CIRCULATING PUMPS, AN APPROPRIATELY SIZED DIAPHRAGM-TYPE HYDRONIC EXPANSION TANK OPTIMIZED FOR INDOOR UTILITY ENVIRONMENTS, AIR/DIRT SEPARATORS, CHEMICAL FEED SYSTEMS, AND CODE-MANDATED SAFETY RELIEF VALVES.
CONTRACTOR TO PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS OF THE LAYOUT OF THE EQUIPMENT.
• SECONDARY HYDRONIC LOOP: FURNISH AND INSTALL TWO (2) NEW SECONDARY HEATING HOT WATER PUMPS (CONFIGURED AS A LEAD/LAG SYSTEM) AND ALL NECESSARY APPURTENANCES TO CREATE A COMPLETE SECONDARY LOOP SERVED BY THE PRIMARY LOOP. SECONDARY PUMPS SHALL BE EQUIPPED WITH VARIABLE FREQUENCY DRIVES (VFDS) AND ASSOCIATED DYNAMIC BALANCING VALVES TO MAINTAIN APPROPRIATE SYSTEM FLOW ACROSS THE FACILITY. CONTRACTOR TO PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS OF THE LAYOUT OF THE EQUIPMENT.
• RIGGING & LOGISTICS: THE CONTRACTOR SHALL SUBMIT A COMPREHENSIVE RIGGING AND LOGISTICS PLAN TO THE COR FOR REVIEW AND APPROVAL PRIOR TO THE START OF CONSTRUCTION. THE PLAN MUST DETAIL CRANE PLACEMENTS, STRUCTURAL PATH LOADING EVALUATIONS, DELIVERY SCHEDULES, AND UTILITY SHUTDOWN COORDINATION.
• PRESSURE TESTING & HYDRONIC PREP: ALL NEW PRIMARY AND SECONDARY HYDRONIC PIPING LOOPS MUST BE HYDROSTATICALLY PRESSURE TESTED AT 1.5 TIMES THE SYSTEM DESIGN PRESSURE FOR A MINIMUM CONTINUOUS DURATION OF 24 HOURS PRIOR TO THE APPLICATION OF PIPE INSULATION. SYSTEM FLUSHING, CHEMICAL CLEANING, AND WATER TREATMENT PASSIVATION MUST BE PERFORMED BEFORE EQUIPMENT STARTUP.
CONTROLS & AUTOMATION SCOPE:
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO FULLY AUTOMATE, MONITOR, AND INTEGRATE THE NEW MECHANICAL AND PLUMBING PLANT INFRASTRUCTURE.
• BAS INTEGRATION: INTEGRATE THE TWO (2) NEW 1,000 MBH HEATING BOILERS, TWO (2) NEW DOMESTIC WATER HEATERS (DWH), PRIMARY/SECONDARY PUMPS, VFDS, WATER SOFTENING STATUS, AND PROPANE AUTOMATIC
CHANGEOVER VALVES INTO THE EXISTING CAMPUS BUILDING AUTOMATION SYSTEM (BAS).
• NOTE: THE EXISTING CAMPUS BAS PLATFORM AND VENDOR ARE CURRENTLY UNKNOWN; THE CONTRACTOR IS RESPONSIBLE FOR FIELD-VERIFYING THE CURRENT SYSTEM ARCHITECTURE AND PROVIDING ALL
NECESSARY GATEWAYS, CONTROLLERS, AND SOFTWARE DRIVERS FOR FULL COMPATIBILITY.
• SEQUENCE OF OPERATIONS: PROGRAM AND FULLY VALIDATE COMPREHENSIVE OPERATIONAL SEQUENCES. THIS INCLUDES AUTOMATIC LEAD/LAG ROTATION, OUTDOOR AIR TEMPERATURE RESET CURVES, PRIMARY/SECONDARY VARIABLE FLOW CONTROL.
ELECTRICAL & COMMUNICATIONS SCOPE:
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO PERFORM ELECTRICAL AND DATA COMMUNICATION MODIFICATIONS NECESSARY TO SUPPORT THE NEW EQUIPMENT PLANT.
• POWER DISTRIBUTION & SAFETY DISCONNECTS: SAFELY DISCONNECT ELECTRICAL SERVICES FROM THE THREE (3) EXISTING BOILERS, TWO (2) EXISTING WATER HEATERS, AND ALL EXISTING PRIMARY/SECONDARY PUMPS SCHEDULED FOR REPLACEMENT. PROVIDE AND INSTALL NEW CIRCUIT BREAKERS, CONDUIT, WIRE, LOCAL SAFETY DISCONNECT SWITCHES, AND VARIABLE FREQUENCY DRIVES (VFDS) TO SERVE THE NEW BOILERS, WATER
HEATERS, AND PUMPS.
• ELECTRICAL COMPATIBILITY CHECK: THE CONTRACTOR SHALL VERIFY THAT ALL EXISTING CIRCUIT BREAKERS AND ELECTRICAL DISTRIBUTION CONDUCTORS SCHEDULED TO REMAIN ARE FULLY COMPATIBLE WITH THE NEW EQUIPMENT’S NAMEPLATE MINIMUM CIRCUIT AMPACITY (MCA) AND MAXIMUM OVERCURRENT PROTECTION (MOP) RATINGS.
• COMMUNICATIONS & NETWORK SCOPE: INSTALL ALL NECESSARY LOW-VOLTAGE CONDUIT, SHIELDED CABLING, AND NETWORK COMMUNICATION MODULES (E.G., BACNET MS/TP OR MODBUS) TO LINK THE INTERNAL MICROPROCESSOR CONTROL BOARDS OF THE BOILERS AND WATER HEATERS DIRECTLY TO THE CENTRAL BAS NETWORK CONTROLLER.
TESTING, ADJUSTING, AND BALANCING (TAB):
• SYSTEM REBALANCING: PERFORM A COMPREHENSIVE WATER-SIDE SYSTEM BALANCE OF THE NEW PRIMARY AND SECONDARY HEATING HOT WATER LOOPS. BALANCE BOTH THE PRIMARY BOILER PUMPS AND SECONDARY DISTRIBUTION PUMPS TO DESIGN FLOW RATES AND HEAD PRESSURES. FINAL CERTIFIED TAB REPORTS MUST BE SUBMITTED TO THE COR FOR APPROVAL.
COMMISSIONING SCOPE:
THE CONTRACTOR SHALL PROVIDE COMPREHENSIVE, INDEPENDENT COMMISSIONING SERVICES FOR ALL NEW SYSTEMS INSTALLED UNDER THIS PROJECT. A DETAILED COMMISSIONING PLAN MUST BE SUBMITTED TO THE COR FOR
REVIEW AND APPROVAL PRIOR TO FUNCTIONAL TESTING.
• HVAC COMMISSIONING: EXECUTE COMPLETE COMPONENT, EQUIPMENT, AND SEQUENCE VALIDATION FOR THE CENTRAL HYDRONIC HEATING PLANT. COMMISSIONING SHALL VERIFY BOILER COMBUSTION EFFICIENCIES (ENSURING SMAQMD RULE 411 COMPLIANCE), PRIMARY/SECONDARY PUMP SEQUENCES, OUTDOOR AIR RESET LOGIC, AND VFD MODULATION.
• PLUMBING COMMISSIONING: EXECUTE COMPLETE FUNCTIONAL TESTING FOR THE DOMESTIC HOT WATER (DHW) PLANT. COMMISSIONING SHALL VERIFY CONDENSING WATER HEATER EFFICIENCIES, DOMESTIC HOT WATER RECIRCULATING PUMP OPERATIONS, THE DOMESTIC WATER SOFTENING SYSTEM REGENERATION CYCLES, AUTOMATIC PROPANE FUEL CHANGEOVER, AND THE DIGITAL MASTER MIXING VALVE STATION TO ENSURE STEADY, SAFE DELIVERY TEMPERATURES TO THE CLINIC.
• INTEGRATED CONTROLS VERIFICATION: PERFORM END-TO-END TESTING OF ALL DATA POINTS INTEGRATED INTO THE BAS. VERIFY THAT ALL ALARMS, SYSTEM STATUSES, RUNTIME TOTALS, AND TREND CONFIGURATIONS FOR BOTH THE HVAC AND PLUMBING EQUIPMENT REPORT ACCURATELY TO THE CENTRAL WORKSTATION.
GENERAL NOTES
1. SURVEY: BEFORE ANY WORK IS STARTED, THE CONTRACTOR SHALL MAKE A THOROUGH SURVEY WITH THE COR, OF AREAS OF BUILDINGS (INSIDE AND OUTSIDE) IN WHICH ALTERATIONS OCCUR AND AREAS WHICH ARE ANTICIPATED ROUTES OF ACCESS, AND FURNISH A REPORT, SIGNED BY BOTH, TO THE CONTRACTING OFFICER. THIS REPORT SHALL LIST BY ROOMS AND SPACES, ETC:
A. EXISTING CONDITION AND TYPES OF RESILIENT FLOORING, DOORS, WINDOWS, WALLS AND
OTHER SURFACES NOT REQUIRED TO BE ALTERED THROUGHOUT AFFECTED AREAS OF
BUILDINGS.
B. EXISTENCE AND CONDITIONS OF ITEMS SUCH AS PLUMBING FIXTURES AND ACCESSORIES,
ELECTRICAL FIXTURES, EQUIPMENT, VENETIAN BLINDS, SHADES, ETC., REQUIRED BY
DRAWINGS TO BE EITHER REUSED OR RELOCATED, OR BOTH.
C. SHALL NOTE ANY DISCREPANCIES BETWEEN DRAWINGS AND EXISTING CONDITIONS AT SITE.
D. SHALL DESIGNATE AREAS FOR WORKING SPACE, MATERIALS STORAGE AND ROUTES OF
ACCESS TO AREAS WITHIN BUILDINGS WHERE ALTERATIONS OCCUR AND WHICH HAVE BEEN
AGREED UPON BY CONTRACTOR AND COR.
E. SHALL SUBMIT PRE-CONSTRUCTION SURVEY REPORT PRIOR TO CONDUCTING ANY WORK.
F. SEE SPEC SECTION 01 00 00 - 1.7 FOR MORE INFO.
2. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SYSTEMS AND SURFACES INDICATED TO REMAIN. ALL DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST
TO THE GOVERNMENT.
3. THE CONTRACTOR SHALL PROVIDE BARRICADES AT ALL WORK AREAS TO PREVENT PERSONNEL
FROM ENTERING AREAS OF WORK, UNLESS OTHERWISE NOTED
4. AT THE END OF EACH DAY, CONTRACTOR SHALL CLEAN AND REMOVE WASTE FROM THE WORK
AREA(S). THERE WILL BE NO EXCEPTION TO THE DAILY CLEAN UP REQUIREMENT. STORING
CONSTRUCTION WASTE NEAR A STORAGE TRAILER IS NOT PERMITTED.
5. DIMENSIONS OF ALL REPLACEMENT MATERIALS SHOULD REFER TO THE EXISTING MATERIALS AND
TRY TO MATCH AS CLOSE AS POSSIBLE, UNLESS OTHERWISE NOTED.
6. ROOM NUMBERS INDICATED ON PLANS ARE FOR REFERENCE AND COORDINATION OF THESE
DOCUMENTS ONLY.
7. PRODUCTS IDENTIFIED AS BASIS OF DESIGN (BOD) ARE NOT REQUIRED. PRODUCTS MAY BE INCLUDED BUT ARE NOT LIMITED TO THE BOD, AN APPROVED EQUAL PRODUCT WILL BE PERMITTED.
8. WORK SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES, ORDINANCES
AND REGULATIONS.
9. CONTRACTOR IS RESPONSIBLE FOR JOB SAFETY, CONSTRUCTION PROCEDURES, COORDINATION OF
THEIR WORK WITH OTHER TRADES AND ON-SITE SECURITY.
10. MINOR DETAILS OR INCIDENTAL ITEMS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR A PROPER
AND COMPLETE INSTALLATION SHALL BE INCLUDED AS REQUIRED.
11. CONTRACTOR SHALL MAINTAIN EGRESS PATHS FOR BUILDING OCCUPANTS AT ALL TIMES.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS WHICH ARE REQUIRED
FOR THE SATISFACTORY COMPLETION OF WORK.
13. THE CONTRACTOR SHALL COORDINATE THE TIMING AND SEQUENCE OF WORK WITH THE
CONTRACTING OFFICER, GOVERNMENT EMPLOYEES AND BUILDING TENANTS.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL AND/OR RECYCLING
OF ALL DEMOLITION MATERIALS UNLESS NOTED TO SALVAGE AND TURN OVER TO THE
GOVERNMENT FOR REUSE OR RELOCATION.
15. EXECUTE WORK IN A CAREFUL AND ORDERLY MANNER WITH LEAST POSSIBLE DISTURBANCE TO THE
PUBLIC AND BUILDING OCCUPANTS.
16. WHERE ALTERATIONS OCCUR, OR NEW AND OLD WORK JOIN, CUT, REMOVE, PATCH, REPAIR OR
REFINISH TO ADJACENT SURFACES AND LEAVE IN AS GOOD CONDITION AS EXISTED PRIOR TO
COMMENCING WORK.
17. HOT WORK PERMITS (WELDING, BRAZING, SOLDERING, TORCH CUTTING, ETC.) SHALL BE OBTAINED
DAILY THROUGH THE COR.
18. ALL WORK TO BE DONE OFF HOUR SHALL BE COORDINATE AND SCHEDULE WITH THE COR,
GOVERNMENT EMPLOYEES AND BUILDING TENANTS.
19. PROVIDE HANGERS, CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING. ENSURE COMPLIANCE WITH VA SEISMIC DESIGN GUIDELINES IN ACCORDANCE WITH HANDBOOK H-18-8, VA SEISMIC DESIGN REQUIREMENTS, AND SPECIFICATIONS.
20. DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE TO DETERMINE EXACT LOCATIONS OF SYSTEMS IN THE FIELD AND SUBMIT SURVEY REPORT IN ACCORDANCE WITH SPECIFICATIONS.
CONTRACTOR SHALL PROVIDE NECESSARY OFFSETS OR RE-ROUTE TO AVOID CONFLICTING WITH
EXISTING CONDITIONS. .
APPLICABLE CODES
CALIFORNIA BUILDING STANDARDS CODE (TITLE 24)
• 2025 CALIFORNIA BUILDING CODE (CBC) / TITLE 24, PART 2 (EFFECTIVE DATE: JANUARY 1, 2026)
• 2025 CALIFORNIA ELECTRICAL CODE (CEC) / TITLE 24, PART 3 (EFFECTIVE DATE: JANUARY 1, 2026)
• 2025 CALIFORNIA MECHANICAL CODE (CMC) / TITLE 24, PART 4 (EFFECTIVE DATE: JANUARY 1, 2026)
• 2025 CALIFORNIA PLUMBING CODE (CPC) / TITLE 24, PART 5 (EFFECTIVE DATE: JANUARY 1, 2026)
• 2025 CALIFORNIA ENERGY CODE / TITLE 24, PART 6 (EFFECTIVE DATE: JANUARY 1, 2026)
REGIONAL ENVIRONMENTAL & NATIONAL FUEL/FIRE CODES
• SMAQMD RULE 411 (SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT) (CURRENT ACTIVE/ENFORCED)
• NFPA 54 / ANSI Z223.1: NATIONAL FUEL GAS CODE (2024 EDITION)
• NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (2025 EDITION)
• ANSI/ASHRAE STANDARD 135: BACNET (2024 EDITION)
DEPARTMENT OF VETERANS AFFAIRS (VA) SPECIFICATIONS & MANUALS
• VA MASTER SPECIFICATIONS (PG-18-1) (CURRENT ACTIVE REVISIONS)
• VA HVAC DESIGN MANUAL (PG-18-10) (NOVEMBER 1, 2017 EDITION, REVISED MARCH 1, 2024)
• VA STEAM, HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEMS DESIGN MANUAL (MAY 1, 2024 EDITION)
• VA PLUMBING DESIGN MANUAL (PG-18-10) (JUNE 1, 2022 EDITION, REVISED FEBRUARY 1, 2024)
• VA ELECTRICAL DESIGN MANUAL (PG-18-10) (MARCH 1, 2025 EDITION)
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
N/A
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
NOTES, ABBREVIATIONS, SYMBOLS
Checker Author G-003
MECHANICAL GENERAL NOTES
1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE HARD
SUSPENDED CEILING, OR ACOUSTICAL CEILING.
2. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH MECHANICAL INSTALLATION AND
DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
3. FOR TYPICAL PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.
PLUMBING GENERAL NOTES
1. COORDINATE INSTALLTION OF ALL PIPING WITH OTHER CONTRACTORS. NOTIFY CONSTRUCTION MANAGER
OF ANY DEVIATIONS FROM THESE DRAWINGS PRIOR TO FABRICATION AND/OR INSTALLATION.
2. CONTRACTOR TO INSTALL ALL EQUIPMENT AND MATERIALS AS SHOWN ON DWGS. IN ACCORDANCE WITH SPECIFICATIONS, IN THE EVENT OF A CONFLICT BETWEEN DWGS. AND SPECIFICATIONS THE DRAWINGS WILL
GOVERN.
3. CONTRACTOR TO VERIFY ALL PIPE ROUTINGS AND DIMENSIONS BEFORE ORDERING MATERIAL OR DOING
WORK.
4. ALL NEW PIPING IS TO BE FLUSHED AND TESTED IN ACCORDANCE WITH THE SPECIFICATIONS.
5. CONTRACTOR TO INSTALL PIPE SUPPORTS AND MATERIALS IN ACCORDANCE WITH THE SPECIFICATIONS AND
STATE CODES.
A/E ARCHITECT / ENGINEER
AP ACCESS PANEL
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
B BOILER
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
COP CENTER OF PIPE
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
Db DRY-BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EER ENERGY EFFICIENCY RATIO
ENT ENTERING
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FM FLOW METER
FS FLOW SWITCH
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
GA GAUGE
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
HB HOSE BIBB
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HZ HERTZ
I/O INPUT/OUTPUT
ID INSIDE DIAMETER
IN INCHES
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
MAX MAXIMUM
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MOV MOTOR OPERATED VALVE
KW KILOWATT
KWH KILOWATT HOUR
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LVG LEAVING
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
P PUMP
PD PRESSURE DROP
PG PRESSURE GAGE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSV PRESSURE SAFETY VALVE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RV RELIEF VALVE
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SI SQUARE INCHES
SP STATIC PRESSURE
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
TAB TESTING, ADJUSTING, BALANCE
TDS TOTAL DISSOLVED SOLIDS
V VALVE
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VSD VARIABLE SPEED DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
DRAWING SYMBOLS
26-SF-3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
DRAWING NUMBER WHERE DRAWN
H4
H7
A
PIPING SYMBOLS
FLUE VENT
COMBUSTION AIR
FV
CA
EXISTING PIPE TO BE DEMOLISHED
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
PRESSURE GAGE
THERMOMETER
PIPE UP
PIPE DOWN
GENERAL PIPING SYMBOLS
FLOW METERM
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
VALVE SYMBOLS
ABBREVIATIONS
EXISTING PIPE TO BE DEMOLISHED
CONTROLS SYMBOLS
TT TEMPERATURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
PDT PRESSURE DIFFERENTIAL TRANSMITTER
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
PDS PRESSURE DIFFERENTIAL SWITCH
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES MINIMUM LENGTH IN
DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO
TRANSMIT TEMPERATURE TO EMCS
MOTOR
STARTER
M
ELECTRIC OPERATED CONTROL DAMPER/OR
VALVE
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TC
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
VSMC VARIABLE SPEED MOTOR CONTROLLER
PC
PRESSURE CONTROLLER. SEE SEQUENCE OF
OPERATION
SC
SPEED CONTROLLER. SEE SEQUENCE OF
OPERATION
FC
FLOW CONTROLLER. SEE SEQUENCE OF
OPERATION
PSH PRESSURE SWITCH HIGH
FSH FLOW SWITCH HIGH
PSL PRESSURE SWITCH LOW
KC TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
FSL FLOW SWITCH LOW
HOT WATER RETURN
HOT WATER SUPPLYHWS
HWR
DOMESTIC HOT WATERDHW
DOMESTIC COLD WATERDCW
NATURAL GASNG
Revisions: Date:
PIPE COARSE VIEW
PIPE FINE VIEW
EXISTING SWBD "MSB"
EXISTING PNL "BNL1"
EXISTING TELECOM
CABINET
EXISTING COMMUNICATION
CABINET
EXISTING AHU-1
EXISTING CONCRETE
PAD TO REMAIN.
DEMOLISH EXISTING BOILER,
PUMPS, ASSOCIATED PIPING,
AND APPURTENANCES.
DEMOLISH EXISTING BOILERS,
PUMPS, ASSOCIATED PIPING,
AND APPURTENANCES.
H W
S H
W R
H W
S H
W R
2"
HWR
2"
HWS
2"
HWS2"
HWR
2"
HWR
2"
HWS
3/4"
HWS
2"
HWS
2"
HWR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
1/2" = 1'-0"
LEVEL 0 - MECHANICAL DEMOLITION PLAN
Checker Author MD-101
1/2" = 1'-0"
MECHANICAL DEMOLITION
UP
EXISTING 6" EQUIPMENT
PAD. CONTRACTOR TO
MODIFY EQUIPMENT PAD AS
NECESSARY PRIOR TO NEW
EQUIPMENT INSTALLATION.
REFER TO SPECIFICATIONS
FOR MORE REQUIREMENTS.
88-B-1
88-B-2
88-ET-1
88-AS-1
88-HWP-P-1
88-HWP-P-2
88-HWP-S-1
88-HWP-S-2
EXISTING SWBD "MSB"
EXISTING PNL "BNL1"
EXISTING TELECOM
CABINET
EXISTING COMMUNICATION
CABINET
EXISTING AHU-1
CONTRACTOR TO PROVIDE
NEW 6" EQUIPMENT PAD AS
NECESSARY PRIOR TO NEW
EQUIPMENT INSTALLATION.
REFER TO SPECIFICATIONS
FOR MORE REQUIREMENTS.
3"
HWS 3"
HWR
3"
HWS
POT FEEDER
INSTALL PER
MANUFACTURER
REQUIREMENTS
H W
S
H W
R
H W
S
H W
R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
1/2" = 1'-0"
LEVEL 0 - MECHANICAL PLAN
Checker Author MH-101
1/2" = 1'-0"
Level 0 - MECH NEW WORK
Level 1
10' - 0"
BASEMENT
0' - 0"
Lev el 1
10'
- 0"
BASEMENT
0' - 0"
88-B-2 88-B-1
88-HWP-S-188-HWP-S-2
POT FEEDER
88-AS-1
88-ET-1
H W
S
H W
R
H W
S
88-HWP-P-1
88-HWP-P-2
3"
HWR
3"
HWS
Level 1 10' - 0"
BASEMENT
0' - 0"
88-B-188-B-2
3"
HWS
1"
HWS
3"
HWR
3"
HWR
88-ET-1
C A
6"
CA
C A
F V
3"
HWR
H W
R 3
H W
S
H W
S
6"
FV
F V
H W
S
H W
R
3/4"
NG
POT
FEEDER
PROVIDE
BACKDRAFT
DAMPER AT
EACH BOILER
VENT PIPE
POT FEEDER
88-B-188-B-288-HWP-S-1
88-HWP-S-2
88-HWP-P-188-HWP-P-2
3"
⌀ HWR
3"
H W
S
H W
R
H W
S
H W
S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
3/4" = 1'-0"
LEVEL 0 - MECHANICAL PLAN VIEWS
Checker Author MH-102
MECHANICAL NEW WORK ISOMETRIC VIEW 1 Copy 1
3/4" = 1'-0"
MECHANICAL NEW WORK SECTION VIEW Copy 1
MECHANICAL NEW WORK ISOMETRIC VIEW 2 Copy 1
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
N/A
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
MECHANICAL SCHEDULES
Checker Author MI-201
EXPANSION TANK SCHEDULE
MARK TYPE
APPROX SYSTEM
VOLUME
MIN
TEMPERATURE
MAX
TEMPERATURE
INITIAL PRESS.
IN TANK
MAX OPERATING
PRESS.
RELIEF VALVE
PRESS.
PRESS. AT
TANK
MIN VOLUME
TANK
MIN BLADDER
VOLUME
PIPE SIZE
AT TANK
MAKE-UP WATER
FILL SIZE REMARKS
88-ET-1 EXPANSION TANK 60 GAL 40 F 240 F 12 PSI 125 PSI 125 PSI 12 PSI 23 GAL 23 GAL 1 IN.
AIR SEPARATOR SCHEDULE
MARK TYPE SIZE (IN.)
FLOW
(GPM) WPD (FT)
BUILT-IN
STRAINER REQ'D REMARKS
88-AS-1 AIR SEPARATOR 12 100 1.29 N/A
HYDRONIC PUMP SCHEDULE
MARK TYPE FLUID
FLOW
(GPM) HEAD (FT) SP GR MIN % EFF HP PHASE VOLT MAX RPM
SPEED
CONTROL REMARKS
88-HWP-P-1 PRIMARY, INLINE WATER 100 15.35 1.0 61 0.75 1 110-240 3600 VARIABLE
88-HWP-P-2 PRIMARY, INLINE WATER 100 15.35 1.0 61 0.75 1 110-240 3600 VARIABLE
88-HWP-S-1 SECONDARY, FRAME-MOUNTED END SUCT. WATER 100 40 1.0 72 1.5 3 230-460 1760 VARIABLE
88-HWP-S-2 SECONDARY, FRAME-MOUNTED END SUCT. WATER 100 40 1.0 72 1.5 3 230-460 1760 VARIABLE
HOT WATER HEATING BOILER SCHEDULE
MARK TYPE
FLOW
(GPM) EWT LWT
WPD
(PSIG) HP
OUTPUT
(MBH)
MAX HEAT
INPUT (MBH) MIN % EFF
NG SUPPLY
PRESS. FUEL
RELIEF VALVE
SETTING (PSIG) PHASE VOLT REMARKS
88-B-1 HOT WATER BOILER 100 140 F 160 F 3 30 870-960 1000 87 7 IN. W.C. NAT. GAS 125 1 120
88-B-2 HOT WATER BOILER 100 140 F 160 F 3 30 870-960 1000 87 7 IN. W.C. NAT. GAS 125 1 120
Revisions: Date:
CHEMICAL FEED SYSTEM SCHEDULE
MARK TYPE
MAX OPERATING
PRESS.
MAX
TEMPERATURE
CONNECTION
SIZES HP PHASES VOLTS REMARKS
88-PF-1 DOME BOTTOM FILTER FEEDER 200 PSI 200 F 3/4 IN. N/A N/A N/A
NOTES: BASIS OF DESIGN IS TACO CA90-125
NOTES: BASIS OF DESIGN IS AERCO BENCHMARK 1000 HE BOILER
NOTES: BASIS OF DESIGN FOR PRIMARY PUMP IS TACO VR30M-F. BASIS OF DESIGN FOR SECONDARY PUMP IS TACO FI1507D-4P-PM
NOTES: BASIS OF DESIGN IS J.L. WINGERT CO. F-DB-HD
NOTES: BASIS OF DESIGN IS TACO 4903A-125
IT
MC HS BAS
STS
TYPICAL PRIMARY PUMP
B-2B-1
PP-2PP-1
SP-2SP-1
AS-1
ET-1
P O
T F
E E
D E
R
HWS TO
BLDG
HWR
FROM
BLDG
"Ø
H W
S
3"Ø HWS
3"Ø HWR
3"Ø HWS
3"Ø HWS
"Ø
H W
S
"Ø
H W
S
"Ø
H W
S
3"Ø HWS
"Ø
H W
S
"Ø
H W
R "Ø
H W
R
P-1.1
P-1.2 P-2.2
P-2.1
TT TT
T-1.1 T-2.1
T-3.1
TT
"Ø
H W
R
3"Ø HWR
TT TT
TT
FT
DPT
EXISTING BUILDING
DP SENSOR LOCATED
IN THE BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
N/A
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
MECHANICAL CONTROLS
Checker Author MI-401
HEATING HOT WATER CONTROL POINTS
System Component
Point Legend System Output Sytem Inputs System Software / Control
S h o w o n G ra p h ic s
T re n d in g
RemarksP o in t
ID
A b b re v ia ti o n
P ri o ri ty
A d d
-A lt e rn a te
N o
Binary Analog Binary Anaglog Alarm Processing Application / Function
E le ct ri c D e v ic e
S ta rt
S to p
O p e n
C lo s e
S p e e d C o m m a n d
V a lv e P o s it io n
D a m p e r P o si ti o n
S ta tu s
A la rm
P re ss u re b i)
H ig h H u m id ity
H ig h S ta ti c P re s s u re
L o w
T e m p e ra tu re
T e m p e ra tu re a n
P re ss u re a n
P o si ti o n
F lo w a n
P e rc e n t
S ta ti c P re s s u re
C a rb o n
M o n o x id e
H u m id ity
V a c u u m
L o c a l A la rm
P a n e l
A re a A la rm
P a n e l
M a st e r
A la rm P a n e l
H ig h L im it
L o w
L im it
S c h e d u le
S ta rt S to p
F u n c ti o n
D u ty
C y cl e
T e m p e ra tu re
E c o n o m iz e r
E n th a lp y E c o n o m iz e r
T e m p e ra tu re
R e se t
D e m a n d L im iti n g
T e m p e ra tu re
O v e rr id e
S ta ti c P re s s u re
R e se t
P re s su re V o lu m e
C o n tr o l
F a ilu re
M o d e
S p a c e T e m p e ra tu re C o n tr o l
F u ll
C o m m u n ic a ti o n
HWS TEMPERATURE AI HWST ● ● ●
HWR TEMPERATURE AI HWRT ● ● ●
BOILER 1 - HWS TEMPERATURE AI B1-HWST ● ● ●
BOILER 1 - HWR TEMPERATURE AI B1-HWRT ● ● ●
BOILER 2 - HWS TEMPERATURE AI B2-HWST ● ● ●
BOILER 2 - HWR TEMPERATURE AI B2-HWRT ● ● ●
LEAD PRIMARY PUMP VFD AO PP1-VFD ● ● ●
LAG PRIMARY PUMP VFD AO PP2-VFD ● ● ●
LEAD SECONDARY PUMP VFD AO SP1-VFD ● ● ●
LAG SECONDARY PUMP VFD AO SP2-VFD ● ● ●
LEAD PRIMARY PUMP ALARM BI PP1-ALA ● ●
LAG PRIMARY PUMP ALARM BI PP2-ALA ● ●
LEAD SECONDARY PUMP ALARM BI SP1-ALA ● ●
LAG SECONDARY PUMP ALARM BI SP2-ALA ● ●
LEAD PRIMARY PUMP STATUS BI PP1-STS ● ●
LAG PRIMARY PUMP STATUS BI PP2-STS ● ●
LEAD SECONDARY PUMP STATUS BI SP1-STS ● ●
LAG SECONDARY PUMP STATUS BI SP2-STS ● ●
HW FLOW PRIMARY (GPM) AI HW-PF ● ● ●
HW FLOW SECONDARY (GPM) AI HW-SF ● ● ●
BOILER 1-DP AI B1-DP ● ● ● ● ●
BOILER 2-DP AI B2-DP ● ● ● ● ●
BUILDING-DP AI BL-DP ● ● ● ● ●
BOILER 1 COMMUNICATION AI B1-COMM ● ●
BOILER 2 COMMUNICATION AI B2-COMM ● ●
1. GENERAL
1.1. THE CONTROL CONTRACTOR SHALL INTEGRATE ALL MECHANICAL EQUIPMENT WITH THE EXISTING
BAS SYSTEM.
1.2. AT COMPLETION OF PROJECT, CONTROL CONTRACTOR SHALL HAVE ACCOUNT EXECUTIVE,
TECHNICAL REPRESENTATIVE AND SERVICE REPRESENTATIVE PERFORM A WALKTHROUGH WITH
THE PROJECT ENGINEER, HVAC SHOP, M&O MAINTENANCE, BOILER PLANT OPERATORS, ETC. TO REVIEW ALL SYSTEMS, COMPONENTS, DEVICES, CONTROLS, PANELS, ETC. INSTALLED & INSTRUCT & DISPLAY ALL WORKING SET POINTS. THIS SHALL BE IN ADDITION TO TRAINING & INSTRUCTIONS ALREADY DESCRIBED IN THE SPECIFICATIONS. THIS SHALL BE COORDINATED & SCHEDULED TO
OCCUR PRIOR TO TURNING OVER THE SPACE TO THE CLIENT.
1.3. CONTROL CONTRACTOR SHALL PROVIDE BUT NOT LIMITED TO BELOW COMPONENTS TO CONNECT
MECHANICAL EQUIPMENT TO THE BUILDING AUTOMATION SYSTEM:
A. FLOW METER
B. BUILDING DIFFERENTIAL PRESSURE SENSOR (IF NOT ALREADY INSTALLED)
C. CURRENT SENSORS (IT)
2. HEATING HOT WATER BOILER CONTROL
2.1. HEATING HOT WATER (HW) BOILER SHALL BE ACTIVATED AND OPERATE TO MAINTAIN HEATING HW
TEMPERATURE SETPOINT WHEN THE WATER SUPPLY TEMPERATURE DROPS BELOW HEATING HW
TEMPERATURE SETPOINT.
2.2. THE HEATING HW BOILER MANUFACTURER SHALL PROVIDE BUT NOT LIMIT TO BELOW
COMPONENTS:
2.2.1. BAS GATEWAY.
2.2.2. BOILER TEMPERATURE SENSORS.
2.3. CONTROL CONTRACTOR SHALL PROVIDE BUT NOT LIMIT TO BELOW COMPONENTS:
2.3.1. START/STOP RELAY FOR THE LEAD BOILER.
2.3.2. AUTOMATIC CONTROL VALVES.
2.3.3. COMMUNICATION NETWORK TO CONNECT BOILERS, PUMPS INTO BAS.
2.3.4. LOOP TEMPERATURE SENSORS
2.3.5. FLOW METER
2.4. BOILER OPERATION
2.4.1. THE HEATING HOT WATER TEMPERATURE SETPOINT IS 160°F. THE BAS SHALL BE ABLE TO
MONITOR AND CHANGE SETPOINT REMOTELY.
2.4.2. BOILERS SHALL BE AUTOMATICALLY STARTED OR STOPPED BY THE BAS WHEN THE WATER
SUPPLY TEMPERATURE DROPS BELOW OR RISES ABOVE THE HEATING HW TEMPERATURE
SETPOINT FOR 30 MINUTES (ADJ.)
2.4.3. UPON ACTIVATION OF THE BOILER START SEQUENCE, THE BAS SHALL FIRST OPEN THE BOILER WATER ISOLATION VALVES. ONCE THE VALVE POSITION IS VERIFIED BY ZC, PRIMARY BOILER START/STOP (S/S) DIGITAL OUTPUT (D.O.) SHALL ENERGIZE TO ACTIVATE THE BOILER
PLANT.
2.4.4. UPON DEACTIVATION OF THE BOILER START SEQUENCE, THE REVERSE PROCESS SHALL
OCCUR.
2.4.5. CONTROL OF INTERNAL BOILER OPERATION SHALL BE THROUGH THE ON-BOARD CONTROL
PANEL PROVIDED BY THE BOILER MANUFACTURER. BOILERS SHALL MODULATE TO MAINTAIN
THE SUPPLY HEATING HOT WATER TEMPERATURE SETPOINT.
2.4.6. BOILER CONTROL PANEL SHALL SEND A SIGNAL TO BOILER PUMP TO MODULATE PUMP
SPEED IN ACCORDANCE WITH BOILER MODULATION.
2.4.7. BAS SHALL ENERGIZE THE LAG BOILER WHEN THE LEAD BOILER OPERATES AT 100%
CAPACITY AND WATER TEMPERATURE SETPOINT IS STILL NOT MET.
2.4.8. BAS SHALL ROTATE BOILERS TO EQUALIZE OPERATING TIME.
3. HOT WATER TEMPERATURE RESET
3.1. THE HOT WATER TEMPERATURE SETPOINT SHALL BE RESET LIMITED TO 1°F (ADJ) PER HOUR AS
FOLLOWS:
OA DRY BULB HW TEMPERATURE SETPOINT
= < 30°F (ADJ) 160°F (ADJ)
= > 70°F (ADJ) 140°F (ADJ)
THE HOT WATER SUPPLY SETPOINT SHALL LINEARLY RESET BETWEEN THESE TWO POINTS.
4. BUILDING PUMP CONTROL
4.1 SAFETIES AND ALARMS
4.1.1. ONLY ONE BUILDING PUMP SHALL OPERATE AT A TIME. IF EITHER PUMP FAILS, IT SHALL BE
LOCKED OUT. THE LAG PUMP SHALL BE STARTED. THE BAS SHALL NOT ATTEMPT TO START
THE FAILED PUMP UNTIL THE LOCKOUT IS MANUALLY RESET.
4.1.2. THE BAS SHALL MONITOR THE POSITIONS OF THE HOA AND NORMAL-TEST-BYPASS
SWITCHES ON THE VFD.
4.1.3. THE BAS SHALL ROTATE THE LEAD/LAG PUMP TO EQUALIZE RUN TIME.
4.2. OPERATION
4.2.1. A VARIABLE PUMP SYSTEM DESIGN SHALL BE IMPLEMENTED.
4.2.2. THE PUMP SHALL BE CONTROLLED TO SATISFY BUILDING DP SETPOINT.
4.2.3. THE PUMP SPEED SHALL NOT DROP BELOW THE MINIMUM PUMP FLOW AS REQUIRED BY THE
PUMP MANUFACTURER (+10% SAFETY) OR THE MINIMUM VFD SPEED AS RECOMMENDED BY
THE VFD MANUFACTURER, WHICHEVER IS GREATER.
4.2.4. SHOULD THE BUILDING DP REACH OR EXCEED THE SETPOINT AND MINIMUM SPEED FOR THE
PUMP IS REACHED, THE PUMP SHALL MAINTAIN MINIMUM SPEED AND THE MINIMUM BYPASS
CONTROL VALVE SHALL MODULATE TO MAINTAIN THE DP SET POINT.
4.2.5. BUILDING PUMP SHALL RUN UPON HEATING COMMAND FROM ANY EQUIPMENT AND RUN AT
VARIABLE SPEED TO MEET THE DP SENSOR SETPOINT AT THE BUILDING. SETPOINT SHALL BE
SET AND VERIFIED DURING TESTING, ADJUSTING, AND BALANCING.
4.2.6. UPON AN INCREASE IN BUILDING DP ABOVE SETPOINT THE BUILDING PUMP SHALL SLOW
DOWN TO MAINTAIN THE SETPOINT (ADJ.)
4.2.7. UPON A DECREASE IN BUILDING DP BELOW SETPOINT (ADJ.) THE REVERSE PROCESS SHALL
OCCUR.
5. HOT WATER TEMPERATURE RESET
5.1. BOILER MBH SHALL BE CALCULATED AND INDICATED AT THE BAS USING HOT WATER FLOW RATE
AND TEMPERATURES AS FOLLOWS:
MBH = ((HWS - HWR)) X FLOW RATE (GPM)) X 500/1000
6. ALARM
6.1. ALARM SHALL INDICATE AT THE BAS WHEN THE FOLLOWING HAPPENS:
6.1.1. HEATING HW PUMP IS COMMANDED TO RUN, BUT PUMP OPERATION IS NOT DETECTED BY IT.
6.1.2. BOILER PUMP IS COMMANDED TO RUN, BUT PUMP OPERATION IS NOT DETECTED BY IT.
6.1.3. BOILER ISOLATION VALVE POSITIONS ARE NOT VERIFIED BY ZC.
6.1.4. THE HEATING HOT WATER SUPPLY TEMPERATURE IS 5°F (ADJ.) GREATER OR LESS THAN THE
TEMPERATURE SETPOINT FOR 20 CONSECUTIVE MIN (ADJ.).
Revisions: Date:
6" = 1'-0"
MECHANICAL CONTROLS DIAGRAM
EXISTING PNL "BNL1"
EXISTING TELECOM
CABINET
EXISTING COMMUNICATION
CABINET
EXISTING AHU-1
EXISTING CONCRETE
PAD TO REMAIN.
DEMOLISH EXISTING DOMESTIC
WATER HEATERS, ASSOCIATED
PIPING, AND APPURTENANCES.
DEMOLISH EXISTING FLUE
VENT TO BOILERS AND
DOMESTIC WATER HEATERS.
DEMOLISH EXISTING
WATER SOFTENER SYSTEM
AND ASSOCIATED PIPING.
NG
DHW
DCW
DHWR
NG
D C
W D
C W
6"
FV
6"
FV
8"
FV
F V
8"⌀
FV
6"⌀
FV
F V
D C
W
3/4"
NG
1"
DHWR
2"
DHW
/2
N G
3/4"
NG
2 1/2"
DCW
2 1/2"
DCW
PQ-102
3/4"
NG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
1/2" = 1'-0"
LEVEL 0 - PLUMBING DEMOLITION PLAN
Checker Author PD-101
1/2" = 1'-0"
BASEMENT - PLUM DEMOLITION
DHWRDHWS
DCW
CONNECT COMBUSTION
AIR INTAKE TO EXISTING
LOUVER ABOVE DOOR.
(TYP) MODIFY LOUVER
AS REQUIRED.
3"
CA 3"
CA 6"
CA 6"
CA
8"
FV
F V
88 - DWH-1
88 - DWH-2
MIXING STATION
FLUE VENT UP THRU
EXISTING ROOF
PENETRATION.
MODIFY AS
REQUIRED.
88-WS-1
88-WS-2
WATER SOFTENER
STORAGE TANK
6"
FV
88 - DET - 1
2 1/2"
DCW
2 1/2"
DCW
/4
N G
PQ-102
PROVIDE CONDENSATE
NEUTRALIZATION KIT,
ONE PER BOILER
8"
FV
6"
FV
PROVIDE CODE-
COMPLIANT MOTORIZED
DAMPER AND INTERLOCK
WITH WATER HEATER.
ONE PER WATER HEATER.
PROVIDE CODE- COMPLIANT
MOTORIZED DAMPER AND
INTERLOCK WITH BOILER.
ONE PER BOILER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
1/2" = 1'-0"
LEVEL 0 - PLUMBING PLAN
Checker Author PQ-101
1/2" = 1'-0"
BASEMENT - PLUM NEW WORK
Level 1
10' - 0"
BASEMENT
0' - 0"
Level 1
10' - 0"
BASEMENT
0' - 0"
F V
F V
8"
FV
8"
FV
MIXING STATION
D H
W
D C
W
/4
D H
W R
88-HWR-1
88-B-1
88-B-2
88 - DWH-2
88 - DWH-1
1 1/2"
NG
3/4"
NG
D C
W
6"
CA
3"⌀ CA
88 - DET - 1
NATURAL GAS
SUPPLY TO WH
DHW SUPPLY
TO BUILDING
DCW SUPPLY
TO WH
DHWR FROM
BUILDING
2 1/2"
DCW
2 1/2"
DCW
88-WS-1
88-WS-2
WATER SOFTENER
STORAGE TANK
Level 1 10' - 0"
BASEMENT
0' - 0"
MIXING STATION
88 - DWH-188 - DWH-2 88 - DET - 1
D C
W
D C
W
D C
W
2"
DCW
3"
CA
2"
DHW
2"
DCW
2"
DHW
D C
W
/4
D H
W R
D H
W
6"
FV
3"
CA
/4
N G
/4
N G
NATURAL GAS
SUPPLY TO WH
DHW SUPPLY
TO BUILDING
DCW SUPPLY
TO WH
DHWR FROM
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
3/4" = 1'-0"
LEVEL 0 - PLUMBING PLAN VIEWS
Checker Author PQ-102
PLUMBING NEW WORK ISOMETRIC - DOMESTIC WATER HEATER
PLUMBING NEW WORK ISOMETRIC - WATER SOFTENERS
Revisions: Date:
3/4" = 1'-0"
Section 2 DRAFT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
N/A
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
PLUMBING SCHEDULES
Checker Author PI-201
PLUMBING PUMP SCHEDULE
MARK
SYSTEM AND/OR
SERVICE TYPE FLUID FLOW HEAD NPSH TEMPERATURE SP. GR.
MIN. %
EFF HP PHASE VOLT MAX RPM
SPEED
CONTROL REMARKS
88-HWR-1 DHW CARTRIDGE RECIRC WATER 7 GPM 24.7 FT N/A 120 1.0 N/A 1/8 1 115 3250 CONSTANT
WATER SOFTENER SCHEDULE
MARK
SYSTEM AND/OR
SERVICE TYPE
INCOMING WATER
HARDNESS
CONTINUOUS
FLOW RATE
PEAK FLOW
RATE
INLET
PRESSURE
BACK WASH
FLOW RATE
SALT
DOSAGE MIN BED MAX BED
TANK SIZE
(DIAM)
SALT CAPACITY
OF BRINE TANK AMP PHASE VOLT REMARKS
88-WS-1 DHW WATER SOFTENER 74 GPM 97 GPM 30-125 PSI 12 GPM 120 LBS 48 LBS 120 LBS 24 IN. 510 LBS N/A 1 120
88-WS-2 DHW WATER SOFTENER 74 GPM 97 GPM 30-125 PSI 12 GPM 120 LBS 48 LBS 120 LBS 24 IN. 510 LBS N/A 1 120
GAS FIRED WATER HEATER SCHEDULE
MARK
SYSTEM AND/OR
SERVICE TYPE
STORAGE
CAPACITY
RECOVERY
@70F RISE
TIME TO RECOVER
CONTENTS (MINS)
RELIEF VALVE
SETTING FUEL TYPE
INLET
PRESSURE FLOW
HEATING
CAPACITY PHASE VOLT REMARKS
88-DWH-1 DHW GAS WATER HEATER 80 GAL 218 GPH 31 150 PSI NATURAL GAS 5-14 IN. W.C. 153 GPH 130,000 BTU/h 1 120
88-DWH-2 DHW GAS WATER HEATER 80 GAL 218 GPH 31 150 PSI NATURAL GAS 5-14 IN. W.C. 153 GPH 130,000 BTU/h 1 120
DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE
MARK TYPE
MIN. TEMP
(F)
MAX.
TEMP (F)
INITIAL PRESSURE
IN TANK
MAX OPERATING
PRESSURE
RELIEF
VALVE PSIG
MIN. TANK
VOLUME
MIN. ACCEPT
VOLUME
PIPE SIZE
TO TANK REMARKS
88-DET-1 POTABLE EXPANSION TANK 33 240 40 PSI 150 PSIG 150 PSIG 15 GAL 10 GAL 1 IN.
DOMESTIC HOT WATER BLENDING VALVE SCHEDULE
MARK
SYSTEM AND/OR
SERVICE
VALVE
SIZE (IN.)
MAX FLOW
RATE MATERIAL
HOT WATER
INLET
MIX WATER
OUTLET
COLD WATER
INLET
RETURN TO
HEATER
MIXED
RETURN
DRAIN
(NPT) REMARKS
88-TMV-1 DHW 2 IN. 78 GPM STAINLESS STEEL 2 IN. 2 IN. 2 IN. 2 IN. 2 IN. 1/2 IN.
Revisions: Date:
NOTES: BASIS OF DESIGN IS MIALO 050SS
NOTES: BASIS OF DESIGN IS WATTS DETA 30
NOTES: BASIS OF DESIGN IS RHEEM TRITON GHE80SU-130(A)
NOTES: BASIS OF DESIGN IS TACO IL0011
NOTES: BASIS OF DESIGN IS MARLO MGT-240-2
HS MS
IT
STS
ECC
2"Ø DHW
2"Ø DCW
DWH-2DWH-1
DET-1
DHW RECIRC
TO TMV
DCW TO
WH
DHW TO
BLDG
TMV-1
HWR-1
2"Ø DCW
2"Ø DHW
3/4"Ø
DHW
2 1/2"Ø DCW
2 1/2"Ø DCW
WS-1 WS-1
WS
STORAGE
TANK
DCW TO
WS-1
AND -2
DCW TO
BLDG
ISO VALVE
2"Ø DHW
TT PT
TTTT
TTPT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
BUILDING 88 BOILER & DOMESTIC
WATER HEATER REPLACEMENT
McClellan VA Clinic 5342 Dudley Boulevard, McClellan Park, CA 95652New England Engineering, Inc.
30 Turnpike Road, Suite #1 Southborough, MA 01772 Phone: (508) 485-4633 Ext. 54
FAX: (508) 485-1830
July 10, 2026
KEY PLAN
Drawing Scale
N/A
C U se rs
\h a u n g \D o c u m e n ts
\M cC le lla n B
B o ile r R e p la c e m e n t_ h a u n g
G H
V P
.r v t
/3
/2
:0
:0
P
M
PLUMBING CONTROLS
Checker Author PI-401
1. GENERAL
1.1. DOMESTIC WATER SYSTEM SHALL BE TIED INTO THE EXISTING BUILDING MANAGEMENT SYSTEM.
1.2. CONTROL CONTRACTOR SHALL PROVIDE GRAPHICS ON BAS SHOWING ALL THE AVAILABLE
CONTROL POINTS. BAS SHALL BE ABLE TO MONITOR AND CONTROL THE DOMESTIC WATER HEATER, INCLUDING BUT NOT LIMITED TO THERMAL MIXING VALVE.
1.3. AT COMPLETION OF PROJECT, CONTROLS CONTRACTOR SHALL HAVE ACCOUNT EXECUTIVE,
TECHNICAL REPRESENTATIVE AND SERVICE REPRESENTATIVE PERFORM A WALKTHROUGH WITH VA
PROJECT ENGINEER, HVAC SHOP, PLUMBING SHOP, M&O MAINTENANCE, ETC. TO REVIEW ALL
SYSTEMS, COMPONENTS, DEVICES, CONTROLS, PANELS, ETC. INSTALLED & INSTRUCT & DISPLAY ALL WORKING SET POINTS. THIS SHALL BE IN ADDITION TO TRAINING & INSTRUCTIONS ALREADY DESCRIBED IN SPECIFICATIONS. THIS SHALL BE COORDINATED & SCHEDULED TO OCCUR PRIOR TO
TURNING OVER THE SYSTEM TO THE VA.
1.4. UNITS CAN BE NORMALLY STARTED AND STOPPED REMOTELY AT THE BAS.
1.5. CONTROL CONTRACTOR SHALL PROVIDE BUT NOT LIMIT TO THE FOLLOWING COMPONENTS TO
MAKE A COMPLETE DOMESTIC WATER SYSTEM:
A. DHWR TEMPERATURE SENSOR
B. FLOW METER
1.6. WATER HEATERS AND THERMAL MIXING VALVE SHALL BE PACKAGED, SKID MOUNTED SYSTEMS WITH BUILT-IN CONTROLLER. CONTROLLER SHALL HAVE BACNET CONNECTION CAPABILITY THAT
ALLOWS THE BAS TO MONITOR AND CONTROL THE SYSTEM. CONTROL SHALL PROVIDE LOCAL
ALARMS AND AT BAS IF DEVIATIONS FROM THE CONTROL PARAMETERS ARE DETECTED.
2. DOMESTIC HOT WATER HEATER CONTROL
2.1. TEMPERATURE CONTROL OF DOMESTIC HOT WATER HEATERS:
2.1.1. DOMESTIC HOT WATER (HW) SUPPLY TEMPERATURE SETPOINT IS 130°F (ADJ.). BAS SHALL BE
ABLE TO MONITOR AND CHANGE THE SETPOINT REMOTELY.
2.1.2. THE DOMESTIC HW HEATER CONTROLLER SHALL MODULATE SUPPLY WATER CONTROL
VALVE TO MAINTAIN DOMESTIC HW SUPPLY TEMPERATURE SETPOINT AT ALL TIMES. THE
SUPPLY WATER VALVE COMMAND AND POSITION SHALL BE INDICATED ON BAS GRAPHICS.
3. THERMOSTATIC MIXING VALVE CONTROL
3.1. TEMPERATURE CONTROL OF THERMAL MIXING VALVE:
3.1.1. DOMESTIC HOT WATER (HW) SUPPLY TEMPERATURE SETPOINT IS 120°F (ADJ.). BAS SHALL BE
ABLE TO MONITOR AND CHANGE THE SETPOINT REMOTELY.
3.1.2. THE CONTROLLER SHALL MODULATE MIXING VALVE TO MAINTAIN DOMESTIC HW SUPPLY
TEMPERATURE SETPOINT AT ALL TIMES. THE MIXING VALVE COMMAND AND POSITION SHALL
BE INDICATED ON BAS GRAPHICS.
4. ALARM
4.2. ALARM SHALL INDICATE AT THE BAS WHEN THE FOLLOWING HAPPENS:
4.2.1. DOMESTIC HW PUMP IS COMMANDED TO RUN, BUT PUMP OPERATION IS NOT DETECTED BY
IT.
4.2.2. WATER HEATER ISOLATION VALVE POSITIONS ARE NOT VERIFIED BY ZC.
4.2.3. THE DOMESTIC HOT WATER SUPPLY TEMPERATURE IS 5°F (ADJ.) GREATER OR LESS THAN
THE TEMPERATURE SETPOINT FOR 20 CONSECUTIVE MIN (ADJ.).
DOMESTIC HOT WATER CONTROL POINTS
System Component
Point Legend System Output Sytem Inputs System Software / Control
S h o w o n G ra p h ic s
T re n d in g
RemarksP o in t
ID
A b b re v ia ti o n
P ri o ri ty
A d d
-A lt e rn a te
N o
Binary Analog Binary Anaglog Alarm Processing Application / Function
E le ct ri c D e v ic e
S ta rt
S to p
O p e n
C lo s e
S p e e d C o m m a n d
V a lv e P o s it io n
D a m p e r P o si ti o n
S ta tu s
A la rm
P re ss u re b i)
H ig h H u m id ity
H ig h S ta ti c P re s s u re
L o w
T e m p e ra tu re
T e m p e ra tu re a n
P re ss u re a n
P o si ti o n
F lo w a n
P e rc e n t
S ta ti c P re s s u re
C a rb o n
M o n o x id e
H u m id ity
V a c u u m
L o c a l A la rm
P a n e l
A re a A la rm
P a n e l
M a st e r
A la rm P a n e l
H ig h L im it
L o w
L im it
S c h e d u le
S ta rt S to p
F u n c ti o n
This is the start of the file's text. The full file is on GovTribe.