McCarthy_ (1)

495 KB Posted

Attached to
Canton HS Addition & Remodeling P-CEP Campus-New 3rd stadium
Solicitation number
RFP - PCCS - 240000000104
Issued by
Wayne County, Pentwater Village, Michigan

About this file

This document is an addendum for a construction management bid package related to the Canton HS New Stadium and Additions project. The project is located in Wayne County, Michigan and is being managed by the Plymouth Canton Community Schools. The addendum provides updates to the bidding instructions, bid division index, and milestone schedule. Key details include a bid proposal deadline of November 2, 2023, a requirement for 5% bid security, and a revised milestone schedule with pre-contract submittals due December 14, 2023 to January 5, 2024 and stadium and building addition completion dates of October 30, 2024 and March 1, 2025 respectively. The construction schedule indicates the new stadium construction will occur from January 2, 2024 to August 30, 2024 and the new building addition from January 2, 2024 to September 30, 2024.

Text of this file

- 1 -

PLYMOUTH CANTON COMMUNITY SCHOOLS McCarthy & Smith, Inc.

BID PACKAGE HS4-P-CEP 1

CANTON HS NEW STADIUM AND ADDITIONS

October 27, 2023

ADDENDUM #2

CONSTRUCTION MANAGEMENT PACKAGE - Bidding Requirements & General Conditions

BID PROPOSAL DEADLINE: THURSDAY, NOVEMBER 02, 2023 @ 1:00 P.M. (local time)

A. Section 00 21 13 - Instructions to Bidders

1. Apparent low, qualified bidders will be contacted for a post bid interview. Post bid interviews will take place virtually.

2. All bids are to be accompanied by a Bid Security in the amount of five (5) percent of the amount of the bid as a guarantee that if the proposal is accepted, the bidder will execute the contract and file the required bonds within ten (10) days after notice of award of contract.

3. All bids are to be accompanied with a signed and notarized Affidavit of Bidder form for the Iran Economic Sanctions Act. This form is available in Section 004210 of the Bidding Requirements & General Conditions Manual.

4. Milestone Schedule has been reissued.

B. Section 00 41 26 – Bid Division Index, Descriptions and Pricing Forms

1. Bid Division 101: Sitework and Underground Utilities

A. Under the Also Included section Add:

- Reference revised Milestone schedule and disregard issued phasing plan.

- Furnish and install flag pole

- Bidder to include clearing and grubbing within limits of new addition.

2. Bid Division 102: Asphalt Paving and Exterior Concrete

A. Under the Also Included section Add:

- Bidder to include all ACO Trench Drains drains outside of running track shown on civil drawings and specified in 33 4416 Utility Trench Drains

3. Bid Division 166: Synthetic Turf A. Under the Also Included section

Add:

- Bidders responsible trench drain withing running track only. Limits of Trench Drain is in the radius of the D Zone only and depicted below.

- 2 -

B. Please use the following detail for the trench drain in the D Zone.

END OF ADDENDUM

SECTION 00 31 13

MILESTONE SCHEDULE

The Milestone Schedule indicates durations of the construction activities for significant areas during the construction period. Completion of an area is considered to be attained when the Work of subsequent activities can proceed in accordance with their scheduled dates.

During the construction period, a Construction Schedule will be collectively developed and updated from current information and input from Contractors. The Construction Schedule will detail Contractor performance responsibilities between Project milestones.

ACTIVITY DATES

Preconstruction

Plans & Specs available for Bidder Pick-up 10/17/23

Pre-Bid Meeting at 1:00 PM 10/25/23

Bids Due Date @ 1:00 PM 11/2/23

Post Bid Interviews 11/3/23 to 11/10/23

Contract Award 12/13/23

Please Note: The School District reserves the right, in its sole and absolute discretion, to make modifications to the timeline set forth above as it determines to be in its best interest.

Contract Submittals & Shop Drawings

Pre-Contract Submittals 12/14/23 to 1/5/24

Shop Drawing / Product Data / Samples 1/8/24 to 1/22/24 Closeouts Stadium 9/30/24 to 10/30/24 Building Addition 2/1/25 to 3/1/25

Construction Schedule

New Stadium Construction 1/2/24 to 8/30/24

New Building Addition Construction 1/2/24 to 9/30/24

END OF SECTION

Other files

File Type Posted
McCarthy_ (2) —
McCarthy_ —
HS4 PCEP1 Ad For Bid (3).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .