This Scope of Services document outlines master planning and feasibility study services for the Massachusetts Convention Center Authority (MCCA), issued under COMMBUYS Bid Number BD-27-1208-1208C-1208L-134564 and Document Identifier FY27MCEC101500000002. The selected respondent will provide comprehensive master planning services organized into five primary components: (1) Existing Conditions Assessment, including facility audits of structural, mechanical, electrical, plumbing, and life-safety systems; capital replacement program analysis; space utilization studies; and technology infrastructure review; (2) Market and Economic Analysis, encompassing competitive benchmarking against regional and national convention centers, stakeholder engagement through interviews and workshops with event planners, hoteliers, and community leaders, demand forecasting for convention and trade show activity, and economic impact analysis; (3) Master Plan Visioning and Design, involving program development for expanded exhibit halls and meeting spaces, site and urban integration planning with connections to downtown and transit opportunities, and sustainability and resiliency measures aligned with LEED certification and net-carbon approaches; (4) Implementation and Financial Planning, including multi-phase construction scheduling, detailed capital expenditure budgeting, and procurement strategy frameworks; and (5) Presentation and Reporting, delivering multiple presentations and both draft and final master plan reports with implementation strategies, financing plans, and projected timelines. The scope indicates that the consultant may be retained for additional services beyond the final report submission, with fees to be negotiated based on the scope and duration required.

No specific pricing terms, contract award dates, response deadlines, or renewal options are detailed in this Scope of Services document. The services are to be performed pursuant to terms outlined in an attached Agreement (Appendix C) and in accordance with Massachusetts General Laws (MGL) procurement requirements. The document emphasizes iterative reporting and communication with the Authority throughout the execution of all five service components, with the final Master Plan Report to be deemed final only upon review and approval by the Authority.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCCA Document Identifier: FY27MCEC101500000002 COMMBUYS BID Number: BD-27-1208-1208C-1208L-134564 COMMBUYS Alternate ID: FY27 Master Plan

EXHIBIT A

SCOPE OF SERVICES

The selected Respondent, at the direction of the Executive Director or his designee, shall provide Master

Planning and Feasibility Services to the Authority as described below. The Scope of Services shall be performed pursuant to the terms described in the Agreement attached hereto as Appendix C.

1. Existing Conditions Assessment

• Facility Audit: Inspect each facility and review all documentation; structural, mechanical, electrical, plumbing (MEP), and life-safety systems inclusive of all deferred maintenance, obsolete components environmental and hazardous conditions.

• Capital Replacement Program: Analyze current (5) year Capital Replacement Plan to determine pace and schedule.

• Space Utilization Study: Evaluate current floor plans, exhibit hall dimensions, loading docks, and meeting room flexibility against modern industry standards. Analyze current utilization for higher efficiency.

• Technology Audit: Review existing audio/visual, Wi-Fi capacity, telecommunications, and smart-building infrastructure with a goal of fully integrated facilities with open protocols for competitive advantages.

• Communication: Report to the Authority any requirements or assistance needed, deliver an iterative report summarizing the status of each task above.

2. Market and Economic Analysis

• Competitive Benchmarking: Analyze competing regional and national convention centers to identify gaps in offerings and demand trends.

• Stakeholder Engagement: Conduct interviews and workshops with past/potential event planners, staff, administration, local hoteliers, community groups, local and small businesses, tourism boards, and elected officials.

• Demand Forecasting: Project future convention, trade show, and meeting demand to justify the scale and type of programmatic improvements. Project negative impact to remain stagnant and loss of business share.

• Economic Growth: Analyze the current reporting structure for Economic Impact and develop a

Global Approach to the actual Authority impacts to the economy. Consider the impacts of improved facilities, the constructions periods (positive and negative) to the growth over the term of the Master

Plan and beyond.

• Communication: Report to the Authority any requirements or assistance needed, deliver an iterative report summarizing the status of each task above.

3. Master Plan Visioning and Design

• Program Development: Define space requirements for expanded exhibit halls, ballrooms, breakout rooms, and outdoor activation zones. Designs should welcome public space and community

MCCA Document Identifier: FY27MCEC101500000002 COMMBUYS BID Number: BD-27-1208-1208C-1208L-134564 COMMBUYS Alternate ID: FY27 Master Plan integration while creating a destination. Conceptual designs should offer variable design alternatives that allow for a single or multiple phased approach.

• Site and Urban Integration: Design seamless connections to the surrounding community, downtown core, identify public transit opportunities, pedestrian pathways, and adjacent hospitality and entertainment districts.

• Sustainability and Resiliency: Integrate energy-efficient building systems, LEED certification goals, and smart-city infrastructure. Emphasis on a Net-Carbon approach.

• Communication: Report to the Authority any requirements or assistance needed, deliver an iterative report summarizing the status of each task above.

4. Implementation and Financial Planning

• Phasing Strategy: Create a multi-phase construction schedule that minimizes the impacts on the existing facility and its’ ability to remain operational during upgrades with key deliverables identified.

• Cost Estimating: Provide detailed capital expenditure (CapEx) budgets and project(s) cost framework for.

• Procurement and Delivery Strategy: Outline the framework for hiring design teams, engineering consultants, and construction managers consistent with MGL’s.

• Communication: Report to the Authority for any requirements or assistance needed; deliver an iterative report summarizing the status of each task above.

5. Presentation and Reporting

• Presentations: Create multiple presentations that illustrate the goals and objectives of the Master

Plan, the designs that attain these goals along with the financial and analytical methods utilized to support these recommendations.

• Reports: Create an Executive Summary along with the detailed Master Plan Report that outlines the strategy for implementation, financing plan, projected timelines and milestones in draft form. Upon review and comment from the Authority, the report will be deemed final.

• Additional Services: The Consultant may be retained for additional duties beyond the submission of the Final Report; these fees will be subjected to the negotiated rates between the Authority and

Consultant and the duration required.