PERFORMANCE WORK

STATEMENT (PWS)

FOREIGN ADVERSARY AIRCRAFT SUPPORT

TO MARINE AIR GROUND TASK FORCE TRAINING COMMAND (MAGTF TC) AT MARINE

CORPS AIR GROUND COMBAT CENTER, TWENTYNINE PALMS, CA

1.0 INTRODUCTION

MAGTFTC is the United States Marine Corps premiere Service Level Training venue. MAGTFTC provides advanced collective training, almost all in a live fire combined arms training environment, to the majority of

USMC units prior to their deployment overseas. MAGTFTC provides support to five (5) Integrated Training

Exercises (ITX) annually, located at Twentynine Palms, up to five (5) Mountain Training Exercises (MTX) annually, located at Bridgeport California, and up to two (2) Talon Exercises (TALONEX) at Yuma and

Twentynine Palms (executed concurrently with the twice annual WTI course). All MAGTFTC training utilizes the MAGTF as the basic training unit, usually comprised of battalion and squadron sized units.

MAGTFTC is an accredited program as part of the Joint National Training Capability (JNTC) program, so this training is also provided to joint and coalition forces during many of the events.

MAGTFTC service level training events are mandated through MCO 3500.11F, MAGTF Training Program.

While each exercise has its own unique features, the training environment is largely live fire (MTX is largely non-live fire). Each exercise emphasizes integrated training between all facets of the MAGTF (aviation, ground, logistics and command).

ITX is a 29 day exercise that utilizes a crawl, walk, run methodology, exercising Offensive, Defensive and

Stability Operations METs. The vast majority of this exercise is in a live fire combined arms environment, integrating air and ground fires. In the exercise, MAGTFTC presents both friendly and enemy combat capabilities. ITX also has a considerable portion done in a Force on Force Urban setting.

MTX is a 28 day exercise conducted 5 times per year at the Marine Corps Mountain Warfare Training Center, located near Bridgeport California. MTX is focused on the same METs, however the training environment is either arduous terrain, both in ruggedness and altitude or cold weather.

TALONEX is 5 week exercise that is executed concurrently with WTI. Parts of the exercise are executed at

Yuma and portions are conducted at Twentynine Palms. TALONEX utilizes both a live and non-live fire training environment and offers the greatest flexibility in the exact training the exercise force conducts.

2.0 SCOPE

The scope of this effort is to provide familiarization of flight characteristics, capabilities and limitations of the foreign adversary rotary-wing and propeller driven aircraft to MAGTFTC personnel and members of each exercise force. This will be accomplished by having accessibility to two foreign adversary contractor-provided aircrafts that shall participate in certain exercise events as part of a realistic opposing force.

3.0 GENERAL REQUIREMENTS

3.1 The Contractor shall provide support to the MAGTFTC exercise during specified portions of ITX, MTX

(Option) and TALONEX (Option). Support shall include aircraft and personnel, maintenance and logistic support (i.e. aircrews, support personnel, maintenance test flights, transporting of contractor personnel, aircraft or equipment to and from maintenance facilities, and/or permanent operating sites, or to train aircrew, equipment, tools, materials, replacement parts, and all other items, except as specified herein as Government Furnished Property (GFP)) necessary to perform training operations specified by this PWS.

3.2 Contractor Point of Contact. Contractor shall provide a primary point of contact for the coordination of tasks identified in this PWS.

3.3 Exercises. Contractor shall attend and support up to a maximum of ten (10) separate, two (2) day planning conferences, associated with ITX and MTX exercises; and two (2) one (1) day planning conferences, associated with bi-annual WTI training courses at MCAS Yuma during the flight phase of

WTI. The TALONEX planning conference is option based on WTI Planning efforts. Coordination between the COR and the contractor will primarily take place Monday through Friday between the hours of 0800 – 1630, Federal Holidays included. Typical training days will not exceed 12 hours.

3.4 Planning Conference. The contractor shall attend planning conferences. Typical duration of planning conferences is 2 days (ITX, MTX) and 1 day (TALONEX). The contractor shall be notified at least 30 days prior to the scheduled planning conference. Historically, planning conferences are scheduled a year in advance. Conferences take place Monday – Friday, 0800 – 1630.

3.5 Management Plan. The contractor shall develop a management plan to meet task requirements listed in section 4 of this PWS.

3.6 Missions. The contractor shall be familiar with missions in; Surface to Air Missile Suppression Attack

Flights, Simulated Attacks on friendly ground units, Intelligence collection on friendly ground units and Offensive/Defensive Air Combat Maneuvers against Rotary-wing, Fixed-wing and Tilt-Rotor

Aircraft.

3.7 Aircrew Qualifications.

3.7.1 The Contractor shall provide current and qualified Pilots/Adversary Instructors appropriate for the Mission, Design, and Series (MDS) of aircraft.

3.7.2 Pilots shall be authorized by the Federal Aviation Administration (FAA) to conduct operations in the MDS and possess a current FAA Medical certificate.

3.7.3 Pilots shall have a minimum of 2,000 total flight hours, at least 250 hours of Pilot in

Command flight time in their respective aircraft, and not less than five (5) hours in model within the previous 60 days prior to actual curriculum flights.

3.7.4 For non-government provided aircraft, pilot/operator in command shall be licensed, rated, and current IAW FAA regulations for operations conducted under Federal Aviation Regulation

Part 91.313. Operators/Pilots shall have previous military aircraft operations and/or flight test experience. (http://www.ecfr.gov/cgi-bin/text-idx?SID=fcb0bc7798fd3e348c2c7907c8b82378&mc=true&node=se14.2.91_1313&rgn=div8)

3.7.5 Flightline Access It is the contractor’s responsibility to contact the Provost Marshall’s Office

(Base Access) prior to requiring access to ensure they have appropriate permissions to access the Flightline and are compliance with current security regulations.

3.8 Aircraft Requirements.

3.8.1 The Contractor shall provide FAA-certified Adversary Aircraft in the MDS required to meet http://www.ecfr.gov/cgi-bin/text-idx?SID=fcb0bc7798fd3e348c2c7907c8b82378&mc=true&node=se14.2.91_1313&rgn=div8 http://www.ecfr.gov/cgi-bin/text-idx?SID=fcb0bc7798fd3e348c2c7907c8b82378&mc=true&node=se14.2.91_1313&rgn=div8

MAGTFTC syllabus training requirements. Aircraft shall be maintained in accordance with an FAA-Certified Maintenance Program by FAA-Certified Maintenance Technicians.

3.8.2 The Contractor shall submit a DD Form 2400 - Civil Aircraft Certificate of Insurance, DD

Form 2401-Civil Aircraft Landing Permit, and DD Form 2402-Civil Aircraft Hold Harmless

Agreement. These agreements and any others required must be kept current during the entire period of operations under the contract.

3.8.3 The Contractor shall consider the aircraft provided under this contract as transient military aircraft and not subject to landing fees at DoD controlled airfields.

3.8.4 Flight Safety. The contractor shall adhere to the MCAGCC Flight Operations Standard

Operating Procedures (SOP). The current version is XXXXXXXXXX, but is subject to change as the procedures change. The COR will provide the most up to date version prior to the contractor conducting Flight Operations.

3.8.5 The contractor shall maintain liability for any damage or loss of the aircraft and third party liability.

3.8.6 The contractor shall provide all maintenance, oil, special equipment, and any other support services associated with operation of the aircraft. The contractor will comply with Federal

Regulations for all hazardous material found in the Code of Federal Regulations (CFR), Title 40, Parts 260-265, 270, 300 and state regulations for hazardous materials.

(http://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title40/40tab_02.tpl)

3.8.7 All aircraft shall be operated in accordance with applicable Government aeronautical regulations, including United States Navy (USN), United States Air Force (USAF), and local military flying directives, including foreign government requirements. The contractor shall comply with federal, local state and DoD requirements for operation of civil aircraft in support of military operations.

4.0 SPECIFIC TASKS

4.1 Rotary Wing Adversary Support. The rotary-wing foreign attack helicopter required in support of this requirement shall act as a realistic dissimilar aircraft with unique capabilities supporting specific aircraft training. The amount of rotary-wing adversarial support will be determined by the adversarial requests that the COR will collate and route to the contractor for a response to the feasibility to support all requests.

NOTE: The aircraft shall be either a Mi-24 HIND or Mi-17 HIP and should be capable of using tracking pods compatible with the Tactical Air Combat Systems range at MCAS Yuma, Arizona.

4.1.1 The helicopter shall be a dissimilar rotary-wing aggressor against rotary-wing, fixed-wing, Forward Operating Bases, Forward Arming & Refueling Points and Anti-Aircraft Artillery

Defense units and other friendly force positions.

4.1.2 Blade Hours. The contractor shall provide at each ITX (a maximum of 5 possible exercises annually) up to no more than 40 flight hours under day Visual Flight Rule (VFR) conditions.

http://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title40/40tab_02.tpl

4.1.3 The rotary wing attack helicopter shall participate in the following training:

(a) Air and Missile Defense Operations. The attack helicopter, due to its size, flight profile, firepower and defensive maneuvering capabilities, constitutes a unique threat creating a realistic, dissimilar and credible

Opposing Force (OPFOR) to stress the joint forces conducting Joint Air and Missile Defense Operations.

(b) Close Air Support. The attack helicopter will act as an aggressor to interfere with the exercises forces conducting offensive, defensive and stability operations. This will include potential use during friendly aviation operations in order to force decision making.

(c) Intelligence Collection on friendly forces.

(d) Air to Ground attack of friendly forces. Exercise forces will be executing offense, defense, or stability operations and be confronted with adversary RW aircraft forcing them to react correctly.

4.2 OPTIONAL TASK: Fixed-Wing Propeller Driven Adversary Support.

4.2.1 The contractor shall provide fixed-wing support if it is deemed necessary during the planning conference. The contractor shall be notified of this requirement at a minimum of

15 days before the WTI course. The government is not required to exercise this option.

NOTE: The aircraft required is an AN-2 Colt that is capable of using tracking pods compatible with the Tactical Air Combat Systems range at MCAS Yuma, Arizona.

4.2.2 The foreign fixed-wing propeller driven aircraft will be used to provide a realistic dissimilar aircraft supporting Anti-Air Warfare evolutions.

4.2.3 This aircraft will be a dissimilar fixed-wing aggressor exhibiting unique visual/ Infra-Red and radar signatures against Blue airborne and ground based air defense units. Visual identification and countering enemy weapon systems capabilities would be the primary student learning objectives.

4.2.4 Blade Hours. The contractor shall provide up to 12 flight hours under day VFR conditions.

4.3 OPTIONAL TASK: Support to MTX at Bridgeport California.

4.3.1. The contractor shall provide RW support as described in 4.1 at MCMWTC, Bridgeport

California.

4.3.2. This support is not to exceed 5 total days and 15 total Blade Hours per exercise.

4.4. OPTIONAL TASK: Support to TALONEX at Twentynine Palms.

4.4.1. The contractor shall provide RW support as described in 4.1 at Twentynine Palms in support of the portions of TALONX that occur at Twentynine Palms, California.

4.4.2. The support is not to exceed 3 days and 10 total Blade Hours.

4.5 Sorties. The contractor shall deliver flight sorties in support of the MAGTFTC exercises as per the adversarial requests developed during the planning conference.

4.6 Mission & Performance Planning. The Contractor shall attend Mission and Performance planning briefings prior to each flight evolution in support of the MAGTFTC training.

4.7 Academic Instruction Support.

4.7.1 The contractor shall provide subject matter expertise in support of MAGTFTC exercises to include Adversary Aircraft Capabilities and Limitations, Threat Aircraft

Employment and Tactics, Dissimilar Air Combat Tactics and Defensive

Countermeasure Procedures

4.7.2 The contractor shall provide familiarization of adversarial aircrafts, capabilities/limitations through the conduct of aircraft tours as requested via coordination with the Contracting Officer Representative (COR).

4.8 Threat Profile & Employment Replication. The Contractor shall operate the adversary aircraft in a safe manner when replicating intended hostile force’s tactics as identified during the mission and performance planning brief as identified in 4.4.

4.9 Adversary Weapons Systems Training.

4.9.1 The Contractor shall provide aircraft orientation to MAGTFTC Instructors and other personnel prior to inflight operations.

4.9.2 The contractor shall have the capability to allow one COR approved passenger to ride along during adversary training for debriefing purposes.

4.10 Mission Briefings and Debriefings. The contractor shall attend daily air operations briefings and other critical briefings, to include debriefings for the purpose of After Action review (AAR) to gain the appropriate integration with the training objectives of specific events. The contractor shall provide pertinent data in the form of verbal, written or electronic feedback. Pilots shall assist

MAGTFTC Instructors as required with the debriefing of MAGTFTC student aircrew members following training events. Aircrews must provide same-day flight debriefs as required.

5 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

5.5 The following performance standards shall be utilized by the Contracting Officer Representative

(COR) during the performance of this requirement. These performance standards will be incorporated into the Quality Assurance Surveillance Plan.

Performance Standards

PWS

Paragraph

Performance

Objective

Standard AQL

3.1 Provide Aircraft, Personnel, Maintenance, and logistic

support

Services required to

Support ITX, MTX, TALONEX

Exercises

100% of services provided

4.4 Mission/Performance

Planning

Attend conferences to support syllabus training

95% of services provided

4.5 Academic Instruction Provide aircraft

capabilities and limitations to attendees

90% of services provided

4.6 Threat Profile and

Employment Replication

Replicate hostile force tactics

95% of services provided

4.7 Adversary Weapons

Systems Training

Provide rotary-wing aircraft weapons training

90% of services provided

4.8 Mission Briefings and

Debriefings

Briefing and

Debriefings of pertinent data

95% of services provided

7.0 Provide Support Materials

Provide two (2) pages of documentation based on deliverables

100% of services provided

6 DELIVERABLES

6.5 These reports shall be provided in Contractor preferred format to the COR as identified in the below table. These reports may be electronic or hard copy.

Table 1.

Deliverable Content Due Date

6.1 Mission and

Performance Plan

(No more than two (2) pages)

Reference PWS

Paragraph 4.4

• Mission fuel requirements

• The flight route based on known notional enemy threat location and threat capabilities

• The mission plan to passengers or aircrew

• Addresses aircraft altitude, airspeed, weight and balance, range, angle of bank and aircraft maneuver limitations

• Required separation between aircraft

No later than (NLT) four (4) hours prior to each flight

6.2 Sorties

Reference PWS

Paragraph 4.3

• Flights as required to support

MAGTFTC Exercise events.

Due at the time and place required by the MAGTFTC OPFOR

Coordinator

6.3 Adversary Weapons

Systems Training

(No more than two (2) pages)

Reference PWS

Paragraph 4.7

• Aircraft Orientation for passenger/aircrew

• Aircraft performance characteristics and limitations

• Emergency Egress procedures

• Passenger Emergency cockpit procedures

NLT two (2) hours prior to each flight

7 TRAVEL. All services will be performed at the installation. No travel is required or authorized.

8 PERFORMANCE. The services shall be performed at the Marine Corps Air Ground Combat Command

Twentynine Palms California, or MCMWTC at Bridgeport California. The period of performance shall be for

12 months from date of award with four (4) one (1) year option periods if exercised.

9 CONTRACT TYPE. This is a Firm-Fixed price contract with Cost Reimbursement for Fuel IAW PWS paragraph 11.0.

10 GOVERNMENT-FURNISHED FACILITIES AND PROPERTY (GFP)

10.5 The Contractor shall utilize Government Furnished Property as required to support MAGTFTC training. (Appendix 3)

10.6 The Government will provide some on-site hangar space for the rotary-wing aircraft, and flight line access, and Class C telephone access for both the rotary-wing and propeller driven aircraft.

Additionally, the Government will provide assistance in obtaining a Common Access Card (CAC) and Base Decals for automobile access to the Marine Corps Air Ground Combat Center

(MCAGCC).

10.7 The Government shall provide some hangar and flight line space for the duration of the flight period for the rotary- wing aircraft. In the event that the aircraft requires extended maintenance, hangar space will be provided for up to two (2) additional weeks. It remains the responsibility of the contractor to provide the maintenance of the aircraft.

11 FUEL AND FERRYING

11.5 Fuel will be provided by the Government and reimbursed up to the rate for Government contract fuel in support of this PWS. Fuel will be reimbursed for actual flight time originating at MCAS

Yuma, Arizona and for ferry flights to and from MCAS Yuma, Arizona. Actual flight time for reporting purposes is defined in Chief of Naval Operations Instructions, OPNAVINST 3710.7 series. (https://www.cnatra.navy.mil/tw4/vt27/docs/3710.7u.pdf)

11.6 The Contractor must obtain a Non-Government Agency Department of Defense Activity Address

Code (T- DODAAC) Fuel Card in order to purchase fuel on military installations. A Non-US

Government Fuel Purchase Agreement (FPA) must be completed and submitted to DLA Energy at

DLAENERGYFPA@dla.mil. This document will be provided to the contractor for completion.

11.7 The Contractor shall attach the Fuel invoices to WAWF for reimbursement of Aircraft Fuel associated with the performance at MCAS Yuma. Fuel obtained at MCAS Yuma and for ferry flights to and from MCAS Yuma are the only fuels costs that will be reimbursed.

11.8 The total curriculum flight hours does not include ferry time required for transporting the aircraft to and from MCAS Yuma, Arizona.

12 SECURITY REQUIREMENTS

12.5 Security Clearance. Pilots and aircrew shall possess at a minimum a SECRET Security

Clearance. The DD254 shall be provided to the Contractor upon award. A completed draft DD

254 is required by the contractor upon receipt of the contractor’s proposal.

12.6 MCAGCC / MAGTFTC security requirements and restrictions. Aircrew and Maintenance personnel must be able to meet the MCAGCC / MAGTFTC Provost Marshall base access and security clearance requirements, including requirements to access the SELF, or have escorts with the appropriate access and clearance.

12.6.1 The contractor, contractor employees, and contractor subcontractors shall comply with these requirements. Failure to comply with security requirements does not relieve the contractor of performance requirements. The current

MCAS Yuma contractor access requirement is to present to the Station Pass &

ID office located at Building 952/MCAS Yuma Main gate two forms of identification to include one picture identification. Acceptable forms of identification include a valid state driver’s license, a valid state identification card, US passport, social security card and birth certificate. If there are any questions concerning identification requirements or document applicability, contact the COR (or Government Technical Representative, if no COR is assigned). Responsibility to provide correct documentation in order to gain access to MCAS Yuma is that of the contractor. Vehicle access requires presenting to the Station Pass & ID a valid state driver’s license, current vehicle insurance card, and valid vehicle registration.

12.6.2 Contractor and subcontractor employee compliance with installation rules and regulations.

12.6.3 The Contractor is responsible for ensuring that each of its subcontractors fully https://www.cnatra.navy.mil/tw4/vt27/docs/3710.7u.pdf complies with the following requirements:

12.6.3.1 The Contractor is responsible for providing information required to obtain clearances, permits, passes, or security badges required for Contractor personnel or equipment access. This includes information required for police or background checks or investigations and all other requirements of the issuing activity.

12.6.3.2 The Contractor is responsible for ensuring such clearances, permits, passes, or security badges are promptly returned to the issuing activity upon termination of an employee, completion of a project, or termination of a contract or subcontract.

12.6.3.3 All Contractor personnel performing work under this contract who require access to military installations shall obtain personal entry and vehicle passes from the Provost Marshall’s Office (PMO) of each base.

12.6.3.4 The Commanding General of the installation, or his designated representative, has broad authority to remove or exclude any person in fulfilling his responsibility to protect personnel and property, to maintain good order and discipline, and to ensure the successful and uninterrupted performance of the Marine Corps mission. In the exercise of this authority, the Commanding

Officer, or his designated representative, may refuse to grant personal entry passes or may bar Contractor employees, including employees who have been granted a personal entry pass. Refusal to grant an employee a personal entry pass or barment of an employee does not relieve the Contractor of the responsibility to continue performance under this contract. The Contractor’s employees shall observe and comply with all base rules and regulations applicable to contract personnel, including those applicable to the safe operation of vehicles, and shall not be present in locations not required for the proper performance of this contract. Then only exception to posted speed limits is passing troops in formation where the speed shall be reduced to 10 miles per hour. Troops in formation have the right-of way over all vehicular traffic.

12.6.3.5 Contractor personnel performing work under this contract shall be readily identifiable an employee of the contractor through the use of uniforms or nametags, or via an alternate method approved by the contracting officer

12.6.3.6 Contractor personnel and equipment entering a military installation are subject to security checks. Contractor personnel shall follow any direction given by Military Police or other security or safety person

Appendix 1

Applicable Documents

1. Chief of Naval Operations Instructions, OPNAVINST 3710.7

(https://www.cnatra.navy.mil/tw4/vt27/docs/3710.7u.pdf)

2. Federal Aviation Regulation Part 91.313 (http://www.ecfr.gov/cgi-bin/text-idx?SID=fcb0bc7798fd3e348c2c7907c8b82378&mc=true&node=se14.2.91_1313&rgn=div8)

3. Code of Federal Regulations (CFR), Title 40, Parts 260-265, 270, 300 (http://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title40/40tab_02.tpl)

4. MAGTFTC Flight Operations Standard Operating Procedures (SOP) – shall be provided at award

Appendix 2

Glossary

Defensive Air Combat Manuevers (DACM)- A Simulated Air Combat mission where the adversary aircraft will attack the friendly fixed wing (FW) or rotary wing (RW) aircraft and depending on the scope of the training objective, the friendly aircraft/s may or may not fight turn from defensive measures to offensive measures.

Defensive Tactics- is a mission set where the friendly aircraft aggressed by the adversarial aircraft just to test the friendly aircraft ability to defend themselves.

Mi-17 (NATO reporting name "Hip")- is a Russian helicopter in production at two factories in Kazan and Ulan-

Ude. It is known as the Mi-8M series in Russian service. It is a medium twin-turbine transport helicopter. There are also armed gunship versions.

Mi-24 HIND- is a large helicopter gunship, attack helicopter and low-capacity troop transport with room for eight passengers.

Rotary Wing Aggress- Adversarial aircraft will aggress a friendly flight evolution and the scope of their mission will be explained the mission brief.

Simulated Ground Attacks- Adversarial aircraft will conducted simulated ground attacks on friendly ground units.

https://www.cnatra.navy.mil/tw4/vt27/docs/3710.7u.pdf http://www.ecfr.gov/cgi-bin/text-idx?SID=fcb0bc7798fd3e348c2c7907c8b82378&mc=true&node=se14.2.91_1313&rgn=div8 http://www.ecfr.gov/cgi-bin/text-idx?SID=fcb0bc7798fd3e348c2c7907c8b82378&mc=true&node=se14.2.91_1313&rgn=div8

Surface-to-Air Missile Suppression Attack Flights (SAMSAF)- Simulated adversary attacks on to friendly

Surface-to-Air Missile units or personnel to test their readiness.

Visual flight rules (VFR)- are a set of regulations under which a pilot operates an aircraft in weather conditions generally clear enough to allow the pilot to see where the aircraft is going.

Appendix 3

Governemnt Furnished Equipment