MC SKY BLUE SHADE 2319 POT AND PKG INFO.pdf

PDF 68 KB Posted

Attached to
Cloth, Marine Corps Sky Blue Federal contract opportunity
Solicitation number
SPE1C1-25-R-0136
Issued by
Defense Logistics Agency Troop Support Clothing and Textiles

About this file

This document is a detailed technical specification for MC Sky Blue 2319 Gabardine cloth, a wool and polyester/wool fabric for military use. The specification covers cold water sponging and semi-decating services, with precise requirements for fabric processing, including wetting out, drying, conveyance, and semi-decating procedures. Key technical parameters include a minimum width of 60" prior to sponging and 59" after sponging, with mothproofing requirements per MIL-DTL-43665D dated September 2, 2020.

The document outlines extensive quality assurance provisions, including shade evaluation, sampling procedures, and testing protocols. Contractors must submit swatches for government laboratory evaluation, with rejection of end items possible if shade or quality standards are not met. Test reports must be submitted within 90 days, and the cloth must meet specific visual and dimensional standards. The fabric is intended for military clothing production, with rigorous inspection processes to ensure consistency, color accuracy, and manufacturing quality across production lots.

View the file

Other files for this federal contract opportunity

Other files attached to Cloth, Marine Corps Sky Blue, newest first.
File Type Posted
MIL-DTL-10176L.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLOTH, MC SKY BLUE 2319 GABARDINE: WOOL, POLYESTER/WOOL,

TYPE II, CLASS 12

STANDARD SAMPLE IS IDENTIFIED AS ROLL NUMBER

3864 AND IS APPLICABLE FOR SHADE, FINISH

AND COLORFASTNESS.

SPEC: MIL-DTL-10176L DATED 30 MARCH 2018

MOTHPROOFING SPEC: MIL-DTL-43665D DATED 2 SEPT 2020

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

a. This solicitation/award consists of the following documents, exhibits, and other attachments

b. DLA Troop Support Clothing & Textiles Additional Quality Assurance Requirements Revision 1 dated August 2021, which has superseded DLA Troop Support Clothing and Textiles Additional Quality Assurance Requirements dated October 2018.

RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND

NON-MANUFACTURERS)

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF

TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE

MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT

INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

SKY BLUE MC SHADE 2319, MOTHPROOFED,

SPONGED

SERVICES FOR COLD WATER SPONGING AND SEMI-DECATING OF: CLOTH, MC SKY BLUE 2319

GABARDINE: WOOL, POLYESTER/WOOL, 60" MINIMUM WIDTH PRIOR TO SPONGING. 59"

MINIMUM WIDTH AFTER SPONGING.

1. Purpose of the Servicing: The condition of the cloth to be serviced is the state in which it was presented to and accepted by the Government for the original producer, as fully finished and meeting the requirements of the applicable specification. It is the purpose of servicing of this cloth to remove all tensions and to stabilize ("set') the cloth in that state, so that it will drape freely in the tailoring of the end-item garment.

2. Wetting Out: The cloth shall be led into wetting-out tank full width and thoroughly wet out while in motion. The water shall be suitably son and clean. A wetting agent shall be used to assure thorough saturation of the cloth. Wet - out cloth shall not be left standing and shall be fully processed once it saturation of the cloth. Wet out cloth shall not be left standing and shall be fully processed once it is wet-out. There shall be no water or mineral stains or drying marks or bars. The water temperature shall be uniform and selected to suit the fabric in question and to assure maximum cloth stability.

3. Drying: The cloth that has been wet out per paragraph 2 above shall be dried full width. The drying arrangement shall be such that the cloth is not held under tension either in length or width and can freely relax in all directions during the drying operations. The drying system used shall lend itself to temperature control and shall be properly ventilated lo assure uniform heat distribution. The system shall assure that the cloth emerges from it fully dried, free from stains, discolorations and mineral deposits. The cloth shall not touch metal objects or otherwise overheated surfaces and the cloth shall not be allowed to remain in the drying device during any machine stoppage. Extreme care shall be taken to precluded any scorches of the cloth, or any over drying.

4. Conveyance: The cloth emerging from the dryer shall be loosely Oat-folded on the conveyance used to move the cloth to semi-decating. The cloth shall be given an opportunity to cool off without having excessive layers of cloth from other pieces bearing down on the cloth. Care shall be taken that cloth is not exposed to any areas where dripping of water, oil, steam or other pollutants endangers its cleanness.

5. Semi-Decating: The sponged and dried cloth shall be "set" by steam treatment in a semi-decating device. The cloth shall be rolled, full width between a cloth "mantle" over a perforated metal cylinder. Care shall be taken to roll the cloth between the mantle, free from any wrinkles;

selvages fully flattened and with only enough tension to preclude distortions, bias, bowing filling or other deficiencies. All due care shall be taken to avoid seam marks, and the mantle shall be free from any protrusions that might impress themselves on the cloth serviced. Steam shall be uniformly flown from the metal cylinder through the mantle onto the cloth to be serviced. Care shall be taken to assure that there shalt be no steam condensation onto the cloth, and that the serviced cloth shall be free from decating marks.

6. Put-Up and Measuring and Roll Marking: The cloth, which has been sponged and semi-decated shall be put on fiberboard tubes of a length at least equal to the width of the cloth. The cloth shall be rolled firmly but without tension. The cloth being put-up shall be measured by an accurate, recently calibrated device that is in direct contact with the cloth while running over a hard service.

Each piece of cloth shall also be measured in the width, between selvages, at least at three points along its length. The lowest of these three measurements, rounded down to the nearest full inch shall be the sponged width for the respective roll. The sponge length and width shall then be entered at the space provided on the original piece ticket. If for any reason, the original piece ticket has become unavailable, a new piece ticket shall be securely attached. Item description, applicable National Stock Number (NSN), and contract data (copies from a piece ticket in the same batch) and piece number (which may be obtained from the indelible marking at the end of the roll), shall then be legibly marked on the new ticket.

7. National Stock Number (NSN): NSN's shall be affixed to the respective piece tickets as the sponged NSN.

8. Preparation for Delivery: 8.1 Pres/Pack to ASTM-D-3951 Each roll shall be packed in a polyethylene bag as a minimum 8.2 Marking: MIL-STD-2073-ID, dated DECEMBER 15, 1999.

9. Unusable Materials: Fabrics found by the contractor to be obviously unusable, when detected, shall be set aside and not include in the inventory list of sponged cloth. The unusable material shall be returned with each shipment of sponged cloth clearly marked "Defective Cloth – Unsponged."

10.

Tabulation: For each lot serviced, tabulation shall accompany the shipping document (DD250) showing piece number, length and width of each roll serviced. DD250 shall show total yardage received, total yardage defective (if applicable), total yardage sponged. Payment shall be made on yardage received and sponged. Payment shall be made on yardage received and sponged. No payments shall be made for defective yardage, which is not sponged.

11.

Plant Visits: The Government reserves the right to visit the contractor's plant at any time during working hours to observe performance of the contract and/or to examine the end product. In plant visits and observations shall be confined to:

a.Ascertaining that material furnished the contractor by the Government is properly stored and safeguarded from damage before, during and after the completion of the services hereunder.

b.Assuring, by actual observations, that the specified operations be performed.

12.Quality Assurance Provisions for Commercially Sponged Cloth:

b.The sponged and semi-decated cloth shall be inspected by the Government for sponging defects, semi-decating defects, markings, and width/length measurements.

c.Yard by Yard Examination - The yard-by-yard examination shall be as specified below. The sample size shall be in accordance with the following:

Lot Size (yards) Sample size rolls

500 or less 8

501 to 3,200 13

3,201 to 35,000 20

35,001 to 500,000 32

500,001 to over 50

The following defect, when present shall be scored four points for each yard in which it occurs.

-Width less than specified

Except for the above defect, all defects shall be scored and assigned demerit points as follows:

-defects 3 inches or less in any dimension - one point

-defects exceeding 3 inches to 6 inches in any dimension - two points

-defects exceeding 6 inches to 9 inches in any dimension - three points

-defects exceeding 9 inches in any dimension - four points d.The following conditions after sponging and semi-decating shall be scored as defects:

-unclean overall

-ends of cloth unmarked

-water or mineral stains

-drying marks or bars

-scorch marks permanent creases

-incorrect label or marking

e. Total yardage in sample

- The lot shall be unacceptable if the total of the actual length of the rolls in the sample is less than the total of the lengths marked on the roll tickets.

f. Quality conformance inspection - The lot shall be unacceptable if the point count exceeds 2.5 points per 100 square yards when examined as specified in paragraphs b. and c. above.

Government Acceptance Testing. Unless otherwise stated in the contract, testing performed at the DLA PTC for acceptance purposes will be completed in forty five (45) calendar days. The contract delivery requirements are based on the assumption that DLA Troop Support and the DLA PTC will require a total of 45 SHADE EVALUATION OF CONTRACTOR FURNISHED MATERIALS:

calendar days from the date of the receipt of samples at the Government laboratory to the date the completed test results are mailed to the contractor.

If this time frame is exceeded, the contract delivery schedule will be extended by the number of additional days needed to complete the testing, provided the contractor can establish that the delay in its delivery was caused by the Government exceeding the prescribed time. The foregoing provision for the extension of delivery schedules is exclusive and the Government shall not be liable to suit for breach of contract by reason of any delay of the Government in providing test results.

Shade Evaluation. Shade Evaluation is Acceptance Testing; each lot must be submitted for evaluation. Lots shall not be shipped until shade is approved by Government. The prime contractor will require the fabric or component supplier to present to the source QAS the complete lot prepared for shipment, a set of tally sheets by shipment listing case numbers, roll numbers, and yardage of each roll and a shade swatch (header) from each roll with roll and case numbers identified on each swatch.

The following sampling procedure will be followed unless otherwise specified.

- SHADE SAMPLING IS APPLICABLE

- The color of the test specimen shall match the standard sample viewed using AATCC Evaluation Procedure 9, Option A, with sources simulating artificial daylight D75 illuminant with a color temperature of 7500 (+/- 200)°K, with illumination of 100 (+/- 20) foot candles, and shall be a good match to the standard sample under incandescent lamplight at 2856 (+/- 200)°K.

- FOR SHADE TESTING: THE COMPLETED DD FORM 1222 AND THE SWATCHES SHALL BE

FORWARDED TO:

DLA Product Testing Center Analytical

700 Robbins Avenue

Philadelphia, PA 19111

ATTN: BLDG 5D Shade Room

EMAIL: paactlab@dla.mil

- FOR PHYSICAL (NON-SHADE) TESTING: IN ACCORDANCE WITH CLAUSE 52.246-9032, THE

CONTRACTOR'S APPROVED QUALIFIED LABORATORY WILL BE REQUIRED TO FORWARD A

COMPLETED TEST REPORT FOR EACH LOT OF COMPONENTS TO: paactlab@dla.mil. THE QAR OR

THE SUPPLIER SOURCE SAMPLING REPRESENTATIVE, WILL FORWARD THE COMPLETED DD

FORM 1222, ALONG WITH THE SIGNED TEST REPORT. SAMPLES FOR PHYSICAL TESTING WILL

ONLY BE FORWARDED UPON REQUEST TO:

DLA Product Testing Center Analytical

700 Robbins Avenue

Philadelphia, PA 19111

ATTN: BLDG 5D

EMAIL: paactlab@dla.mil

PHONE: 215-737-3246

- THE USE OF ELECTRONIC SUBMISSION OF DD FORM 1222 IS AUTHORIZED.

SHADE EVALUATION OF CONTRACTOR FURNISHED COMPONENTS

Contracts awarded under this solicitation shall require shade evaluation of Contractor furnished components in accordance with the following provisions:

(a) Swatches shall be cut by the Contractor from those pieces or rolls selected by the Government representative. For yard for narrow loom material each swatch shall be a full width and 12" in length. The number of pieces or rolls to be sampled shall be in accordance with the following table:

Lot Size Pieces to be sampled

1 to 8 pieces Each piece

9 to 25 pieces 8 pieces

26 to 90 pieces 20 pieces

91 to 160 pieces 32 pieces over 160 pieces 1 of 5 pieces

(b) The swatches shall be submitted to the Government laboratory for shade evaluation. If any swatches are rejected, the end items made from the rejected component lot shall also be rejected.

In these instances, the Contractor shall without cost to the Government, cut additional shade swatches from each remaining piece or roll in the rejected sample lot which was not previously sampled and submit these swatches to the Government for shade evaluation.

(c) Swatches submitted in accordance with (a) and (b) above, shall also be evaluated for uniformity of shade when so specified in section 3 of the fabric specification and when the standard sample is referenced for uniformity of shade. Notification. The vendor shall notify the DLA-PTC representative via email between fourteen (14) calendar days and thirty (30) days from when lots are to be presented to the QAS. This allows arrangements to be made if the lab specialist requests to witness testing at the place of performance. The DLA-PTC will reply in writing by the date of lot presentation, whether witnessing, or side-by-samples, are requested. If no reply is received by the date of presentation to the QAS, the contractor may proceed.

Notifications should include:

Commercial lab contact information

Government lot #

Contract

Product

Specification

Date of lot presentation to the QAS

Certified Test Reports. Test reports shall be signed and certified by the testing facility, accompanied with a DD Form 1222 and emailed to the Government for evaluation to the following address:

paactlab@dla.mil.

The test report presented to the Government shall be not older than ninety (90) calendar days. A separate report shall be provided from each test facility when a single lot of material, components, or end items is tested by more than one test facility for different characteristics.

52.246-9P44 - IDENTIFICATION OF QUALIFIED

LABORATORY AND SOURCE SAMPLING (AUG 1999) DSCP

(Ref. t8342 – 4/08)

File details come from the government source that posted it. Updated .