SOW.doc
DOC document 70 KB Posted
- Attached to
- Maynard_Sidewalk
- Solicitation number
- Not on record
About this file
Updated SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Proposal_Q&A.docx | DOCX document | |
| Proposal_Q&A.docx | DOCX document | |
| MA180001_Wage_Determination-_Middlesex_County.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE STATEMENT OF WORK
This Project is subject to the availability of funding, award will not be guaranteed.
LOCATION: The location of the work is at the Federal Regional Center / DHS, 63 Old Marlboro rd. Maynard, MA 01754. Work location shall take place in the FRC Federal Regional Center Building.
DESCRIPTION OF WORK: The work consists of providing all labor, transportation, materials, supplies, equipment, tools, subcontracts, and performing all work necessary to remove and replace approximately 166 linier ft. x 70 of concrete in. wide walkway in front of the FRC building. The contractor shall remain solely responsible for designing the project and installation to satisfy all prescriptive and performance requirements in this performance statement of work.
PRINCIPAL ELEMENTS:
The work to be performed includes the following principal elements:
(The quantities of work listed are approximate and are provided only for the purpose of limit the responsibility of the contractor (and any subcontractors) to perform all work and furnish labor, material, and equipment shown, specified or reasonably inferred by the below descriptions. )
The contractor shall repair/replace the concrete walkway to the front of the FRC.
The contractor shall remove the existing concrete walkway from the handicap ramp down in front of the FRC down to just beyond where the walkway turns heading between the two facilities approximately 1000 sq. ft.
The contractor shall not remove or disturb the existing curbing without getting approval from the COR the contractor is responsible for any damage to exciting curbing.
Any curbing that is disturbed or broken shall be replaced with the same type and color curbing.
The contractor shall prep the removed area of concrete walkway and replace with new concrete minimum of 4000psi ¾ stone.
The new area shall be level with the existing curbing making a smooth transition from the walkway to the handicap ramp entrance walkway.
The new walkway shall conform and meet industry standards for cement sidewalks.
All construction material shall be removed from the site no Government dumpsters shall be used.
Safety barriers/caution tape or any other barriers shall be used to prevent personnel from entering the construction area.
| Access to the front entrance shall be maintained by use of the handicap ramp. |
| This action is being solicited as a total small business set-aside. In accordance with FAR 36.204, the magnitude of this project is between |
$25,000 and $100,000.
North American Industrial Classification System Code (NAICS) is 237310 and the Small Business Size Standards is $36,500,000.
Concrete testing is required for each load of concrete.
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The contractor shall be required to (a) coordinate scheduling of work with the government to minimize disruption, (b) prosecute the work diligently, (c) commence work under this contract within 10 calendar days after the date the contractor receives notice to proceed, and (d) complete
The entire work ready for use not later than 30 calendar days after the notice to proceed.
Work shall be performed during normal duty hours for Government personnel, 7:00 am to 3:30 PM Monday through Friday, excluding Federal holidays.