MATTAPOISETT-MARION-WAREHAM-612061-136417-CDSP.pdf
PDF 81 MB Posted
- Attached to
- Resurfacing and Related Work on I-195
- Solicitation number
- 612061-136417
- Issued by
- Plymouth County, Massachusetts
About this file
This is a project description document for a pavement resurfacing contract on Interstate 195 in Massachusetts, involving the cities of Mattapoisett, Marion, and Wareham. The project consists of two primary work scopes: depth pavement fine milling with crack sealing and resurfacing using a 0.75-inch Ultra-Thin Bonded Overlay Polymer for the I-195 mainline extending from mile marker 29.2 to mile marker 39.7, and two-depth pavement fine milling with crack sealing and resurfacing using 2 inches of Superpave Surface Course 12.5-Polymer for specified off-ramps and on-ramps in Wareham, rest stop facilities, and associated ramps at I-195/North Street, I-195/Front Street, and I-195/Route 28. Bidders must be pre-qualified by the Massachusetts Department of Transportation in the PAVEMENT-SURFACING category to submit proposals for this work.
This is a federally-funded project, indicating that all bidding and contracting procedures must comply with federal aid requirements and regulations. The project specifications reference attached technical documents detailing the precise work requirements, material standards, and quality specifications for all resurfacing activities. Specific attention is required regarding the differentiation between the ultra-thin bonded overlay application for the mainline and the superpave surface course requirements for ramps and rest stop areas, as these specifications govern both construction methodology and material procurement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .