Material List_FOL Ratings Upgrade.xls

XLS spreadsheet 35 KB Posted

Attached to
FOLSOM SUBSTATION RATINGS UPGRADES HARDWARE
Solicitation number
89503321QWA000095
Issued by

View the file

Other files

File Type Posted
Sol_89503321QWA000095.pdf PDF
SSJ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FOLSOM SUBSTATION RATINGS UPGRADE

MATERIAL LIST

DESCRIPTIONUNITSQTY
*TENSION INSULATOR ASSEMBLY X (31 1020):EA1
- TENSION INSULATOR ASSEMBLY X (31 1020) C onsisting of the following parts:

- Y-C LEVIS BALL = 9 EA

- PORC ELAIN INSULATORS, 15,000 LB M&E = 117 EA

- SOC KET C LEVIS = 9 EA

- YOKE PLATE, 8 INC H C ONDUC TOR SPAC ING = 9 EA

- C LEVIS EYE = 18 EA

- STATION POST INSULATOR, TR-308, UNDERHUNG = 3 EA

- STATION POST INSULATOR, TR-202 = 6 EA

1272 AAC Narcissus Cable, 3,135ftFT3135
4" Aluminum Tubing , 6063 (Schedule 40) 400 ft (10 , 40 ft pcs)FT400
Side Formed Al. Terminal, 4'', 4-Hole Pad to Dual 12720 8'' Spaced BarrelsEA118
Al. Split Parallel Spacer, 12720 Barrel, 8'' SpacedEA126
FT Dead End, Single Pad, Narcissus 1272Kcmil 61str, Terminal & SS HardwareEA21
Side Formed Al. Terminal, 4'', 4-Hole Pad to 12720 BarrelEA27
Al. TEE SPLIT MAIN 4'' PIPE RUN TO 4 HOLE 4'' X 4.9'' LONG , 90 DEGREE ROTATED, PADEA18
Al. TEE SPLIT MAIN 3'' PIPE RUN TO 4 HOLE 4'' X 5.5'' LONG , 90 DEGREE ROTATED, PADEA5
Center Formed 4-Hole Terminal, 4'' Bus to 4'' PadEA21
Bus Expansion with Guide, 4'' Bus to Center Formed 4-Hole, 4'' PadEA15
Bus Support, Slip/Rigid Clamp, 4'' Bus, 3''/5'' Bolt CircleEA5
Bus Support, Slip/Rigid Clamp, 4'' Bus, 3''/5'' Bolt CircleEA8
Al. Dual Cable Support, 12720 Split Runs, 8'' Spaced, 5'' Bolt CircleEA8
Al. Terminal, 4'', 4-Hole Pad to 90° 12720 BarrelEA27
Bus Tee, 4'' Leg to 4'' Main Run at 0° AngleEA5
Cable Tee, 09540 Split Run to 4-Hole, 4'', 90° PadEA9
Cable Tee, 10335 Split Run to 4-Hole, 4'', 90° Pad9
Cable Tee, 06360 Split Run to 4-Hole, 4'', 90° PadEA5
Al. BUS SUPPORT, VERTICAL, 4'' PIPE TO 5'' B.C.EA5
Material to be delivered to Folsom Substation. The Contractor to load and unload the material at the substation. Delivery to be arranged in advance, no earlier than September 17, 2021 and no later than October 15, 2021.

File details come from the government source that posted it. Updated .