About this file

This is a Request for Proposal issued by the City of West Sacramento, California, soliciting design services from qualified firms or individuals for the Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility. The RFP seeks comprehensive design services as detailed in the accompanying Scope of Work, with selected proposers to be referred to as "Contractors." The document establishes standardized terminology for the procurement process, defining synonymous terms such as Firm, Consultant, Supplier, Vendor, and Contractor, as well as clarifying that Purchase Order, Contract, and Agreement are interchangeable, and that Services, Work, Scope, and Project carry equivalent meanings. Pricing proposals, cost proposals, and rate tables are similarly treated as synonymous for submission purposes.

The file does not contain specific information regarding proposal due dates, site visit requirements, bidder conference scheduling, contract award timelines, contract term duration, or renewal options. Additionally, pricing terms, set-asides, incumbent contractor information, funding sources, and budget amounts are not detailed in the provided excerpt. Further documentation within the complete RFP package, including the Scope of Work and additional attachments, would contain these essential procurement details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

26-073-RFP

MASTER PLANNING, DESIGN, AND CONSTRUCTION SUPPORT

SERVICES FOR THE WEST SACRAMENTO FIRE TRAINING FACILITY

City of West Sacramento

1110 W Capitol Ave

West Sacramento, CA 95691

RELEASE DATE: November 13, 2026

DEADLINE FOR QUESTIONS: January 4, 2027

RESPONSE DEADLINE: January 8, 2027, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/cityofwestsacramento https://procurement.opengov.com/portal/%7bproject.government.code%7d

City of West Sacramento

REQUEST FOR PROPOSALS

Master Planning, Design, and Construction Support Services for the

West Sacramento Fire Training Facility

I. Introduction II. Scope of Work

III. Proposal Requirements IV. General Information V. Terms and Conditions

VI. Evaluation Criteria VII. Consultant Selection and Contract Award

VIII. Standard Contract Information IX. Proposer Questionnaire

Attachments:

A - Contract for Services (West Sacramento) - Boilerplate for RFP 11.4.24

B - Insurance Checklist 1 million/2 million

Request for Proposals #26-073-RFP Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

1. Introduction

1.1. Summary

Please state the Statement of Purpose of this Solicitation, being as descriptive as possible.

STATEMENT OF PURPOSE

The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide design services for the West Sacramento Fire Training Facility. More details on the City's needs for this work are provided in the Scope of Work.

Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal

("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor."

SYNONYMOUS TERMS

Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous:

a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror

b. Purchase Order, Contract, Agreement

c. Services, Work, Scope, and Project

d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet

1.2. Background

West Sacramento is a vibrant riverfront community centrally located in Northern California. West

Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 55,000. West Sacramento has a Council/Manager form of government. Citizens elect four City Council Members by district (as of the November, 2022 election) who serve four year terms and directly elect the mayor who serves a four-year term. The City is full-service with nine (9) departments and nearly 500 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. In addition, the City maintains port, water, wastewater, and solid waste enterprise funds. Other activities and related entities include the West Sacramento Redevelopment Successor Agency, Reclamation District 900 and the West Sacramento Area Flood Control Agency.

https://secure.procurenow.com/portal/cityofwestsacramento/projects/288213/document?section=2777527

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

1.3. Contact Information

Megan Gideon

Project Manager II

1110 West Capitol Ave, 1st Floor

West Sacramento, CA 95691

Email: megang@cityofwestsacramento.org

Phone: (916) 617-4684

Department:

Capital Projects - Construction

1.4. Timeline

Project Release Date November 13, 2026

Pre-Proposal Meeting (Non-Mandatory) December 3, 2026, 10:00am

2895 Industrial Blvd, West Sacramento, CA 95691.

Entrance is at the intersection of Harbor Blvd and

Industrial Blvd. Prior to reaching the port entrance gate, you will veer to the right and follow the side path to the connex boxes on the right.

Attendance is strongly encouraged but is not required to submit a proposal. Information provided during the site visit that materially affects the solicitation will be documented and issued through a written addendum.

Question Submission Deadline January 4, 2027, 5:00pm

Proposal Submission Deadline January 8, 2027, 2:00pm

Interview Date (If conducted) January 28, 2027

Contract Award Date (if required) March 3, 2027 mailto:megang@cityofwestsacramento.org tel:(916)617-4684

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

2. Scope of Work

2.1. Scope of Work

The City of West Sacramento ("City") is soliciting proposals from qualified architectural and engineering consulting firms to provide comprehensive professional services for the planning, environmental review, design, permitting, bidding, and construction support of a new Fire Training Facility located on City-owned property within the Port of West Sacramento.

The project has two primary objectives. First, the Consultant shall develop a comprehensive master plan for the long-term development of the Fire Training Campus, establishing a vision for future expansion, site circulation, utilities, training facilities, and supporting infrastructure. The master plan shall identify a phased approach to future development while ensuring that initial improvements do not preclude or negatively impact future expansion opportunities.

Second, the Consultant shall design and prepare complete construction documents for Phase 1 of the project. Phase 1 is anticipated to include the construction of a new permanent training building and associated site improvements, together with all supporting utilities, environmental documentation, permitting, bidding assistance, and construction administration services necessary to deliver the project through construction.

The existing site currently contains two operational fire training burn structures consisting of a multi-story burn tower and a single-story burn building. A former modular classroom building previously serving the facility has been demolished. The City's vision is to transform the site into a permanent, modern fire training campus that supports current operational needs while providing flexibility for future growth and evolving training requirements.

The selected Consultant shall provide all professional services necessary to successfully complete both the master planning effort and the design and implementation of Phase 1 improvements. All Phase 1 improvements shall be designed to be compatible with, and supportive of, the long-term Fire Training

Campus Master Plan.

Task 1 - Project Management, Coordination, and QA/QC

The Consultant shall provide overall project management and coordination throughout the duration of the project, including but not limited to:

• Project kickoff meeting.

• Development and maintenance of project schedule.

• Biweekly design coordination meetings during active design, unless otherwise approved by the

City.

• Coordination with City staff, the Fire Department, the Port of West Sacramento, utility providers, regulatory agencies, and other stakeholders.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Monthly progress reports and project status updates.

Quality Assurance / Quality Control (QA/QC)

The Consultant shall implement and maintain a documented Quality Assurance/Quality Control (QA/QC) program throughout the duration of the project to ensure that all deliverables are complete, coordinated, accurate, and internally consistent prior to submission to the City.

The Consultant shall identify, in its proposal, the individual responsible for overseeing the QA/QC program. The identified QA/QC Manager shall be independent of the day-to-day production of the work to the maximum extent practicable and shall be responsible for verifying that all required quality reviews have been completed prior to each design submittal.

The Consultant shall prepare and maintain a QA/QC Matrix identifying the required quality reviews to be performed at each design milestone, including, at a minimum:

• Conceptual Design

• 30% Design

• 60% Design

• 90% Design

• 100% Construction Documents

The QA/QC Matrix shall identify:

• Required interdisciplinary coordination reviews between architectural, civil, structural, mechanical, electrical, plumbing, fire protection, and other applicable disciplines.

• Constructability reviews.

• Code compliance reviews.

• Specification and drawing coordination reviews.

• Cost estimate reconciliation with the current design.

• Completion of internal quality reviews prior to each submittal to the City.

• The individual(s) responsible for completing each review.

The Consultant shall certify that each design submittal has undergone the required QA/QC review prior to submission to the City.

Task 2 - Existing Conditions Evaluation

The Consultant shall perform all necessary investigations to evaluate existing site conditions, including:

• Site reconnaissance.

• Topographic and boundary survey sufficient to support project design.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Research and evaluation of existing site infrastructure and available utility records.

• Coordinate and provide all geotechnical engineering services and investigations necessary to support project design.

• Verification of existing site constraints and opportunities.

• Evaluate existing water, sewer, storm drainage, electrical, gas, and communication utilities serving the site.

• Determine the capacity of existing utilities to support the proposed facility and anticipated future buildout identified in the site master plan.

• Identify any required utility upgrades or extensions.

o Verify existing utility locations, depths, sizes, points of connection, and other characteristics necessary to support design, including field verification or subsurface investigation where necessary.

• Identification of permitting requirements.

The Consultant shall initiate coordination with applicable utility providers during the Existing Conditions

Evaluation to identify available capacity, service requirements, anticipated utility improvements, and potential schedule or cost impacts prior to advancement of the Phase 1 design.

Task 3 – Programming, Master Planning, and Conceptual Design

Working closely with City staff and the Fire Department, the Consultant shall develop a programming document identifying project requirements and operational needs.

3.1 Programming

• The programming effort shall include, at a minimum:

o Space needs assessment.

o Operational workflow.

o Building layout alternatives.

o Site circulation.

o Vehicle access.

o Apparatus movements.

o Future expansion opportunities.

3.2 Programming Workshop

• The Consultant shall facilitate a programming and design workshop with Fire Department personnel and City staff prior to the commencement of schematic design. The workshop shall

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility identify operational requirements, training needs, building functionality, apparatus circulation, storage needs, and future expansion opportunities. The Consultant shall document the workshop findings and incorporate the City's direction into the design. A minimum of one four-hour workshop shall be conducted.

3.3 Fire Training Campus Master Plan

The Consultant shall develop a comprehensive Fire Training Campus Master Plan identifying the proposed Phase 1 improvements and establishing a long-term vision for future campus development.

The Master Plan shall demonstrate how future buildings, training props, circulation, parking, utilities, and supporting infrastructure can be accommodated without requiring significant reconstruction or relocation of completed Phase 1 improvements. The Master Plan shall serve as the basis for the layout, design, and implementation of the Phase 1 project.

At a minimum, the Master Plan shall include:

• Existing conditions summary identifying site opportunities and constraints.

• Project narrative describing the planning process, design assumptions, operational goals, and long-term vision for the Fire Training Campus.

• Conceptual site layout illustrating the proposed Phase 1 improvements and anticipated future development.

• Phasing plan identifying logical implementation phases for future campus expansion.

• Utility Master Plan identifying existing and proposed water, sewer, storm drainage, electrical, gas, communications, and other utility infrastructure necessary to support both Phase 1 improvements and future campus buildout.

• Site circulation plan illustrating emergency vehicle access, apparatus circulation, pedestrian circulation, parking, service access, and site connectivity.

• Infrastructure constraints map identifying easements, utilities, environmental constraints, access limitations, and other factors affecting future development.

• Future building and training prop test-fits demonstrating the site's ability to accommodate anticipated future facilities while maintaining safe operational circulation.

• Preliminary opinion of probable construction costs for each anticipated development phase.

• Recommendations for implementation priorities and future project sequencing.

The Consultant shall submit draft and final Master Plan documents for City review and approval.

Master Plan deliverables shall include, at a minimum:

• PDF copies of all reports, plans, exhibits, and presentation materials.

• Native electronic design files.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Editable CAD files compatible with the City's CAD standards.

• GIS-compatible files for all applicable mapping, utility, and infrastructure information in a format acceptable to the City.

3.4 Operational Continuity and Construction Phasing

The Consultant shall coordinate throughout design with the West Sacramento Fire Department to ensure that the proposed facility supports current training operations, accommodates future training needs, and maintains safe access to the existing training facilities during construction to the maximum extent practicable.

As part of the design and construction documents, the Consultant shall develop temporary circulation, access, construction staging, and training continuity plans necessary to support continued Fire

Department operations during construction. At a minimum, the Consultant shall:

• Evaluate construction phasing and staging in relation to ongoing Fire Department training activities.

• Identify temporary apparatus and emergency vehicle access and circulation routes.

• Identify construction staging, material storage, contractor access, and work areas to maintain separation between construction activities and Fire Department operations.

• Identify temporary pedestrian access and other operational routes, as applicable.

• Coordinate planned utility shutdowns, access restrictions, and other construction activities that may temporarily affect training operations.

• Develop staging and phasing diagrams sufficient for incorporation into the construction documents and use by the Contractor during construction.

• Identify any anticipated periods when continued use of existing training facilities cannot reasonably or safely be maintained and coordinate those restrictions with the City during design.

The Consultant shall incorporate applicable operational continuity, access, staging, and phasing requirements into the construction documents so that prospective bidders can account for these requirements in their bids and construction sequencing.

3.5 Conceptual Design

The Consultant shall prepare conceptual site plans and building concepts for City review.

Task 4 – Environmental Review and Entitlements

The Consultant shall provide all environmental planning, technical analysis, documentation, and coordination necessary to support environmental review and obtain environmental clearance for the

Project in accordance with the California Environmental Quality Act (CEQA) and other applicable federal, state, and local environmental requirements.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

The Consultant shall evaluate the Project and existing site conditions, recommend the appropriate CEQA compliance pathway, and coordinate with the City, as Lead Agency, throughout the environmental review and approval process.

Services shall include, at a minimum:

• Review available environmental, historical, and site documentation relevant to the Project.

• Identify applicable environmental regulatory requirements, permits, approvals, responsible agencies, trustee agencies, and other agency coordination requirements.

• Prepare or coordinate technical studies determined necessary to support environmental review and CEQA clearance, including, as applicable, studies addressing:

o Air quality and greenhouse gas emissions.

o Noise and vibration.

o Transportation and traffic.

o Biological resources.

o Cultural and historic resources.

o Tribal cultural resources and support for required consultation.

o Hazards and hazardous materials.

o Geology and soils, as applicable to environmental review.

o Hydrology and water quality.

o Any additional environmental studies or analyses determined necessary by the City as Lead

Agency or required by an applicable responsible or trustee agency.

• Evaluate the project site for potential hazardous materials concerns associated with current or historical site uses and prepare or coordinate additional investigation and recommendations as necessary.

• Evaluate the appropriate CEQA compliance pathway and prepare the environmental documentation necessary to achieve CEQA clearance in accordance with the environmental services included in the Consultant's approved fee proposal. Potential CEQA documentation may include a Notice of Exemption (NOE), Initial Study/Negative Declaration or Mitigated Negative

Declaration (IS/ND or IS/MND), Environmental Impact Report (EIR), or other documentation determined necessary by the City as Lead Agency.

• Prepare notices, findings, mitigation measures, mitigation monitoring and reporting documentation, and other supporting CEQA documents, as applicable.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Prepare and submit environmental permit applications and supporting documentation required by applicable regulatory agencies.

• Coordinate with the City and applicable regulatory, responsible, and trustee agencies throughout the environmental review process.

• Respond to agency and City comments and revise and resubmit environmental documentation as necessary to obtain environmental clearance and required approvals.

• Coordinate environmental requirements and mitigation measures with the project design and incorporate applicable requirements into the construction documents.

The Consultant shall support the City through completion of the CEQA process and environmental clearance for the Project, including preparation of final environmental documentation and applicable notices and supporting materials required for City consideration and approval.

Task 5 - Site Development Design

The Consultant shall prepare complete civil engineering plans for site improvements including, but not limited to:

• Site grading.

• Drainage improvements.

• Asphalt pavement rehabilitation and replacement.

• Utility improvements.

• Water service modifications.

• Relocation of the existing fire hydrant to improve functionality for training operations.

• Sewer main extension necessary to serve the proposed building.

• Fencing modifications.

• Relocation of existing fencing on the western property boundary.

• Security gates and controlled site access, including coordination of card readers, security cameras, and associated power and communications infrastructure.

• ADA compliance.

• Exterior lighting.

• Utility coordination.

The Consultant shall evaluate the site for emergency vehicle circulation, turning movements, training operations, and future site expansion.

Utility Design and Coordination

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

Based upon the utility investigations and capacity analyses completed under Task 2, the Consultant shall provide all utility engineering, design, and coordination services necessary to serve the Phase 1 improvements and support the long-term development identified in the Fire Training Campus Master

Plan.

Services shall include, at a minimum:

• Prepare required utility demand, load, capacity, and other engineering calculations or analyses necessary to support the proposed improvements.

• Identify utility conflicts and required relocations, extensions, replacements, or capacity improvements.

• Design required on-site utility improvements, relocations, and extensions.

• Identify and design required off-site utility improvements necessary to serve the project, to the extent such improvements are within the Consultant's professional disciplines and are required by the applicable utility provider or approving agency.

• Coordinate with all applicable public and private utility providers throughout design, including obtaining utility requirements, points of connection, service requirements, design criteria, and required approvals.

• Prepare and submit utility application packages, plans, calculations, exhibits, and supporting documentation required for utility review and approval.

• Respond to utility provider comments and revise and resubmit design documents as necessary to obtain approval.

• Coordinate utility improvements with the architectural, civil, structural, mechanical, electrical, plumbing, fire protection, and other applicable project disciplines.

• Prepare easement exhibits, legal descriptions, and supporting documentation required for new or modified utility easements, as applicable.

• Identify utility provider fees, service requirements, anticipated lead times, and utility-provided work that may affect the project budget or schedule.

• Incorporate approved utility improvements and utility provider requirements into the final construction documents, as applicable.

The Consultant shall coordinate required utility improvements through approval by the applicable utility providers and shall promptly notify the City of any utility requirement, conflict, capacity limitation, schedule impact, or off-site improvement that may materially affect the project scope, cost, or schedule.

Task 6 - Building Design

The Consultant shall prepare complete architectural and engineering design documents for a new permanent Fire Training Facility.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

The City anticipates utilizing a pre-engineered metal building with a fully finished interior; however, the

Consultant may recommend alternate solutions that provide equal or greater value.

The Consultant shall identify and document applicable building, fire, accessibility, energy, structural, and other codes and standards governing the Project and prepare a code analysis sufficient to support design and permitting.

The City anticipates constructing an approximately 2,400-square-foot building. The proposed facility is anticipated to include, at a minimum:

• Two-story structure.

• Attached single apparatus bay.

• Large multi-purpose classroom/training room.

• Minimum of two restrooms.

• Shower facilities.

• Second-floor offices for Fire Department training personnel.

• Mechanical, electrical, plumbing, fire protection, structural, and telecommunications systems.

• Data, telecommunications, audiovisual, and technology systems necessary to support classroom, training, and administrative functions.

• Building security and access control systems, including card readers and security cameras, as applicable.

• Furniture, fixtures, and equipment (FF&E) planning and coordination.

• Energy Code compliance.

The Consultant shall verify programming requirements during the design process and recommend refinements as appropriate.

Task 7 – Cost Estimating and Value Engineering

The Consultant shall prepare independent Opinions of Probable Construction Cost at each design milestone, including:

• Conceptual Design

• 30% Design

• 60% Design

• 90% Design

• Final Bid Documents

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

The Consultant shall continuously monitor the estimated construction cost throughout the design process and notify the City immediately if the estimated construction cost is anticipated to exceed the

City's established construction budget.

If the estimated construction cost exceeds the City's established construction budget, the Consultant shall evaluate the design, identify cost-saving opportunities, and revise the design as necessary to bring the project within the approved construction budget at no additional cost to the City, provided the City has not materially modified the Scope of Work or Project Program.

For purposes of this Agreement, the Project Program shall consist of the project objectives, scope, functional requirements, and anticipated improvements identified in this Request for Proposals, as refined and approved by the City during the Programming and Master Planning phase. Revisions necessary to maintain the project within the approved construction budget shall be considered part of the Consultant's Basic Services and shall not constitute additional services unless the City directs material changes to the approved Project Program after completion of the applicable design milestone.

The Consultant shall not advance the design to the next design milestone if the estimated construction cost materially exceeds the approved construction budget without written authorization from the City.

Task 8 - Construction Documents

The Consultant shall prepare complete bid-ready construction documents including:

• Drawings.

• Technical specifications.

• Engineer's Opinion of Probable Construction Cost.

• Bid schedules.

• Permit documents.

• Supporting calculations.

• Coordination with applicable reviewing agencies.

Documents shall be suitable for competitive public bidding. The Consultant shall coordinate all disciplines to ensure the construction documents are complete, coordinated, and suitable for competitive bidding with minimal conflicts or omissions.

Task 9 – Permitting and Agency Coordination

The Consultant shall provide all professional services necessary to support the City's acquisition of required permits, approvals, and agency authorizations necessary for the project, including, but not limited to:

• Building permits.

• Utility approvals.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Fire Department coordination.

• Environmental permits and approvals.

• Port of West Sacramento coordination and approvals.

• Address assignment through Yolo County and other applicable agencies.

• Easements, legal descriptions, plats, or other property documentation required to support the project.

The Consultant shall prepare and submit complete permit application packages and supporting documentation required by each permitting or reviewing agency. Permit processing services shall include, at a minimum:

• Preparation of permit application forms.

• Preparation of permit-ready plans, specifications, calculations, and supporting technical documentation.

• Preparation of Port approval packages and supporting documentation, as required.

• Preparation of environmental permit applications and supporting documentation, as applicable.

• Coordination with permitting and reviewing agencies throughout the review process.

• Attendance at agency meetings reasonably necessary to obtain required project permits and approvals.

• Preparation of written responses to agency review comments.

• Revision and resubmittal of plans and supporting documents as necessary to obtain approvals.

• Coordination of all required consultant disciplines to address agency comments.

• Preparation of final approved permit documents for use during construction.

The Consultant shall prepare and maintain a permit and agency approval tracking log identifying required permits and approvals, responsible agencies, submittal dates, review status, outstanding comments, resubmittal dates, and final approval status.

The Consultant shall also assist the City with documenting the Fire Department's long-term occupancy and operational use of the City-owned Port property as necessary to support project approvals.

Task 10 - Bidding Assistance

The Consultant shall provide bidding support services, including:

• Attendance at the pre-bid meeting and site walk, as applicable.

• Preparation of responses to bidder questions and requests for clarification.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Evaluation of proposed substitutions and preparation of recommendations to the City.

• Preparation of addenda, revisions, sketches, or other documentation necessary to clarify the

Contract Documents during bidding.

• Technical review of bids for conformance with the Contract Documents and assistance to the

City during bid evaluation, as requested.

• Preparation of conformed Contract Documents incorporating issued addenda following award, if requested by the City.

Task 11 – Construction Administration and Commissioning Support

Construction Administration

During construction, the Consultant shall provide professional construction administration and support services, including, at a minimum:

• Attend the preconstruction meeting.

• Attend regular construction progress meetings and provide design-related coordination as necessary.

• Perform site observations at appropriate construction milestones to observe general conformance with the Contract Documents and identify design-related issues.

• Review and respond to submittals, shop drawings, and Requests for Information (RFIs) within the timeframes established by the construction contract.

• Review proposed substitutions and provide recommendations to the City.

• Review contractor change order proposals, including evaluation of scope, quantities, and cost, and provide recommendations to the City.

• Review contractor pay applications and provide recommendations to the City regarding consistency with observed progress and the Contract Documents.

• Provide interpretations, clarifications, sketches, and supplemental information necessary to clarify the intent of the Contract Documents.

• Participate in inspections and coordination meetings with permitting agencies and other authorities having jurisdiction, as necessary.

• Prepare the punch list and perform follow-up observations to verify completion of identified items.

• Assist the City in determining Substantial Completion and Final Completion.

• Review operation and maintenance manuals, warranties, and other contractor closeout submittals for compliance with the Contract Documents.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Review contractor-provided record information and prepare final record drawings reflecting documented changes made during construction.

• Provide project closeout assistance through final acceptance.

The Consultant shall provide revisions, clarifications, and corrective design services necessary to address errors, omissions, conflicts, or inconsistencies in the Consultant's Contract Documents at no additional cost to the City.

Proposers shall identify the number of construction progress meetings, site observations, and other construction-phase site visits included in the proposed fee and clearly identify any assumptions regarding the anticipated construction duration.

Commissioning Support

The Consultant shall provide commissioning support services throughout construction and project closeout, including, at a minimum:

• Attend up to three (3) commissioning meetings with the City, Contractor, Commissioning

Authority (if applicable), and other project stakeholders.

• Review and provide comments on the Commissioning Plan and related commissioning documentation for consistency with the Contract Documents.

• Participate in functional performance testing of applicable building systems, including HVAC, plumbing, electrical, fire protection, fire alarm, building controls, and other systems designed by the Consultant, as appropriate to the Consultant's design responsibilities.

• Review commissioning deficiencies identified during testing and provide design clarifications or recommendations necessary to resolve design-related issues.

• Coordinate with the City and Contractor to support functional testing, startup, and final acceptance of building systems.

• Review final commissioning documentation for consistency with the Contract Documents.

• Incorporate commissioning documentation, testing results, and final system acceptance information into the project closeout documentation and record documents, as applicable.

Deliverables

At a minimum, the Consultant shall provide the following deliverables, as applicable to the Scope of

Work:

Planning, Programming, and Design Development

• Draft and Final Fire Training Campus Master Plan

• Existing Conditions Report

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Programming Report

• Basis of Design Report

• Environmental documentation and technical studies, as required

• Engineer's Opinion of Probable Construction Cost at each design milestone

• Code Analysis

• Utility Capacity Analysis

• QA/QC Matrix identifying required reviews and responsible personnel

• QA/QC certification accompanying each design milestone submittal

Design Documents

• Conceptual Design Package

• 30% Design Submittal

• 60% Design Submittal

• 90% Design Submittal

• 100% Construction Documents

• Permit-ready construction documents

• Bid-ready construction documents

• Technical specifications

• Utility approval packages

• Construction phasing/continuity plan

Permitting

• Complete permit application packages

• Supporting calculations and technical documentation

• Agency response letters

• Revised permit submittals

• Permit and agency approval tracking log.

• Final approved permit documents

Bidding Support

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

• Bid addenda

• Responses to Requests for Information (RFIs)

• Bid evaluation assistance

• Substitution reviews, if requested

Construction Support

• Submittal reviews

• RFI responses

• Site observation reports

• Punch list

• Final record drawings based upon contractor-provided record information.

• Commissioning support documentation

• Project closeout documentation

Electronic Deliverables

All deliverables shall be provided electronically. Hard copies shall be provided only when specifically requested by the City or required by a reviewing or permitting agency. Electronic deliverables shall include:

• Editable CAD and/or BIM (Revit) files compatible with the City's standards.

• GIS-compatible files for mapping and utility information, where applicable.

• Native electronic files for reports, specifications, spreadsheets, cost estimates, and calculations.

• Signed and stamped PDF copies of all final reports, plans, specifications, and calculations.

• Final specifications in editable Microsoft Word format.

• Cost estimates in editable Microsoft Excel format.

2.2. Term of Contract

The initial term of the Contract is at the City's discretion and may be up to 3 years. The City also reserves the right to extend the Contract for up to 2 additional 1-year terms (individually, “Extension”) upon the same terms and conditions as parties agreed to in the Contract. Thus, parties agree the Contract may be for a total of 5 years upon the same terms and conditions as parties agreed in the Contract.

Notwithstanding the foregoing, the City is not obligated to extend the Contract for any amount of time.

If there is outstanding work within the Scope of Work at the end of the term of the Contract and the City requires time to solicit for and secure an alternative contractor, Contractor shall continue to provide the services within the Scope of Work on a month-to-month basis, not to exceed six (6) months, at the same

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility cost, terms, and conditions in effect at the termination of the Contract. The City shall give Contractor at least thirty (30) days written notice of such a need and the anticipated timeline to secure an alternative contractor.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

3. Proposal Requirements

3.1. Proposal Format & Content

Proposer Questionnaire must include each of the following sections to be uploaded in the Proposer

Questionnaire section.

A. Proposal Transmittal Letter

B. Proposer's Mandatory Qualifications and Experience

C. Technical Project Approach

D. Cost Proposal

Specific content and format requirements for each section are detailed below.

Each section shall be uploaded in the Proposer Questionnaire section of this RFP.

3.2. Proposal Transmittal Letter

A Proposer is required to provide a written transmittal letter and offer in the form of a standard business letter ("Proposal Transmittal Letter" or "Letter"). The Proposal Transmittal Letter shall reference and respond to the following subsections in sequence and have attached to it corresponding documentation, as required. A Proposal Transmittal Letter is mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected.

A. Proposer's Name and Contact.The Letter shall state the complete name, or business name, of the Proposer making the Proposal. The Letter shall state the name, title, mailing address, email address, and telephone number of the person the City should contact regarding the Proposal.

B. Statement of Offer. The Letter shall state that the Proposal is an offer to complete the Scope of

Work and the offer, including the Cost Proposal rates and budget, remains valid for at least ninety (90) business days after the Proposal due date.

C. Conflict of Interest.The Letter shall state whether the Proposer, or any individual who shall perform work under the Contract, has a possible conflict of interest and, if so, the nature of that conflict. The City reserves the right to terminate the Contract if its execution would or could create, or give the appearance of creating, a conflict of interest. The City, at its sole discretion, shall make all determinations on the existence or appearance of a conflict of interest.

D. City Contract Terms. The Letter shall include a statement of acknowledgement that the City’s standard contract and insurance (Included in Attachments) have been reviewed and accepted by the Proposer with or without qualification.

1. If the Proposer has qualifications, the Proposer shall download a copy of the standard contract and re-upload a version of the document in the Proposer Questionnaire under https://secure.procurenow.com/portal/cityofwestsacramento/projects/288213/document?section=2777524 https://secure.procurenow.com/portal/cityofwestsacramento/projects/288213/document?section=2777524 https://secure.procurenow.com/portal/cityofwestsacramento/projects/288213/document?section=undefined https://secure.procurenow.com/portal/cityofwestsacramento/projects/288213/document?section=2777531 https://secure.procurenow.com/portal/cityofwestsacramento/projects/288213/document?section=2777524

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

Standard City Contract Qualifications identifying the contract language at issue and

Proposer's suggested adjustment or modification.

2. If no qualifications are identified, Proposer is presumed to have accepted the City' standard contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification.

E. Subcontractors. The Letter shall state whether the Proposer intends to use subcontractors, subconsultants, or other contracting parties to complete the Scope of Work (collectively, "Subcontractors"). If so, the Letter shall clearly identify the name of each proposed

Subcontractor, their mailing address, email address, and telephone number as well as the service related to the Scope of Work that the Subcontractor is anticipated to perform. NOTE:

The Contractor must obtain written approval from the City prior to the use of any

Subcontractor, even after a Contract is executed.

F. Signature and Authority. The Letter shall be signed by a person empowered to bind the

Proposer to the provisions of the RFP, and any contract awarded pursuant to it. Evidence demonstrating authority to bind the Proposer shall be included or attached to the Letter, such as a statement describing the signatory's role with or relationship to the Proposer.

3.3. Proposer's Mandatory Qualifications and Experience

A Proposal shall demonstrate that the Proposer holds the qualifications and experience required to complete the Scope of Work by referencing and responding to the following subsections in sequence and attaching corresponding documentation, as required ("Mandatory Qualifications and Experience").

The qualifications and experience listed below are mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected.

A. Organization. A brief description of Proposer's background, years in business, organizational history, and client base. Briefly state Proposer's total number of employees and list all relevant licenses, specialties, and trainings held by Proposer and/or employees. List office location(s) and identify the office(s) from which services will be performed.

B. Experience. A brief statement of how long Proposer has been performing the services required to complete the Scope of Work. Proposer shall have a minimum of five (5) years of experience providing the services required to complete the Scope of Work to public agencies in California. If the Proposer has been in business for less than five years, the experience of its principals may be used to meet this requirement.

C. Public Agency Experience.A description of no more than ten (10) public sector projects completed within the last five (5) years that demonstrates Proposer's experience performing services to complete the Scope of Work, including a statement as to whether Proposer has experience working for the City of West Sacramento, or a public agency similar in size to the

City. Note key personnel involved in each project and if they are proposed for this Proposal and

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility if applicable, differentiate which work was performed by subcontractor. List any contractual relationships with the City existing now or within the past five (5) years.

D. Personnel.A narrative description, resume, and organizational structure chart of personnel to be assigned to complete tasks within the Scope of Work, clearly indicating where Subcontractors will be used, if applicable. The narrative description or resume shall list, at least, each individual’s title, education, relevant experience and duration, professional licenses, and demonstrated accomplishments. Identify the individual who will lead the day-to-day work effort and serve as the primary contact to the City.

E. References. A list of five (5) references for whom the services required to complete the Scope of

Work have been performed by Proposer within the last three (3) years. The list of references shall include name, mailing address, email address, brief description of services completed relevant to this RFP, and point of contact who can attest to the quality and effectiveness of the services.

F. Local Benefit.A statement describing any and all local benefit the Proposer would bring to the

Contract. For example, local benefit may include but is not limited to local vendors, suppliers, labor or subcontractors used in support of the project as well as fees or taxes paid to the City. To the extent practical, the local benefit described with the Proposal should be measurable. At the end of the Contract, the Contractor shall be required to provide a report detailing the measures taken to enhance the local benefit and whether or not stated goals were met. For purposes of this section, a local vendor or service provider is one located within the City limits and in possession of a West Sacramento business license. If the solicitation has Federal funds, there will be no Local Benefit considered.

G. History.A statement as to whether there have been any mergers, acquisitions, or sales related to

Proposer's organizational structure within the last three (3) years. If so, attach an explanation providing relevant details.

H. Legal Challenges.A statement as to whether there is any pending litigation against the Proposer.

If such litigation exists, attach an opinion of counsel as to whether the pending litigation will impair the Proposer's ability to perform the Contract.

I. Fiscal Viability. A statement as to whether, in the last ten (10) years, the Proposer has filed (or had filed against it) any bankruptcy or insolvency proceeding, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors. If so, attach an explanation providing relevant details.

J. Business License.Registration with the Secretary of State to conduct business in the State of

California. Attach a copy of a proof of registration.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

3.4. Technical Project Approach

A document detailing the operational and/or organizational approach the Proposer will take to timely fulfill the Scope of Work shall be submitted with the Proposal ("Technical Project Approach"). The

Technical Project Approach shall be a comprehensive narrative describing how the Proposer will complete the Scope of Work, communicate with the City throughout the work, advance the project objectives, and provide continuity on work efforts.

3.5. Cost Proposal

A document detailing all costs associated to complete the Scope of Work shall be submitted with the

Proposal ("Cost Proposal"). For sealed bids, the Cost Proposal shall be opened after and separately from the rest of the Proposal. Cost Proposal shall include all applicable federal, state, and local taxes and must be all-inclusive of project expenses, as no additional charges shall be allowed, except for additional services as requested by the City, if any. There shall be no additional reimbursement for travel time or expenses, telephone costs, copying costs, etc.

If applicable, the Cost Proposal shall separately delineate costs for optional term extensions and/or optional services. Proposer agrees to maintain pricing pursuant to the Cost Proposal for the duration of the Contract, and any optional extensions.

Title: Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility

4. General Information

4.1. Proposal Submission

All Proposals, including any attachments, exhibits, or amendments, shall be submitted through the City's

E-Procurement Portal, which will deliver Proposals to the City of West Sacramento staff overseeing the solicitation. Proposals not submitted through the City's E-Procurement Portal shall be deemed nonresponsive and rejected. Proposals may not be delivered orally, by paper, by email, by facsimile transmission, or by any other means.

All proposals shall be submitted through the City’s e-Procurement Portal no later than:

Friday, January 8, 2027 at 2:00 pm.

A Proposer shall respond to the RFP and any exhibits, attachments, or amendments.

A Proposer's failure to submit a Proposal in compliance with the procedures and timelines set forth in the RFP shall cause the Proposal to be deemed nonresponsive and rejected. A late Proposal shall not be accepted. Additional time to respond shall not be granted to any Proposer.

4.2. Questions and/or Objections

It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the RFP and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this RFP and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”).

A Proposer may submit Questions related to this RFP to the City through the City’s e-Procurement Portal at or before:

Monday, January 4, 2027 at 5:00 pm.

Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all.

Any revisions to the Standard Contract should be in the Proposal Transmission Letter and shown in redline, as described above.

4.3. General Proposal Format Requirements

A. The City discourages lengthy and costly proposals.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .