Market Survey Questionnaire CalumetDMDF.docx
DOCX document 23 KB Posted
- Attached to
- DMDF Calumet Harbor and River Vertical Expansion
- Solicitation number
- W912P622R0004
About this file
This document is a market survey questionnaire for the DMDF Calumet Harbor and River Vertical Expansion project. The USACE Chicago District is seeking construction of an approximately 3,800 foot long, 11-20 foot high berm using on-site fill material. Additional work includes installing wick drains and a series of monitoring wells and piezometers to monitor berm settlement during construction. Firms must also reinforce sections of the berm with geotextiles, stone blankets, and geofabric. Estimated at over $10 million, the project entails heavy earthwork to construct the berm and build an approximately 6,000 foot gravel access road, 4,000 foot drainage ditch, culverts, and 3,000 foot chain link fence. Interested construction firms must submit examples of completed projects over $10 million in size and scope involving berm or levee construction and installation of monitoring equipment. Responses are due by May 23 to Kyle Smith at the USACE Chicago District.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Market Survey Questionnaire
1. Project Title: Chicago, Illinois – DMDF Calumet Harbor and River Vertical Expansion
2. Project Location including county: Chicago, Illinois County: Cook
| 3. Project NAICS Code: | 238910 | ||
| 4. Response Date: | 23 May | ||
| Short Project Description: | The proposed project includes construction of 11-20ft high berm about 3,800ft long using satisfactory fill available on site. The berm will be constructed on top of the existing disposal area, therefore stage construction of the berm will be required. In addition, a series of wick drains must be installed within the footprint of the berm to help with consolidation of the material. During the construction, monitoring of the settlement of the berm is necessary. Therefore, a series of monitoring wells and piezometers must be installed. Some of the sections of the berm will need to be reinforced with geotextiles, stone blankets, and geofabric. The berm will be built with clean harbor dredged material available on site, heavy earthwork will be required to move material from the stockpile area on the site. In addition, construction of an approximately 6,000ft gravel access road, construction of an approximately 4,000ft of drainage ditch, construction of culverts, construction of approximately 3,000 ft of chain link fence with the gate and seeding of approximately 5 acres of land will be required. The work will be done close to East 95th Street and South Kreiter Ave, in Chicago with heavy vehicular and train traffic. | ||
| Type of action: | Construction Project | ||
| 5. Estimated Advertisement Date: | June 22 | ||
| 6. Estimated Award Date: | Sep 22 | ||
| 7. Estimated Performance Period: | 450 days | ||
| 8. Project Magnitude: | More than $10,000,000 | ||
| 9. Criteria: | Interested construction firms must provide no more than three (3) example projects with greater than 95 percent completion, or projects completed in the past ten (10) years in which the interested firm served as the prime contractor. Example projects must be of similar size and scope. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance. For each example project include original contract amount, pending and actual modification cost, pending and actual claims. | ||
| a. Projects similar in scope to this project include: | Projects considered similar in scope will include the new construction of the levee and/or berms. In addition, project should demonstrate installation of the monitoring equipment such as piezometers, monitoring wells, and wick drains. | ||
| b. Projects similar in size to this project include: | Projects considered similar in size will include a minimum installation of 50 of wick drains, and or installation of 3,000 feet of berm or levee. |
10. Based on the definitions above, for each project submitted, include:
a. Current percentage of construction complete and the date when it was or will be completed.
b. Scope of the project.
c. Size of the project.
d. The dollar value of the construction contract and design-build construction.
e. The type and percentage of the contract cost, excluding cost of materials that was self-performed as physical vertical and horizontal construction by construction trade(s).
f. Identify the number of subcontractors by construction trade utilized for each project.
g. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.
h. The portion and percentage of the project that was self-performed.
i. Demonstrate and provide successful construction of the project within the last 5 years.
j. Demonstrate and provide documentation of successful Department of Defense and/or Federal Contracting Experience.
11. Based on the definitions above, for each project submitted, include:
a. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement.
b. Total submittal package shall be no longer than 8 pages.
| 12. Submission of Reponses: | Reponses should be sent to Kyle Smith | |
| kyle.d.smith@usace.army.mil |
(312) 846-5370