This is an informal market research survey conducted by the Defense Logistics Agency (DLA) Troop Support to gather industry input on the procurement strategy for Bag, Stowage, Chemical (NSN 8465-01-710-8416, PGC 12915). The product must be manufactured in accordance with specification NU/PD 20002A dated May 30, 2024. DLA Troop Support is seeking information from manufacturers regarding the feasibility of a Firm-Fixed Price, Indefinite Delivery, Indefinite Quantity (IDIQ) contract structure consisting of a three-year term with separate pricing for each one-year tiered period. The government estimates annual requirements of 6,500 units per tier period, with a minimum quantity of 1,625 units and maximum quantity of 19,500 units across all three years, with delivery to military customers throughout the United States and to DLA's third-party logistics provider (Travis Association for the Blind) in Austin, Texas.

Respondents are requested to provide company identification, manufacturing capabilities, pricing information by tier period, production lead times, and delivery capabilities by the deadline of Friday, August 7th at 3:00 P.M. Eastern Time, addressed to Adam Smith (adam.g.smith@dla.mil) and Ryan Hutton (ryan.hutton@dla.mil). Key survey topics include: commerciality of the item under FAR 2.101, ability to produce Product Demonstration Models within 30 days, realistic production lead times (government estimates 249 days including 159 days production and 90 days Factory Acceptance Testing), minimum and maximum monthly/annual production quantities, labor-to-material cost ratios, and price volatility. The survey also solicits industry input on whether to include Materials Cost Economic Price Adjustment provisions tied to Department of Labor Producer Price Index metrics. The Navy is identified as the primary customer. This survey is explicitly stated as market research only and does not constitute a solicitation for bids or proposals, with all responses to remain confidential.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

Troop Support 700 Robbins Avenue Philadelphia, Pennsylvania 19111-5092

July 24, 2026

SUBJECT: Informal Market Research Survey – BAG, STOWAGE, CHEMICAL

Item: Bag, Stowage Chemical Purchase Description: Bag, Stowage, Chemical shall be made in accordance with NU/PD 20002A. Dated 30 MAY 2024

PGC: 12915

NSN: 8465-01-710-8416 (1 size)

DLA Troop Support is conducting an informal market research on the above items to determine an acquisition strategy that will enhance our support of military customers worldwide, as well as to determine what industry is capable of providing Bag, Stowage, Chemical For this reason, DLA Troop Support would appreciate your firm sharing its expertise and insight into how these items can be most efficiently procured.

This informal market survey is intended to gather information only. The acquisition approach listed below was designed to promote competition and to ensure a viable industrial base for the supply of Bag, Stowage, Chemical. Firm-Fixed Price, Indefinite Delivery, Indefinite Quantity Contract Type consisting of a three-year contract whereby the offerors may offer separate prices for each one-year tiered price period. DLA Troop Support requires input from industry to formulate our acquisition strategy regarding how many contracts are necessary, the length of the contract(s), and what type of companies and how many companies are interested in competing for the requirement. Your firm’s response to the questionnaire will help the Government to determine an appropriate term for the contract based on the current capabilities of the industry.

It should be noted that this inquiry, in no way, should be interpreted as a solicitation for offers. No information provided in response to this inquiry will be considered binding between the vendor and the Government. With this in mind, please review specifications for the above-listed items and answer the questions on the attached pages. The answers you provide will remain confidential.

Please return this survey to Adam Smith at adam.g.smith@dla.mil and Ryan Hutton at ryan.hutton@dla.mil by Friday August 7th at 3:00 P.M. Local Philadelphia, PA time.

NOTE: THIS IS A MARKET RESEARCH SURVEY, NOT A REQUEST FOR A BID/PROPOSAL. Please review the following pages and provide current market prices. Thank you for your time and consideration.

I. Government Requirement(s):

The quantities provided below are estimates and may change at the time of solicitation based on changes in demand and supply position.

The listed quantities below are for three one-year ordering periods. Within the three one-year ordering periods, there will be three one-year price tier periods.

Tier Period
Minimum Quantity
Annual Estimated Quantity
Maximum Quantity
Tier 1 - Year 1
1,625
6,500
19,500

Tier 2 - Year 2

6,500

Tier 3 - Year 3

6,500

Total
1,625
19,500
19,500

The Annual Estimated Quantity (AEQ) is broken down by each item and per each Tier period as follows:

Item: Bag, Stowage, Chemical (PGC: 19125): The Annual Estimated Quantity (AEQ) is 6,500 units for each Tier period (Tier 1, Tier 2, and Tier 3).

Notes:

1. The Minimum Quantity is 1,650 each.

2. The Annual Estimated Quantity (AEQ) is 6,500 for each Tier period (Tier 1, Tier 2, and Tier 3). AEQ refers to the Government's good faith estimate of the requirements during a specified contract tier period. The AEQ does not obligate the government to order a specific quantity, it is provided for informational purposes only.

3. The Maximum Quantity is 19,500 pairs and reflects the sum of approximately 150% of the AEQ for each Tier period (a total of 3 Tiers) to account for fluctuations in customer demand. The Government reserves the right to place orders up to the Maximum Contract Quantity. The Government is not obligated to order the Maximum Contract Quantity.

4. *The Minimum Economic Quantity is the minimum quantity required to make an economic production run/maintain proficient manufacturing lines.

**The Maximum Quantity requested for this survey is the maximum quantity that can be continuously produced for this item in a normal peacetime situation. Please take into account other current contracts and pending awards.

5. The Navy is the primary customer.

6. Ordering period: Three one-year ordering periods. Within the three one-year ordering periods, there will be three one-year price tier periods.

7. Delivery Destinations:

VSTZ/SD0131

Travis Association for the Blind AF & MC 3PL - Distribution Services 4512 South Pleasant Valley Road Austin, TX 78744

8. FOB Destination: Inspection/Acceptance at Origin

Quantities for the item:

Tier Period
Minimum Quantity
Annual Estimated Quantity
Maximum Quantity
Tier 1 - Year 1
1,625
6,500
19,500

Tier 2 - Year 2

6,500

Tier 3 - Year 3

6,500

Total
1,625
19,500
19,500

The Government reserves the right to place orders for any combination of the items up to the Maximum Quantity. The Government is not obligated to order the contract Maximum Quantity; however, the Government has the legal right to order up to this quantity prior to the final expiration of any resultant contract, but not to exceed 722 units in any given 30-day period.

II. Company Description:

Please provide as much insight/information as possible on the following questions to the best of your knowledge at this point in time:

1. Company Identification and Contact Information Company Name: ______________________________________________ Company Address: ____________________________________________ Company Main Phone Number: __________________________________ Company CAGE: ______________________________________________ Point of Contact #1 Name: ___________________________________________________ Title/Position: _____________________________________________ Phone: ___________________________________________________ Email: ___________________________________________________ Point of Contact #2

Name:___________________________________________________
Title/Position:_____________________________________________

Phone: ___________________________________________________ Email: ____________________________________________________

a. Business size (Large or Small)?

NOTE: NAICS Code is 332999 – Cut and Sew Apparel Contractors; Small business being defined as a firm that employs less than 750 people)

b. If you are a Manufacturer, are you planning to submit an offer on this solicitation? (Y/N) _________

1) If no, why? __________________________________________________

2) If yes, what is the manufacturing address/ Place of Performance:

a. Will any part of the manufacturing process be subcontracted? (Y/N) _________

i. What percentage will be subcontracted? ____________ %

ii. What is/are the subcontractor(s) company name and address?

iii. What is/are the subcontractor(s)’s CAGE code?

2. Commerciality:

a. Is the item commercial or modified commercial in accordance with Federal Acquisition Regulation (FAR) 2.101? For example: is the item of a type used by the general public; sold or offered for sale to the general public? Is the modification of a type available in the commercial marketplace?

FAR 2.101 - Commercial product means— (1)A product, other than real property, that is of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes, and– (i)Has been sold, leased, or licensed to the general public; or (ii)Has been offered for sale, lease, or license to the general public;

(2)A product that evolved from a product described in paragraph (1) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace, but will be available in the commercial marketplace in time to satisfy the delivery requirements under a Government solicitation;

(3)A product that would satisfy a criterion expressed in paragraph (1) or (2) of this definition, except for- (i)Modifications of a type customarily available in the commercial marketplace; or (ii)Minor modifications of a type not customarily available in the commercial marketplace made to meet Federal Government requirements. “Minor modifications” means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component, or change the purpose of a process. Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product. Dollar values and percentages may be used as guideposts, but are not conclusive evidence that a modification is minor;

(4)Any combination of products meeting the requirements of paragraph (1), (2), or (3) of this definition that are of a type customarily combined and sold in combination to the general public;

(5)A product, or combination of products, referred to in paragraphs (1) through (4) of this definition, even though the product, or combination of products, is transferred between or among separate divisions, subsidiaries, or affiliates of a contractor; or (6)A nondevelopmental item, if the procuring agency determines the product was developed exclusively at private expense and sold in substantial quantities, on a competitive basis, to multiple State and local governments or to multiple foreign governments

b. If the answer to (a) is no, does your firm deal in commercial products that would be comparable to the item required and/or can they be used in lieu of the item? If so, could you provide examples? ___________________________________________________________________

c. Are you aware of commercial items available in the marketplace that you could manufacture with minor modification to meet government requirements and Berry Compliance? _____________________________________________________________________

3. Items Required:

Please also provide your production capability is broken down.

Item
Minimum Economic Monthly Quantity*
Minimum Economic Annual Quantity*
Maximum Monthly Quantity**
Maximum Annual Quantity**

Item: Bag, Stowage, Chemical

a. The Government anticipates issuing and closing the solicitation for a period of 30 days, is 30 days enough time for your firm to produce and submit Product Demonstration Models (PDMs) from each place of performance made in accordance with the applicable purchase description? (Y/N)

1) If no, how many days are necessary to be able to submit PDMs with your proposal? _________ days

2) What is the reason your company cannot produce and submit PDMs in 30 days?

b. Are there any known industrial base issues you are aware of with this item?

Delivery Can you deliver the subject item to military customers throughout the US (direct vendor delivery) as well as to DLA’s 3PL? (Y/N)__________

a. The initial production lead time associated with each item is 249 days with FAT (159 days for PLT and 90 days for FAT).

1) Is this realistic? (Y/N)

2) If not, what is the estimated initial production lead-time? ________days

3) If not, what is the estimated production lead-time for subsequent delivery orders? _____days

4) If the production lead time of 159 days is not realistic, why?

Pricing:

1. Please provide an Estimated Unit Price for each Tier Period for each item:

Tier Pricing
Item: Bag, Stowage, Chemical

(PGC 12915)

Tier 1

Tier 2

Tier 3

a. What is your estimated labor to material ratio?

Labor: _________% / Material: __________%

b. Is pricing of the item stable or volatile?

1) If volatile, why?

c. Would you like the Materials Costs Economic Price Adjustment – Department of Labor Index (Feb 2023) Procurement Note (see below) included in the solicitation? (Y/N) _________

If yes, indicate the index/indices to be considered for the EPA clause and the percentage of the item cost that is material-related that the PPI will apply to:

Index% of item cost
____________________________________
____________________________________

Material Cost Economic Price Adjustment -Department of Labor (Feb 2023)

(a) Warranties. The contractor warrants that—

(1) The base unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this procurement note; and

(2) Prices invoiced shall be computed in accordance with the terms of this procurement note.

(b) Definitions. As used throughout this procurement note—

(1) "Index", for the purpose of price adjustment under this procurement note, means the Producer Price Index(es) reported in the monthly publication entitled, “Producer Price Indexes”, published by the United States (U.S.) Department of Labor (DOL), Bureau of Labor Statistics (BLS) for the following code number(s) and title(s): _________________[contracting officer fill-in]_________________________. Note: Up to two indexes can be used under this procurement note. If two indexes are used, a unit allowance for each index must be identified in paragraph (5).

(2) "Base index" means the arithmetic average of the final version of the index published for the 3 months preceding the closing date for receipt of proposals or the date required for receipt of final proposal revisions if discussions were held.

(3) “Adjusting index" means the arithmetic average of the first published and/or the final version of the index for the 3 months prior to the month in which the adjusting contract modification is effective.

(4) "Base unit price" means the unit price applicable to a quantity of a contract line item established at contract award, exclusive of any price adjustment pursuant to this procurement note. Thus, when applicable, the term “base unit price” shall mean the tier or option term unit price established at contract award that corresponds to the tier or option term for which a price adjustment is being made.

(5) “Unit allowance” means the portion of the base unit price’s material-related cost(s) that is/are subject to the adjustment under this procurement note. For this solicitation, the unit allowance is: ________[contacting officer fill-in percentage] _________. If two indexes are being used, indicate the unit allowance per index cited in paragraph (1): ______________________________________________________________________________

(6) “Adjustment period” means the period during which a particular adjustment to the unit price under this procurement note (calculated at the beginning of the adjustment period) will apply.

(c) Adjustments. The price adjustment shall be made to the base unit price that was established at contract award for the tier or option period that corresponds to the adjustment period for which the adjustment is being made. Prior to the end of each adjustment period, the contracting officer will calculate the adjusting index and any adjusted contract unit price(s) for the new adjustment period and modify the contract accordingly. The contracting officer will make price adjustments in accordance with this procurement note by issuing a contract modification showing the base index, the adjusting index, the base unit price, the mathematical calculations, and the changed unit price(s). The price adjustment shall apply to orders issued after the effective date of the contract modification establishing the adjusted unit price for the adjustment period. The contracting officer will base the price adjustment(s) for each adjustment period on the percentage change between the base index and the adjusting index for the adjustment period, as applied to the unit allowance of the applicable base unit price(s). The unit allowance agreed to at time of award will remain fixed throughout the life of the contract unless the Government authorizes a change.

1) The contractor shall decrease its price in any particular adjustment period if the adjusting index is less than the base index. This contract allows one (1) price adjustment per year.

(2) Example of adjustment calculation if one index is used:

A contract containing three (3), one-year tier terms was awarded on 24 March 2021. The date for receipt of final proposal revisions was 21 January 2021. The Tier Term 2 unit price (i.e., the base unit price in this example) is being adjusted under the terms of this procurement note. Tier Term 2 contains a unit price of $35.50 and begins on 24 March 2022. The index being used is WPU 034203 – PPI Commodity data for Textile products and apparel-Finished manmade, silk, and other natural fiber (excluding cotton and wool) broadwoven fabrics, not seasonally adjusted. The unit allowance is 30%.

Calculating the base index: Average the final version of the index published for the 3 months preceding the date required for receipt of final proposal revisions (21 January 2021).

(Final version of index for October 2020: 185.8; November 2020: 187.9; December 2020: 187.6) = 187.1* Calculating the adjusting index: Average the first published or final version (as applicable) of the index for the 3 months prior to the month in which the adjusting contract modification is effective (March 2022).

(Index for December 2021: 246.591; January 2022: 246.745; February 2022: 248.606) = 247.3* Calculating the change to index: Adjusting index (247.3) minus base index (187.1) = 60.2 Calculating the economic price adjustment:

1. Divide the change to index (60.2) by the base index (187.1) to obtain the economic price adjustment factor = 60.2 /187.1 = .32182790 or 32.1828%**

2. Multiply the base unit price ($35.50) by the unit allowance (30%) to obtain the cost covered for this adjustment = $35.50 x 30% = $10.65***

3. Multiply the cost covered ($10.65) by the economic price adjustment factor (32.1828%) to calculate the economic price adjustment amount = $10.65 x 32.1828% = $3.43***

4. Add the economic price adjustment amount ($3.43) to the base unit price ($35.50) to calculate the adjusted Tier Term 2 unit price = $35.50 + $3.43 = $38.93

(3) Example of adjustment calculation if two indexes are used:

A contract containing three (3), one-year tier terms was awarded on 24 March 2021. The date for receipt of final proposal revisions was 21 January 2021. The Tier Term 2 unit price (i.e., the base unit price in this example) is being adjusted under the terms of this procurement note. Tier Term 2 contains a unit price of $55.00 and begins on 24 March 2022. The item is a 50/50 blend of nylon and cotton, therefore two indexes are being used: (1) Index WPU 034203 – PPI Commodity data for Textile products and apparel-Finished manmade, silk, and other natural fiber (excluding cotton and wool) broadwoven fabrics, not seasonally adjusted and (2) Index WPU 034201 - PPI Commodity data for Textile products and apparel-Finished cotton broadwoven fabrics, not seasonally adjusted. The corresponding unit allowance for index WPU 034203 is 20%. The corresponding unit allowance for index WPU 034201 is also 20%.

Calculating the base index: Average the final version of the index published for the 3 months preceding the date required for receipt of final proposal revisions (21 January 2021).

(1) (Final version of index WPU 034203 for October 2020: 185.8; November 2020: 187.9; December 2020: 187.6) = 187.1*

(2) (Final version of index WPU 034201 for October 2020: 158.3; November 2020: 158.3; December 2020: 158.3) = 158.3* Calculating the adjusting index: Average the first published or final version (as applicable) of the index for the 3 months prior to the month in which the adjusting contract modification is effective (March 2022).

(1) (Index WPU 034203 for December 2021: 246.591; January 2022: 246.745; February 2022: 248.606) = 247.3*

(2) (Index WPU 034201 for December 2021: 178.728; January 2022: 178.88; February 2022: 185.634) = 181.1* Calculating the change to index:

(1) Adjusting index (247.3) minus base index (187.1) = 60.2 (index WPU 034203)

(2) Adjusting index (181.1) minus base index (158.3) = 22.8 (index WPU 034201) Calculating the economic price adjustment:

1. Divide the change to index by the base index to obtain the economic price adjustment factor.

a. 60.2 /187.1 = .32182790 or 32.1828%**

b. 22.8/158.3 = .14390819 or 14.3908%**

2. Multiply the base unit price by the unit allowance to obtain the cost covered for this adjustment.

a. $55.00 x 20% = $11.00***

b. $55.00 x 20% = $11.00***

3. Multiply the cost covered by the economic price adjustment factor to calculate the economic price adjustment amount.

a. $11.00 x 32.1828% = $3.54***

b. $11.00 x 14.3908% = $1.58***

4. Add the total economic price adjustment amount ($3.54 + $1.58 = $5.12) to the base unit price ($55.00) to calculate the adjusted Tier Term 2 unit price = $55.00 + $5.12 = $60.12 *In computing the base and adjusting indexes, the contracting officer will round the resulting figure to the first decimal place.

**The contracting officer will round this number to the fourth decimal place.

***The contracting officer will round all dollar figures to the nearest cent.

(d) Upward ceiling and downward floor on economic price adjustment. An upward ceiling and downward floor of no more than 10% of the applicable base unit price shall apply. The contractor agrees that the aggregate of the increases in any contract unit price under the terms of this procurement note shall not exceed 10% of the applicable base unit price, except as provided hereafter.

(1) If at any time the contractor has reason to believe that within the near future a price adjustment under the terms of this procurement note will be required that will exceed the adjustment ceiling or floor for any item, the contractor shall promptly notify the contracting officer in writing of the expected increase or decrease. The notification shall include a revised ceiling or floor the contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the contracting officer.

(2) If an increase in the index would raise a contract unit price for an item above the current ceiling, the contracting officer may issue a contract modification to raise the ceiling. If the contracting officer does not raise the contract ceiling, the contracting officer will promptly notify the contractor in writing. If a decrease in the index would lower a contract unit price for an item below the current floor, the contacting officer may issue a contract modification to lower the floor. If the contracting officer does not lower the contract floor, the contracting officer will promptly notify the contractor in writing.

(e) Invoices. The basis for prices payable under this contract is the latest adjusted unit price incorporated into the contract as of the date of order.

(f) Retroactive adjustment. This paragraph applies only if the contracting officer selected “first published index” in paragraph (b)(3). If the Government has already paid for orders delivered during an adjustment period, the contractor may request a retroactive adjustment. The contracting officer will base the retroactive adjustment on the difference between a higher final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, subject to the adjustment ceiling in paragraph (d) and under the following conditions:

(1) The request for equitable adjustment clearly establishes that the unit price adjustment for the adjustment period would have been higher if the final revised index had been used and identifies all invoices and payments to which it applies cites the specific index differences relating to the requested adjustment and provides a calculation of the total net price adjustment for items delivered during that adjustment period.

(2) The total dollar change for items delivered is $____[contracting officer fill-in]____ ($500.00 unless otherwise stated) or more for the applicable adjustment period(s).

(3) The contracting officer received the contractor’s written request within 45 days following publication of the final revised index.

The contractor shall adjust its prices downward based on the difference between a lower final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, subject to the limitation in paragraph (f)(2).

(g) Revision of index. If the applicable index is discontinued or its method of derivation is altered substantially, or if the contracting officer determines that the index consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute. The contracting officer will modify the contract to reflect such substitute effective on the date the index was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(h) Final invoice. The contractor shall include a statement on the final invoice confirming it has applied all decreases required by this procurement note to the amounts invoiced.

(i) Disputes. The “Disputes” clause of the contract applies to any dispute arising under this procurement note.

Important Notice: Availability of Solicitations Availability of solicitations, FAR 5.102(d) applies, as our office no longer issues solicitations or amendments in paper form. Offeror should register to receive notification of this solicitation or solicitation amendments. The solicitation will be posted on https://www.dibbs.bsm.dla.mil//.

Important Notice: New Federal Business Opportunities FBO Website Federal Business Opportunities (FBO) moved to SAM.gov. Visit SAM.gov today to preview new features like saved searches and the ability to follow notices. New to SAM.gov, please visit https://sam.gov/content/help for information about how to start your account.

Important Note on Foreign Content:

The Defense appropriations and authorization acts and other statutes (including what is commonly referred to as "The Berry Amendment" impose restrictions on the DoD's acquisition of foreign products and services. Generally, Clothing and Textile items (as defined in DFARS clause 252.225-7012) and "specialty metals" (as defined in DFARS clause 252.225-7014) must be grown, reprocessed, reused, melted or produced in the United States, its possessions or Puerto Rico, unless one of the DFARS 225.7002-2 exceptions applies.

Lack of response will be interpreted as non-interest. If you have any further questions, please reach out to Adam Smith at adam.g.smith@dla.mil or Ryan Hutton at ryan.hutton@dla.mil.

image1.png

File details come from the government source that posted it. Updated .