Market Research Capability Statement W912ER21R0006 Air Traffic Control Tower Iraq.docx

DOCX document 32 KB Posted

Attached to
Air Traffic Control Tower, Iraq
Solicitation number
W912ER21R0006
Issued by

About this file

This document provides details on a market research opportunity for the repair and restoration of an Air Traffic Control Tower at Imam Ali Air Base in Iraq. The U.S. Army Corps of Engineers seeks information from capable contractors interested in a potential fixed-price design-bid-build construction contract between $1-5 million to repair electrical, HVAC, mechanical, plumbing, backup power, fire suppression, and conveyance systems to deliver a complete and usable facility to the Iraqi Air Force. Contractors should have experience restoring air traffic control towers and critical infrastructure in the CENTCOM area of responsibility. Interested parties must possess an Iraq commercial business license and ability to access the base, and are requested to submit capability statements and project experience by August 10, 2020 for consideration. The solicitation is scheduled for release on May 30, 2021 with proposals due June 31, 2021 and contract award by September 30, 2021.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 1. GENERAL

1. Business Name: (Insert Business Name)

2. Business Address: (Insert Business Address)

3. Cage Code: (Insert Cage Code)

4. NAICS Codes: (Insert all applicable NAICS Codes)

5. Responsible Point of Contact:

Name:(Insert Name)
Telephone:(Insert Telephone Number)
Email:(Insert Email Address)

6. Check All That Apply: Our firm is:

|_| Small business |_| 8(a) small business |_| Veteran-owned small business |_| Service-disabled veteran-owned small business |_| HUBZone small business |_| Small disadvantaged business |_| Women-owned small business concern.

|_| None of the above.

SECTION 2. CONTRACTOR ARRANGEMENT

1. Our firm will be proposing on this project as a:

|_| Sole contractor |_| Prime contractor performing at least 50% of the work with subcontractor(s) |_| Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted) |_| Joint venture with (Insert business name, business size, and cage code).

(See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a) Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b). )

SECTION 3. CAPABILITY

1. If awarded a contract, the maximum capacity our firm can adequately provide Performance and Payment Bonds in accordance with FAR Clause 52.228-15, Defense Base Act (DBA) Insurance and SPOT requirement.

|_| Yes|_| Capable|_| No
|_| Yes|_| Capable|_| No
|_| Yes|_| Capable|_| No

BONDING CAPACITY

Type:

Amount per contract:
$
$
Aggregate amount:
$
$

2. If solicited, our firm is capable of providing Bid Guarantee in accordance with FAR Clause 52.228-1.

|_| Yes |_| Capable |_| No

3. Our firm has necessary Government of Iraq (GoI) business license and ability to obtain the necessary badging/access at Imam Ali Air Base, Iraq.

|_| Yes |_| Capable |_| No

4. Our firm is capable of handling numerous Construction contracts simultaneously at |_|1, |_|2-5, |_|6-10, |_|11-15, |_|16-20, geographically diverse locations.

5. Our firm has performed work in the following locations:

|_| IRAQ |_| CENTCOM AOR

6. Our firm has constructed the following facility types/projects:

Check All That Apply

Construction Projects

|_|
Air Traffic Control Tower restoration
|_|
Air Traffic Control Tower construction
|_|
Repair and restoration of critical infrastructure
|_|
Airfield Infrastructure development

7. Our firm |_| does/ |_| does not have the above capabilities, qualifications, AND EXPERIENCE to perform design-bid-build (D-B-B) projects in an overseas environment, to include CONSTRUCTION MANAGEMENT, LOGISTICAL SUPPORT for personnel, materials and equipment, in areas, including subcontractors and suppliers.

8. If awarded a contract, our firm |_| is/ |_| is not financially capable to perform the cost of the construction and related services.

9. Based on our previous experience, identify the percent work effort would expect to subcontract. (Insert the percentage)

10. Our firm is performing, |_| is/ |_| is not successfully performed construction of facilities and associated services for the following U.S. or Foreign military commands / facilities / projects in IRAQ or CENTCOM AOR.

CAPABILITY STATEMENT

W912ER21R0006

Imam Ali Air Base, Air Traffic Control Tower Repair (ATCT)

CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS

PROJECT EXPERIENCE TEMPLATE

(Make additional copies as needed but not more than five pages)

Project Title:

Location:

Address of work site:

Contract number:

Task order number:

Dates of performance:
From

To

Total Contract Value:
$
Total Value to date:
$

Procuring activity:

Procurement point of contact:

Phone:

Type of agency:
Fed Govt

State Govt

Municipality

Private

Other (describe)

Performed as:
Prime Contractor

Subcontractor

Other (describe)

General description of work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

MINIMUM ONE OR MAXIMUM FIVE PROJECT EXPERIENCE ARE ALLOWED FOR SUBMISSION

File details come from the government source that posted it. Updated .