This document is an Inspection Memorandum prepared by a professional engineering firm for the City of Hopewell, Virginia regarding the condition of the roof and support piles at the Hopewell Marina. The inspection was conducted to evaluate the current state of the approximately 100'x 140' western boat shed, which provides roof cover for sixteen boat slips and access walkways/pier lines. The findings indicate that approximately 60% of the boat shed's roof support piles have some form of distress, including deterioration, damage, and/or significant loss of plumbness, primarily at or slightly above the water line. The roof cover has also been significantly compromised due to deterioration and apparent hail damage, rendering it mostly non-functional. Given the poor condition of the support piles and roof structure, the engineering firm recommends evaluating the long-term plan and budgetary concerns for the facility, and considers replacing the roof cover alone as a short-term and costly remedy.

The document does not provide any information about pricing terms, set asides, incumbents, funding requirements or sources, or contract term and renewal options, as this appears to be a technical inspection report rather than a procurement document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I(DYIN L. FLOYID. IP).B., L.S.

ITNGINI]DIIINIII and LANII S URYDYING P.O. BOX 1178 CHESTERF]ELD, VIRGINIA 23832 PHONE: (804) 778-4s18

CITY OF HOPWELL

3OO N. MAIN STREET

HOPEWELL, V]RGINIA 23850

INSPECNON MEMOMNDUM -

,January 19, 2021-

RE: ROOF AND PIER SUPPORT P]LES

HOPEWELL MARI:\TA

CITY OF HOPEW.ELL, V]RGINIA

Issue/Task: Provide site inspection of the current condition of the western boat shed at the HopeweJ"l Marina. The subject structure is approximately 100'x 140' providing roof cove:r to sj-xteen boat slips and access walkways/pier fines.

Findings: We made a site previous site inspection in March 2018 to evaluation and offer potential repair options for the damaged support. pi1es. It is our understand.ing several of the most severely damaged pi.Les had secondary metaL brackets instafled.

However, it remains than approximately 608 of the boat shed,s roof support piles have some form of disEress. The distress is present in the form of deteriorati-on/damage and/or significantllr esg of pJ-umb. The damaged. and deterioration is largely confined to the area at or slightly above the water fine. The plumbness of the piles is most apparent at the connections between the piles and roof framing system.

The current concern of i.he roof cover is poor. The roof cover has been significantly compromised via deterioration and apparent hail-storm damage. Based on our observation the roof cover is mostl-y non-functional (see attached photo). fhe current condition of the exj-sting roof framing is questionable. However, the lack of a functioning cover wil-l- accelerate the deterioration of the roof framing system.

There was discussion of replacing the roof cover on1y. We believe that is woul-d be costly and only a short-term remedy. Install-ation of a new roof on questionable roof framing and a currently distressed pile support system is akin to putting a Band-Aid on gangrene.

It is our opinion, that the time has come, for a decision on the future of the facility.

As presented in our previous report, pi1e system stabilization can be accomplish but only addresses the support system and not the roof connections and potential deteriorated roof f:=aming and cover.

As stated, a decisic,n on how the facil:lty is util-ized shoul-d be made. With the roof cover compromised, open slips may be an option (i.e. remove the roof system). This woul-d l-essen the Load requirements on t.he piles and potentj-aIIy be the first step in a total- rebuilcl.

We recommend that ir.n evaluation of l:he long-term plan and budgetary concerns for this boat slip be made.

Shou1d you have any questions, please contact us

,JN o1-03121. srR/KLF

CTTY OF HOPEWLL

Roof cover Western Boat Shed/Slips-Ciry of Hopewell

,til i

7-A nffiilsfiry ffi