Map_-_Rip_Rap_Stone_Installation_v4.jpg

JPG image 229 KB Posted

Attached to
Government Campus Pond Fountain Replacements and Related Work
Solicitation number
QQ-2026-082
Issued by
Collier County, Florida

About this file

This is a project specification image for the Government Campus Pond Fountain Replacements and Related Work contract opportunity with Collier County Procurement Services in Florida. The image is a map titled "Rip Rap Stone Installation" that visually depicts the shoreline stabilization work required at the Building F Pond location. The map illustrates the planned installation area for the approximately 300 linear feet of heavy-duty erosion control geotextile fabric and 6"-12" riprap stone that comprises the pond edge stabilization component of the project. This visual reference supports the comprehensive scope of work that includes fountain replacement at two locations—a 5 HP horizontal fountain system at the Jail Pond and a 1 HP horizontal fountain system at Building F Pond—along with the shoreline stabilization work shown in this map. The non-mandatory pre-bid meeting is scheduled for November 12, 2025, at 10:00 am, with vendor questions due by December 2, 2025, and bid submissions required by December 4, 2025, through the Collier County Procurement Services Online Bidding System.

Vendors must submit a comprehensive lump sum price for each pond location and provide required documentation including a W-9, E-Verify MOU, Sunbiz record, and geotextile fabric specifications. The contract will be awarded to the responsive vendor submitting the lowest quote based on a Quick Quote informal bidding process. All work must be performed on the Collier County government complex in Naples, Florida, and vendors must maintain extensive insurance coverage, including workers' compensation, employer's liability, commercial general liability, and automobile liability, with Collier County named as an additional insured. For projects exceeding $200,000, performance and payment bonds from a surety rated "A-" or better are required. The project is structured as a one-time purchase with firm pricing, and all work must include labor, materials, equipment, permits, and incidentals performed in full compliance with industry standards and applicable codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .